HomeMy WebLinkAboutDAQ-2025-0015221 DAQC-274-25 Site ID 10335 (B5) MEMORANDUM TO: CEM FILE – TESORO LOGISTICS OPERATIONS, LLC THROUGH: Harold Burge, Major Source Compliance Section Manager FROM: Rob Leishman, Environmental Scientist DATE: March 12, 2025 SUBJECT: Source: Truck Loading Rack Vapor Recovery Units (VRU) A and B Contact: Tina Harper – 615-499-1641 Location: 474 West 900 North, Salt Lake City, Salt Lake County, UT Test Contractor: Alliance Technical Group FRS ID#: UT0000004903500004 Permit/AO#: Title V operating permit 3500008002 dated October 17, 2023 40 CFR Appendix B, Performance Specifications 8 40 CFR 63, Subpart CC Subject: Review of RA/PST Report dated October 7, 2024 On October 8, 2024, DAQ received a Relative Accuracy/Performance Specification Test (RA/PST) report for the Tesoro Logistics Truck Loading Racks Vapor Recovery Units A and B in Salt Lake City, UT. Testing was performed on September 12, 2024, to determine the relative accuracy of the VOC monitoring systems. The DAQ-calculated test results are: RA/PST EVALUATION: Tesoro Logistics VRU A NSPS RATA - Test Date - 9/12/2024 Primary Channel Manufacturer Serial No. Units CEM Value RM Value Relative Accuracy Status VOC/THC John Zink IR-8400DC 6655 ppm 441.389 334.397 1.7% Passed Stack Test Deviation Report There were no deviations observed during testing. Calibration gases were in date and met performance specifications. Tesoro Logistics VRU B NSPS RATA - Test Date - 9/12/2024 Primary Channel Manufacturer Serial No. Units CEM Value RM Value Relative Accuracy Status VOC/THC John Zink IR-8400DC 5485 ppm 351.950 275.148 1.2% Passed Stack Test Deviation Report There were no deviations observed during testing. Calibration gases were in date and met performance specifications. 1 8 2 2 DEVIATIONS: No deviations were noted in this report. CONCLUSION: Tesoro Logistics operates the continuous emissions monitors (CEM) on the VRU A and VRU B stacks to measure VOC emissions. The CEM was audited by the DAQ and found to meet quality assurance requirements found in 40 CFR Part 60, Appendix B, Performance Specification 1, and R307-170, Continuous Emission Monitoring System Program. Quarterly cylinder gas audits and an annual relative accuracy test audit were conducted in accordance with the procedures outlined in UAC R307-170. RECOMMENDATION: The Tesoro Logistics VRU A and VRU B CEM systems were operating as required in R307-170 and 40 CFR 60.13 at the time of this evaluation. HPV: No. ATTACHMENTS: RATA Review Spreadsheets, RATA Report October 7,2024 Bryce Bird, Director Utah Division of Air Quality 195 West 1950 North P.O. Box 144820 SaIt Lake City. UT 84116 Re: Tesoro Logistics Operations LLC Salt Lake City Terminal Truck Loading Rack VRU A and B RATA Report Permit # 35fin08002 Tesoro Logistics Operations LLG 539 South Main Street Findlay, OH 45840 Iel: 4L9.422,2L21 DEPAHTMENT OF ENVIIIONMENTAL QUALITY ocT - 8 n24 DIVISION OF AIR OUAUTY Dear Mr. Bird: Enclosed you will find the 2024 Truck Loading Rack (TLR) Volatile Organic Compounds (VOC) Relative Accuracy Test Audit (RATA) Reports for Vapor Recovery Units A and B. I certify that testing was conducted while the source was operating at the rate and/or conditions specified in the applicable approval order, operating permit, or federal regulation. During testing, the point source combusted fuels, used raw materials, and maintained process conditions representative of normal operations, and operated under such other relevant conditions specified by the Director. Based on information and belief formed after reasonable inquiry, the statements and information contained in the report are true, accurate, and complete. Please contact Tina Harper at (615) 499-1641or al kkharper@marathonpetroleum.com if you have any questions. i-#r**fr^ Vice President Attachment : 2024 Annual RATA Report At6rre TECHNICAL GRCUP RATA Report Tesoro Logistics Operations LLC 475 West 900 North Salt Lake City, UT 84103 Sources Tested: VRU A & VRU B Test Dates: September 12 & 13,2024 Project No. AST-2024-3593 DEPANTMENT OF EWRONMENTAL OI'AUTV ocT - 8 202[ DIVISION OF AIR OUAL]TY Prepared By Alliance Technical Group, LLC 3683 W 2270 S, Suite E West Valley City, UT 84120 Resulatorr Information TECI-JI.JICAL GROIJP Sourcc Test R4tort Test Program Summary Permil No. Regulatory Citations Source Infonnation Title V 3500008002 40 CFR Part 60, Appendix B - Performance Specification 8 40 CFR Part 63, Subpart CC trr;ff!f, VRUB Contact Information Target Paratneler NMHC NMHC Test Location Test Company Tesoro Logistics Operations, LLC Alliance Technical Group, LLC Tesoro Salt Lake City Terminal 3 683 W 2270 S, Suite E 475 West 900 North West Valley City, UT 84120 Salt Lake City, UT 84103 Faciliry contact Hfi:,Yffi:f Tina Harper charles.horton@alliancetg.comkkharper@narathonpetroleum.com eS2) 663-7565 (615) 499-164r Field Team Leader Ryan Lyons ryan. lyons@alliancetg.com (708) 21448s0 QA/@ Manager Kathleen Shonk katie. shonk@alliancetg. com (8t2) 4s2478s Test Plan/Report Coordinator Delarne Spangler delaine. spangler@alliancetg. com Report Reviewer Sarah Perry sarah. perry @alliancetg. com AST-202+3593 Tesoro - Salt Lake City, UT 2 of7l Page i pilt6rpe Source Test Report C e rt ifi c at ion State ilentTECHNICAL GHOUP Alliance Technical Group, LLC (Alliance) has completed the source testing as described in this report, Results apply only to the source(s) tested and operating condition(s) for the specific test date(s) and time(s) identified withrn this report. All results are intended to be considered in their entirety, and Alliance is not responsible for use of less than the complete test report without written consent. This report shall not be reproduced in full or rn part without written approval from the customer. To the best of my knowledge and abilities, all information, facts and test data are correct. Data presented in this report has been checked for completeness and is accurate, error-free and legible. Onsite testing was conducted in accordance with approved internal Standard Operating Procedures. Any deviations or problerns are detailed in the relevant sections in the test report. This report is only considered valid once an authorized representative of Alliance has signed in the space provided below; any other version is considered draft. This document was prepared in portable document format (.pdf) and contains pages as identified in the bottom footer of this document. 9t30t2024 Charles Horton, QSTI Alliance Technical Group, LLC Date Tesoro - Salt Lake City, UTAST-2024-3593 3 of 7l Page ii 1.0 l.t 1.2 1.3 t.4 1.5 2.0 3.0 3.1 3.2 J.J pilrdrpe rECL-iNICAL GROUP Source Test Repon Table ofContents TABLE OF CONTENTS Process/Control System Descriptions.. ................ l-l ... t-l U.S. EPA Reference Test Method 25B - Non-Methane Hydrocarbons......... ....................... 3-l U. S. EPA Reference Test Method 205 - Gas Dilution System Certification. . .. . ... .. . . . ........ ... 3-2 Quality Assuance/Quality Control-U.S. EPAReferenceTestMethod 258............... .......3-2 LIST OF TABLES Table2-l: SummaryofPerformanceSpecificationTestResults-VRUA................... ....................2-l Table2-2: SummaryofPerformanceSpecificationTestResults-VRU8................... ....................2-l APPENDICES Appendix A RA and Field Data Appendix B Quality Assurance/Quality Control Data Appendix C CEMS Data Tesoro - Salt Lake City, UT 4 of 7l AST-2024-3593 Page iii 5 of 7l T-(l ll lal,l il Source Test Report Introduclion 1.0 Introduction Alliance Technical Group, LLC (Alliance) was retained by Marathon Petroleum Logistics (Marathon) to conduct performance specification @S) testing at the Tesoro Logistics Operations LLC (Tesoro) facility in Salt Lake Ciry-, Utah. Portions of the tacility are subject to provisions of the 40 CFR 60 Appendix B, PS 8, 40 CFR Part 63, Subpart CC and the Utah Department of Environmental Quality, Division of Air Quality (llDAQ) Title V Permit No 3500008002. Testing included conducting a relative accuracy test audit (RATA) to determine the relative accuracy 1RA) of the non-methane hydrocarbons (NMHC) contrnuous emissions monitoring systems (CEMS) serving two (2) Vapor Recovery Units (VRLD designated as VRU A and VRU B. l.l Process/ControlSystemDescriptions Two (2) Continuous Vapor Processing Systems (CVPS) are used to collect the vapors displaced during product loading at the truck loading rack (TLR). The vapors are transported tkough airtight collection systems to VRU A and VRU B for total volatile organic compound (TVOC) emissions control. Emissions fiom the carbon adsorption vapor collection and processing systems shall not exceed an average of l0 milligrams of volatile organic compounds per liter ol gasoline loaded 1mg/L) over a three-hour period. Compliance with this parameter will be demonstrated by maintaining operation at less than the established operating limit of I 1,000 ppm ofl VOC. VRU A and B are each equipped rvith a non-dispersive infrared OfDIR) CEMS to measure NMHC emissions on a wet basis as propane. The CEMS are Intiared Industries IR8400D analyzers with a NMHC span of 0-5% and Methane span of 0-20%. 1.2 CEMS Descriptions Parameter: Make: Model: Serial No.: Span: Pollutant - VRU A NMHC Intiared Industries IRS40ODC 6655 Pollutant - VRU B NMHC Infrared Industries IRS4OODC 5485 Propane 0-5%; Methane 0-20%o Propane 0-5%; Methane 0-200/, 1.3 Project Team Personnel involved in this project are identified in the following table Table l-1: Project Team Tesoro Personnel Tina Harper Alliance Personnel Ryan Lyons Mitchell Manwaring l.,l Site Specific Test Plan & Notification Testing was conducted in accordance with the Site-Specific Test Plan (SSTP) submitted to UDAQ by Tesoro. 1.5 Test Program Notes Ret'erence method raw data is two (2) hours otTplant data. The CEMS data server clock is on Eastern Standard Time versus the rettrence CEMS clock at the taciliw on Mountain Time. AST-202.1-3593 Tesoro - Salt Lake Citv. L;T Page l-l 6 olTl 7 of7l put6lpe Source Test Repon Summary of ResultsTECI-I NICAL GROUP 2.0 Summaqr of Results Alliance conducted PS testrng at the Tesoro facility in Salt Lake City, Utah on September 12 and 13, 2024. Testing included conducting a RATA to determine the RA of the NMHC CEMS serving VRU A and VRU B. Tables 2-l and 2-Z provide sunuuries of the RA results in comparison to the applicable RA requirements. Any difference between the summary results listed in the following tables and the detailed results contained in appendices is due to rounding for presentation. Table 2-l: Summarlr of Performance Specification Test Results - VRU A Table 2-2t Summary of Performance Specification Test Results - VRU B I Calsulat€d using the applioable souroe standard for the pollutanl See Appendix B for the applicable strndrrd used. Non-Methane Hyd nocarbons Concentration, ppmvw 1.83 Yo I I Caloulated using the applioable source standard for the pollutanl See Appendix B for 0re applicable standard used. Tesoro - Salt Lake City, UTAST-202+3593 8 of 71 Page 2-1 9 ofTl pul6rpe TECHNICAL GFOUP Source Test Repon Testing Methodology 3.0 Testing Methodologr The emission testing program was conducted in accordance with the test methods listed in Table 3-1. Method descriptions are provided below while quality assurance/quality control data is provided in Appendix B. Table 3-1: Sounce Testing Methodologr 3.1 U.S. EPA Reference Test Method 25B - Non-Methane Hydrocartons Non-methane hydrocarbon OIMHC) concentration was continuously monitored at the VRU outlets