HomeMy WebLinkAboutDERR-2025-002077Utah Department of Environmental Quality - UST Release Detection
TANK OWNERSHIP
Name PARKLAND USA - DIVISION OF PARKLAND
CORPORATION
Address 1970 E. 68TH AVE.
DENVER, CO 80229
Contact PARKLAND USA - DIVISION OF PARKLAND
CORPORATION
Phone
Email Jake.Thomas@parklandusa.com
TANK LOCATION
Name HART'S #40
Address 585 E STATE RD
AMERICAN FORK, UT 84003
A Operator None
Phone None
B Operator SAME
Phone SAME
Facility ID: 1000244 Inspection Date: 03/06/2025
DISPENSER DETAILS
DISP
ID/ALT
ID
SUBSTANCE UDC PIPE FLEX LOC
INSTALL
DATE
UDC
INSTALL
DATE
FIRE
VALVE
SAT
PRESENT
UDC
TEST
DISP
FLEX
CP
TEST
1 - 1/2 Gasoline Yes Steel Flex in Sump None None Yes No None None
2 - 3/4 Gasoline Yes Steel Flex in Sump None None Yes No None None
3 - 5/6 Gasoline Yes Steel Flex in Sump None None Yes No None None
4 - 7/8 Diesel Yes Steel Flex in Sump None None Yes No None None
5 - 9/10 Gasoline Yes Steel Flex in Sump None None Yes No None None
6 -
11/12
Gas/Diesel Yes Steel Flex in Sump None None Yes No None None
TANK DETAILS
Tank ID/Alt ID 6 / 6
E-Gen/AST No / No
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc June 24, 1998 / 12000 / North
Center
Substance
Stored Gasoline / Premium
Tank Material-
Mod
Fiberglass Reinforced Plastic-
None
ATG Veeder Root / TLS-350 CSLD No
Manifold
LTT Test Feb. 29, 2024
LLD Test Feb. 29, 2024
Pipe Material-
Mod Flexible Plastic / Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model
Spill/Overfill/Sm
Delivery
5 gal. Double Walled Spill Bucket /
Automatic shutoff / No
PST Fund/Other
Type Yes / None
Tank/Pipe Rel
Det
TankATG
PipeAutoLineLeakDetection /
PipeLineTightness
CP Tank Test None
CP Pipe Test None
2025-03-21 Page 1 of 13
Tank ID/Alt ID 7 / 7
E-Gen/AST No / No
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc June 24, 1998 / 20000 / South
Center
Substance
Stored Gasoline / Regular
Tank Material-
Mod
Fiberglass Reinforced Plastic-
None
ATG Veeder Root / TLS-350 CSLD No
Manifold
LTT Test Feb. 29, 2024
LLD Test Feb. 29, 2024
Pipe Material-
Mod Flexible Plastic / Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model
Spill/Overfill/Sm
Delivery
5 gal. Double Walled Spill Bucket /
Automatic shutoff / No
PST Fund/Other
Type Yes / None
Tank/Pipe Rel
Det
TankATG
PipeAutoLineLeakDetection /
PipeLineTightness
CP Tank Test None
CP Pipe Test None
Tank ID/Alt ID 8 / 8
E-Gen/AST No / No
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc June 24, 1998 / 20000 / South
Substance
Stored Diesel /
Tank Material-
Mod
Fiberglass Reinforced Plastic-
None
ATG Veeder Root / TLS-350 CSLD No
Manifold
LTT Test Feb. 29, 2024
LLD Test Feb. 29, 2024
Pipe Material-
Mod Flexible Plastic / Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model Red Jacket / VR FX1V
Spill/Overfill/Sm
Delivery
5 gal. Double Walled Spill Bucket /
Automatic shutoff / No
PST Fund/Other
Type Yes / None
Tank/Pipe Rel
Det
TankATG
PipeAutoLineLeakDetection /
PipeLineTightness
CP Tank Test None
CP Pipe Test None
Tank ID/Alt ID 9 / 9
E-Gen/AST No / No
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc June 24, 1998 / 20000 / South
Center
Substance
Stored Diesel / Off-road Diesel
Tank Material-
Mod
Fiberglass Reinforced Plastic-
None
ATG Veeder Root / TLS-350 CSLD No
Manifold
LTT Test Feb. 29, 2024
LLD Test Feb. 29, 2024
Pipe Material-
Mod Flexible Plastic / Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model
Spill/Overfill/Sm
Delivery
5 gal. Double Walled Spill Bucket /
Automatic shutoff / No
PST Fund/Other
Type Yes / None
Tank/Pipe Rel
Det
TankATG
PipeAutoLineLeakDetection /
PipeLineTightness
CP Tank Test None
CP Pipe Test None
2025-03-21 Page 2 of 13
Tank ID/Alt ID 10 / 10
E-Gen/AST No / No
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc June 24, 1998 / 12000 / North
Center
Substance
Stored Gasoline / High Octane (Racing)
Tank Material-
Mod
Fiberglass Reinforced Plastic-
None
ATG Veeder Root / TLS-350 CSLD No
Manifold
LTT Test Feb. 29, 2024
LLD Test Feb. 29, 2024
Pipe Material-
Mod Flexible Plastic / Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model Red Jacket / VR FX1V
Spill/Overfill/Sm
Delivery
5 gal. Double Walled Spill Bucket /
Automatic shutoff / No
PST Fund/Other
Type Yes / None
Tank/Pipe Rel
Det
TankATG
PipeAutoLineLeakDetection /
PipeLineTightness
CP Tank Test None
CP Pipe Test None
Tank ID/Alt ID 11 / 11
E-Gen/AST No / No
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc June 24, 1998 / 12000 / North
Substance
Stored Gasoline / Non-Ethanol
Tank Material-
Mod
Fiberglass Reinforced Plastic-
None
ATG Veeder Root / TLS-350 CSLD No
Manifold
LTT Test Feb. 29, 2024
LLD Test Feb. 29, 2024
Pipe Material-
Mod Flexible Plastic / Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model
Spill/Overfill/Sm
Delivery
5 gal. Double Walled Spill Bucket /
Automatic shutoff / No
PST Fund/Other
Type Yes / None
Tank/Pipe Rel
Det
TankATG
PipeAutoLineLeakDetection /
PipeLineTightness
CP Tank Test None
CP Pipe Test None
INSPECTION COMMENTS
None
2025-03-21 Page 3 of 13
FACILITY RESPONSES
Financial Responsibility
Financial responsibility method is ok?Yes
The above accurately represents the
facility's release detection records Yes
