HomeMy WebLinkAboutDAQ-2025-0015311
DAQC-277-25
Site ID 10123 (B4)
MEMORANDUM
TO: STACK TEST FILE – HF SINCLAIR WOODS CROSS REFINING, LLC
THROUGH: Harold Burge, Major Source Compliance Section Manager
FROM: Paul Morris, Environmental Scientist
DATE: March 13, 2025
SUBJECT: Sources: Heaters 8H2, 12H1, 20H2, 20H3, 24H1, 25H1, Furnaces 8H2, 24H1,
and Boilers #5, #8, #10, and #11
Contact: Travis Smith – 801-299-6625
Location: 393 South 800 West, Woods Cross, Davis County, UT
Tester: Alliance Technical Group, LLC
FRS ID #: UT000004901100013
Permit/AO#: Approval Order (AO) DAQE-AN101230057-23, dated November 15, 2023
Subject: Review of Stack Test Protocol dated March 4, 2025
On March 10, 2025, the Utah Division of Air Quality (DAQ) received a protocol for testing of the HF Sinclair
Woods Cross Refining’s Heaters 8H2, 12H1, 20H2, 20H3, 24H1, 25H1, Furnaces 8H2, 24H1, and Boilers #5,
#8, #10, and #11 located in Woods Cross, UT. Testing will be performed April 7-18, 2025, to determine
compliance with AO Conditions II.B.1.a.
PROTOCOL CONDITIONS:
1. RM 1 used to determine sample velocity traverses: OK
2. RM 2 used to determine stack gas velocity and volumetric flow rate: OK
3. RM 3A used to determine dry molecular weight of the gas stream: OK
4. RM 4 used to determine moisture content: OK
5. RM 7E used to determine NOx content: OK
6. RM 10 used to determine CO content: OK
7. RM 25A used to determine VOC content: OK
DEVIATIONS: No deviations were noted.
CONCLUSION: The protocol appears to be acceptable.
RECOMMENDATION: Send protocol review and test date confirmation notice.
ATTACHMENTS: Pretest protocol dated March 4, 2025
6 3
UTAH DFPARTMENT OF
r;lVlSlON OF AIR OUALITY
,.dttFfinctorr
March 4,2025
Mr. Bryce Bird, Director
Division of Air Quality
Utah Department of Environmental Quality
195 North 1950 West
Salt Lake City, Utah 841l6
Certified Mail: 7022 0410 0002 3551 6592
CO, CO2, NOx, and VOC Compliance Testing - 8H2, 12H1,20H2,20H3, 24H1,25H1, and
Boilers #5,#8, #10, and #11. HF Sinclair Woods Cross Refining LLC, Davis County
Director Bird:
In accordance with Section R307-165-3, Condition II.B.1.a of Approval Order DAQE-AN101230057-23,
and Conditions ILB.l4.b.l,II.B.l4.c.l, and II.B.14.d.l of Title V Operating Permit I100013001, HF
Sinclair Woods Cross Refining LLC is providing notification of source testing planned to be conducted at
the Woods Cross Refinery. Alliance Technical Group, LLC of Salt Lake City, UT has been contracted to
conduct:
1. CO compliance stack testing of the following emission sources:
- 8H2, Crude Furnace #l
- 20H3, Reactor Charge Heater
-24H1, Crude Unit Furnace
- 25H1, FCC Feed Heater
- Boiler #1 1
2. CO2 compliance stack testing of the following emission source:
- 8H2, Crude Furnace #l
3. NOx compliance stack testing of the following emission sources:
- 8H2, Crude Furnace #1
- 12H1, NHDS Reactor Charge Furnace
- 20H2, Fractionator Charge Heater
- 20H3, Reactor Charge Heater
- 24H1, Crude Unit Furnace
- 25H1, FCC Feed Heater
- Boiler #5
- Boiler #8
HF SinclairWoods Cross Refining LLC
1070 W. 500 S, West Bountiful, UT 84087
801 -299-6600 | HFSinclair.com
RE:
- Boiler #10
- Boiler #l I
4. VOC compliance stack testing of the following emission source:
- Boiler #l I
This testing program is planned for April 7 - April 18,2025. A copy of the test protocol is enclosed.
If you have any questions or need additional information, please call me at (801) 299-6625 or email at
ft ravis. sm ith@.hfsinclair. com.
F. Travis Smith
Environmental Specialist
Enclosure
cc: E. Benson (r) File 2.4.4
K. Amold
J. Barton
Site Specific Test Plan
HF Sinclair Woods Cross Refining, LLC
1070 West 500 South
West Bountiful, UT 84087
Sources to be Tested: Multiple Sources
Proposed Test Dates: April 7 - ll,14 - 18,2025
Project No. AST-2025-l4l 4
Prepared By
Alliance Technical Group, LLC
3683 W 2270 S, Suite E
West Valley City, UT 84120
pilt6rpe
I I (;ill..ll(;r\l (rl1()ili)Site Specifrc Test Plan
Test Program Summarv
Regulatory Information
Permit No.