in accordance with Method 25B as described in Appendix A. In this Method a gas sample was continuously exftacted from the VRU exhaustthrough a Teflon sample line (unheated) and glass fiber filter to a non-dispersive infra-red analyzer (NDIR). The concentrations of CHa were continuously recorded and at one-minute intervals on a data acquisition system @AS). The NDIR system response time was determined, as required in Method 25B, and was considered in corresponding the CHa readings with the exhaust volumetric flow rate readings over each averaging period. The NDIR system response time were less than one minute. A response time correlation/correction was not applied. The NDIR analyzer utilized for the test program was a CAI 100 which is capable of simultaneously measuring CFIr concentrations. The atalyzer was calibrated with propane at three concentrations (25-35Yo, 45-55yo and 80- 90Yo of range) within the respective ranges utilized. Calibration drift was checked at approximately one-hour intervals during each test run using mid-level (45-55% of analyzer range) calibration gas standards of propane and methane. For the initial calibration error test, an EPA kotocol/Primary Standard propane calibration gas standard of approximately 80% of analyzer range was introduced to the sample probe to calibrate the CHq channels of the Method 2513 analyzer. This was followed by the introduction of an EPA ProtocoUPrimary Standard propane calibration gas standard of 45-55%o and 25-35oh of analyzer range. The resulting ar.alyzer responses were within 5% of the respective calibration gas and predictable values. Next, the CFIa system response time was determined by altemately introducing zero gas and the high-level calibration gas. The time was recorded fromthe concentration change to the measurement system response is equivalent to 950/o of the step change. This procedure was repeated until three reading are obtained and the results averaged. The quality control measures are described in Section 3.3. The relative accuracy of the NMHC CEMS will be determined based on the procedures found in 40 CFR 60, Performance Specification 8. AST-2024-3593 Tesoro - Salt Lake City, UT l0 ofTl Page 3-l =laAIIEE! ll ' (. J.Source Test Report Testing Methodology 3.2 U.S. EPA Reference Test Method 205 - Gas Dilution System Certification A calibration gas dilution system field check was conducted in accordance with U.S. EPA Ret'erence Method 205. An initial three (3) point calibration was conducted, using individual Protocol I gases, on the analyzer used to complete the dilution system tield check. Multiple dilution rates and total gas tlow rates were utilized to tbrce the dilution system to perform two dilutions on each mass flow controller. The diluted calibration gases was sent directly to the analyzer, and the analyzer response recorded in an electronic field data sheet. A mid-level supply gas, with a cylinder concentration within l0olo of one of the gas divider settings described above, was introduced directly to the analyzer, and the analyzer response recorded in an electronic field data sheet. The cylinder concentration and the analyzer response agreed within 2%0. These steps were repeated three (3) times. The average analyzer response agreed within 2Yu of rhe predicted gas concentration. No single injection diflered more than 2oh from the average instrument response lor that dilution. Copies of the Method 205 data can be found in the Quality Assurance/Quality Control Appendix. 3.3 Quality Assurance/Quality Control - U.S. EPA Refertnce Test Method 25B Cylinder calibration gases used met EPA Protocol I (+/- 2%) standards. Copies of all calibration gas certificates can be found in the Qualitv Assurance/Quality Control Appendix. Within two (2) hours prior to testing, zero gas was introduced througlr the sampling s!-stem to the analyzer. Atler adjusting the analyzer to the Zero gas concentration and once the analyzer reading was stable, the analyzer value was recorded. This process was repeated for the High-Level gas, and the time required for the analyzq reading to reach 95 percent of the gas concentration was recorded to determine the response time. Next, Low and Mid-Level gases were introduced through the sampling system to the analyzer, and the response was recorded when it w'as stable. All values were less than */- 5 percent of the calibration gas concentrations. Mid Level gas was introduced through the sampling system. After the analyzer response was stable, the value was recorded. Next, Zero gas was introduced through the sampling system, and the analyzer value recorded once it reached a stable response. The Analyzer Drifl was less than */- 3 percent of the span value. A Data Acquisition System with battery backup was used to record the instrument response in one (l) minute averages. The data was continuously stored as a t.CSV flrle in Excel format on the hard drive of a computer. At the completion of testing, the data was also saved to the Alliance server. All data was reviewed by the Field Team Leader before leaving the facility. Once arriving at Alliance's oft-rce, all written and electronic data was relinquished to the report coordinator and then a final review was performed by the Project Manager. Tesoro - Salt Lake Citt-, L:TAST-202.t-3593 ll of 7l Page 3-2 12of'71 13 ol71 Ail6treTf CIINICAL GROLP NMHC Summary f,ocation: Tesoro Loqistics Oprcrations, LLC - Salt Lake City. LtT Sourcc: VRU A ProJect No.:AST-202,1-3 593 Confidence Coeflicien( CC aa = ltolt * rrllVn I where, to e?r 2.306 = degrees of freedom value n l_= number of runs selected for oaloulating the RA Sd 10.1.985 = standard deviation of differmce CC 80.698 = confidence coefficient Relatlve Accuracy, R { ldl+lcclRA = 73;ffix100 d;!|]!i!!= avemge difference of Referenoe Method and CE\,IS CC _!j].,1[9_: oonfidence coefficient AS 1 1000.000 = applicable source standard" ppmvw RA 1.70 = relative sccuraoy, q'o Run No.I)ate Tlnrc Reference }lethod NilIHC (ss CrHr) Concentration Cf,,}IS NNIHC (as C,H.) Concentratlon nhmw Average DllTcrencc nnmwStartEnd I 2 J .l 5 6 7 8 9 9t 9r 9t 9t 9t 9i 9r 9l 9i t'21 zi21 2,2t zi21 2/21 zt21 zt21 221 l:55 2:16 2:37 3:08 3:29 3;50 1:21 -t:45 5:06 2: l5 2:36 2:57 3:28 3:,19 4: l0 J:.1-l 5:05 5:26 371.5 3 63.6 259.8 236.9 I 93.1 291.1 I65. I r 025.8 I 0 I..t 420.2 337.0 209.9 361.6 368.1 517. t 283.5 t287.2 I 8.1.9 ..18.75 26.68 49.9.1 127.71 175.00 2t9.69 1 18.39 261 .4J .8:t.5 "t Average 335.0 .1.11.4 - 106..13 3 Standard Deviatim (Sd'10.1.985 Applicable Source Standard (AS I 1,000 Cont-rdence Coefficient (CC 80.698 Relative Accuracv (R l'1,7 0/o Perfonnmoe Required - Apolicable Source Standarc RA S 109,O Perfommce Secifi cation lUethor PS8 14 of 7l E'IaI&€atFeI€e4a,E&EEdEilEi!EaZg& A€ € \O NX- - <+ o {iN + Jt+ ii o a .c l l aii o e :i q c l 6.i F - r JN N 6X. - JN NX- - d-- N6 tr t r Ft - *8 3 aa a aIEIaI n€.,. 1r:Nri€aF-oNe;o€o9dod9@.trIz(J,oooaoQOdUz o6l6lUooo0rd 6NdFadz f&.A F=jQo()=6qo-lJvi5o,. !gJoFi6JIi It r E : I.I-(! l5 of 7l pllt6rEe TECHN](]AL CNOLI N Run 1- RM Data Location: Source: Project No.: Tesoro Loeistics Operations, LLC - Salt Lake City, UT VRI] A AST-2024-3593 Date: 9/12/24 Time Unit Status Uncorrected Run Average (Cor.) Cal Gas Concentration (CMA) Pretest System Zero Response Posttest System Zero Response Average Zero Response (Co) Pretest System Cal Response Posttest System Cal Response Average Cal Response (Cy) Corrected Run A NMHC - Outlet ppmvw Valid 371.49 5000.00 -9.42 6.28 -1.57 5009.85 4999.58 5004.72 NA I l:55 I l:56 tr.57 I l:58 I l:59 l2:00 l2:01 t2.02 l2:03 12:04 l2:05 12:06 l2:07 l2:08 12:09 l2:10 12:l I 12:12 12:13 12:14 t2.t5 310.5 r 29t.45 267.02 26t.9t 285.48 302.34 3r9.18 357.42 37 r.72 394.66 422.75 424.50 423.72 412.08 438.68 460.81 492.33 237.89 394.42 462.86 469 54 l6 ofTl pult6rrpe TECHNi(]AL CNOL]i) Run2-RMData Location: Source: Project No.: Iesoro Losistics Operations, LLC - Salt Lake Citv, UT VRU A AST-2024-3593 Date= 9/12124 Time Unit Status NMHC - Outlet ppmYw Valid Uncorrected Run Average (Coor) Cal Gas Concentration (CmJ Pretest System Zrro Response Posttest System Zcro Response Average Zero Response (Co) Pretest System Cal Response Posttest System Cal Response Average Cal Response (Cy) 363.63 5000.00 -9.42 6.28 -1.57 5009.85 4999.58 5004.72 NACorrected Run A 12:16 t2"t7 I2: l8 12.19 t2.20 t2.2r t2"22 12:23 t2.24 12:25 12:26 12:27 t2.28 12:29 l2:30 l2:31 l2:32 12:33 12:34 12:35 12:36 605.60 644.42 686.52 688.69 470.34 302.48 180.07 r82.18 306.84 270.93 269.96 281.05 280.02 25t.54 26t.t7 269.35 344.32 377.33 359.67 336.66 267.t5 17 of7l pullEnpe TECHN.CAL CNOLI - Run3-RMData Location: Source: Project No.: Tesoro Logistics Operations, LLC - Salt Lake CiW, UT VRIJ A AST-2024-3593 D*e:9/12/24 Time Unit Status Uncorrected Run Average (Coo,) Cal Gas Concentration (Cr*rJ Pretest System Zero Response Posttest System Zero Response Average Zero Response (Co) Pretest System Cal Response Posttest System Cal Response Average Cal Response (C*r) Corrected Run A NMHC - Outlet ppmvw Valid 259.80 5000.00 -9.42 6.28 -1.57 5009.85 4999.58 5004.72 NA 1237 l2:38 12.39 l2:40 1241 l2 42 l2 43 12:44 l2:45 12:46 l2:47 12:48 t2"49 l2:50 12:51 12.52 t2.53 12:54 t2.55 t2.56 l2:57 248.80 243.93 227.63 218.53 195.04 309.26 378.21 304.61 395.21 305. l4 182.38 188.71 t95.73 204.19 108.46 l6 I .52 194.26 368. I I 365.3 3 336.30 324.50 l8 ofTl An6rrrceTECHN,CAL CNOL Run4-RMData Location: Source: Project No.: Tesoro Logistics Operations, LLC - Salt Lake City, UT VRU A AST-2024-3593 Date:9/12/24 Time Unit Status NMHC - Outlet ppmvw Valid Uncorrected Run Average (Co6r) Cal Gas Concentration (CuJ Pretest System Zero Response Posttest System Zero Response Average Zero Response (Co) Pretest System Cal Response Posttest System Cal Response Average Cal Response (Cy) 23 1.86 5000.00 6.28 5. l3 5.71 4999.58 4947.88 4973 73 NACorrected Run A l3 :08 l3 :09 l3:10 l3:l I l3: l2 l3:13 l3:14 l3:15 l3: 16 l3:17 l3: l8 l3:19 l3:20 l3:21 t3"22 13 23 1324 t3.25 1326 13:27 13 :28 t27.76 82.04 tt.62 17.91 28.79 I2l.9l 198.38 238.44 236.27 29t.44 297.76 322.73 236.96 252.55 300.34 271.08 261.9?. 336.83 384.45 47 t.65 378.30 l9 ofTl An6rrpeTECHNiCAL C:NC}L'A Run5-RMData Location: Source: Project No.: Tesoro Logistics Operations, LLC - Salt Lake City, UT VRUA AST-2024-3593 Datez 9/12/24 Tinre Unit Status NMHC - Outlet ppmvw Valid Uncorrected Run Average (Co6") Cal Gas Concentration (CMJ Pretest System Zero Response Posttest System Zero Response Average Zrro Response (Co) Pretest System Cal Response Posttest System Cal Response Average Cal Response (C*) 193. I4 5000.00 6.28 5. 