HomeMy WebLinkAboutDAQ-2025-001222131
Where:
X = grams/kW-hr rate for each generator (recorded by CEM)
K = total kW-hr generated by the generator each day (recorded by output meter) D =
daily output of pollutant in lbs/day
iii. All engines shall be catalytic-controlled as outlined in IX.H.11.h.
H.21. General Requirements: Control Measures for Area and Point Sources, Emission Limits
and Operating Practices, Regional Haze Requirements
a. Except as otherwise outlined in individual conditions of this Subsection IX.H.21 listed
below, the terms and conditions of this Subsection IX.H.21 shall apply to all sources
subsequently addressed in Subsection IX.H.22. Should any inconsistencies exist
between these two subsections, the source specific conditions listed in IX.H.22
shall take precedence.
b. The definitions contained in R307-101-2, Definitions and R307-170-4,
Definitions, apply to Section IX, Part H. In addition, the following definition also
applies to Section IX, Part H.21 and 22:
Boiler operating day means a 24-hour period between 12 midnight and the following
midnight during which any fuel is combusted at any time in the boiler. It is not
necessary for fuel to be combusted for the entire 24-hour period.
c. The terms and conditions of R307-107-1 and R307-107-2 shall apply to
all sources subsequently addressed in Subsection IX.H.22.
d. Any information used to determine compliance shall be recorded for all periods when the
source is in operation, and such records shall be kept for a minimum of five years. All
records required by IX.H.21.c shall be kept for a minimum of five years. Any or all of
131
these records shall be made available to the Director upon request.
e. All emission limitations listed in Subsections IX.H.22 shall apply at all times, unless
otherwise specified in the source specific conditions listed in IX.H.22. Each source
shall submit a report of any deviation from the applicable requirements of Subsection
IX.H,
including those attributable to upset conditions, the probable cause of such deviations, and
any corrective actions or preventive measures taken. The report shall be submitted to the
Director no later than 24-months following the deviation, or earlier, as specified by an
underlying applicable requirement. Deviations due to breakdowns shall be reported
according to the breakdown provisions of R307-107.
f. Stack Testing:
i. As applicable, stack testing to show compliance with the emission limitations for the
sources in Subsection IX.H.22 shall be performed in accordance with the
following:
A. Sample Location: The testing point shall be designed to conform to the
requirements of 40 CFR 60, Appendix A, Method 1, or the most recent version
of the EPA- approved test method if approved by the Director.
B. Volumetric Flow Rate: 40 CFR 60, Appendix A, Method 2, or the most
recent version of the EPA-approved test method if approved by the
Director.
C. Particulate (PM): 40 CFR 60, Appendix A, Method 5B, or the most recent version
131
of the EPA-approved test method if approved by the Director. A test shall consist
of three runs, with each run at least 120 minutes in duration and each run
collecting a minimum sample of 60 dry standard cubic feet. The back half
condensables shall also be tested using Method 202. The back half condensables
shall not be used for compliance demonstration but shall be used for inventory
purposes.
D. Calculations: To determine mass emission rates (lb/hr, etc.) the
pollutant concentration as determined by the appropriate methods above shall be
multiplied by the volumetric flow rate and any necessary conversion factors to give
the results
in the specified units of the emission limitation.
E. A stack test protocol shall be provided at least 30 days prior to the test.
A pretest conference shall be held if directed by the Director.
g. Continuous Emission and Opacity Monitoring.
i. For all continuous monitoring devices, the following shall apply:
A. Except for system breakdown, repairs, calibration checks, and zero and span
adjustments required under paragraph (d) 40 CFR 60.13, the owner/operator of
an affected source shall continuously operate all required continuous
monitoring systems and shall meet minimum frequency of operation
requirements as outlined in R307-170 and 40 CFR 60.13.
B. The monitoring system shall comply with all applicable sections of R307-170;
40 CFR 13; and 40 CFR 60, Appendix B – Performance Specifications.
131
C. For any hour in which fuel is combusted in the unit, the owner/operator of
each unit shall calculate the hourly average NOx concentration in
lb/MMBtu.