Source Information
DAQE-AN10t230057-23
Source Name
Refinery Gas Fired Process
Heater
Gas Oil Hydrocracking (GHC)
Fractionator Charge Heater
Gas Oil Hydrocracking (GHC)
Fractionator Charge Heater
Crude Unit Furnace No. 2
FFCU #2 Feed Heater
Crude Unit Furnace No. I
Boiler No. 5
Boiler No. 8
Boiler No. l0
Boiler No. I I
Contact Information
Source ID
l2Hl
20H2
20H3
24Hr
25Hr
8H2
B-05
B-08
B-10
B-l I
Target Parameters
NOx
NOx
NOx, CO
NOx, CO
NOx, CO
CO2, NOx, CO
NOx
NOx
NOx
NOx, CO, VOC
Test Location
HF Sinclair Woods Cross Refining, LLC
1070 West 500 South
West Bountiful, UT 84087
Eric Benson
eric.benson@hfsinclair.com
(801) 299-6623
F. Travis Smith
ftravis. smith@hfsinc lair.com
(80t) 299-662s
Test Company
Alliance Technical Group, LLC
3683 W 2270 S, Suite E
West Valley City, UT 84120
Project Manager
Charles Horton
charles. horton@alliancetg.com
(3s2) 663-7568
Field Team Leader
Alan Jensen
alan j ensen@alliancetg. com
(847) 220-3949
(subject to change)
QA/QC Manager
Kathleen Shonk
katie. shonk@alliancetg.com
(812) 4s2478s
Test Plan/Report Coordinator
Delaine Spangler
delaine. spangler@alliancetg.com
AST-2025-14r4 HF Sinclair - West Bountiful. UT Page i
Site Speci/ic Test Plan
Table of Contents
TABLE OF CONTENTS
l.l Emission Unit and Control Unit Descriptions............... ......... l-2
2.0 Summar of Test Program........ ......2-l
2.2 Process/Contol System Parameters to be Monitored and Recorded................. ........,.......2-l
2.3 Proposed Test Schedule .............2-l
3.1 U.S. EPA Reference Test Methods I and 2 - Sampling/Traverse Points and Volumetric Flow Rate ..... 3-l
3.2 U.S. EPA Reference Test Method 3,{ - Oxygen/Carbon Dioxide......... ...... 3-1
3.3 U.S. EPA Reference Test Method 4 - Moisture Content......... .................... 3-2
3.4 U.S. EPA Reference Test Method 7E - Nitrogen Oxides.......... .............,....3-2
3.5 U.S. EPA Reference Test Method l0 - Carbon Monoxide..... .....................3-2
3.6 U.S. EPA Reference Test Method 25A -Volatile Organic Compounds ....,.3-2
3.7 Quality Assurance/Quality Control - U.S. EPA Reference Test Methods 3A,78 and 10....................... 3-3
3.8 Quality Assurance/Quality Control - U.S. EPA Reference Test Method 25A........................................ 3-4
LIST OF TABLES
Table 2- l : Program Outline and Tentative Test Schedule ...................... 2-2
AST-2025-1414 HF Sinclair - West Bountiful. UT Page ii
pill6rpe
Sile Specific Test Plan
Introductiona ltl'.li(.11i (, It (
1.0 Introduction
Alliance Technical Group, LLC (Alliance) was retained by HF Sinclair Woods Cross Refining,LLC (HF Sinclair) to
conduct compliance testing at the Woods Cross refinery in West Bountiful, Utah. Portions of the facility are subject
to provisions of the Utah Department of Environmental Quality, Division of Air Quality (UDAQ) Permit No. DAQE-
AN I 0 1230057-23. Testing will be conducted to determine the emission rate of nitrogen oxides (NOx) at the exhaust
of Refinery Gas Fired Process Heater (l2Hl), Gas Oil Hydrocracking Fractionator Charge Heaters (20H2), Boiler No.
5 (B-05), Boiler No. 8 (B-08), and Boiler No. 10 (B- I 0). Testing will also determine the emissions rates of NOx and
carbon monoxide (CO) at the exhaust of Gas Oil Hydrocracking Fractionator Charge Heaters (20H3), Crude Unit
Furnace No. 2 (24H1), FFCU #2Feed Heater (25H1), Crude Unit Fumace No. I (8H2). Testing will also include
determining the emission rate of NOx, CO, and volatile organic compounds (VOC) from the exhaust of Boiler No. I I
(B-r l).