13 5.7 | 4999.58 4947.88 4973.73 NACorrected Run A 13:29 I3:30 I3:3 I t3'.32 I3:33 l3:34 l3:35 l3:36 13:37 l3:38 l3:39 l3:40 l3:41 13:42 l3:43 l3:44 l3:45 13 46 13:47 l3 :48 13:49 253.98 159.98 142.95 205.07 2t2.03 173.08 93.12 25t.65 246.33 t95.27 t50.72 l3 1.38 148.47 t49.37 t7 t.37 176.99 192.35 212.08 221.46 262.55 305.80 20 of7l All6r1peTECHN CAL CNTJLI - Run6-RMData Location: Source: Project No.: Tesoro Logistics Operations, LLC - Salt Lake City, UT VRUA AST-2024-3593 Date: 9l12/24 Time Unit Status NMHC - Outlet ppmvw Valid Uncorrected Run Average (Co6") Cal Gas Concentration (CuJ Pretest System Zero Response Posttest System Zero Response Average Zero Response (Co) Pretest System Cal Response Posttest System Cal Response Average Cal Response (Cp) 297.4t 5000.00 6.28 5. l3 5.71 4999.58 4947.88 4973.73 NACorrected Run Ave l3:50 13:51 t3.52 l3:53 t3.54 l3:55 l3:56 t3.57 l3:58 l3:59 l4:00 l4:01 t4.02 l4:03 l4:04 l4:05 l4:06 l4:07 l4:08 l4:09 l4:10 65.47 36.89 23.89 229.43 238.t7 259.25 310.00 33 1.99 321.39 121.59 22.68 70.76 94.76 199.80 389. I9 494.t9 707.70 1,142.80 941.50 t28.23 11586 2l ofTl pgll6rpe rECH N icAL cno.'r]o".,ror,: TesoroLogisticsoperations,LLC-SaltLakeCity,UT Run7-RMData Source: VRUA Project No.: AS [ -!Q2z!1]!!! Date:9/12124 Time Unit Status NMHC - Outlet ppm\ry Valid 165. I 3 5000.00 5. l3 -1.55 t.79 4947.88 4985. r6 4966.52 NA Uncorrected Run Average (Coo") Cal Gas Concentration (CuJ Pretest System Zero Response Posttest System Zero Response Average Zero Response (Co) Pnetest System Cal Response Posttest System Cal Response Average Cal Response (C*r) Corrected Run A l4:24 l4:25 l4:26 14.27 l428 t4.29 l4:30 I4:31 t4.32 l4:33 t4'.34 I4:35 I4:36 14:37 l4:38 t4'.39 l4:40 l4:41 t4.42 l4:43 l4:44 l9l.8l 189.60 |3.79 169.99 n5.23 lL9.47 155.09 247.48 215.7 | 3 14.61 205. l6 126.43 78.55 99.14 t20.87 -80.86 t54.29 128.04 t8l.9l 237.59 383.89 22 ofTl AllArEeTEC H N 1cA L c n o t'tl""rrrn: TesoroLogisticsoperations,LLC-saltLakecity,ur Run8-RMData Source: VRUA Project No.: AST-2024-3 593 Datez 9ll2l24 Time Unit Status Uncorrected Run Average (Coo") Cal Gas Concentration (Cm,r) Pretest System Zero Response Posttest System Zero Response Average Zero Response (Co) Pretest System Cal Response Posttest System Cal Response Average Cal Response (Cy) Corrected Run Ave NMHC - Outlet ppmvw Valid 1025.75 5000.00 5. l3 -1.55 r.79 4947.88 4985. l6 4966.52 NA l4:45 l4:46 l4:47 l4:48 l4:49 l4:50 l4:5 1 l4:52 l4:53 l4:54 l4:55 l4 56 l4:57 l4:58 l4:59 l5:00 15:0 I l5:02 l5 :03 I5 :04 l5 :05 456.05 430.23 4t6.23 404.86 421.24 474.t0 443.73 484.73 385.75 1,476.7 5 7.437 .40 8,383.71 90.34 t5.44 4.87 0.38 26.9t 38.06 59.94 53.68 36.36 23 of 'll AilEnrceTECHNI(]AL CNOLI O Run9-RMData Location: Source: Project No.: Tesoro Loc,istics Operations, LLC - Salt Lake Ciw, UT VRU A AST-2024-3593 Datel 9ll2/24 Time Unit Status NMHC - Outlet pPmlry Valid Uncorrected Run Average (Co5) Cal Gas Concentration (CnrJ Pretest System Zero Response Posttest System Zero Response Average Zero Response (Co) Pretest System Cal Response Posttest System Cal Response Average Cal Response (Cp) l0 1.36 5000.00 5. l3 - 1.55 1.79 4947.88 4985. l6 4966.52 NACorrected Run A l5 :06 l5 :07 l5 :08 15 :09 15: l0 15:l l t5.t2 l5: l3 l5:14 l5: l5 l5: l6 l5: l7 l5: l8 l5:19 I 5:20 l5:21 1522 l5:23 l5:24 15:25 15.26 56.25 -t2.94 68.55 49.44 20.7 | 27.25 63.81 29.28 3 1.04 62.21 40.60 48.08 85.61 195.9 r t26.t4 185.31 203.07 188.26 145.85 198.65 3 15.41 24 ofTl 25 of71 A/t6rtreTtrCIINICAL GROLP l.ocation: Tesoro Loqistics Operations, LLC - Salt Lake CiW, UT NMHC Summary Source: VRU B Project No.: AST-202.1-3 593 Run No.Date Tlrp Referrme Mcthod NNIHC (as C'H") Conccntratlon DDMW CENIS NMHC (us Crlft) Concentratlon DOmvw Average Diffcrence hamwStarlEnd I 2 J 4 5 6 7 8 9 l0 ll 9/12t21 9/12t21 9/12t21 9/12,'24 9/t2t24 9ttt21 9tt2t24 9ttz'21 9i13t21 9113/21 9n3t21 8:16 8:37 9:09 9:30 9:51 l0:22 l0:43 I l:0,1 7:18 7:39 8:00 8:36 8:57 9:29 9:50 10:l I 10:.12 I 1:03 l1:2.1 7:3 8 7:59 8:20 362.3 235.6 186.2 301.9 3 12.8 39.1.8 49.9 I 038. I 33 1.3 365.0 328.3 398.4 315.8 267.9 5 12.3 415.4 568.4 193.9 I {51.6 3 78.5 453.4 277.3 -36. I I -80.2.1 -81.71 -210.38 -102.57 -173.57 -143.99 -.11 3.56 -47.16 -88.45 51.00 Averagr 3 55.1 475.7 - 120.613 Standrd Deviation (Sd I 19.882 Applicable Source Standard (AS r 1.000 Confi dence Coeffrcient (CC 80.533 Relative Accuracy (RA t,t3 0/o Performmce Required - Aoplicable Source Standan RA < 100,,o Perforrrance Soecifi cation \[ethor PS8 Confidencc CoefIIclcnt, CC cc=lff"sal whcre, Io.czs n Sd CC a aae - ll I19.882 80.533 = degrees of freedom value : number of runs seleoted fc oalculating the R{ = standard deviation of differmce - confidence coefficient Relative Accuracy, RA ld l+ lcclna = 73iffix100 where, d -120.61 = average di.fferenoe of Reference Method and CEN{S CC _-!![ = confidence ccllicient AS-]-!!Q![= applicable source standard" ppmw R.t 1.83 .= relative accuracy, o/a, 26 of71 tt t=€ € <r r oo!166cl5r FF 5oQi € <rN9 -Yfo6!: o -Y 1 .; .l6iCl r^t -<-Q€ N:s- o(,)U qq,a)6tQa0ord atdtsdzL c0)c3a Ii Ur q : I.IT(! 27 of T l pyll6rrpe TECi]T'I CAL CIIOLJ - Run 1- RM Data Location: Source: Project No.: Tesoro Logistics Operations, LLC - Salt Lake Citv, UT VRU B AST-2024-3593 Datez 9l12/24 Time Unit Status Uncorrected Run Average (Coo.) Cal Gas Concentration (Cu.r) Pretest System Zero Response Posttest System Zero Response Average Zero Response (Co) Pretest System Cal Response Posttest System Cal Response Average Cal Response (Cy) Corrected Run A NMHC - Outlet ppmvw Valid 362.32 5000.00 0.29 38. l8 t9.24 4987.t9 4949.89 4968.54 NA 8:16 8: l7 8:18 8: l9 8:20 8:21 8.22 8:23 8:24 8:25 8:26 8.27 8:28 8:29 8:30 8:31 8:32 8:33 8:34 8:35 8:36 206.25 23 5.0 I 256.60 292.94 300.02 259.09 305.26 316.17 336.22 33 5.88 355.34 375.89 376.51 424.67 424.7 | 433.32 437.60 454.63 s16.28 522.16 444.t2 28 olTl AllAlEeTECHNI(]AL CROLJ f Run2-RMData Location: Source: Project No.: Tesoro Logistics Operations, LLC - Salt Lake City, UT VRUB AST-2024-3593 D*el9ll2l24 Time Unit Status NMHC - Outlet ppmvw Valid Uncorrected Run Average (Coo") Cal Gas Concentration (CuJ Pretest System Zero Response Posttest System Zcro Response Average Zero Response (Co) Pretest System Cal Response Posttest System Cal Response Average Cal Response (Cp) 235.57 5000.00 0.29 38. l8 t9.24 4987. l9 4949.89 4968.54 NACorrected Run A 8:37 8:38 8:39 8:40 8:41 8:42 8:43 8:44 8:45 8:46 8.47 8:48 8:49 8:50 8:51 8:52 8:53 8:54 8:55 8:56 8:57 429.93 431.23 439.85 521.00 r23.7 t 783.75 523.80 178.18 120.96 124.20 126.88 127.02 147.35 89.63 89.68 100. l3 94.88 ll3.14 93.21 I 10.51 t77.87 29 ofTl AltArEeTECHNiCAL CNOLI - Run3-RMData Location: Source: Project No.: Tesoro Logistics Operations, LLC - Salt Lake City, UT VRUB AST-2024-3593 Date: 9/12124 Tinre Unit Status NMHC - Outlet ppmvw Valid Uncorrected Run Average (C.o) Cal Gas Concentration (CMJ Pretest System Zero Response Posttest System Zero Response Average Zero Response (Co) Pretest System Cal Response Posttest System Cal Response Average Cal Response (Cm) 186.15 5000.00 38.18 37 .4t 37.80 4949.89 4974.44 4962.17 NACorrected Run Ave 9:09 9:10 9:l I 9:12 9: l3 9:14 9: l5 9:16 9.17 9: l8 9: l9 9:20 9.21 9:22 9:23 9.24 9.25 9.26 9:27 9:28 9:29 171.85 188.39 182.66 182.22 186.90 72.23 149.40 280.67 227.13 273.13 284.3t 292.78 278.19 l s9.8l t67.24 I 15.88 -26.81 66.67 170. l9 220.94 265.42 30 ofTl A]lArEe Run4-RMData TECF{NICAL C)N')U- Location: Tesoro Logistics Operations, LLC - Salt Lake City, UT Source: VRUB Project No.: AST-2024-3593 Datez 9l12/24 Time Unit Stafus NMHC - Outlet ppmvw Valid Uncorrected Run Average (Coo") Cal Gas Concentration (CMJ Pretest System Zero Response Posttest System Zero Response Average Zero Response (Co) Pretest System Cal Response Posttest System Cal Response Average Cal Response (Ce1) 301.91 5000.00 38.18 37 .41 37.80 4949.89 4974.44 4962.17 NACorrected Run A 9:30 9:31 9.32 9:33 9.34 9:35 9:36 9:37 9:38 9:39 9'.40 9:41 9.42 9:43 9:44 9"45 9:46 9:47 9:48 9:49 9:50 301.93 351.46 371.48 373.57 380.72 399.53 365.52 -29.t7 -78.67 194.91 355.20 4t5.32 468.93 478.38 428.59 4l 1.36 403.72 405.75 344.33 6.30 -9.02 3l of 7l All6rrpeIECHN.CAL CNOU: Run5-RMData Location: Source: Project No.: Tesoro Logistics Operations, LLC - Salt Lake City, UT VRUB AST-2024-3593 Datez 9/12/24 Time Unit Status NMHC - Outlet ppmvw Valid 3 12.81 5000.00 38. t8 37 .41 37.80 4949.89 4974.44 4962.t7 NA Uncorrected Run Average (Co6,) Cal Gas Concentration (CMJ Pretest System Zero Response Posttest System Zero Response Average Zero Response (Co) Pretest System Cal Response Posttest System Cal Response Average Cal Response (Cy) Corrected Run A 9:51 9:52 9:53 9:54 9'.55 9:56 9.57 9:58 9:59 I0:00 l0:01 l0:02 l0:03 l0:04 l0:05 l0:06 l0:07 l0:08 l0:09 l0:10 l0:l I -3 1.9 I -39.20 -40.7 5 218.84 481.24 648.54 742.6t 836. l7 887.79 503.73 159.55 I 50.90 153.85 I 24.86 t22.65 I 18.66 164.29 285.49 299.57 401.86 380.33 32 ofTl AltArEeTEGHNI(]AL CNOU-' Run6-RMData Location: Source: Project No.: Tesoro Logistics Operations, LLC - Salt Lake City, UT VRU B AST-2024-3593 Datet 9/12124 Time Unit Status I\MHC - Outlet ppmvw Valid Uncorrected Run Average (Coo.) Cal Gas Concentration (Cmr) Pretest System Zero Response Posttest System Zero Response Average Zero Response (Co) Pretest System Cal Response Posttest System Cal Response Average Cal Response (C*) 394.81 5000.00 37 .4t -9.42 14.00 4974.44 5009.85 4992.15 NACorrected Run A 10.22 10:23 t0.24 l0:25 l0:26 l0:27 l0:28 l0:29 l0:30 l0:31 l0:32 10:33 l0:34 l0:35 l0:36 l0:37 10:38 l0:39 l0:40 l0:41 10.42 510.50 490.59 375.00 365.82 366.7 | 37 5.04 388.13 421.36 277.65 129.t2 409.80 330.21 47 5.94 468.26 502.41 659.24 869.93 722.42 56.67 50.25 45.87 33 ofTl pultEnrce TECHNTCAL CnOLI a Run7-RMData Location: Source: Project No.: Tesoro Logistics Operations, LLC - Salt Lake City, UT VRUB AST-2024-3593 Date: 9/72/24 Time Unit Status NMHC - Outlet ppmvw Valid Uncoruected Run Average (Co5.) Cal Gas Concentration (CurJ Pretest System Zero Response Posttest System Zero Response Average Zero Response (Co) Pretest System Cal Response Posttest System Cal Response Average Cal Response (Cp) 49.9t 5000.00 37 .41 -9.42 14.00 4974.44 5009.85 4992.t5 NACorrected Run A l0:43 l0:44 l0:45 I0:46 t0.47 l0:48 I0:49 I0:50 10:51 I0:52 l0:53 l0:54 l0:55 l0:56 l0:57 l0:58 l0:59 I l:00 ll:01 I l:02 I l:03 38.51 30.24 30.24 30.34 30.20 30.28 30.28 30.27 30.62 33.25 43.89 50.26 50.25 40.39 30.49 32.82 56.29 82.74 105.38 I 15.39 126.08 34 ofTl gJlArEe TECHN.CAL CNOL] - Run8-RMData Location: Source: Project No.: Tesoro Logistics Operations, LLC - Salt Lake CiW, UT VRU B AST-2024-3593 Date:9/12/24 Time Unit Status Uncorrected Run Average (Co5.) Cal Gas Concentration (Cur) Pretest System Zero Response Posttest System Zero Response Average Zero Response (Co) Pretest System Cal Response Posttest System Cal Response Average Cal Response (Cy) Corrected Run A NMHC - Outlet ppmvw Valid 1038.06 5000.00 37.4t -9.42 14.00 4974.44 5009.85 4992.15 NA I I:04 I l:05 I l:06 I l:07 I l:08 I l:09 I l:10 ll:ll I l:12 ll:13 I l:14 ll:15 I l:16 I l:17 l1:18 ll:19 I 1:20 l1:21 ll:22 ll 23 ll:24 t39.4I 137.19 t26.37 122.61 133.87 149.81 - l 00.34 2t4.56 172.83 288.46 341.7 t r,090.09 6,885.08 10,408.41 1,869.74 37 .71 25.36 -16.07 -59.1 I -77.73 -90.69 35 ofTl pull6r1rce TEC H N lcA L c l'l o'-'"l"",ron: TesoroLogisticsoperations,LLC -saltLakecitv,ur Run9-RMData Source: VRUB Project No.: AST-2024-3593 Date:9/13/24 Time Unit Status NMHC - Outlet ppmvw Valid Uncorrected Run Average (Coor) Cal Gas Concentration (Cpr.r) Pretest System Zero Response Posttest System Zero Response Average Zero Response (Co) Pretest System Cal Response Posttest System Cal Response .dverage Cal Response (Cy) Corrected Run Ave 33t.32 5000.00 40.13 90.20 65.17 5003.39 4990.87 4997.13 NA 7:18 7:19 7:20 7:21 7'.22 7:23 7:24 7.25 7:26 7:27 7:28 7:29 7:30 7:31 7:32 7:33 7:34 7.35 7:36 7:37 7:38 516.36 503.46 492.53 487.14 412.t5 468.67 464.55 457.81 92.86 358.81 265.92 135.76 89.17 88.78 83.73 80.23 14t.72 438.68 448.06 456.81 414.51 36 ofTl pulr6rrEe TECHN'CAL CNOLI - Run l0 - RM Data Location: Source: Project No.: Tesoro Logistics Operations, LLC - Salt Lake Citv, l-IT VRU B AST-2024-3593 D*et 9/13/24 Tirne Unit Status NMHC - Outlet ppmvw Valid Uncorrected Run Average (Co6) Cal Gas Concentration (Cp6) Pretest System Zero Response Posttest System Zero Response Average Zero Response (Co) Prrctest System Cal Response Posttest System Cal