Operator Training
A Operator current?Yes
B Operator current?Yes
Monthly checklist available and
complete?Yes
Is the site unmanned?No
C Operators trained?No
TANK RESPONSES
Tank 6 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
Tank 6 ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
No
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
No
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
Tank 6 ATG/IM
Does the ATG system have a valid
annual test?No
Tank 6 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank 6 Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?No
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
No
Tank 6 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 7 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
2025-03-21 Page 4 of 13
Tank 7 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Does the Spill Prevention device have a
potential to release product into the
environment?
Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
Tank 7 ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
No
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
No
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
Tank 7 ATG/IM
Does the ATG system have a valid
annual test?No
Tank 8 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
Tank 7 Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?No
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
No
Tank 7 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 8 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank 8 Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?No
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
No
Tank 8 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 9 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank 9 Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?No
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
No
2025-03-21 Page 5 of 13
Tank 8 ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
No
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
No
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
Tank 8 ATG/IM
Does the ATG system have a valid
annual test?No
Tank 9 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Does the Spill Prevention device have a
potential to release product into the
environment?
Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
Tank 9 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 10 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank 10 Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?No
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
No
Tank 10 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 11 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank 11 Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?No
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
No
Tank 11 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
2025-03-21 Page 6 of 13
Tank 9 ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
No
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
No
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
Tank 9 ATG/IM
Does the ATG system have a valid
annual test?No
Tank 10 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
2025-03-21 Page 7 of 13
Tank 10 ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
No
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
No
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
Tank 10 ATG/IM
Does the ATG system have a valid
annual test?No
Tank 11 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
2025-03-21 Page 8 of 13
Tank 11 ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
No
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
No
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
Tank 11 ATG/IM
Does the ATG system have a valid
annual test?No
DISPENSER RESPONSES
Dispenser 3/4
Flex connectors at the dispensers are
protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 7/8
Flex connectors at the dispensers are
protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 1/2
Flex connectors at the dispensers are
protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 5/6
Flex connectors at the dispensers are
protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
2025-03-21 Page 9 of 13
Dispenser 11/12
Flex connectors at the dispensers are
protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 9/10
Flex connectors at the dispensers are
protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
MONTHLY LEAK DETECTION MONITORING
Mar '24 Apr '24 May '24 Jun '24 Jul '24 Aug '24 Sep '24 Oct '24 Nov '24 Dec '24 Jan '25 Feb '25
Tank 6 Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 7 Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 8 Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 9 Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 10 Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 11 Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail Not Avail
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
NON-COMPLIANCE ITEMS
TANK 10
No Photos
Question:Does the pressurized piping system have a valid line leak detector test?
