HomeMy WebLinkAboutDDW-2025-002601DDW- Eng-0004 Page 1 of 1 3/22/2018
PROJECT NOTIFICATION FORM (PNF)
Utah Division of Drinking Water (DDW)
Please provide the following information for a proposed Public Drinking Water Project.DDW - Plan Review File No.: 20336
For a new public water system (PWS) also complete a New PWS Application Form (see DDW website).DDW - Date Received: 03/21/2025
Submit (preferably by email) the completed PNF with plans and specifications to DDW.
Email completed form & documents to ddwpnf@utah.gov or mail to: Utah Division of Drinking Water
P.O. Box 144830, Salt Lake City, Utah 84114-4830, (801) 536-4200
1. Public Water System (PWS) Information 6. Project Description (provide a unique facility name, location, and sufficient
details to specifically identify the project):System Name:SUNROCK HIGH ADVENTURE BASE UTAH22025
System Number:22025 This camp has been operating under the direction of The Boy Scouts of America for
many, many years. In 2021 the BSA closed
the camp and it sat vacant for aproximatly 5 years. At which time Sunrock
Foundation purchased the lease from the USFS and is calling the it Sunrock High
Adventure Base at Historic Camp Steiner. Since our Ultra Filtration membranes sat
unused for five years they need to be replaced. Our choice to replace the Ultrapac
membranes are IntraTec MB60. We are located just off the Mirror Lake Hwy about
mile marker 33.
Address:723 E 110 N
City, State, Zip:Heber, Utah 84032
Present No. of ERCs system is obligated to serve:20
Population Served:300
No. of ERCs this project will add:
2. Name and Address for Official Correspondence (Mayor, Public Works
Director, Administrative Contact, etc.)
Name:Shad Stevens
Title:Owner
Address:723 E 110 N
City, State, Zip:Heber, Utah 84032
Phone No.:8016361992
E-mail Address:shad.sunrockfoundation@gmail.com
3. Professional Engineer (PE) Responsible for System Oversight (if
applicable)
Name:
Company:
Address:
City, State, Zip:
Phone No.:Checklists for use in preparing plans for review by DDW are available at:
E-mail Address:https://deq.utah.gov/drinking-water/forms-drinking-water
4. Professional Engineer (PE) Responsible for Design of this Project 7. Anticipated Construction Schedule (if applicable):
Name:Advertise for Bids:
Company:Bid Opening:
Address:Begin Construction:
City, State, Zip:Complete Construction:06/10/2025
Phone No.:8a. Is the project exempt from the Hydraulic Model Report requirement? [see
R309-511-4(1)(a)(i) through (iv)]E-mail Address:
5. Local Fire Code Official & Required Fire Flow for Proposed Project 8b. If YES, specify rule reference below [R309-511-4(1)(a)(i)-(iv)]:
Name:
City, State, Zip:9. State or Federal Agency Funding:
Phone No.:Loan #
E-mail Address:
Req'd flow (gpm):
Duration (hrs):