Response Average Cal Response (Ce) 364.98 5000.00 40.13 90.20 65.17 5003.3 9 4990.87 4997.13 NACorrected Run A 7:39 7.40 7:41 7:42 7:43 7:44 7:45 7:46 7:47 7:48 7:49 7:50 7:51 7:52 7:53 7:54 7:55 7:56 7:57 7:58 7:59 94.4t 86.96 413.49 460.47 355.52 162.54 163. l8 13 8.76 t73.27 t94.96 205.91 200.84 191.19 4 I 3.05 553.22 556. I I 595.46 621.85 646.38 689.63 747.48 37 ofTl All6rrrc.eTECHNiGAL CNOL] A Run 1l - RM Data Location: Source: Project No.: VRU B AST-2024-3593 Dile:9/13/24 Time Unit Status Uncorrected Run Average (Co6r) Cal Gas Concentration (CnaJ Pretest System Zero Response Posttest System Zero Response Average Zero Response (Co) Pretest System Cal Response Posttest System Cal Response Average Cal Response (Cy) Corrected Run A IYMHC - Outlet ppmvw Valid 328.29 5000.00 40.13 90.20 65.t7 5003.3 9 4990.87 4997.t3 NA 8:00 8:01 8:02 8:03 8:04 8:05 8:06 8:07 8:08 8:09 8:10 8:11 8:12 8:13 8:14 8: l5 8:16 8: l7 8:18 8:19 8:20 792.98 825.56 695.29 804.82 553. I I 236.22 263.83 204.95 209. l0 228.96 227.06 t62.70 162.58 I 85.80 244.83 t93.62 2t7.84 239.57 158.85 l5 L63 134.75 38 ofTl 39 ofTl 40 ofTl plllBlpe TECHNICN L GFI OU3 QA Data Location Tesoro Locistics Operations, LLC - Salt Lake Citv, UT Source VRU A Project No. AST-2024-3593 Parameter NMHC - Outlet Make Model SAI Ooeratins Ranue CAI 100 T030 r4 10000 Cvlinder [D 7*ro Mid tlish NA EB0078090 EB0078090 Cylinder Certifed Values Ttro Mid Hioh NA 8560 8560 Cylinder Expiration Date 7*ro Mid Hish NA t0l2/31 t0/2/31 fype of Sample Line Heated Samole Line pultfur= TECHNICAL CROUN Location: Tesoro Logistics Operations, LLC - Salt Lake City, UT Response Times Source: VRU A Project No.: AST-2024-3593 7*ro Low Mid 45 55 55 52 42 ofTl pllr6trcp TECiNIC,AL CNOUN Calibration Data Location: Sournce: Project No.: Tesoro Logistics Operations, LLC - Salt Lake Cify, UT VRUA AST-2024-3593 Datez 9/12/24 Parameter NMHC - Outlet Exnected Averase Concentration 4000.00 Span Between Low Hish Desired Soan 6000.00 10000.00 10000.00 Low Range Gas Low Hieh 2500.00 3500 00 Mid Range Gas Low Hish 4500 00 5500.00 High Range Gas Low Hioh 8000.00 9000.00 Actual Concentration (%o or ppm) 7*ro Low Mid Hish 0.00 3000.00 5000.00 8560.00 Response Time (secon ds)51.75 Upscale Calibration Gas (Cp1..)Mid Instrument Response (%o or ppm) Znro Low Mid Hieh 0.42 3000.57 5000. I 3 8562.t7 Performance (7o of Span or Cal. Gas Conc.) Z*ro Low Mid Hish 0.00 -0.02 -0.03 0.00 Status 7*ro Low Mid Hich PASS PASS PASS PASS 43 ofTl AfiAlEeTEC:lNlCAL eRCUc Location: Source: Project No.: Bias/D rift Determina tions Tesoro Logistics Operations, LLC - Salt Lake City, UT VRU A AST-2024-3593 Parameter NIIHC - Outlet Run I Pretest System Zero Response Posttest System Zero Response Pretest System Upscale Response Posttest Svstem Uoscale Resoonse -9.42 6.28 5,009.85 4.999.58 Run 2 Pretest System Zero Response Posttest System Zero Response Pretest System Upscale Response Posttest Svstem Uoscale Resoonse -9.42 6.28 5.009.85 4.999.58 Run 3 Pretest System Zero Response Posttest System Zero Response Pretest System Upscale Response Posttest Svstem Upscale ResDonse -9.42 6.28 5,009.85 4.999.58 Run { Pretest System Zero Response Posttest System Zero Response Pretest System Upscale Response Posttest System Upscale Response 6.28 5.13 4,999.58 4.947.88 Run 5 Pretest System Zero Response Posttest System Zero Response Pretest System Upscale Response Posttest Svstem Upscale ResDonse 6.28 5, l3 4,999.58 4.947.88 Run 6 Pretest System Zero Response Posttest System Zero Response Pretest System Upscale Response Posttest System Upscale Response 6.28 5. l3 4,999.58 4.947.88 Run 7 Pretest System Zero Response Posttest System Zero Response Pretest System Upscale Response Posttest System Upscale Response 5. l3 - r.55 4,947.88 4.985.16 Run 8 Pretest System Zero Response Posttest System Zero Response Pretest System Upscale Response Posttest Svstem Uoscale Resoonse 5. l3 - l.s5 4,947.88 4.985.16 Run 9 Pretest System Zero Response Posttest System Zero Response Pretest System Upscale Response Posttest Svstem Uoscale Resoonse 5. l3 - 1.55 4.947.88 4.985.16 Run 10 Pretest System Zero Response Posttest System Zero Response Pretest System Upscale Response Posttest Svstem Uoscale Response - 1.55 4,985.16 pullErlrce TEC:tNlCAL QFOUP Bias/D rift Determina tions Lo.rtion Source: VRUA Project No.: AST-2024-3593 Parameter NVIHC - Outlet Run I Date 9ll2l21 Span Value Initial Instrument Zero Cal Response Initial Instrument Upscale Cal Response Pretest System Zero Response Posttest System Zero Response Pretest System Upscale Response Posttest System Upscale Response 10,000.00 0.42 5.000. l3 -9 42 6.28 5.009.85 4.999.58 Bias (%) Pretest Zero Posttest Zero Pretest Span Posttest Soan NA NA NA NA Dnft io'61 Zero Mid 0.16 -0 10 Run 2 Date 9ll2l24 Span Value Instrument Zero Cal Response Instrument Upscale Cal Response Pretest System Zero Response Posttest System Zero Response Pretest System Upscale Response Posttest Svstem Upscale Response 10,000.00 0.42 5,000. l3 -9.42 6.28 5,009.85 4,999.58 Bias (%) Pretest Zero Posttest Zero Pretest Span Posftest Soan NA NA NA NA Dritl (0z6) Zero Mid 016 -0. l0 Run 3 Date 9/12121 Span Value Instrument Zero Cal Response Instrument Upscale Cal Response Pretest System Zero Response Posttest System Zero Response Pretest System Upscale Response Posttest Svstem IJnscale Resnonse 10,000.00 0.42 5,000. 13 -9.42 6.28 5,009.85 4.999 58 Bias (oo) Pretest Zero Posttest Zero Pretest Span Posttest Span NA NA NA NA Dritl (e6) Zero Mid 0.16 -0.10 45 ofTl plltErtre TECHNICAL GROUD Bias/D rift D eterminatio ns l,ocation: Tesoro Logistics Operations, LLC - Salt Lake City, UT Source: VRU A Project No.: AST-2024-3593 Parameter NMHC - Outlet Run 4 Date 9ll2lA Span Value Instrument Zero Cal Response Instrument Upscale Cal Response Pretest System Zero Response Posttest System Zero Response Pretest System Upscale Response Posttest Svstem Uoscale Resoonse 10,000.00 0.42 5,000.13 6.28 5. l3 4,999.58 4.947.88 Bias (%) Pretest Zero Posttest Zero Pretest Span Posttest Soan NA NA NA NA Drift(%) Zero Mid -0.01 4.52 Run 5 Date 9ll2l24 Span Value Instrument Zero Cal Response Instrument Upscale Cal Response Pretest System Zero Response Posttest System Zero Response Pretest System Upscale Response Posttest Svstem Uoscale Resoonse 10,000.00 0.42 5,000. l3 6.28 5. l3 4,999.58 4.947.88 Bias (%) Pretest Zero Posttest Zero Pretest Span Posttest Soan NA NA NA NA Drift (%) Zero Mid -0.01 -0.52 Run 6 Date gllzDl Span Value Instrument Zero Cal Response Instrument Upscale Cal Response Pretest System Zero Response Posttest System Zero Response Pretest System Upscale Response Posttest Svstem Uoscale Resoonse 10,000.00 0.42 5,000. I 3 6.28 5.13 4,999.58 4.947.88 Bias (%) Pretest Zero Posttest Zero Pretest Span Posttest Soan NA NA NA NA Driftp6) Zero Mid -0.01 4.52 pllt6lre TEC:lFllCAL GROUD Bias/Drift Determinations [.ocation: Tesoro Logistics Operations, LLC - Salt Lake City, UT Source: VRUA Project No.: AST-2024-3593 Parameter NMHC - Outlet Run 7 Date 9ll2/21 Span Value Instrument Zero Cal Response lnstrument Upscale Cal Response Pretest System Zero Response Posttest System Zero Response Pretest System Upscale Response Posttest Svstem Upscale Response 10,000.00 0.42 5,000.13 5.13 -1.55 4,94'7.88 4,985.16 Bias (0z6) Pretest Zero Posttest Zero Pretest Span Posftest Soan NA NA NA NA Drift (9'o) Zero Mid -0.07 0.37 Run 8 Date 9ll2/21 Span Value Instrument Zero Cal Response Instrument Upscale Cal Response Pretest System Zero Response Posttest System Zero Response Pretest System Upscale Response Posttest Svstem Uoscale Response I0,000.00 0.42 5,000.13 5.13 -1.55 4,947.88 4.985.16 Bias (o/o) Pretest Zero Posttest Zero Pretest Span Posttest Span NA NA NA NA eh\ Zem -0.07 037 Run 9 Date 9/12121 Span Value Instrument Zero Cal Response Instrument Upscale Cal Response Pretest System Zero Response Posttest System Zero Response Pretest System Upscale Response Posttest System Upscale Response 10,000.00 0.42 5,000. t3 5. l3 -1.55 4,947.88 4.985. l6 Bias (96) Pretest Zero Posttest Zero Pretest Span Posttest Span NA NA NA NA Drift (0,'o) Zero Mid -0.07 037 4'7 ol7 | pilt6rre r E o t$rnok fl"!r.liiiit,S#-uL, r.rc - t"r, r-"t" cu. rn Soucc: VRUA Pmjcct No.: Drtc Amlyrcr Make Arnlyrcr Model Aralyrcr SN. 041 0403-2409 Environics ID: 9451 Component/Balmcc Ga: Cylinder Ga ID (Dilttion): Cylinder Gm Corccnu-atio (Diftlion), %: Cylin&r Gc ID lMid-Lcvcl): Cylindcr Ga Cmccrrntion (Mid-Lcvcl), %: o2nt2 23 84 'Not all AST Environica Urut!2-l0L Mas Tergct Msr Flor Trlct Dilution Terget Fl,ow Rrtc Ttgct Cooccntretlou Actul Conccntntion IDj6ti@ I Aml5zer CooccDFrtiotr lo/"\ lnJcmo I Anelyzcr CoccntntioD uJCmotr , Andyzcr ConcGtrtratioD lo/"1 Aveng. AadSzcr CoDcGDtmtlon to/"\ Diffcrcncc lo/^l Avcngc Elru(*2%) I OI./5I o 5o l9 I9l I 9.1 l9.l l9.l 19.06 0.00 o.u/o I OIJ5I 00 50 t9 120 l9 t.9 ll9 I 1.91 o.05 -o.49n I OIJI I lo 40 48 4E 4.8 4.8 4.8 4.83 0.02 O.4oto IOUIL 00 40 74 24 4 ool o 50h AYamgc Aaelyrcr CooceDtmtioD Itrj.c'ti@ I Enq ( *2%) Injcstia 2 Enor(+2*) Injcctio 3 Emr(tz%) l9 06 o.a/o O.A/o o.u/o l9l O U/o 0 0zo O.loto 483 o ?o/n o ff/.-O )./; 2.42 0.fzo O.0/o o.a/o 48 ofTl UTNH OTPARTMENT OF OcT - 8 ?024 ENVIRONMENTAL QUALITY DIVISION OF AIR OUALITY 49 of71 AIlAlEeTECHN'CN L GHOUE QA Data Location Tesoro Logistics Operations, LLC - Salt Lake City, UT Source VRU B Project No. AST-2024-3593 Paranreter NMH(- - (}rflef Make Model S/N Ooeratins Ranse CAI 100 T030 I 4 10000 Cylinder ID Trro Mid Hish NA EB0078090 EB0078090 Cylinder Certifed Values 7*ro Low Mid Hish NA 8560 8560 8560 Cylinder Expiration Date Trro Low Mid Hish NA t0/2/31 t0/2/3t r0t2t3t Ivoe of Sample Line Heated Samole Line pllt6rEe TECHNICAL CROIJII Location: Tesoro Losistics Operations, LLC - Salt Lake CiW, UT Response Times Source: VRUB Project No.: AST-2024-3593 Times. seconds Parameter NMHC - Outlet 7-cto Low Mid Hish 45 55 55 52 Average 51.8 put6tr= TEC.INICAL CNOUN Calibration Data Location: Source: Project No.: Tesoro Logistics Operations, LLC - Salt Lake Citv, UT VRUB AST-2024-3593 D*e: 9/12/24 Parameter NMHC - Outlet Exoected Averase Concentration 4000.00 Span Between Low High Desired Snan 6000.00 10000.00 10000.00 Low Range Gas Low Hioh 2500.00 3500 00 Mid Range Gas Low Hish 4500.00 5500.00 High Range Gas Low Hish 8000.00 9000.00 Actual Concentration (7o or ppm) 7*ro Low Mid Hish 0.00 3000.00 5000.00 8560.00 Resoonse Time (seconds)5t.75 Upscale Calibration Gas (C*r^)Mid Instrument Response (7o or ppm) 7*ro Low Mid Hioh 0.42 3000.57 5000. I 3 8562.17 Performance (7o of Span or Cal. Gas Conc.) 7*ro Low Mid Hish 0.00 -0.02 -0.03 0.00 Status 7-ero Low Mid Hish PASS PASS PASS PASS pult6'ire TEC-I NiCAL CNCUlr Location: Source: Project No.: Calibration Data Tesoro Logistics Operations, LLC - Salt Lake City, UT VRU B AST-2024-3593 Date: 9/13/24 Parameter NMHC- Outlet Expected Average Concentration 4500.00 Span Between Low HiCh Desired Span 6750.00 I I250.00 10000.00 Low Range Gas Low Hish 2500.00 3500.00 Mid Range Gas Low Hioh 4500.00 5500.00 High Range Gas Low Hish 8000.00 9000.00 Actual Concentration (7o or ppm) Znro Low Mid Hish 0.00 3000.00 5000.00 8560.00 ResDonse Time (seconds)51.75 Uoscale Calibration Gas (C Mid lnstrument Response (7o or ppm) Z*ro Low Mid Hish 0. t7 3022.29 5003.68 8557.29 Performance (7o of Span or CaL Gas Conc.) Z*to Low Mid Hioh 0.00 0.77 0.10 0.00 Status Z*ro Low Mid Hish PASS PASS PASS PASS 53 of71 pull6rrce IE.CiIN CAL C=OI-,,J P Bias/Drift Determinations Lo."tion,@ Source: VRU B Project No.: AST-202{-3593 Param€ter NMHC - Outlet Run I Pretest System Zero Resporoe Posttest System Zero Response Pretest System Upscale Response P^(ttcsr qv(rlfr I Tncnelc Pecmnce 0.29 38.1 8 4,987.t9 .1.949.89 Run 2 ketest System Zero Response lostlest Systcm Zero Response lretest System Upscale Resporse )osfteqt Svslefr I inscale Resmns, 0.29 38.1 8 4,987. I 9 r oro eo Run 3 ?retest System Zero Response losttest System Zero Resporoe lretest System Upscale Respome losttest Svstem Uoscalc Resmroe 38.1 8 37.41 .t,9.19.89 {.97{.