Comments:None
TANK 10
No Photos
Question:Does the pressurized piping system have a valid annual line tightness test or valid monthly
monitoring?
Comments:None
TANK 10
No Photos
Question:ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and
maintained (system and tank setup reports, maintenance records)? Written documentation of
calibration, maintenance, and repair is kept for at least one year after work is completed?
Comments:None
TANK 10
No Photos
Question:ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two
most recent months and 10 of last 12 months)? Show results in the RD tab.
Comments:None
TANK 10
No Photos
Question:Does the ATG system have a valid annual test?
Comments:None
TANK 11
No Photos
Question:Does the pressurized piping system have a valid line leak detector test?
Comments:None
TANK 11
2025-03-21 Page 10 of 13
No Photos
Question:Does the pressurized piping system have a valid annual line tightness test or valid monthly
monitoring?
Comments:None
TANK 11
No Photos
Question:ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and
maintained (system and tank setup reports, maintenance records)? Written documentation of
calibration, maintenance, and repair is kept for at least one year after work is completed?
Comments:None
TANK 11
No Photos
Question:ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two
most recent months and 10 of last 12 months)? Show results in the RD tab.
Comments:None
TANK 11
No Photos
Question:Does the ATG system have a valid annual test?
Comments:None
TANK 6
No Photos
Question:Does the pressurized piping system have a valid line leak detector test?
Comments:None
TANK 6
No Photos
Question:Does the pressurized piping system have a valid annual line tightness test or valid monthly
monitoring?
Comments:None
TANK 6
No Photos
Question:ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and
maintained (system and tank setup reports, maintenance records)? Written documentation of
calibration, maintenance, and repair is kept for at least one year after work is completed?
Comments:None
TANK 6
No Photos
Question:ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two
most recent months and 10 of last 12 months)? Show results in the RD tab.
Comments:None
TANK 6
No Photos
Question:Does the ATG system have a valid annual test?
Comments:None
TANK 7
No Photos
Question:Does the pressurized piping system have a valid line leak detector test?
Comments:None
TANK 7
No Photos
Question:Does the pressurized piping system have a valid annual line tightness test or valid monthly
monitoring?
Comments:None
TANK 7
No Photos
Question:ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and
maintained (system and tank setup reports, maintenance records)? Written documentation of
calibration, maintenance, and repair is kept for at least one year after work is completed?
Comments:None
TANK 7
No Photos
Question:ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two
most recent months and 10 of last 12 months)? Show results in the RD tab.
Comments:None
TANK 7
No Photos
Question:Does the ATG system have a valid annual test?
2025-03-21 Page 11 of 13
Comments:None
TANK 8
No Photos
Question:Does the pressurized piping system have a valid line leak detector test?
Comments:None
TANK 8
No Photos
Question:Does the pressurized piping system have a valid annual line tightness test or valid monthly
monitoring?
Comments:None
TANK 8
No Photos
Question:ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and
maintained (system and tank setup reports, maintenance records)? Written documentation of
calibration, maintenance, and repair is kept for at least one year after work is completed?
Comments:None
TANK 8
No Photos
Question:ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two
most recent months and 10 of last 12 months)? Show results in the RD tab.
Comments:None
TANK 8
No Photos
Question:Does the ATG system have a valid annual test?
Comments:None
TANK 9
No Photos
Question:Does the pressurized piping system have a valid line leak detector test?
Comments:None
TANK 9
No Photos
Question:Does the pressurized piping system have a valid annual line tightness test or valid monthly
monitoring?
Comments:None
TANK 9
No Photos
Question:ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and
maintained (system and tank setup reports, maintenance records)? Written documentation of
calibration, maintenance, and repair is kept for at least one year after work is completed?
Comments:None
TANK 9
No Photos
Question:ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two
most recent months and 10 of last 12 months)? Show results in the RD tab.
Comments:None
TANK 9
No Photos
Question:Does the ATG system have a valid annual test?
Comments:None
FACILITY
No Photos
Question:C Operators trained?
Comments:None
2025-03-21 Page 12 of 13
Prepared by fueloperator.com
Inspection Information
Inspector:Perdue, Laura
Record
Created:
March 21, 2025, 11:23
a.m.
Inspection
Date:March 6, 2025