This site-specific test plan (SSTP) has been prepared to address the notification and testing requirements ofthe UDAQ
permit.
AST-2025-t414 HF Sinclair - West Bountiful. UT Page l-l
Site Specific Test Plan
lnlroduclion
Emission Unit and Control Unit Descriptions
Unit ID Process Description Air Pollution Controls
t2Hl NHDS Reactor Charge Fumace. 50.2 MMBtu,4rr process
furnace, fired on plant gas
NGULNB
20H2 Gas Oil Hydrocracker (GHC) Fractionator Charge
Heater, 47.0 MMBtU/hr HHV, fired on plant gas, natural
draft,4 burners, up-fired fumace. Stack temperature
approximately 5 l0 to 650"F.
Ultra-low NOx burners
20H3 Gas Oil Hydrocracker Charge Heater, 39.7 MMBtu/hr
HHV, fired on plant gas, natural draft, 6 bumers (Next
Generation, Ultra Low NOx), and up-fired furnace.
Stack temperature approximately 646'F.
Ultra-low NOx burners
24Hl Crude Unit No. 2 Furnace, 32.5 MMBtu/hr process
fumace, fired on plant gas natural draft, 4 burners, and
up-fired furnace. Stack temperature approximately
460'F.
Ultra-low NOx burners
25Hl Fluidized Catalytic Cracking Unit (FCCU) #2 Feed
Heater, 17.7 MMBtU/hr HHV, fired on plant gas, natural
draft, 3 burners, and up-fired fumace. Stack temperature
approximately 650"F.
Ultra-low NOx burners
8H2 Process Heater, 99 MMBtuAr HHV, fired on plant gas.
Stack temperature approximately 640 to 720oF.
Ultra-low NOx burners
Boiler No. 5 Steam boiler, 70.0 MMBtufrr, fired on plant gas SCR
Boiler No. 8 Steam boiler, 92.7 MMBtu/hr HHV, fired on plant gas,
forced draft, I burner, side-fired fi.rrnace, no air preheat.
Stack temperature approximately 440 to 480'F.
Low-NOx bumers and selective
catalytic reduction using aqueous
or anhydrous ammonia
Boiler No. l0 Steam boiler, 89.3 MMBtU/hr HHV, fired on plant gas,
forced draft, I burner, side-fired fumace, no air preheat.
Stack temperature approximately 3 l0-500"F.
Selective catalytic reduction using
aqueous or anhydrous ammonia
Boiler No. 1 I Steam boiler, 89.3 MMBtU/hr HHV, fired on plant gas,
forced draft, I burner, side-fired furnace, no air preheat.
Stack temperature approximately 3 l0-500'F.
Low-NOx burners and selective
catalytic reduction using aqueous
or anhydrous ammonia
AST-2025- l4 I 4 HF Sinclair - West Bountiful, UT Page l-2
pill6rpe
Ti(. lll'.ttCAI (jln()Sile Specific Tesl Plan
Inlroduction
1.2 Project Team
Personnel planned to be involved in this project are identified in the following table.
Table l-l: Project Team
1.3 SafetyRequirements
Testing personnel will undergo site-specific safety training for all applicable areas upon arrival at the site. Alliance
personnel will have current OSHA or MSHA safety training and be equipped with hard hats, safety glasses with side
shields, steel-toed safety shoes, hearing protection, fire resistant clothing, and fall protection (including shock corded
lanyards and full-body hamesses). Alliance personnel will conduct themselves in a manner consistent with Client and
Alliance's safety policies.
A Job Safety Analysis (JSA) will be completed daily by the Alliance Field Team Leader.
HF Sinclair Personnel F. Travis Smith
Regulatory Agency UDAQ
Alliance Personnel Alan Jensen
other field personnel assigned at time of testing event
AsT-2025-1414 HF Sinclair - West Bountiful. UT Page l-3
Site SpeciJic Test Plan
Summam ofTesl Proprams
2.0 Summary of Test Program
To satisfy the requirements of the UDAQ permit, the facility will conduct a performance test program to determine
the compliance status of Heaters 12H1,20H2,20H3,24H1,25H1,8H2, and BoilerNos. 8 - I l.
2.1 General Description
All testing will be performed in accordance with specifications stipulated in U.S. EPA Reference Test Methods 3A,
78, 10, 19 and 25A. Table 2-l presents an outline and tentative schedule for the emissions testing program. The
following is a summary of the test objectives.
Testing will be performed to demonstrate compliance with the UDAQ permit.
Emissions testing will be conducted on the exhaust of Heaters 12H1,20H2,20H3,24H1,25H1,8H2, and
BoilerNos.8-ll.