{.1 Run,l Jretest System Zero Resporse losttest Syst€m Zero Response lretsst System Upscale Response )^.llc!t qw.tP6 T l*rrlc Pe<mn< 38.18 37.+t 1,949.89 4.971.4.1 Rrrn 5 lretest System Zero Respome lostlest System Zero Response ketest System Upscale Response )^crtp.t qr/.1F6 I Inc^alr DatMnt, 38.18 17.41 1,9{9.89t97tlt Run 6 feresl System zefo Kesponse ?osttest System Zero Resporse )etest Syslem Upscale Resporuc )osilesf Svsiem I Imcele Recmnse 37.41 -9.t2 1,971.11 5.009.85 Run 7 lretest Systm Ztro Rcspome Josrtest System Ztro Response )retest Systsm lJ'pscale Resporoe )^.ltFat SvetPm I lncrrla Pesmnc, 37.{I -9.t2 4,97.t.4{ 5.(n9.85 Ilrrn fl Jretest Systm Ztro Resporee losnest System Zero Resporue lreaest System Upscale Respome )^.hP.t qvetFm I fnocele Pccmnc 37.{l -9.12 1,971.11 5m985 Run I lretest System Zero Respome losttest Systcm Zero Response lretest System Upscale Response )^c*F.t qu.tffi I I*nrle Pe<mnc 40.13 90.20 5,003.39 4.990.87 Rrrn l0 Jretest Systcm Zero Respome losttest System Zero Response lretest System Upscale Respome )osllest Svslm IiDscale Resmree 40.13 90.20 5,003.39 .1.990.87 Run I lretest Systm Zero Response lostlest System Zero Response lretest Systm Upscale Resporoe )^(ltc.t SwctPh I'nc..l. P.cMh. 40. l3 90.20 5,001.39 {_990.87 Run l2 lretest Systcm Zero Resporue losllosl System Zero Response tetesi System Upscale Respome )osttest Svstem Uoscalc Resmme 54 ofTl Parameter NMHC - Outlet Run I Date 9ll2l21 Span Value Initial Instrument Zero Cal Response Initial Instrument Upscale Cal Response Pretest System Zero Response Posftest System Zero Response Pretest System Upscale Response Posttest Svstem Uoscale Resoonse 10,000.00 0.42 5,000.13 0.29 38.18 4,987.19 4.949.89 Bias (9'b) Pretest Zero Posttest Zero Pretest Span Posttest Soan NA NA NA NA Drift 1e'"1 Zero Mid 0.38 -0.37 Run 2 Date 9ll2l2l Span Value Instrument Zero Cal Response Instrument Upscale Cal Response Pretest System Zero Response Posttest System Zero Response Protest System Upscale Response Posttest System Upscale Response 10,000.00 0.42 5,000.13 0.29 38.18 4,98'7.19 4.949.89 Bias (%) Pretest Zero Postlest Zero Pretest Span Posttest Span NA NA NA NA Drift(%) Zero Mid 0.38 -o 17 Run 3 f)ate 9ll2l24 Span Value Instrument Zero Cal Response Instrument Upscale Cal Response Pretest System Zero Response Posttest System Zero Response Pretest System Upscale Response p^etrFcf (rrctem I Incnqle Resnnnsr 10,000.00 0.42 5.000.13 38.18 37.41 4,949.89 4.974.44 Bias (%) Pretest Zero Posttest Zero Pretest Span Posttest Soan NA NA NA NA Drift (%) Zero Mid -0.01 0.25 A]|ArEeTEGHNICAL GROUP Bias/D rift Determina tions Tesoro Logistics Operations, LLC - Salt Lake City, UT VRU B AST-2024-3593 Location: Source: Project No.: 55 ofTl pulr6rre TECHT.JICAL GROU 3 Bias/D rift Determinatio ns I-.rtiott Source: VRU B Project No.: AST-2024-3593 Peremeter NVIHC - Outlet Run 4 Date 9/1212{ Span Value Instrument Zero Cal Response lnstrument Upscale Cal Response Pretest System Zero Response Posttest System Zero Response Pretest System Upscale Response Pos$est Svstem Upscale ResDonse 10,000.00 0.42 5,000.13 38.18 37.41 4,949.89 4.974.44 Bias (e6) Pretest Zero Posttest Zero Pretest Span Posftest Soan NA NA NA NA Drift (o./i,) Zero Mid -0.01 0.25 Run 5 Date 9ll2l21 Span Value Instrument Zero Cal Response Instrument Upscale Cal Response Pretest System Zero Response Posttest System Zero Response Pretest System Upscale Response Posttest Svstem Uoscale Resoonse 10,000.00 0.42 5,000. I 3 38.1 8 37.41 4,949.89 4.974.44 Bias (94r) Pretest Zero Posttest Zero Pretest Span Posttest Span NA NA NA NA Drift e,6) Zero Mid -0.01 nrs Run 6 Date 9ll2l24 Span Value Instrument Zero Cal Response Instrument Upscale Cal Response Pretest System Zero Response Posttest System Zero Response Pretest System Upscale Response Posttest Svstem Upscale Response 10,000.00 0.42 5,000.13 37.4t -9.42 4,974.U 5.009.85 Bias (orc) Pretest Zero Posttest Zem Pretest Span Posttest Span NA NA NA NA Drift 1o.,o; Zero Mid 4.47 0.35 Run 7 Date 9ll2l21 10,000.00 0.42 5,000. l3 37.41 -9.42 4,974.44 5,009.8s Span Value Instrument Zero Cal Response Instrument Upscale Cal Response Pretest System Zero Response Posttest System Zero Response Pretest System Upscale Response NA NA NA NA Bias (%) Pretest Zero Posttest Zero Pretest Span Run 8 Date 9ll2/21 Span Value Instrument Zero Cal Response Instrument Upscale Cal Response Pretest System Zero Response Posttest System Zero Response Pretest System Upscale Response Posttest Svstem Uoscale 10,000.00 0.42 5,000. l3 37.41 -9.42 4,974.44 5.009.85 Bias (9'o) Pretest Zero Posttest Zero Pretest Span NA NA NA NA Run 9 Date 9ll3l21 Span Value Instrument Zero Cal Response Instrument Upscale Cal Response Pretest System Zero Response Posttest System Zero Response Pretest System Upscale Response 10,000.00 0. l7 5,003.68 40.13 90.20 5,003.39 Bias (o,i,) Pretest Zero Posttest Zero Pretest Span NA NA NA NA pult6rre TECHT.iICAL GROUf Bias/D rift Determinatio ns [-ocation: Tesoro Logistics Operations, LLC - Salt Lake Cit-v, UT Source: VRU B Project No.: AST-2024-3593 Drift (0,6) Zero Mid Drift (%) Zero Mid 57 of7l pllt6rlre IECHNICAL GROUP Bias/D rift Determinations Location: Tesoro Logistics Operations, LLC - Salt Lake Cit-v, UT Source: VRU B Project No.: AST-2024-3593 Parameter NMHC - Oudet Run 10 Date 9ll3l21 Span Value Instrument Zero Cal Response Instrument Upscale Cal Response Pretest System Zero Response Posttest System Zero Response Pretest System Upscale Response Posttest System Upscale Response 10,000.00 0.17 5,003.68 40.1 3 90.20 5,003.39 4,990.87 Bias (%) Pretest Zero Posttest Zero Pretest Span Posttest Soan NA NA NA NA Drift (oz) Zero Mid 0.50 {.13 Run 1l Date 9ll3l21 Span Value Instrument Zero Cal Response Instrument Upscale Cal Response Pretest System Zero Response Posttest System Zero Response Pretest System Upscale Response Posftest Svstem Uoscale Resoonse 10,000.00 0.17 5,003.68 40.13 90.20 5,003.39 4.990.87 Bias (%) Pretest Zero Posttest Zero Pretest Span Posttest Span NA NA NA NA Drift(%) Zero 0.50 -0.13 59 ofTl M < z,^\:'z rl,'),1. " Red Ball Technical Gas Service 555 Craig Kennedy Way Shreveport, LA 7'1107 800-551 {150 PGVP Vendor lD # G12023 EPA PROTOCOL GAS CERTIFICATE OF ANALYSIS Cyinder Number: Produci lD Number: Cyinder Pressure: coA # Customer PO. NO.: Customer: 80078090 1 25959 1900 PS|G 80078090 20230913-U Certification Oate Expiration Oate: MFG Facility: Lot Number: Tracking Numb€r: Previous Certifi cation Dates: ton42023 Itfr))t)0:11 -shreveoort-lA :80078090 20230913 )84269001 Thrs callbration standard has been certified per the l\,4ay 2012 A-600/R-1 G2 SMART4ERT Coltc.ntradon Unc.rtdnty AndytcalPdn td. Assal,rdon E800642s1 E80064251 2016101149 05t17t2024 GMIS N2 C3H8 1495 PPM 0 603 2647a MKS MKS 2031DJG2EKVS13T 017146467 10n3n023 Thrsrstocertrfythegasesreferencedhavebeencalrbrated/tested,andveflfiedtomeetthedefinedspecrficatons Thrs calibration/test was performed usrng Gases or Scales that are traceable through Natronal lnstrtute of Standards and Technology (NIST) to the lnternatronal System of Unrts (Sl). The basrs of complrance stated rs a comparison of the measurement parameters to the speclfied or requrred calbratror/testrng process The expanded uncertarntres use a coverage factor of k=2 to approximate the 950/0 confldence level of the measurement. unless otheMrse noted. Thrs calrbratron certrficate app|es only to the rtem descflbed and shall not be reproduced other than rn full, without wntten approval from Red Ball Technical Gas Services lf not rncluded, the uncertainty of calibratrons are avarlable upon request and were taken rnto account when determinrng pass or farl ,/a"dn th"r/nu Aaron Varelas Analytical Chemist Assay Laboratory Red Ball TGS Vereon 02-J Rcvrscd on 2018-0$17 60 ofTl Red Ball Technical Gas Service 555 Craig Kennedy Way Shreveport, LA 71107 800-55'l {150 PGVP Vendor lO # G12023 EPA PROTOCOL GAS CERTIFICATE OF ANALYSIS Cyinder Number: Product lO Number: Cyinder Pressure: coA f Customer PO. NO.: Customer: =BOO4?2q125371 '1900 PS|G = RIOA) ) AI:t )O? a\1 ) )( ) -o Certification Date Expiration Date: MFG Facility: Lot Number: Tracking Numb€r: Previous Certirication Dates : 1)D9t2I)):a 12n7t2031 - Shreveport - LA =80042240 20231220 1651 26635 his calrbratton standard has been certrfied per the NIay 2012EPA Traceabrlity Protocol, Document EPA-600/R-12153'1 G1 r Oo Not Use This Cvlinder Below 100 p6iq (0.7 Megapascal).. ot Use This Cvlinder Below 100 psiq (0.7 Megapascal!. I Certitied Concentration(s) Carbon Dioxide Oxygen Coocanffion 1cL97 % 10.99 06 Unc.rt lnty roog % 10.03 % Andydcal Prlncld. NDIR MPA A3rqFd On 12n9/20123 12n7Dt23 Balance Analytical Measurement Oata Available Online. SMARTCERT concentration uncertaintv(%l NlsTReference cc716408 20230109 cc749145 20230108 E80004315 20201022 E80014830 20150605 12 003 0k 20 03 oi6 24 75.h I 53 0/o 1 1 62980025 12/18n023 1 1 6298002s 12/14n023 Thrsrstocertifythegasesreferencedhavebeencalibrated/tested,andveflfiedtomeetthedefinedspecificahons Thrs ca|bratror/test was performed usrng Gases or Scales that are traceable through Natronal Institute of Standards and Technology(NIST)tothelnternatronalSystemofUnrts(Sl) Thebasrsofcomphancestatedrsacompansonofthe measurement parameters to the specrfied or requrred calbration/testing process The expanded uncertainties use a coverage factor of k=2 to approxlmate the 95% confldence level of the measurement. unless otheMise noted. Thrs calrbratron certrfrcate appltes only to the item descnbed and shall not be reproduced other than rn full, wrthout wntten approval from Red Ball Techntcal GasServrces. lf notrncluded,theuncertaintyof calibratronsareavarlableuponrequestandweretakenlntoaccount when determining pass or farl Aupr-- l'hn@ Hayden Hartley Anal),st Assay Laboratory: Red Ball TGS Versaon 02-J Revised on 2018-0917 6l ol7 t ---\-7- :E*i PJIAfrbd-q Accreditation ,f6z754 Red Ball Technical Gas Service 555 Craig Kennedy Way Shreveport, LA 71107 800-551{150 PGVP Vendor lO#G12o24 EPA PROTOCOL GAS CERTIFICATE OF ANALYSIS Cyinder Number: Product lO Number: Cyinder Pressure: coA # Customer PO. NO.: Customer: aBoa78022 127947 1900 PS|G l- Hol) / ut D) ?t ] ) 4ll / 01 -o Certification Oate Erpiration Oate: MFG Facility: Lot Number: Tracking Number: Previous Certifi cation Oates : 7 t08t2024 07 t06t2032 . shreveoon - LA 80078022 2024r)701 484267623 Thrs calrbration standard has been per the raceabrlrty Reference SMARTCERT cqrcentr.Oorl Urcertdnty Anal],tcal Pdnclplc A33sFd On oer Lot cc738420 20230109 EA0022009 20201022 Balance N2 N2 N2 oncentration Uncertai NIS FF61 042 cc738420 EB0022009 02n7n026 o7 n9/2031 04/05/2030 SRM GMIS GMIS co2 207530h 0 101 12 003 o/o 0 122 24760 0237 SRM 2659a SRM 2559a c1 E47E1 0 03 017146467 07n8n024rr629A0025 06n7nO24 Thrsistocertrfythegasesreferencedhavebeencalibrated/tested,andvenfiedtomeetthedeflnedspecrficatrons Thrs calrbratron/test was performed usrng Gases or Scales that are traceable through Natronal lnstrtute of Standards and Technology(NIST)tothelnternatronalSystemofUn(s(Sl) ThebasrsoFcomplrancestatedrsacompaflsonofthe