Loading...
HomeMy WebLinkAboutDSHW-2025-001530 Exploration & Production Waste Regulatory Transition Guidance This document is intended to provide key information and important timelines for facilities transitioning to regulations under the Division of Waste Management and Radiation Control (Division). Permiing The standards for Solid Waste Exploration and Production Waste Landfill and Surface Impoundment Permits became eective October 15, 2024. A Temporary Permit is required to continue operating during the application process for a Class VII permit. ● Temporary Permit TP Bonds must be transferred to the Division within 60 days of TP Issued Date. If reconfiguring the facility before the Class VII permit, submit a Landfarm transition plan with 90 days of TP Eective Date, or Surface impoundment closure plan with 90 days of TP Eective Date. Applications for a Class VII permit must be submied within 180 days of TP Eective Date. ● Solid Waste Class VII Exploration and Production Waste Landfill Permit Landfill and Surface Impoundment (combined) Application Checklist Applicable Rule R315321 ● Solid Waste Class VII Exploration and Production Waste Surface Impoundment Permit Landfill and Surface Impoundment (combined) Application Checklist Surface Impoundment (only) Application Checklist Applicable Rule R315322 Records & Reporting Requirements ➢ Maintain daily operating records, such as facility monitoring, inspections and maintenance. ➢ Record daily tons or cubic yards of waste received, number of vehicles, and waste types. ➢ Waste volume must be converted to tons for reporting. 53 barrels of produced water = 1 ton. ➢ Quarterly Reports are required and payment of fees per ton.* ➢ Annual reports are required, including annual waste totals, capacity and financial assurance. ➢ Self Inspection Checklist Link. Fees Fees as outlined in 196119 6 are calculated on a per ton basis with the rate being published annually in the Division’s fee schedule. *Payment is required when submiing Quarterly Reports on the following schedule. January 15th Reporting Quarter October - December April 15th Reporting Quarter January - March July 15th Reporting Quarter April - June October 15th Reporting Quarter July - September IMPORTANT NOTE Liner Requirement Changes Beginning 2030 During the 2025 General Legislative Session, S.B. 159 changed the requirements for liners at Solid Class VII landfills. This change requires an impervious synthetic or clay liner system that has hydraulic conductivity no greater than 1E-7 centimeters per second. Additionally, the bill requires waste acceptance in unlined Class VII landfills to conclude by July 1, 2030. The Division will begin outreach on this new requirement in the coming months. Contact Information: 8015360200 Bryan Wa bryanwa@utah.gov or Nathan Nicolodemos nanicolodemos@utah.gov *This guidance document is not intended to provide detailed information on the requirements or application process. Please consult the applicable rules and regulations, or reach out to the Division for additional assistance.