Performance testing will be conducted at the maximum normal operation load for each source.
Each of the three (3) test runs will be approximately 60 minutes in duration for each source.
2.2 Process/Control System Parameters to be Monitored and Recorded
Plant personnel will collect operational and parametric data at least once every l5 minutes during the testing. The
following list identifies the measurements, observations and records that will be collected during the testing program:
Calculated fuel gas flow rate - mscf/d or mscf/hr;
Fuel gas GHV - Btu/scf;
Heat Input - MMBtU/hr;
Fuel Gas Analysis
Ammonia flow rate (if the unit is equipped with SCR and if ammonia flow rate is monitored),
Stack Oz
2.3 Proposed Test Schedule
Table 2- I presents an outline and tentative schedule for the emissions testing program
a
a
a
a
a
a
a
a
a
a
AST-2025-14 t4 HF Sinclair - West Bountiful, UT Page 2-l
Fla
Site Specif.c Test Plan
Summary ofTest Programs
Table 2-l: Program Outline and Tentative Test Schedule - Week I
DAY I -April7,2025
Equipment Setup & Pretest QA/QC Checks, setup on Heater 20H2 4hr
DAY2-April8,2025
Heater 20H2
Oz 3A
3 60 min
l0 hr
NOx 7E
Mass Emission Factors l9
Heater 20H3
Oz 3A
J 60 min
NOx 7E
CO l0
Mass Emission Factors l9
Setup on l2Hl
DAY 3 - April9,2025
Heater l2Hl
o:3A
J 60 min
l0 hr
NOx 7E
Mass Emission Factors l9
Setup on 8H2
DAY4-April 10,2025
Heater 8H2
Oz / COz 3A
J 60 min
l0 hr
NOx 7E
CO l0
Mass Emission Factors l9
Setup on B-l I
DAY5-April 11,2025
B-l I
Oz I COt 3A
J 60 min l0 hr
BWS 4
NOx 7E
CO l0
VOC 25A
Mass Emission Factors l9
AST-2025- l4 I 4 HF Sinclair - West Bountiful, UT Page 2-2
pJ/l6rpe
'; 'rl, t;. .i :
Table 2-2: Program Outline and Tentative Test Schedule - Week 2
Sile Specirtc Test Plan
Summary of Test Programs
ffi ffiffi
DAY I -April 14,2025
B-5
Oz 3A
I 60 min
l0 hr
NOx 7E
CO t0
Mass Emission Factors l9
Setup on 24Hl
DAY2-April 15,2025
Heater 24Hl
Oz 3A
J 60 min
l0 hr
NOx 7E
CO l0
Mass Emission Factors l9
Heater 251
Oz 3A
5 60 min
NOx 7E
CO l0
Mass Emission Faclors l9
Setup on B-08
DAY4-April 17,2025
B-08
Oz 3A
J 60 min
l0 hr
NOx 7E
Mass Emission Factors l9
B-10
Oz 3A
5 60 minNOx7E
Mass Emission Factors t9
DAY5-April 18,2025
Contingency Day
AST-2025-14 l4 HF Sinclair - West Bountiful, UT Page 2-3
G Site SpeciJic Test Plan
Sumnary ofTest Programs
2.4 Emlssion Llmits
Emission limits for each pollutant are below.
Table 2-2: Emission Limlts
2.5 Test Report
The final test report must be submitted within 60 days of the completion of the performance test and will include the
following information.
o Introductioz - Brief discussion of project scope of work and activities.
o Results and Discussion - A summary of test results and process/control system operational data with
comparison to regulatory requirements or vendor guarantees along with a description of process conditions
and,/or testing deviations that may have affected the testing results.
o Methodologt - A description of the sampling and analytical methodologies.
o Sample Calculations - Example calculations for each target parameter.
o Field Dala - Copies of actual handwritten or electronic field data sheets.
o Quality Conlrol Data - Copies of all instrument calibration data and/or calibration gas certificates.
t Process Operating/Conffol System Data - Process operating and conhol system data (as provided by HF
Sinclair) to support the test results.