measurement parameters to the specrfied or requrred cahbrahon/testrng process The expanded uncertarntres use a coverage tactor of k=2 to approximate the 95% confidence level of the measurement, unless otherwrse noted Thrs calbration certrficate applres only to the rtem descflbed and shall not be reproduced other than rn full wrthout wntten approval from Red Ball Technrcal Gas Serurces lf not rncluded, the uncertarnty of calrbratrons are avarlable upon request and were taken rnto 3ccount when determinrng pass or farl durp"^ lfr,@ Hayden Hartley Anal),st Assay Laboratory Red Ball TGS Version 02-J Revrsed on 2018-0917 62 olTl A/t6tre SOURCE TESTING Mass Flow Contro!ler Calibration Note: Themassflowcontroller'scalibrationvaluesareusedbythedilutionsystem'soperatingsoftwaretoimproveaccuracy. Thesecalibrationsarenot necessarily indicative of the systems overall performance. Performance is verified by conducting a Method 205 prior to each field use. calibration Performed By TCH Dilution Systcm Makc: Dilution Systcm Modcl: Dilution Systcm S/N: Calibratlon Equlpmcnt Makc: Calibration Equipmcnt Modcl: Calibration Equipmcnt 5/N: Flow Ccll S/N: Flow Cell S/N: Calibration Gas: Baromctric Pressure, mmHg: Ambicnt Tcmpcraturc,'F: Scientific .lOSLPD/5MM.D/5M, M-1SLPM-D/5 272727/272L20 272121 272720 25,48 73.5 Mass Flow Controllcr lD Sizc, ccm: Make: Modcl: S/N: fi1 10,000 HastinBs EFC202 1339352003 fr2 10,000 HastinBs EFC202 1339352007 fl3 1,000 Hastings EFC202 1339354003 S.t Flow Truc Flow Diffcrcnce cc/min cclmin Sct Flow True Flow Diffcrcncc cc/min cc/min Sct Flow Truc Flow Differcncc cclmin cclmin 5% LOYo 20% 30% 40% 50% 60% 70% 80% 90% 100% 500 s12 2.4% 1,000 t,oy 3.4% 2,000 2,085 4.30/o 3,000 3,114 3.8% 4,000 4,723 3.t% 5,000 5,130 2.6% 6,000 5,146 7.4% 7,000 7,L69 2.4% 8,000 8,175 2.2% 9,000 9,205 2,3% 10,000 to,244 2.4% 500 507 1.4% 1,000 I,o24 2.4% 2,000 2,056 2.8% 3,000 3,075 2,5% 4,000 4,ou 2.7% 5,000 5,088 7.8% 6,000 6,088 7.s% 7,000 7,105 7s% 8,000 8,737 L.7% 9,000 9,1a2 Z.tr/o 10,000 70,7u 2.6% 50 49.8 0.40/0 100 101.2 7.2% 200 203.8 L.9% 300 306.9 2.3% 400 409.8 2.5% 500 512.3 ?.5% 600 674.2 2.4% 700 776.9 2.4% 800 819.1 2,4% 900 927.2 2.4%o 1,000 L,o22.3 2.2% 63 olTl Date 9/25/24 64 ofTl 65 of 7l Run 11 12-Sep-24 13:55:002 12-Sep-24 13:56:003 '12-Sep-24 13:57:00 4 12-Sep-24 13:58:005 12-S6p-24 13:59:006 12-Sep-24 14:00:007 12-Sep-24 14:01 :00 8 12-Sep-24 14.O2:OO9 12-Sep-24 14:03:00'10 12-Sep-24 14:04:00 1 1 12-Sep-24 14:05:00 '12 12-Se9-24 14:06:00'13 12-Sep-24 14:O7:OO14 12-Sep-24 14:08:0015 12-Sep-24 14:09:0016 12-Sep-24 14:10:00'17 '12-Sep-24 '14:1 1 :0018 12-Sep-24 1412:.OO19 12-Sep-24 14:13:0020 12-Sep-24'14:14:OO 281. 312. 344. 312. 359. 359. 359. 375. 422. 453. 469. 500. 484. 484. 484. 500. 531. 57E. 547. 141 . 531.21 '12-Seo-24 14:15:00 RATA Runs Detail: Salt Lake City Unit A, UT 1 12-Sep-24 1 4:1 6:00 406.2 12-Sep-24 1417:00 O41.3 12-Sep-24 14:18:00 672.4 12-Sep-24 14:19:00 7815 12-Sep-24 14:20:00 7816 12-Sep-24 14:21:00 7817 12-Sep-24 1422:00 234.8 12-Sep-24 14:23:00 2O3. 9 12-Sep-24 14:24:OO 219.10 12-Sep-24 1425:OO 187.11 12-Sep-24 14:26:00 219.12 12-Sep-24 14:27:00 203.13 12-Sep-24 14:2800 203.14 12-Sep-24 14:29:00 187.15 12-Sep-24 14:30:00 172.16 12-Sep-24 14:31:00 187.17 12-Sep-24 14:32:00 172.18 12-Sep-24 '14:33:00 219. 19 12-Sep-24 14:34:00 20 12-Sep-24 '14:35:00 21 12-Sep-24'14:36:00 Run 51 12-Sep-24 15:29:00 344.2 12-Sep-24 15:30:00 375.3 12-Sep-24 15:3'l :00 359.4 12-Sep-24 15:32:00 359.5 12-Sep-24 '15:33:00 375.6 12-Sep-24 l5:34:00 359.7 12-Sep-24 15:35:00 375.8 12-Sep-24 l5:36:00 359.9 '12-Sep-24 15:37:00 359.10 12-Sep-24 15:38:00 359.11 12-Sep-24 15:39:00 359.12 12-Sep-24 15:40:00 359.13 12-Sep-24 15:41 :00 359.14 12-Sep-24 15:42:00 375.15 12-Sep-24 1 5:43:00 359.16 12-Sep-24 15:44:00 391.17 12-Sep-24 15:45:00 359.18 12-Sey24 15:46:00 375.19 12-Sep-24 15:47:OO 375.20 12-Sep-24 15:48:00 391.21 12-Sep-24 15:49:00 406. Run 3 1 l2-Sep-24 '14:37:00 1872 12-Sep-24 14:38:00 2343 12-Sep-24 '14:39:00 2194 12-Sep-24 '14:40:00 2345 12-Sep-24 14:41:0O 2196 12-Sep-24 14:42:00 2037 12-Sap-24 14:43.00 25O8 12-Sep-24 14:4400 2509 12-Sep-24 14:45:00 26610 12-Sep-24 14:46:00 28111 12-Sep-24 14:47:OO 26612 12-Sep-24 14:48:00 23413 12-Sep-24 14:49:00 25014 12-Sep-24 14:50:00 25015 12-Sep-24 1 4:51 :00 250 1 6 12-Sep-24 'l 4:52:00 14117 12-Sep-24 14:53:00 14'l18 12-Sep-24 14:54:00 14119 12-Sep-24 1 4:55:00 125 20 12-Sep-24 '14:56:00 14121 12-Sep-24 14:57:00 125 Run 41 12-Sep-24'l 5:08:002 12-Sep-24 15:09:00 3 12-Sep-24 1 5:10:004 12-Sep-24'l 5:11:005 12-Sep-24 15:12:006 12-Sep-24'l 5:13:007 12-Sep-24 1 5:14:00I 12-Sep-24 15:'15:009 12-Sep-24 15:16:0010 12-Sep-24 15:17:0011 12-Sep-24 15:18:0012 l2-Sep-24 15:19:0013 12-Sep-24 15:20:0014 12-Sep-24 15:21 :0015 12-Sep-24 15:22:OO16 l2-Sep-24 1 5:23:0017 12-Sep-24 15:24:0018 12-Sep-24 15:25:0019 12-Sep-24 15:26:0020 12-Sep-24 15:27:OO 328. 359. 375. 328. 375. 344. 344. 344. 344. 344. 359. 359. 375. 391. 359. 375. 406. 391. 406. 375. 375.21 12-Sep-24 15:28:00 Run 61 12-Sep-24 15:50:00 406.2 12-Sep-24 15:51 :00 4063 12-Sep-24 15:52:00 4064 12-Sep-24 15:53:00 3445 12-Sep-24 15:54:00 4066 12-Sep-24 15:55:00 4067 12-Sep-24 15:56:00 406.8 12-Sep-24 15:57:00 422. 9 12-Sep-24 15:58:00 438 10 12-Sep-24 15:59:00 453 1 1 12-Sep-24 16:00:00 500 12 12-Sep-24 16:01 :00 453 13 12-Sep-24 16:02:00 45314 12-Sep-24 16:03:00 422. l5 12-Sep-24 16:04:00 422 16 12-Sep-24 16:05:00 469.17 12-Sep-24 16:06:00 578.18 12-Sep-24 16:07:00 81219 12-Sep-24 16:0E:00 1047 20 1 2-Sep-24 16:09:00 1 391 . 21 12-Seo-24 16:10:00 219. 66 olTl 'l 12-Sep-24 2 12-Sep-24 3 12-Sep-24 4 12-Sep-24 5 12-Sep-24 6 12-Sep-24 7 12-Sep-24 8 l2-Sep-24 9 12-Sep-24'10 12-Sep-2411 12-Sep-24 12 12-Sep-24 13 12-Sep-24 14 12-Sep-24 15 12-Sep-24 16 12-Sep-24 17 12-Sep-24 18 12-Sep-24 19 12-Sep-2420 12-Sep-24 21 12-Sep-24 Run 7 16:24:00 16:25:00 16:26:00 16:27:0O 16:28:00 16:29:00 '16:30:00 16:31 :00 '16:32:00 16:33:00 16:34:00 16:35:00 16:36:00 16:37:00 '16:38:00 '16:39:OO 16:40:00 16:41 :00 '16:42:00 16:43:00 16:44:00 234 250 250 34 234. 250. 250. 266. 250. 297. 312. 359. 125. 391. 391 453 Run 1 12-Sep-24 16:45:00 500 2 12-Sep-24 16:46:00 5473 12-Sep-24 16:47:00 516.4 12-Sep-24 16:48:00 531 ,5 12-Sep-24 16:49:00 516.6 12-Sep-24 16:50:00 531.7 12-Sep-24 1 6:51 :00 547.6 12-Sep-24 16:52:00 547.9 12-Sep-24 16:53:00 562.10 12-Sep-24 1 6:54:00 562.11 12-Sep-24 16:55:00 797.12 12-Sep-24 16:56:00 542213 l2-Sep-24'16:57:00 13516.14 12-Sep-24 16:58:00 438.15 12-Sep-24 16:59:00 250.16 12-Sep-24 17:00:00 234.17 12-Sep-24 17:01:00 2O3. 1E 12-Sep-24 17:02:00 203.19 12-Sep-24'17:03:00 203.20 12-Sep-24 17:O4:OO 2O3. 21 l2-Sep-24 l7:05:00 2O3 Run 91 12-Sep-24 17:06:00 187.2 12-Sep-24 17'.O7:OO 172.3 12-Sep-24 17:08:00 1874 12-Sep-24 17:09:00 '187 5 12-Sep-24 17:10:00 187 6 12-Sep-24 17:11:00 2O3. 7 '12-Sep-24 17'.'12:OO 156. 8 12-Sep-24 17:13:00 187 .9 12-Sep-24 17:14:OO 18710 12-Sep-24 17:15:00 187 . 11 12-Sep-24'17:16:00 1E7 12 12-Sep-24 17'.17:0O 172 'I 3 12-Sep-24 17:1E:00 2O3'14 12-Sep-2417:19:00 18715 12-Sep-24 17:2O:OO '187. 16 12-Sep-24 17.2'l:OO '187.17 12-Sep-24 17:22.OO 18718 12-Sep-24 1 7:23:00 187 .19 12-Sep-24 17:24:OO '187 20 12-Sep-24 17'.25'.OO 172.21 12-Sep-24 17:26:00 187. un1 1 12-Sep-24'19:06:00 No Data 2 12-Sep-2419:07:00 No Data 3 12-Sep-24 19:08:00 No Data 4 12-Sep-24 19:09:00 No Data 5 12-Sep-24 19:10:00 No Data 6 12-Sep-24 19:'l 1:00 No Data 7 12-Sep-24 19:12:00 No Data 8 12-Sep-24 19:13:00 No Data 9 12-Sep-24 19:14:00 No Data 10 12-Sep-24 19:15:00 No Data 11 12-Sep-24 19:16:00 No Data 12 12-Sep-24 19:17:00 No Data 13 12-Sep-24 19:18:00 No Data 14 12-Sep-24 19:19:00 No Data 15 12-Sep-24 19:20:00 No Data 16 12-Sep-24 19:21:@ No Data 17 12-Sep-24 19:22:OO No Data'18 12-Sep-24 19:23:00 No Data 19 12-Sep-24 19:24:00 No Oata 20 12-Sep-24 19:25:00 No Oata 21 12-Sep-24 19:26:0O No Data Run'l'l 1 '12-Sep-24 19:06:00 No Data 2 12-Sep-24 19:07:00 No Data 3 12-Sep-24 19:08:00 No Data 4 12-Sep-24 19:09:00 No Data 5 12-Sep-24 19:10:00 No Data 6 12-Sep-24 19:11:00 No Data 7 12-Sep-24 19:12:00 No Data 8 12-Sep-24 19:13:00 No Data 9 12-Sep-24 19:14:00 No Data 10 12-Sep-24 19:15:00 No Data11 12-Sap-24 19:16:00 No Data 12 12-Sey24 1 9:1 7:00 No Data 13 12-Sep-24 19:18:00 No Data 14 12-Sep-24 19:19:00 No Data 15 12-Sep-24 19:20:00 No Data16 12-Sep-24 19:21:00 No Data 17 12-Sep-24 19'.22'.OO No Data 18 12-Sep-24 19:23:00 No Oata19 12-Sep-24 19:24:00 No Data 20 12-Sep-24 19:25:00 No Data21 12-Seo-2419:26:00 No Data Run 12 1 12-Sep-24 19:06:00 No Data 2 12-Sep-24 19:07:00 No Data 3 12-Sep-24 19:08:00 No Data 4 12-Sep-24 19:09:00 No Data 5 12-Sep-24 19:10:00 No Data 6 12-Sep-24 l9:1 1 :00 No Data 7 12-Sep-24 19:12:00 No Data 8 12-Sep-24 19:13:00 No Data 9 12-Sep-24 19:14:00 No Data'10 12-Sep-24 l9:15:00 No Data 1 1 12-Sep-24 19:'16:00 No Data 12 12-Sep-24 l9:17:00 No Data'13 12-Sep-24 19:18:00 No Data14 12-Sep-24 19:19:00 No Data 15 '12-Sep-24 19:20:00 No Data16 12-Sep-24 19:21:00 No Data 17 12-Sep-24 19:22:OO No Oata 18 l2-Sep-24 19:23:00 No Data 19 12-Sep-24 19:24:OO No Data 20 12-Sep-24 19:25:00 No Data21 12-Sep-24 '19:26:00 No Data 67 otTl 68 ofTl 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 '17 18 19 20 21 Run 1 2-Sep-24 09:55:00 lntf Shut 2-Sep-24 09:56:00 Intf Shut 2-Sep-24 09:57:00 lntf Shut 2-Sep-24 09:58:00 lntf Shut 2-Sep-24 09:59:00 lntf Shut 2-Sep-24 10:00:00 lntf Shut 2-Sep-24 10:01 :00 lntf Shut 2-Sep-24 10:02:00 lntf Shut 2-Sep-24 10:03:00 lntf Shut 2-Sep-24 10:04:00 lntf Shut 2-Sep-24 10:05:00 lntf Shut 2-Sep-24 10:06:00 lntf Shut 2-Sep-24 10:07:00 lntf Shut 2-Sep-24 10:08:00 lntf Shut 2-Sep-24 10:09:00 lntf Shut 2-Sep-24 10:10:00 2-Sep-24 '10:11:00 2-Sep-24 10:12:00 2-Sep-24 10:13:00 2-Sep-24 10:14:00 2-Sep-24 10:15:00 164.0C 683.0( 327.W 264.OC 245.0C 239.0C 1 12-Sep-2410:16:00 233.2 12-Sep-2410:17:00 245.3 12-Sep-24 10:18:004 12-Sep-24 10:19:005 12-Sep-2410:20:00 3146 1 2-Sep-24 10:21 :007 '12-Sep-24 1O:22:OO 327.8 12-Sep-2410:23:00 314.9 12-Sep-24 1O24:OO 37710 12-Sep-24 10:25:00 40811 12-Sep-2410:26:00 4112 12-Sep-24 1O:27:OO 427'13 12-Sep-24 10:28:00 45214 12-Sep-24 10:29:0015 12-Sep-24 10:30:00 452'16 12-Sep-24 '1 0:31 :00 48317 12-Sep-24 '10:32:00 5118 12-Sep-24 1 0:33:00 52719 12-Sep-24 10:34:00 52020 12-Sep-24 10:35:00 52721 12-Seo-24 10:36:00 527 1 12-Sep-2410:37:00 545.2 12-Sep-24 '10:38:00 52O.3 12-Sep-2410:39:00 520.4 12-Sep-2410:40:00 520.5 1 2-Sep-24 '10:41 :00 558.6 12-Sep-24 1O:42:OO 258.7 12-Sep-2410:43:00 740.8 12-Sep-24 10:44:00 620.9 12-Sep-2410:45:00 364.10 12-Sep-2410:46:00 220.11 12-Sep-2410:47:@ 195. 12 12-Sep-2410:48:00 195. 1 3 12-Sep-24 10:49:00 177 .14 12-Sep-2410:50:00 164.15 12-Sep-2410:51:00 145.16 12-Sep-2410:52:00 145.17 12-Sep-24 10:53:00 152.18 12-Sep-24 10:54:00 152.19 '12-Sep-24 10:55:00 152.20 12-Sep-24 10:56:00 145.21 12-Sep-24 10:57:00 145. 1 12-Sep-24 11:09:00 212-Sep-24'l 'l :10:00 312-Sep-24 1'1 :11:004 12-Sep-24 11:12OO 512-Sep-24 11:13:006 12-Sep-24 11:14:OO7 12-Sep-24 1 1 :1 5:00I 12-Sep-24 11:16:009 '12-Sep-24'11 17:AO10 12-Sep-24 1 1 :'1 8:0011 12-Sep-24 11:19:00'12 12-Sep-24'11:20:0013 12-Sep-24 11:21:OO14 12-Sep-24 11:22:OO15 12-Sep-24 11:23:0016 12-Sep-24 11.24:OO17 12-Sep-24 11:25:0018 12-Sep-24 11:26:0019 12-Sep-24 11:27:@20 12-Sep-24 11:28:0021 12-Seo-24 1't :29:00 264 245 245. 239 245 239 270 64 270 208 245 270 289 302 302 320 320 314 51 12-Sep-24'l 1:30:0O 414. 