D. At the end of each boiler operating day, the owner/operator shall calculate and
record a new 30-day rolling average emission rate in lb/MMBtu from the
arithmetic average of all valid hourly emission rates from the CEMS for the
current boiler operating day and the previous 29 successive boiler operating
days.
E. An hourly average NOx emission rate in lb/MMBtu is valid only
if the minimum number of data points, as specified in R307-
170, is acquired by the owner/operator for both the pollutant
concentration monitor (NOx) and the diluent monitor (O2 or
CO2).
H.22 Source Specific Emission Limitations: Regional Haze
Requirements, Best Available Retrofit Technology
a. PacifiCorp Hunter
i. Particulate Limitations on Units #1 and #2
A. Emissions of particulate (PM) shall not exceed 0.015 lb/MMBtu
heat input from each boiler based on a 3-run test average.
B. Stack testing for the emission limitation shall be performed each year on
each boiler.
C. Monitoring for PM shall be conducted in accordance with the compliance
assurance monitoring requirements of 40 CFR 64 as detailed in the
source’s operating permit.
ii. NOx Limitations on Units #1 and #2
A. Emissions of NOx from each boiler shall not exceed 0.26 lb/MMBtu
heat input for a 30-day rolling average.
131
B. Measuring of all NOx emissions shall be performed by CEM.
iii. NOx Limitation on Unit #3
A. Emissions of NOx shall not exceed 0.34 lb/MMBtu heat input for a
30- day rolling average.
B. Measuring of all NOx emissions shall be performed by CEM.
b. PacifiCorp Huntington
i. Particulate Limitations on Units #1 and #2
A. Emissions of particulate (PM) shall not exceed 0.015 lb/MMBtu
heat input from each boiler based on a 3-run test average.
B. Stack testing for the emission limitation shall be performed each year on
each boiler.
C. Monitoring for PM shall be conducted in accordance with the compliance
assurance monitoring requirements of 40 CFR 64 as detailed in the
source’s operating permit.
ii. NOx Limitations on Units #1 and #2
A. Emissions of NOx from each boiler shall not exceed 0.26 lb/MMBtu
heat input for a 30-day rolling average.
B. Measuring of all NOx emissions shall be performed by CEM.
c. PacifiCorp Carbon
i. Conditions on Units #1 and #2
A. The owner/operator shall permanently close and cease operation of
Carbon units #1 and #2 by August 15, 2015. The owner/operator
shall notify the Director of the permanent closure of the Carbon Plant
by no later than September 15, 2015.
B. The owner/operator shall request a rescission of Operating Permit #
700002004 and Approval Order DAQE-AN0100810005-08 by no
later than September 15, 2015.
C. Operating Permit # 700002004 and Approval Order DAQE-
AN0100810005-08 shall be rescinded by no later than December
15, 2015.
from the CEMS for the current boiler operating day and the previous 29 successive boiler operating
days.
E. An hourly average NOx emission rate in lb/MMBtu is valid only if the minimum number of data points,
as specified in R307-170, is acquired by the owner/operator for both the pollutant concentration
monitor (NOx) and the diluent monitor (O2 or CO2).
H.23. Source Specific Emission Limitations: Regional Haze Requirements, Reasonable Progress
Controls
a. Ash Grove Cement Company – Leamington Cement Plant
i. Emissions from the Kiln 1/Raw Mill Stack shall not exceed the following:
A. 0.07 lbs filterable PM per ton of clinker
B. 2.8 lbs NOx per ton clinker based upon a 30-day rolling average, and 1,347.2 tons per rolling
12-month period
ii. The PM emission rate from the Kiln 1/Raw Mill Stack shall be determined by stack test. Stack
testing shall be performed at least once annually.
iii. Emissions of NOx shall be determined by CEM as outlined in IX.H.21.g.A and B.