NOx; 0.10 lbfir,IMBtu
NOx: 0.04 IbA,IMBtu
NOx: 0.04 lb/I{MBtu
CO:0.04lbA,IMBtu
NOx: 0.04 lbA,IMBtu
CO: 0.04 lb/]vlMBtu
NOx:0.04lbA{MBtu
CO: 0.04 lbA,IMBtu
NOx: 0.02lbA,IMBtu
NOx: 0.02 lb[r,IMBtu
CO: 0.037 lbA,IMBtu
VOC: CO: 0.004 lbA,IMBtu
AST-2025-1414 HF Sinclair- West Bountiful, UT Page24
Parameter U.S. EPA Reference
Test Methods Notes/Remarks
Volurnetric Flow Rate t&2 Full Velocity Travcrscs
Oxygen / Carbon Dioxide 3A Instrunrental Analysis
Moisture Contcnt 4 Gravintetric Analysis
Nitrogen Oxidcs 7E lnstrumental Analysis
Carbon Monoxide l0 Instrumental Analysis
Mass Emission Factors t9 Fucl Faclors/Heal Inputs
Volatile Organic Compounds 25A Instrumental Analysis
Gas Dilution Systenr Certification 205
Allalpe Site Spctilic Test Plul
Testing lfuthodologv
3.0 Testing Methodology
This scction provides a description of the sanrpling and analytical proccdures for cach tcst nrethod that will bc
employed during thc tcst program. All cquipment, procedurcs and quality assurancc measurcs neccssary for the
cornpletion of thc test program llrcct or excccd the spccificatrons oIeach rclevant tcst method. The emission testing
program will be conductcd in accordancc with the test mcthods listed in Table 3-1.
Table 3-l: Source Testing Methodology
All stack diamcters. depths, widths, upstrcam and downstreanr disturbance distances and nipple lcngths will bc
nreasured on site with an EPA Method I verillcation nleasuren)ent provided by the Field Team Leader. These
nleasurements will be included in the test report.
3.1 U.S. EPA Refercnce Tcst Methods I and 2 - Sampling/Travcrsc Points and Volumetric Flow Rate
Thc sampling location and nunrbcr of traverse (sampling) points will bc selected in accordancc with U.S. EPA
Rcfcrence Test Method l. To dcterminc thc minimum number of traversc points. the upstrcam and downstreanr
distances will be equated into equivalent dianreters and compared to Figure I -l (tbr isokinetic sanrpling) and/or Figure
l-2 (nreasuring velocity alone) in U.S. EPA Referencc Test Mcthod l.
Full velocity lravcrses will be conducted in accordancc with U.S. EPA Rclcrence Test Method 2 to determine thc
average stack gas velocity pressure. static pressure and temperature. The velocity and static pressure measurement
systor will consist ol a pitot tubc and inclined manometer. Thc stack gas tcmperature will bc measured with a K-
typc thcmrocouplc and pyrometer.
3.2 U.S. EPA Reference Test Method 3A - Oxygen/Carbon Dioxide
Thc oxygen (Or) and carbon dioxidc (CO2) tcsting will be conducted in accordancc with U.S. EPA Refercnce Tcst
Method 3A. Data will be collected online and reported in one-nrinute averages. The sampling system will consist of
a stainless stcol probc, Tcflon samplc linc(s), gas condilioning syslem and the identified gas analyzcr. The gas
conditioning system will be a non-contact condenser used to remove moisture fiom the stack gas. If an unheated
Tcflon samplc linc is uscd. then a portable non-contacl condcnscr will be placed in thc systenr dircctly aflcr thc probc.
Otherwise, a heated Tellon sample line will be used. The quality control measures are described in Section 3.7.
AST-2025-t4I4 I IF Sinclair - West Bountifirl. UT Page 3-l
F::AIfatpE)Site Specific Test Plan
Testing Methodologl'
3.3 U.S. EPA Reference Test Method 4 - Moisture Content
The stack gas moisture content u,ill be determined in accordance with U.S. EPA Reference Test Method 4. The gas
conditioning train will consist of a series of chilled impingers. Prior to testing, each impinger will be filled with a
known quantity of water or silica gel. Each impinger will be analyzed gravimetrically before and afler each test run
on the same analytical balance to determine the amount of moisture condensed.
3.4 U.S. EPA Reference Test Method 7E - Nitrogen Oxides
The nitrogen oxides (NOx) testing will be conducted in accordance with U.S. EPA Reference Test Method 78. Data
will be collected online and reported in one-minute averages. The sampling system will consist of a stainless steel
probe, Teflon sample line(s), gas conditioning system and the identified gas analyzer. The gas conditioning system
will be a non-contact condenser used to remove moisture from the stack gas. If an unheated Teflon sample line is
used, then a portable non-contact condenser will be placed in the system directly after the probe. Otherwise, a heated
Teflon sample line will be used. The quality control measures are described in Section 3.8.
3.5 U.S. EPA Reference Test Method l0 - Carbon Monoxide
The carbon monoxide (CO) testing will be conducted in accordance with U.S. EPA Reference Test Method 10. Data
will be collected online and reported in one-minute averages. The sampling system will consist of a stainless steel
probe, Teflon sample line(s), gas conditioning system, and the identified gas analyzer. The gas conditioning system
will be a non-contact condenser used to remove moisture from the gas. If an unheated Teflon sample line is used,
then a portable non-contact condenser will be placed in the system directly after the probe. C)therwise, a heated Teflon
sample line will be used. The quality control measures are described in Section 3.8.