212-Sep-24 11:31 :@ 445.3 12-Sep-2411:32:OO 5084 12-Sep-24 11:33:00 539.5 12-Sep-24 11:34:00 5456 12-Sep-24 1 1 :35:00 558.7 12-Sep-2411:36:00 558.8 12-Sep-24 1 1 :37:00 5459 12-Sep-24 11:38:00 514.10 12-Sep-24 1 1:39:00 50811 12-Sep-24 1't:40:00 489 12 12-Sep-24 11:41 :00 47013 12-Sep-24 11:42:OO 5O214 12-Sep-24 11:43:00 53915 12-Sep-24 11 44OO 56416 12-Sep-2411:45:@ 533.0017 12-Sep-24 1 'l:46:00 514.0018 12-Sep-24 11:47:OO 502.0019 12-Sep-24 1 1 :4€l:00 514.0020 12-Sep-2411:49:00 502.0021 12-Sep-24 11:50:00 495.00 Run 61 12-Sep-24 1 1 :5't :00 495.2 12-Sep-24'l 'l :52:00 495.3 12-Sep-24 1'l :53:00 4774 12-Sep-24 11:54:00 47O.5 't2-Sep-24 1 1 :55:00 452.6 12-Sep-2411:56:00 4777 12-Sep-2411:57:00 5708 12-Sep-24 11 :58:00 658.9 12-Sep-2411:59:00 802. 1 0 12-Sep-24 12:00:00 93411 12-Sep-2412:01:0012 12-Sep-2412:O2:OO 208.13 12-Sep-24 12:03:00 114 12-Sep-24 12:O4:OO 18915 12-Sep-24 1 2:05:00 1 16 12-Sep-24 1 2:06:00 1 8317 12-Sep-24 12:O7:OO 118 12-Sep-24 1 2:08:00 1 9519 12-Sep-24 1 2:09:00 1 20'12-Sep-24'12:'10:00 121 12-Sep-24 12:11:OO 214 69 of71 545 539 539 533 533 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 12-Sep-24 12:22:OQ 12-Se9-24 12:23OQ 12-Sep-24 1224Oa 12-Sep-24 1225OO 12-Sep-24 12:26:00 12-Sep-24 12:27:OO 12-Sep-24 12:28:OO 12-Sep-24 1229OO 12-Sep-24 12:30:00 12-Sep-24 12:31 :00 12-Sep-24 1232:OO 12-Sep-24 12:33:00 12-Sep-24 1234OO 12-Sep-24 12:35:00 12-Sep-24'12:36:00 12-Sep-24 1237:OO 12-Sep-2412:38:00 12-Sep-24 12:39:00 12-Sep-24 124OOO 12-Sep-24 12:41:OO 12-Sep-24 1242OO 539 564 608 164 470 608 61 4. 627 727 934 1',t46 302 245 Run 81 12-Sep-2412:43:OO 220.q. 2 12-Sep-2412:44:OO 2O2.U3 12-Sep-2412:45:OO 183.0(4 12-Sep-24 1 2:46:00 183.0(5 12-Sep-2412:47:OO 170.0(6 12-Sep-24 12at8OO 177.q.7 12-Sep-24 1249@ 164.0(8 12-Sep-24'12:50:00 158.0(9 12-Sep-24 1 2:51 :00 170.0(10 12-Sep-24 12:52:QO 164.ff 11 12-Sep-24 I 2:53:00 164.0(12 '12-Sep-24 1254@ 170.0C13 12-Sep-24 12:55:00 177.0C14 12-Sep-24 1 2:56:00 183.ff 15 12-Sep-24 12:57:OO 183.0( 1 6 12-Sep-24 1 2:58:00 189.0C17 '12-Sep-24 1 2:59:00 183.0('18 12-Sep-24 13:00:00 208.0(19 12-Sep-24 13:01:00 252.ff.20 12-Sep-24 13:02:00 277.OC21 12-Sep-24 '13:03:00 295.0( Run 91 12-Sep-24 '13:04:00 302.0C2 12-Sep-24 13:05:00 327.U3 12-Sep-24'13:06:00 327.0C4 12-Sep-24 13:07:00 320.0C5 12-Sep-2413:08:00 314.0(6 12-Sep-24 13:09:00 333.0C7 '12-Sep-24 1 3:'l 0:00 352.0CI 12-Sep-24 13:11:00 133.0C9 12-Sep-24'13:12:00 358.0C 1 0 12-Sep-24 '1 3:'1 3:00 364.0C 1 1 12-Sep-24 1 3:1 4:00 445.0C12 12-Sep-24 13:'15:00 539.0C13 12-Sep-24 13:'16:00 595.0C14 12-Sep-24'13:17:00 3659.0C't5 12-Sep-24 13:'18:00 12777.0C16 12-Sep-24 '13:'19:00 6480.0C17 12-Sep-24 13:20:00 896.0C18 12-Sep-24 13:21:00 639.0C19 12-Sep-24 1322:OO 514.0C20 12-Sep-2413:23:00 433.0C21 12-Seo-24 13:24:00 377.0C Run 121 13-Sep-24'10:00:00 577.OC2 1 3-Sep-24 10:01 :00 602.0C3 13-Sep-24 10:02:00 658.0C4 13-Sep-24 10:03:00 727.0C 5'13-Sep-2410:04:00 7O2.U6 '13-Sep-24 10:05:00 677.OC7 13-Sep-2410:06:@ 220.X8 13-Sep-2410:07:00 164.0C9 13-Sep-2410:08:00 164.0C10 13-Sep-2410:09:00 139.0(1'l 13-Sep-24't0:10:00 127.OC12 '13-Sep-24't0:'t 't :00 12O.N,13 13-Sep-24'10:12:00 120.0C14 13-Sep-24't0:13:00 120.0C15 13-Sep-24 '10:'14:00 108.0C16 13-Sep-24 10:15:00 102.0C17 1lSep-24 10:16:00 102.0C18 13-Sep-24 10:'17:00 102.0C19 13-Sep-24 '10:'18:00 95.0C20 13-Sep-2410:19:00 102.0(21 13-Sep-24 10:20:00 95.0C Run 101 13-Sep-24 09:18:002 'l}.Sep-24 09:19:003 13-Sep-24 09:20:004 13-Sep-24 09:21 :005 13-Sep-24 09:22:006 '13-Sep-24 09:23:007 13-Sep-24 09:24:008 '13-Sep-24 09:25:009 13-Sep-24 09:26:0010 13Sep-24 09:27:0011 1lSep-24 09:28:0012 1lSep-24 09:29:@13 13Sep-24 09:30:0014 1lSep-24 09:31 :0015 13Sep-24 09:32:0016 1lSep-24 09:33:0017 '13Sep-24 09:34:0018 llSep-24 09:35:00 19 1lSep-24 09:36:0020 1lSep-24 09:37:00 514 477 489 427 1 08. 21 1lSep-24 09:38:00 427. 502 520 358. 252. 239. 252. 258. 233. I1 13-Sep-24 09:39:00 4392 13-Sep-24 09:40:00 4583 '13-Sep-24 09:41 :00 452.4 13-Sep-24 09:42:00 4455 13-Sep-24 09:43:00 445.6 13-Sep-24 09:44:00 4587 13-Sep-24 09:45:00 458.8 13-Sep-24 09:46:00 4649 13-Sep-24 09:47:00 458.10 13-Sep-2409:48:@ 452 1 1 13-Sep-24 09:49:00 43912 13-Sep-24 09:50:00 439 13 13-Sep-24 09:51 :00 414.OO14 13-Sep-24 09:52:00 408'15 '13-Sep-24 09:53:0O 402.@16 13-Sep-24 09:54:00 439.0017 1lSep-24 O9:55:@ 433.0018 13-Sep-24 09:56:00 452.0019 13-Sep-24 09:57:00 489.0020 13-Sep-24 09:58:OO 520.0021 13-Sep-24 09:59:00 558.00 OcT - 8 2024 UTAH DEPARTMENT OF DIVISION OF AIR OUALITY 7l ofTl Tesoro VRU A RATA RM 25B (Tested 9-12-2024) Reference Methods 25 A & B Compromised Source Information Company Name Tesoro Logistics Operations LLC Truck Loading Rack - VRU A Company Contact:Sergio Ibarra Contact Phone No.(801) 336-2086 Point Source:Tesoro Logistics Operations LLC Test & Review Dates Test Date:9/12/2024 Tabs Are Shown Review Date: 3/12/2025 Observer:Not Observed Reviewer:Rob Leishman Emission Limits Emission Rates VOC VOC mg/L gas 10.0000 11000.0 lbs./hr. %O2 Correction as a whole # Test Information Equivalent Diameter (in.)As ft^2 Y Dl H @ Cp Pbar Pq (static) Ps Stack Pressure FALSE 0 Contractor Information Contact:Austin Keough Contracting Company: Alliance Source Testing Address: 2855S 500 W Sutie A, Salt Lake City, Utah 84115 Phone No.: (385) 722-6712 Btu/hr Selected Project No.: Division of Air Quality Instrumental Reference Methods - Gaseous Measurements ppm Method 19 - F factors for Coal, Oil, and Gas Fd Fw Fc dscf/MMBtu wscf/MMBtu scf/MMBtu Diluent F factor used O2 CO2 Anthracite 2 Bituminous 2 Lignite Natural Propane Butane 10100 COAL OIL GAS 9780 9860 9190 8710 8710 8710 10540 10640 11950 320 10610 10200 10390 1970 1800 1910 1420 1040 1190 1250 Wet CEM Correct For O2 Yes Yes Tesoro VRU A RATA RM 25B (Tested 9-12-2024) D$I$v$I$s$I$on of A$I$r Qual$I$ty NSPS Relat$I$ve Accuracy Performance Spec$I$f$I$cat$I$on Test - CEMS Cert$I$f$I$cat$I$on Tesoro Logistics Operations LLC Truck Loading Rack - VRU A Tesoro Logistics Operations LLC VOC/THC Analyzer:John Zink IR-85000DC Serial No.:5484 O2 Analyzer:Serial No.: Acquisition System:Serial No.: Acquisition System: Serial No.: Equivalent Emission Limit:11000 I & J Test Date VOC Dry VOC Test Date % O2 Dry 9/12/2024 ppm lbs/hr 9/30/2014 RM CEMS Diff Run#Start Time End Time RM CEMS Diff RM CEMS Diff Run# Start Time End Time %c %c 1 11:55 12:16 Y 371.49 420.2 -48.71 1 11:55 12:16 2 12:16 12:37 Y 363.63 337 26.63 2 12:16 12:37 3 12:37 12:58 Y 259.80 209.9 49.90 3 12:37 12:58 4 13:09 13:30 Y 231.86 364.6 -132.74 4 13:09 13:30 5 13:29 13:50 Y 193.14 368.1 -174.96 5 13:29 13:50 6 13:50 14:11 Y 297.41 517.1 -219.69 6 13:50 14:11 7 14:24 14:45 Y 165.13 283.5 -118.37 7 14:24 14:45 8 14:45 15:06 Y 1025.75 1287.2 -261.45 8 14:45 15:06 9 15:06 15:27 Y 101.36 184.9 -83.54 9 15:06 15:27 10 10 11 11 12 12 13 13 14 14 15 15 16 16 Average = 334.4 441.39 106.99 Average = Sd Standard Deviation = 105.11 Sd Standard Deviation = Sd Standard Deviation = Confidence Coefficient = 80.80 Confidence Coefficient = Confidence Coefficient = RA - Relative Accuracy =56.20%RA RA - Relative Accuracy = n = 9 0 n = 0 or RA of 1% t0.975 = 2.306 t0.975 = E.L. Relative Accuracy = 1.71% a For steam generators;b Average of three samples; c Make sure that RM and M data are on a consistent basis either wet or dry. 40 CFR 60 Performance Specification 2 For SO2 and NOx Continuous Emission Monitoring Systems 13.2 Relative accuracy Performance Specification. The RA of the CEMSS must be not greater than 20 percent when RM is used in the denominator of Eq. 2-6 (average emissions during test are greater than 50 percent of the emission standard)or 10 percent when the applicable emission standard is used in the denominator of Eq. 2-6 (average emissions during test are less than 50 percent of the emission standard). Up dated January 17, 2006 40 CFR 60 Performance Specification 3 For O2 and CO2 Continuous Emission Monitoring Systems 13.2 CEMS Relative Accuracy Perfromance Specification. The RA of the CEMS must be no grater than 20 percent of the mean value of the reference method (RM) data. 1 percent O2 or CO2. The results are also acceptable if the absolute value of the difference between the mean RM value and the mean CEMS value is less than or equal to 1.0 percent O2 (or CO2). Up dated September 14, 2016 40 CFR 60 Performance Specification 6 For Continuous Emission Rate Monitoring Systems (CERMS) 13.2 CERMS Relative Accuracy. The RA of the CERMS shall be no greater than 20 percent of the mean value of the RM's test data in terms of the nits of the emission standard, or 10 percent of the applicable standard, which err is greater. Up dated January 17, 2006 Ac t i v a t e R u n ? Ac t i v a t e R u n ? Ac t i v a t e R u n ? Passed Tesoro VRU A RATA RM 25B (Tested 9-12-2024) Tesoro VRU A RATA RM 25B (Tested 9-12-2024) State of Utah CalError Page 5 VOC K3 (Propane)O2 Span Value 10,000.00 Span Value Units ppm Units % Cylinder No. Expiration Date Cylinder Value: Response Difference CAL. ERROR Status Cylinder No. Expiration Date Cylinder Value:Response Difference CAL. ERROR Status Zero Gas 0.00 0.42 0.42 0.00%Passed Cal.Zero Gas Low-level Cal. Gas 3,000.00 3,000.57 0.57 0.01%Passed Cal.Mid-level Cal. Gas Mid-level Cal. Gas 5,000.00 5,000.13 0.13 0.00%Passed Cal.High-level Cal. Gas High-level Cal. Gas 8,560.00 8,562.17 2.17 0.02%Passed Cal. <0.25% of span value Zero Gas <0.10% of span value Zero Gas 0.00%40 to 60% of span value Low-level Cal. Gas 25 to 35% of span value Low-level Cal. Gas 30.00%80 to 100% of span value Mid-level Cal. Gas 45 to 55% of span value Mid-level Cal. Gas 50.00% 80 to 90% of span value High-level Cal. Gas 85.60% VOC K4 (Butane)CO2 Span Value Span Value Units ppm Units % Cylinder No. Expiration Date Cylinder Value: Response Difference CAL. ERROR Status Cylinder No. Expiration Date Cylinder Value:Response Difference CAL. ERROR Status Zero Gas Zero Gas Low-level Cal. Gas Mid-level Cal. Gas Mid-level Cal. Gas High-level Cal. Gas High-level Cal. Gas <0.25% of span value Zero Gas <0.10% of span value Zero Gas 40 to 60% of span value Low-level Cal. Gas 25 to 35% of span value Low-level Cal. Gas 80 to 100% of span value Mid-level Cal. Gas 45 to 55% of span value Mid-level Cal. Gas 80 to 90% of span value High-level Cal. Gas 0.00 VOC K2 (Ethane) 0.00 Span Value 0.00 Units ppm Cylinder No. Expiration Date Cylinder Value: Response Difference CAL. ERROR Status Zero Gas Low-level Cal. Gas Mid-level Cal. Gas High-level Cal. Gas <0.10% of span value Zero Gas 25 to 35% of span value Low-level Cal. Gas 45 to 55% of span value Mid-level Cal. Gas 80 to 90% of span value High-level Cal. Gas Page 5 Tesoro VRU A RATA RM 25B (Tested 9-12-2024) Division of Air Quality NSPS Relative Accuracy Performance Specification Test - CEMS Certification Tesoro Logistics Operations LLC Truck Loading Rack - VRU A Tesoro Logistics Operations LLC Average Emission Dry VOC (Propane) VOC (Butane) VOC (Ethane)Average % concentration lbs./hr.CO2 O2 ppm 334.40 Run 1 Dry VOC (Propane) VOC (Butane) VOC (Ethane) Molecular Weight 44.1 58.1 30.1 Qs dscf min CO2 O2 ppm 371.49 lbs/hr #VALUE! Run 2 Dry VOC (Propane) VOC (Butane) VOC (Ethane) Molecular Weight 44.1 58.1 30.1 Qs dscf min CO2 O2 ppm 363.63 lbs/hr #VALUE! Run 3 Dry VOC (Propane) VOC (Butane) VOC (Ethane) Molecular Weight 44.1 58.1 30.1 Qs dscf min CO2 O2 ppm 259.80 lbs/hr #VALUE! Run 4 Dry VOC (Propane) VOC (Butane) VOC (Ethane) Molecular Weight 44.1 58.1 30.1 Qs dscf min CO2 O2 ppm 231.86 lbs/hr #VALUE! Run 5 Dry VOC (Propane) VOC (Butane) VOC (Ethane) Molecular Weight 44.1 58.1 30.1 Qs dscf min CO2 O2 ppm 193.14 lbs/hr #VALUE! Run 6 Dry VOC (Propane) VOC (Butane) VOC (Ethane) Molecular Weight 44.1 58.1 30.1 Qs dscf min CO2 O2 ppm 297.41 lbs/hr #VALUE! Corrected Value Raw Value mg/Liter of gasoline Corrected Value