b. Graymont Western US Incorporated - Cricket Mountain Plant
i. Emissions of PM10 from the listed emission points shall not exceed the following limits:
A. Kiln #1 Baghouse Stack: 6.0 lb/hr
B. Kiln #2 Baghouse Stack: 6.58 lb/hr
C. Kiln #3 Baghouse Stack: 7.54 lb/hr
D. Kiln #4 Baghouse Stack: 13.7 lb/hr
E. Kiln #5 Baghouse Stack: 11.7 lb/hr
F. Briquetter and Crusher Baghouse (D-488) Stack: 0.15 lb PM10 (filterable)/hr
c. Intermountain Power Service Corporation – Intermountain Generation Station
i. Conditions on Units #1 and #2.
A. The owner/operator shall permanently close and cease operation of Intermountain
Generation Station units #1 and #2 by December 31, 2027. The owner/operator shall notify the
Director of the permanent closure of units #1 and #2 by no later than January 31, 2028.
B. Until such time as units #1 and #2 are shut down as outlined above, the following shall apply:
I. Emissions of PM10 from either the unit #1 or unit #2 stack shall not exceed 0.0184
lb/MMBtu heat input.
II. Emissions of NOx from either the unit #1 or unit #2 stack shall not exceed 0.461
lb/MMBtu heat input (based on a 30-day rolling average).
III Emissions of SO2 from either the unit #1 or unit #2 stack shall not exceed 0.138 lb/MMBtu
heat input (based on a 30-day rolling average).
IV. These limits apply at all times except for periods of startup, shutdown, malfunction (NOx
or PM10 only), or emergency conditions (SO2 only).
d. PacifiCorp – Hunter Plant
i. The annual NOx emissions for the entire Hunter Plant from all point and fugitive sources shall not
exceed 11,041 tons/year based on a 12-month rolling total.
ii. As of January 1, 2025, the annual NOx emissions for the entire Hunter Plant from all point and
fugitive sources shall not exceed 10,442 tons/year based on a 12-month rolling total.
iii. As of January 1, 2028, the annual NOx emissions for the entire Hunter Plant from all point and
fugitive sources shall not exceed 9,843 tons/year based on a 12-month rolling total.
iv. The above NOx limits shall be monitored in accordance with the procedures outlined in 40 CFR
Part 52.21(aa)(12) and at a minimum shall be done by summing up emissions as follows:
A. For Units #1, #2 and #3 main boiler stacks, PacifiCorp's reporting to EPA's Acid Rain Emissions
data base for NOx in pounds per hour obtained from the boilers' CEM data shall be used to
calculate NOx emission rates.
B. For Units #1, #2 and #3 emergency diesel-fired equipment, emissions shall be calculated by
multiplying the NOx emission factor from the latest edition of EPA's emission factors compilation
AP-42 and hours of operation. Records documenting equipment usage shall be kept in a log, and
they shall show the date the equipment was used and the duration in hours of operation.
C. For the record keeping requirements of each limit, PacifiCorp shall comply with 40 CFR
Subpart 52.21(aa)(13).
D. For record submittal, PacifiCorp shall comply with 40 CFR Subpart 52.21(aa)(14).
v. To determine compliance with the 12-month rolling NOx limits, the owner/operator shall calculate
new 12-month total NOx emissions by the 20th day of each month using data from the previous 12
months. Records of emissions shall be kept for all periods when the plant is in operation.
vi. Emissions of SO2 from Unit #1 and Unit #2 shall not exceed the following limits:
A. 1.2 lb/MMBtu heat input for any 3-hour period
B. 0.12 lb/MMBtu heat input based on a 30-day rolling average
vii. Emissions of SO2 from Unit #3 shall not exceed 1.2 lb/MMBtu heat input for any 3-hour period
viii. The SO2 emissions shall be determined by CEM as outlined in IX.H.21.g.
e. PacifiCorp – Huntington Plant
i. The annual NOx emissions for the entire Huntington Plant from all point and fugitive sources shall
not exceed 6,604 tons/year based on a 12-month rolling total.
