Loading...
HomeMy WebLinkAboutDERR-2025-001944Utah Department of Environmental Quality - UST Release Detection TANK OWNERSHIP Name LOGAN REGIONAL HOSPITAL Address 500 E 1400 N LOGAN, UT 84341 Contact LOGAN REGIONAL HOSPITAL Phone Email brian.juber@imail.com TANK LOCATION Name LOGAN REGIONAL HOSPITAL Address 500 E 1400 N LOGAN, UT 84321 A Operator KC KNOWLES Phone (435) 716-1000 B Operator None Phone None Facility ID: 0100119 Inspection Date: 03/14/2025 DISPENSER DETAILS DISP ID/ALT ID SUBSTANCE UDC PIPE FLEX LOC INSTALL DATE UDC INSTALL DATE FIRE VALVE SAT PRESENT UDC TEST DISP FLEX CP TEST TANK DETAILS Tank ID/Alt ID 3 / 3 E-Gen/AST Yes / No Siphon/Compart No / No Tank Status Temporarily Out of Use Installed/Cap/Loc Oct. 23, 1997 / 2000 / Single - Separate excavation Substance Stored Diesel / Tank Material- Mod Fiberglass Reinforced Plastic- Double-Walled ATG Veeder Root / TLS-350 LTT Test None LLD Test None Pipe Material-Mod Flexible Plastic / Double-Walled Pipe type/STP Cont U.S. Suction / Yes STP Flex Connectors Steel Flex in Sump LLD Model Spill/Overfill/Sm Delivery 5 gal. Spill Bucket / Automatic shutoff / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det TankATG PipeLineTightness CP Tank Test None CP Pipe Test None Tank ID/Alt ID 4 / 4 E-Gen/AST Yes / No Siphon/Compart No / No Tank Status Currently In Use Installed/Cap/Loc June 25, 2007 / 20000 / West Substance Stored Diesel / Tank Material- Mod Fiberglass Reinforced Plastic- Double-Walled ATG Veeder Root / TLS-300 LTT Test April 26, 2024 LLD Test Aug. 12, 2024 Pipe Material- Mod Flexible Plastic / Double-Walled Pipe type/STP Cont Pressurized / Yes STP Flex Connectors Steel Flex in Sump LLD Model Red Jacket / VR FX1DV Spill/Overfill/Sm Delivery 5 gal. Spill Bucket / Automatic shutoff / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det TankATG PipeAutoLineLeakDetection / PipeLineTightness CP Tank Test None CP Pipe Test None 2025-03-14 Page 1 of 6 Tank ID/Alt ID 5 / 5 E-Gen/AST Yes / No Siphon/Compart No / No Tank Status Currently In Use Installed/Cap/Loc Sept. 26, 2023 / 12000 / East Substance Stored Diesel / Diesel #1 Tank Material- Mod Fiberglass Reinforced Plastic- Double-Walled ATG Veeder Root / TLS-300 LTT Test April 26, 2024 LLD Test Aug. 12, 2024 Pipe Material- Mod Fiberglass Reinforced Plastic / Double-Walled Pipe type/STP Cont Pressurized / Yes STP Flex Connectors Booted Steel Flex LLD Model Red Jacket / VR FX1DV Spill/Overfill/Sm Delivery 5 gal. Double Walled Spill Bucket / Automatic shutoff / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det TankATG PipeAutoLineLeakDetection / PipeLineTightness CP Tank Test None CP Pipe Test None INSPECTION COMMENTS None 2025-03-14 Page 2 of 6 FACILITY RESPONSES Financial Responsibility Financial responsibility method is ok?Yes The above accurately represents the facility's release detection records Yes Operator Training A Operator current?Yes B Operator current?Yes Monthly checklist available and complete?Yes Is the site unmanned?Yes Is a sign posted in a conspicuous area giving the name and telephone number of a person in case of an emergency and if the station is manned part of the time, are C operators trained? Yes Does the site have emergency shutoff device?Yes TANK RESPONSES Tank 3 Temporary Closure Is release detection being maintained or is the depth of product less than 1 inch? Yes What is the depth of product? (Inches)<1 The cathodic protection system being maintained?Yes The tanks are locked and secured?Yes Tank 3 ATG/IM ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes ATG - The tank was filled to at least the minimum level required to ensure a valid leak test, and the tank size is within the allowed upper and lower size limits? Yes Tank 3 ATG/IM Does the ATG system have a valid annual test?Yes Tank 3 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Tank 3 Suction Piping Leak Detection U.S. suction piping has a valid LTT every 3 years or monthly monitoring?Yes Tank 3 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank 4 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes 2025-03-14 Page 3 of 6 Tank 4 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes Tank 4 ATG/IM ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes ATG - The tank was filled to at least the minimum level required to ensure a valid leak test, and the tank size is within the allowed upper and lower size limits? Yes Tank 4 ATG/IM Does the ATG system have a valid annual test?Yes Tank 5 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes Tank 4 Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank 4 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank 5 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Tank 5 Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank 5 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes 2025-03-14 Page 4 of 6 Tank 5 ATG/IM ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes ATG - The tank was filled to at least the minimum level required to ensure a valid leak test, and the tank size is within the allowed upper and lower size limits? Yes Tank 5 ATG/IM Does the ATG system have a valid annual test?Yes DISPENSER RESPONSES MONTHLY LEAK DETECTION MONITORING Mar '24 Apr '24 May '24 Jun '24 Jul '24 Aug '24 Sep '24 Oct '24 Nov '24 Dec '24 Jan '25 Feb '25 Tank 3 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Tank 4 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Tank 5 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl NON-COMPLIANCE ITEMS All items are in compliance. 2025-03-14 Page 5 of 6 Prepared by fueloperator.com Inspection Information Inspector:Rasmussen, DeAnn Record Created: March 14, 2025, 3:37 p.m. Inspection Date:March 14, 2025 2025-03-14 Page 6 of 6