3.6 U.S. EPA Reference Test Method 19 - Mass Emission Factors
Fuel gas samples will be collected by HollyFrontier in stainless steel canisters from a sample tap in the fuel gas supply
to the unit being tested. These samples will be analyzed for hydrocarbons and diluents by gas chromatography with
flame ionization and thermal conductivity detection. The fuel gas samples will be analyzed by HollyFrontier according
to standard operating procedures (e.g., FUELGAS5.M "RGA for Phillips Refining at Wood's Cross, UT - gas
method", 712912014). Carbon, hydrogen, oxygen and nitrogen contenl and higher (gross) heating value will be
calculated based on fuel gas composition, for use in determining the dry oxygen-based "F factor" (Fa) according to
EPA Method 19.
3.7 U.S. EPA Reference Test Method 25A -Volatile Organic Compounds
The volatile organic compounds (VOC) testing will be conducted in accordance with U.S. EPA Reference Test Method
25A. Datawill becollectedonlineandreportedinone-minuteaverages. Thesamplingsystemwillconsistofastainless
steel probe, heated Teflon sample line(s) and the identified gas analyzer. The quality control measures are described in
Section 3.9.
3.8 U.S. EPA Reference Test Method 205 - Gas Dilution System Certification
A calibration gas dilution system field check will be conducted in accordance with U.S. EPA Reference Method 205.
An initial three (3) point calibration will be conducted, using individual Protocol I gases, on the analyzer used to
complete the dilution system field check. Multiple dilution rates and total gas flow rates will be utilized to force the
dilution system to perfornr two dilutions on each mass flow controller. The diluted calibration gases will be sent
directly to the analyzer, and the analyzer response will be recorded in an electronic field data sheet. A mid-level
supply gas, with a cylinder concentration within l0% of one of the gas divider settings described above, will be
introduced directly to the analyzer, and the analyzer response recorded in an electronic field data sheet. The cylinder
concentration and the analyzer response must agree within 27o. These steps will be repeated three (3) times. The
AST-2025-14 l4 Ill" Sinclair- West Bountitul. UT Page 3-2
r--a?--AliatpE)Site Specirtc Test Plan
Testing Methodologl'
average analyzer response must agree within2%o of the predicted gas concentration. No single injection shall differ
more than Zoh from the average instrument response for that dilution.
3.9 Quality Assurance/Quality Control - U.S. EPA Reference Test Methods 3A, 7E and l0
Cylinder calibration gases will meet EPA Protocol I (+l- 2%) standards. Copies of all calibration gas certificates will
be included in the Quality Assurance/Quality Control Appendix of the report.
Low Level gas will be introduced directly to the analyzer. After adjusting the analyzer to the Low-Level gas
concentration and once the analyzer reading is stable, the analyzer value will be recorded. This process will be
repeated for the High-Level gas. For the Calibration Error Test, Low, Mid, and High-Level calibration gases will be
sequentially introduced directly to the analyzer. The Calibration Error for each gas must be within 2.0 percent of the
Calibration Span or 0.5 ppmvl%, absolute difference.
High or Mid-Level gas (whichever is closer to the stack gas concentration) will be introduced at the probe and the
time requircd for the analyzer reading to reach 95 percent or 0.5 ppml%o (whichever was less restrictive) of the gas
concenffation will be recorded. The analyzer reading will be observed until it reaches a stable value, and this value
will be recorded. Next, Low-Level gas will be introduced at the probe and the time required for the analyzer reading
to decrease to a value within 5.0 percent or 0.5 ppm/% (whichever was less restrictive) will be recorded. If the Low-
Level gas is zero gas, the acceptable response must be 5.0 percent of the upscale gas concentration or 0.5 ppmloh
(whichever was less restrictive). The analyzer reading will be observed until it reaches a stable value, and this value
will be recorded. The measurement system response time and initial system bias will be determined from these data.
The System Bias for each gas must be within 5.0 percent of the Calibration Span or 0.5 ppmv/% absolute difference.
High or Mid-Level gas (whichever is closer to the stack gas concentration) will be introduced at the probe. After the
analyzer response is stable, the value will be recorded. Next, Low-Level gas will be introduced at the probe, and the
analyzer value will be recorded once it reaches a stable response. The System Bias for each gas must be within 5.0
percent of the Calibration Span or 0.5 ppmv/% absolute difference or the data is invalidated, and the Calibration Error
Test and System Bias must be repeated.