ii. As of January 1, 2025, the annual NOx emissions for the entire Huntington Plant from all point and
fugitive sources shall not exceed 6,422 tons/year based on a 12-month rolling total
iii. As of January 1, 2028, the annual NOx emissions for the entire Huntington Plant from all point
and fugitive sources shall not exceed 6,240 tons/year based on a 12-month rolling total.
iv. The above NOx limits shall be monitored in accordance with the procedures outlined in 40 CFR
Part 52.21(aa)(12) and at a minimum shall be done by summing up emissions as follows:
A. For Units #1 and #2 main boiler stacks, PacifiCorp's reporting to EPA's Acid Rain Emissions
data base for NOx in pounds per hour obtained from the boilers' CEM data shall be used to
calculate NOx emission rates.
B. For Units #1 and #2 emergency diesel-fired equipment, emissions shall be calculated by
multiplying the NOx emission factor from the latest edition of EPA's emission factors compilation
AP-42 and hours of operation. Records documenting equipment usage shall be kept in a log, and
they shall show the date the equipment was used and the duration in hours of operation.
C. For the record keeping requirements of each limit, PacifiCorp shall comply with 40 CFR
Subpart 52.21(aa)(13).
D. For record submittal, PacifiCorp shall comply with 40 CFR Subpart 52.21(aa)(14).
v. To determine compliance with the 12-month rolling NOx limits, the owner/operator shall
calculate new 12-month total NOx emissions by the 20th day of each month using data from the
previous 12 months. Records of emissions shall be kept for all periods when the plant is in
operation.
vi. Emissions of SO2 from Unit #1 shall not exceed 0.12 lb/MMBtu heat input (595 lb/hr) on a 30-day
rolling average.
vii. Emissions of SO2 from Unit #2 shall not exceed 0.12 lb/MMBtu heat input for any 24-hour block
average.
viii. The SO2 emissions shall be determined by CEM as outlined in IX.H.21.g.
f. Sunnyside Cogeneration Facility
i. Emissions of NOx (during normal boiler operation not including startup, shutdown and
malfunction) shall not exceed 0.25 lb per MMBtu heat input on a 30-day rolling average.
ii. Emissions of NOx (including startup, shutdown and malfunction) shall not exceed 0.6 lb per 10^6
BTU heat input on a 30-day rolling average.
iii. Emissions of SO2 (during normal boiler operation not including startup, shutdown and
malfunction) shall not exceed 0.42 lb per MMBtu heat input on a 30-day rolling average and 462 lb
per hour on a 3-hour block average.
iv. Emissions of SO2 (including startup, shutdown and malfunction) shall not exceed 1.2 lb per 10^6
BTU heat input on a 30-day rolling average.
v. The NOx and SO2 emissions shall be determined by CEM as outlined in IX.H.21.g.
g. US Magnesium LLC - Rowley Plant
i. The owner/operator shall install and operate a flue gas recirculation (FGR) system on the 60
MMBtu/hr (Riley) boiler no later than January 1, 2028.
ii. Following installation of the FGR system, total annual NOx emissions from the Riley boiler shall not
exceed 22.6 tons per rolling 12-month period.
iii. The emission rate from the Riley boiler shall be determined by stack test. Stack testing shall be
performed at least once annually.
iv. To determine compliance with the 12-month rolling NOx limit, the owner/operator shall calculate
new 12-month total NOx emissions by the 20th day of each month using data from the previous 12
months. Records of emissions shall be kept for all periods when the plant is in operation. To
calculate the monthly NOx emissions, the owner/operator shall multiply the lb/hr NOx emission rate
from the most recent stack test by the hours of operation of the Riley boiler for each month.
v. Emissions of NOx from the following Lithium Plant emission points shall not exceed the listed
limits:
A. Boilers: 0.012 lb/MMBtu
B. Burners: 0.037lb/MMBtu
vi. Stack testing to demonstrate compliance with the Lithium Plant NOx limits shall be performed at
least once every five years.