Corrected Value Raw Value Corrected Value Raw Value Corrected Value Raw Value Raw Value Corrected Value Raw Value Wet CEM Yes Correct For O2 Yes Tesoro VRU A RATA RM 25B (Tested 9-12-2024) Division of Air Quality NSPS Relative Accuracy Performance Specification Test - CEMS Certification Tesoro Logistics Operations LLC Truck Loading Rack - VRU A Tesoro Logistics Operations LLC Wet CEM Yes Correct For O2 Yes Run 7 Dry VOC (Propane) VOC (Butane) VOC (Ethane) Molecular Weight 44.1 58.1 30.1 Qs dscf min CO2 O2 ppm 165.13 lbs/hr #VALUE! Run 8 Dry VOC (Propane) VOC (Butane) VOC (Ethane) Molecular Weight 44.1 58.1 30.1 Qs dscf min CO2 O2 ppm 1025.75 lbs/hr #VALUE! Run 9 Dry VOC (Propane) VOC (Butane) VOC (Ethane) Molecular Weight 44.1 58.1 30.1 Qs dscf min CO2 O2 ppm 101.36 lbs/hr #VALUE! Run 10 Dry VOC (Propane) VOC (Butane) VOC (Ethane) Molecular Weight 44.1 58.1 30.1 Qs dscf min CO2 O2 ppm lbs/hr Run 11 Dry VOC (Propane) VOC (Butane) VOC (Ethane) Molecular Weight 44.1 58.1 30.1 Qs dscf min CO2 O2 ppm lbs/hr Run 12 Dry VOC (Propane) VOC (Butane) VOC (Ethane) Molecular Weight 44.1 58.1 30.1 Qs dscf min CO2 O2 ppm lbs/hr Run 13 Dry VOC (Propane) VOC (Butane) VOC (Ethane) Molecular Weight 44.1 58.1 30.1 Qs dscf min CO2 O2 ppm lbs/hr Corrected Value Corrected Value Corrected Value Raw Value Corrected Value Raw Value Corrected Value Raw Value Corrected Value Raw Value Raw Value Corrected Value Raw Value Raw Value Tesoro VRU A RATA RM 25B (Tested 9-12-2024) Division of Air Quality NSPS Relative Accuracy Performance Specification Test - CEMS Certification Tesoro Logistics Operations LLC Truck Loading Rack - VRU A Tesoro Logistics Operations LLC Wet CEM Yes Correct For O2 Yes Run 14 Dry VOC (Propane) VOC (Butane) VOC (Ethane) Molecular Weight 44.1 58.1 30.1 Qs dscf min CO2 O2 ppm lbs/hr Run 15 Dry VOC (Propane) VOC (Butane) VOC (Ethane) Molecular Weight 44.1 58.1 30.1 Qs dscf min CO2 O2 ppm lbs/hr Run 16 Dry VOC (Propane) VOC (Butane) VOC (Ethane) Molecular Weight 44.1 58.1 30.1 Qs dscf min CO2 O2 ppm lbs/hr Corrected Value Raw Value Corrected Value Raw Value Corrected Value Raw Value Tesoro VRU B RATA RM 25B (Tested 9-12-2024) Reference Methods 25 A & B Compromised Source Information Company Name Tesoro Logistics Operations LLC Truck Loading Rack - VRU B Company Contact:Sergio Ibarra Contact Phone No.(801) 336-2086 Point Source:Tesoro Logistics Operations LLC Test & Review Dates Test Date:9/12/2024 Tabs Are Shown Review Date: 3/12/2024 Observer:Not Observed Reviewer:Rob Leishman Emission Limits Emission Rates VOC VOC mg/L gas 10.0000 11000.0 lbs./hr. %O2 Correction as a whole # Test Information Equivalent Diameter (in.)As ft^2 Y Dl H @ Cp Pbar Pq (static) Ps Stack Pressure FALSE 0 Contractor Information Contact:Austin Keough Contracting Company: Alliance Source Testing Address: 2855S 500 W Sutie A, Salt Lake City, Utah 84115 Phone No.: (385) 722-6712 Btu/hr Selected Project No.: Division of Air Quality Instrumental Reference Methods - Gaseous Measurements ppm Method 19 - F factors for Coal, Oil, and Gas Fd Fw Fc dscf/MMBtu wscf/MMBtu scf/MMBtu Diluent F factor used O2 CO2 Anthracite 2 Bituminous 2 Lignite Natural Propane Butane 10100 COAL OIL GAS 9780 9860 9190 8710 8710 8710 10540 10640 11950 320 10610 10200 10390 1970 1800 1910 1420 1040 1190 1250 Wet CEM Correct For O2 Yes Yes Tesoro VRU B RATA RM 25B (Tested 9-12-2024) D$I$v$I$s$I$on of A$I$r Qual$I$ty NSPS Relat$I$ve Accuracy Performance Spec$I$f$I$cat$I$on Test - CEMS Cert$I$f$I$cat$I$on Tesoro Logistics Operations LLC Truck Loading Rack - VRU B Tesoro Logistics Operations LLC VOC/THC Analyzer:John Zink IR-84000DC Serial No.:5485 O2 Analyzer:Serial No.: Acquisition System:Serial No.: Acquisition System: Serial No.: Equivalent Emission Limit:11000 I & J Test Date VOC Dry VOC Test Date % O2 Dry 9/12/2024 ppm lbs/hr 9/30/2014 RM CEMS Diff Run#Start Time End Time RM CEMS Diff RM CEMS Diff Run# Start Time End Time %c %c 1 8:16 8:37 Y 362.32 398.4 -36.08 1 8:16 8:37 2 8:37 8:58 Y 235.57 315.8 -80.23 2 8:37 8:58 3 9:09 9:30 Y 186.15 267.9 -81.75 3 9:09 9:30 4 9:30 9:51 301.91 512.3 4 9:30 9:51 5 9:51 10:12 Y 312.81 415.4 -102.59 5 9:51 10:12 6 10:22 10:43 Y 394.81 568.4 -173.59 6 10:22 10:43 7 10:43 11:04 Y 49.91 193.9 -143.99 7 10:43 11:04 8 11:04 11:25 1038.06 1451.6 8 11:04 11:25 9 7:18 7:39 Y 331.32 378.5 -47.18 9 7:18 7:39 10 7:39 8:00 94.41 453.4 10 7:39 8:00 11 8:00 8:21 Y 328.29 277.3 50.99 11 8:00 8:21 12 12 13 13 14 14 15 15 16 16 Average = 275.1 351.95 76.80 Average = Sd Standard Deviation = 69.13 Sd Standard Deviation = Sd Standard Deviation = Confidence Coefficient = 57.80 Confidence Coefficient = Confidence Coefficient = RA - Relative Accuracy =48.90%RA RA - Relative Accuracy = n = 8 0 n = 0 or RA of 1% t0.975 = 2.365 t0.975 = E.L. Relative Accuracy = 1.22% a For steam generators;b Average of three samples; c Make sure that RM and M data are on a consistent basis either wet or dry. 40 CFR 60 Performance Specification 2 For SO2 and NOx Continuous Emission Monitoring Systems 13.2 Relative accuracy Performance Specification. The RA of the CEMSS must be not greater than 20 percent when RM is used in the denominator of Eq. 2-6 (average emissions during test are greater than 50 percent of the emission standard)or 10 percent when the applicable emission standard is used in the denominator of Eq. 2-6 (average emissions during test are less than 50 percent of the emission standard). Up dated January 17, 2006 40 CFR 60 Performance Specification 3 For O2 and CO2 Continuous Emission Monitoring Systems 13.2 CEMS Relative Accuracy Perfromance Specification. The RA of the CEMS must be no grater than 20 percent of the mean value of the reference method (RM) data. 1 percent O2 or CO2. The results are also acceptable if the absolute value of the difference between the mean RM value and the mean CEMS value is less than or equal to 1.0 percent O2 (or CO2). Up dated September 14, 2016 40 CFR 60 Performance Specification 6 For Continuous Emission Rate Monitoring Systems (CERMS) 13.2 CERMS Relative Accuracy. The RA of the CERMS shall be no greater than 20 percent of the mean value of the RM's test data in terms of the nits of the emission standard, or 10 percent of the applicable standard, which err is greater. Up dated January 17, 2006 Ac t i v a t e R u n ? Ac t i v a t e R u n ? Ac t i v a t e R u n ? Passed Tesoro VRU B RATA RM 25B (Tested 9-12-2024) Tesoro VRU B RATA RM 25B (Tested 9-12-2024) State of Utah CalError Page 5 VOC K3 (Propane)O2 Span Value 10,000.00 Span Value Units ppm Units % Cylinder No. Expiration Date Cylinder Value: Response Difference CAL. ERROR Status Cylinder No. Expiration Date Cylinder Value:Response Difference CAL. ERROR Status Zero Gas 0.00 0.42 0.42 0.00%Passed Cal.Zero Gas Low-level Cal. Gas 3,000.00 3,000.57 0.57 0.01%Passed Cal.Mid-level Cal. Gas Mid-level Cal. Gas 5,000.00 5,000.13 0.13 0.00%Passed Cal.High-level Cal. Gas High-level Cal. Gas 8,560.00 8,562.17 2.17 0.02%Passed Cal. <0.25% of span value Zero Gas <0.10% of span value Zero Gas 0.00%40 to 60% of span value Low-level Cal. Gas 25 to 35% of span value Low-level Cal. Gas 30.00%80 to 100% of span value Mid-level Cal. Gas 45 to 55% of span value Mid-level Cal. Gas 50.00% 80 to 90% of span value High-level Cal. Gas 85.60% VOC K4 (Butane)CO2 Span Value Span Value Units ppm Units % Cylinder No. Expiration Date Cylinder Value: Response Difference CAL. ERROR Status Cylinder No. Expiration Date Cylinder Value:Response Difference CAL. ERROR Status Zero Gas Zero Gas Low-level Cal. Gas Mid-level Cal. Gas Mid-level Cal. Gas High-level Cal. Gas High-level Cal. Gas <0.25% of span value Zero Gas <0.10% of span value Zero Gas 40 to 60% of span value Low-level Cal. Gas 25 to 35% of span value Low-level Cal. Gas 80 to 100% of span value Mid-level Cal. Gas 45 to 55% of span value Mid-level Cal. Gas 80 to 90% of span value High-level Cal. Gas 0.00 VOC K2 (Ethane) 0.00 Span Value 0.00 Units ppm Cylinder No. Expiration Date Cylinder Value: Response Difference CAL. ERROR Status Zero Gas Low-level Cal. Gas Mid-level Cal. Gas High-level Cal. Gas <0.10% of span value Zero Gas 25 to 35% of span value Low-level Cal. Gas 45 to 55% of span value Mid-level Cal. Gas 80 to 90% of span value High-level Cal. Gas Page 5 Tesoro VRU B RATA RM 25B (Tested 9-12-2024) Division of Air Quality NSPS Relative Accuracy Performance Specification Test - CEMS Certification Tesoro Logistics Operations LLC Truck Loading Rack - VRU B Tesoro Logistics Operations LLC Average Emission Dry VOC (Propane) VOC (Butane) VOC (Ethane)Average % concentration lbs./hr.CO2 O2 ppm 330.51 Run 1 Dry VOC (Propane) VOC (Butane) VOC (Ethane) Molecular Weight 44.1 58.1 30.1 Qs dscf min CO2 O2 ppm 362.32 lbs/hr #VALUE! Run 2 Dry VOC (Propane) VOC (Butane) VOC (Ethane) Molecular Weight 44.1 58.1 30.1 Qs dscf min CO2 O2 ppm 235.57 lbs/hr #VALUE! Run 3 Dry VOC (Propane) VOC (Butane) VOC (Ethane) Molecular Weight 44.1 58.1 30.1 Qs dscf min CO2 O2 ppm 186.15 lbs/hr #VALUE! Run 4 Dry VOC (Propane) VOC (Butane) VOC (Ethane) Molecular Weight 44.1 58.1 30.1 Qs dscf min CO2 O2 ppm 301.91 lbs/hr #VALUE! Run 5 Dry VOC (Propane) VOC (Butane) VOC (Ethane) Molecular Weight 44.1 58.1 30.1 Qs dscf min CO2 O2 ppm 312.81 lbs/hr #VALUE! Run 6 Dry VOC (Propane) VOC (Butane) VOC (Ethane) Molecular Weight 44.1 58.1 30.1 Qs dscf min CO2 O2 ppm 394.81 lbs/hr #VALUE! Corrected Value Raw Value mg/Liter of gasoline Corrected Value Corrected Value Raw Value Corrected Value Raw Value Corrected Value Raw Value Raw Value Corrected Value Raw Value Wet CEM Yes Correct For O2 Yes Tesoro VRU B RATA RM 25B (Tested 9-12-2024) Division of Air Quality NSPS Relative Accuracy Performance Specification Test - CEMS Certification Tesoro Logistics Operations LLC Truck Loading Rack - VRU B Tesoro Logistics Operations LLC Wet CEM Yes Correct For O2 Yes Run 7 Dry VOC (Propane) VOC (Butane) VOC (Ethane) Molecular Weight 44.1 58.1 30.1 Qs dscf min CO2 O2 ppm 49.91 lbs/hr #VALUE! Run 8 Dry VOC (Propane) VOC (Butane) VOC (Ethane) Molecular Weight 44.1 58.1 30.1 Qs dscf min CO2 O2 ppm 1038.06 lbs/hr #VALUE! Run 9 Dry VOC (Propane) VOC (Butane) VOC (Ethane) Molecular Weight 44.1 58.1 30.1 Qs dscf min CO2 O2 ppm 331.32 lbs/hr #VALUE! Run 10 Dry VOC (Propane) VOC (Butane) VOC (Ethane) Molecular Weight 44.1 58.1 30.1 Qs dscf min CO2 O2 ppm 94.41 lbs/hr #VALUE! Run 11 Dry VOC (Propane) VOC (Butane) VOC (Ethane) Molecular Weight 44.1 58.1 30.1 Qs dscf min CO2 O2 ppm 328.29 lbs/hr #VALUE! Run 12 Dry VOC (Propane) VOC (Butane) VOC (Ethane) Molecular Weight 44.1 58.1 30.1 Qs dscf min CO2 O2 ppm lbs/hr Run 13 Dry VOC (Propane) VOC (Butane) VOC (Ethane) Molecular Weight 44.1 58.1 30.1 Qs dscf min CO2 O2 ppm lbs/hr Corrected Value Corrected Value Corrected Value Raw Value Corrected Value Raw Value Corrected Value Raw Value Corrected Value Raw Value Raw Value Corrected Value Raw Value Raw Value Tesoro VRU B RATA RM 25B (Tested 9-12-2024) Division of Air Quality NSPS Relative Accuracy Performance Specification Test - CEMS Certification Tesoro Logistics Operations LLC Truck Loading Rack - VRU B Tesoro Logistics Operations LLC Wet CEM Yes Correct For O2 Yes Run 14 Dry VOC (Propane) VOC (Butane) VOC (Ethane) Molecular Weight 44.1 58.1 30.1 Qs dscf min CO2 O2 ppm lbs/hr Run 15 Dry VOC (Propane) VOC (Butane) VOC (Ethane) Molecular Weight 44.1 58.1 30.1 Qs dscf min CO2 O2 ppm lbs/hr Run 16 Dry VOC (Propane) VOC (Butane) VOC (Ethane) Molecular Weight 44.1 58.1 30.1 Qs dscf min CO2 O2 ppm lbs/hr Corrected Value Raw Value Corrected Value Raw Value Corrected Value Raw Value