The Drift between pre- and post-run System Bias must be within 3 percent of the Calibration Span or 0.5 ppmv/%
absolute difference or the Calibration Error Test and System Bias must be repeated.
To determine the number of sampling points, a gas stratification check will be conducted prior to initiating testing.
The pollutant concentrations will be measured at twelve traverse points (as described in Method I ) or three points
(16.7,50.0 and 83.3 percent of the measurement line). Each traverse point will be sampled for a minimum of twice
the system response time.
If the pof lutant concentration at each traverse point does not differ more than 5o/o or 0.5 ppn/O.3% (whichever is less
restrictive) of the average pollutant concentration, then single point sampling will be conducted during the test runs.
If the pollutant concentration does not meet these specifications but differs less than llYo or 1.0 ppm10.5% from the
average concentration, then three (3) point sampling will be conducted (stacks less than 7.8 feet in diameter - 16.7,
50.0 and 83.3 percent of the measureme nt line; stacks greater than 7.8 feet in diameter - 0.4, I .0, and 2.0 meters from
the stack wall). If thc pollutant concentration differs by more than l0% or 1.0 ppm/0.5oh from the average
concentration, then sampling will be conducted at a minimum of twelve ( I 2) traverse points. Copies of stratification
check data will be included in the Quality AssuranceiQuality Control Appendix of the report.
AST-2025- l4 I 4 HF Sinclair - West Bountiful. [-IT Page 3-3
Site Specirtc Te.sr PIan
Testing Methodology
An NOz - NO converter check will be performed on the analyzer prior to initiating testing or at the completion of
testing. An approximately 50 ppm nitrogen dioxide cylinder gas will be introduced directly to the NOx analyzer and
the instrument response will be recorded in an electronic data sheet. The instrumenl response must be within +/- l0
percent of the cylinder concentration.
A Data Acquisition System with battery backup will be used to record the instrument response in one (l) minute
averages. The data will be continuously stored as a *.CSV file in Excel format on the hard drive of a computer. At
the completion of testing, the data will also be saved to the Alliance server. All data will be reviewed by the Field
Team Leader before leaving the facility. Once arriving at Alliance's office, all written and electronic data will be
relinquished to the report coordinator and then a final review will be performed by the Project Manager.
3.10 Quality Assurance/Quality Control - U.S. EPA Reference Test Method 25A
Cylinder calibration gases will meet EPA Protocol I (+l- 2%\ standards. Copies of all calibration gas certificates will
be included in the Quality Assurance/Quality Control Appendix of the report.
Within two (2) hours prior to testing, zero gas will be introduced through the sampling system to the analyzer. After
adjusting the analyzer to the Zero gas concentration and once the analyzer reading is stable, the analyzer value will be
recorded. This process will be repeated for the High-Level gas, and the time required for the analyzer reading to reach
95 percent of the gas concentration will be recorded to determine the response time. Next, Low and Mid-Level gases
will be introduced through the sampling system to the analyzer, and the response will be recorded when it is stable.
All values must be less than +/- 5 percent of the calibration gas concentrations.
Mid-Level gas will be introduced through the sampling system. After the analyzer response is stable, the value will
be recorded. Next, Zero gas will be introduced through the sampling system, and the analyzer value recorded once it
reaches a stable response. The Analyzer Drift must be less than +/- 3 percent of the span value.
A Data Acquisition System with battery backup will be used to record the instrument response in one (l) minute
averages. The data will be continuously stored as a *.CSV file in Excel format on the hard drive of a computer. At
the completion of testing, the data will also be saved to the Alliance server. All data will be reviewed by the Field
Team Leader before leaving the facility. Once arriving at Alliance's office, all written and electronic data will be
relinquished to the report coordinator and then a final review will be performed by the Project Manager.
AST-2025- l4 I 4 HF Sinclair - West Bountiful. UT Page 3-4
F.}--Allalpe Site Specrfic Te.st Plan
Quality Assurance Program
4.0 Quality Assurance Program
Alliance follows the procedures outlined in the Quality Assurance/Quality Control Management Plan to ensure the
continuous production of useful and valid data throughout the course of this test program. The QC checks and
procedures described in this section represent an integral parl of the overall sampling and analytical scheme.
Adherence to prescribed procedures is quite often the most applicable QC check.
4.1 Equipment
Field test equipment is assigned a unique, permanent identification number. Prior to mobilizing for the test program,
equipment is inspected before being packed to detect equipment problems prior to arriving on site. This minimizes
lost time on the job site due to equipment failure. Occasional equipment failure in the field is unavoidable despite the
most rigorous inspection and maintenance procedures. Therefore, replacements for critical equipment or components
are brought to the job site. Equipment retuming from the field is inspected before it is retumed to storage. During
the course of these inspections, items are cleaned, repaired, reconditioned and recalibrated where necessary.
Calibrations are conducted in a manner, and at a frequency, which meets or exceeds U.S. EPA specifications. The
calibration procedures outlined in the U.S. EPA Methods, and those recommended within the Quality Assurance
Handbook for Air Pollution Measurement Systems: Volume III (EPA-600/R-94/038c, September 1994) are utilized.
When these methods are inapplicable, methods such as those prescribed by the American Society for Testing and
Materials (ASTM) or other nationally recognized agency may be used. Data obtained during calibrations is checked
for completeness and accuracy. Copies of calibration forms are included in the report.
The following sections elaborate on the calibration procedures followed by Alliance for these items of equipment.
Dry Gas Meter and Orifice. A full meter calibration using critical orifices as the calibration standard is
conducted at least semi-annually, more frequently if required. The meter calibration procedure determines
the meter correction factor (Y) and the meter's orifice pressure differential (AH@). Alliance uses approved
Alternative Method 009 as a post-test calibration check to ensure that the correction factor has not changed
more than 57o since the last lull meter calibration. This check is performed after each test series.
Pitot Tubes and Manometers. Type-S pitot rubes that meet the geometric criteria required by U.S. EPA
Reference Test Method 2 are assigned a coefficient of 0.84 unless a specific coefficient has been determined
from a wind tunnel calibration. If a specific coefficient from a wind tunnel calibration has been obtained that
coefficient will be used in lieu of 0.84. Standard pitot tubes that meet the geometric criteria required by U.S.
EPA Reference Test Method 2 are assigned a coefficient of 0.99. Any pitot tubes not meeting the appropriate
geometric criteria are discarded and replaced. Manometers are verified to be level and zeroed prior to each
test run and do not require further calibration.
Temperature Measuring Devices. All thermocouple sensors mounted in Dry Gas Meter Consoles are
calibrated semi-annually with a NIST-traceable thermocouple calibrator (temperature simulator) and verified
during field use using a second NlST-traceable meter. NlST-traceable thermocouple calibrators are
calibrated annually by an outside laboratory.
Nozzles. Nozzles are measured three (3) times prior to initiating sampling with a caliper. The maximum
difference between any two (2) dimensions is 0.004 in.
Digital Calipers. Calipers are calibrated annually by Alliance by using gage blocks that are calibrated
annually by an outside laboratory.
AST'-2025- 14 t4 HF Sinclair Wcst Bountiful, UT Page 4- I
Site Specrrtc Te-tt Plan
Quality Assurance Program
Barometer. The barometric pressure is obtained from a nationally recognized agency or a calibrated
barometer. Calibrated barometers are checked prior to each field trip against a mercury barometer. The
barometer is acceptable if the values agree within * 2 percent absolute. Barometers not meeting this
requirement are adjusted or taken out ofservice.
Balances and Weishts. Balances are calibrated annually by an outside laboratory. A functional check is
conducted on the balance each day it is used in the field using a calibration weight. Weights are re-certified
every fwo (2) years by an outside laboratory or internally. If conducted intemally, they are weighed on a
NIST traceable balance. lf the weight does not meet the expected criteria, they are replaced.
Other Equioment. A mass flow controller calibration is conducted on each Environics system annually
following the procedures in the Manufacturer's Operation manual. A methane/ethane penetration factor
check is conducted on the total hydrocarbon analyzers equipped with non-methane cutters every six (6)
months following the procedures in 40 CFR 60, Subpart JJJJ. Other equipment such as probes, umbilical
lines, cold boxes, etc. are routinely maintained and inspected to ensure that they are in good working order.
They are repaired or replaced as needed.
4.2 Field Sampling
Field sampling will be done in accordance with the Standard Operating Procedures (SOP) for the applicable test
method(s). General QC measures for the test program include:
. Cleaned glassware and sample train components will be sealed until assembly.
a
a
a
a
a
a
a
Sample trains will be leak checked before and after each test run.
Appropriate probe, filter and impinger temperatures will be maintained.
The sampling port will be sealed to prevent air from leaking from the port.
Dry gas meter, AP, AH, temperature and pump vacuum data will be recorded during each sample point.
An isokinetic sampling rate of 90-l l0% will be maintained, as applicable.
All raw data will be maintained in an organized manner.
All raw data will be reviewed on a daily basis for completeness and acceptability.
* .'i-ft
A;:l i)t rr,^J?ilr1[.NTOF -
I, NV i IiCNi.lt: NTAL QI JALITYi ---t
I
I
I
t_
L',i,215;;651 OF AtR OUAI tTy
rt , I ^Ilr:
iI
AST-2025 HF Sinclair West Bountiful. IJT Pagc 4-2