March 17, 2025
Attn: Dennis O’Keefe
Golden Gate Petroleum of Nevada
16580 Wedge Parkway #300
Reno, Nevada 89511
Subject:Plan Approval, GG Petroleum - Crescent Junction, Storage Tanks (ST001, ST002), Pumping Facility (PF001), Hydropneumatic Tank (HP001) and Distribution System (DS001), GG Petroleum
Crescent Junction, System #10051, File #13634
Dear Dennis O’Keefe:The Division of Drinking Water (the Division) received the plans and specifications for GG Petroleum - Crescent Junction, Storage Tanks (ST001, ST002), Pumping Facility
(PF001), Hydropneumatic Tank (HP001) and Distribution System (DS001) from your consultant, Jeremy A. Draper, P.E. and Reeve & Associates on March 3, 2024. Additional submittals and clarifications
were received on October 2, 2024, January 16, February 5, and February 26, 2025. This project has met the conditions for receiving a plan approval.
Our understanding of the project is the construction of a permanent hauled water system with independent culinary and fire flow systems. The culinary system will consist of two 5,000-gallon
Steelcore Storage Tanks (ST001, ST002), a Pumping Facility (PF001) that will include a pump house to protect a TW2975T-140R-80 Duplex Booster Pump System and a Flexcon H2P25 26-gallon
Hydropneumatic Tank (HP001) designed to provide 80-psi to the Distribution System (DS001).
We have completed our review of the plans and specifications, stamped and signed byJeremy A. Draper, P.E., dated November 11, 2024, and find they basically comply with the applicable
portions of Utah’s Administrative Rules for Public Drinking Water Systems in R309. On this basis, the plans for GG Petroleum - Crescent Junction, Storage Tanks (ST001, ST002), Pumping
Facility (PF001), Hydropneumatic Tank (HP001) and Distribution System (DS001) are hereby approved.
This approval pertains to construction only. An Operating Permit must be obtained from the Director before GG Petroleum - Crescent Junction, Storage Tanks (ST001, ST002), Pumping Facility
(PF001), Hydropneumatic Tank (HP001) and Distribution System (DS001) may be put in service. A checklist outlining the items required for operating permit issuance is enclosed for your
information.
The Division also received a Water Hauling Request for GG Petroleum - Crescent Junction on February 26, 2025. A separate approval letter will be sent to address your permanent water
hauling request.
Approvals or permits from the local authority or the county may be necessary before beginning construction of this project. As the project proceeds, notice of any changes in the approved
design, as well as any change affecting the quantity or quality of the delivered water, must be submitted to the Division. We may also conduct interim and final inspections of this project.
Please notify us when actual construction begins so that these inspections can be scheduled.
This approval must be renewed if construction has not begun or if substantial equipment has not been ordered within one year of the date of this letter.
If you have any questions regarding this approval, please contact Curtis Page, P.E., of this office, at (435) 650-7795, or me at (385) 515-1464.
Sincerely,
Michael Newberry, P.E.
Permitting and Engineering Support Manager
CMP/mrn/mdbEnclosures –Operating Permit Checklistcc:Orion Rogers, Southeast Utah Health Department, orogers@utah.govNate Reeve P.E., Reeve & Associates, Inc., nate@reeve.coKen Hunter
P.E., Reeve & Associates, Inc, ken@reeve.co
Curtis M. Page P.E., DEQ Southeast District Engineer, cmpage@utah.govDennis O’Keefe, Golden Gate Petroleum - Crescent Junction, rcherep@ggpetro.comDavid Kruse, Division of Drinking Water,
dbkruse@utah.govCPage 10051 13634 PA GG Petroleum - Crescent Junction
Utah Division of Drinking Water ― Checklist for Issuing Operating PermitsWater System Name:System Number: Project Description:File Number:
Items 1 through 8 below must be submitted to the Division and found to be acceptable prior to operating permit issuance (unless a water line project meets the requirements of R309-500-7
and is not required to obtain an Operating Permit).
Distribution lines (not including in-line booster pump stations) requiring Plan Approval may be placed into service prior to submitting all of the following items and receipt of Operating
Permit if the water system has received items 1 and 4 below.☐1.Certification of Rule Conformance by a professional engineer (P.E.) that all conditions of Plan Approval were accomplished,
and if applicable, changes made during construction were in conformance with rules R309-500 through 550☐2.As-built or record drawings incorporating all changes to approved plans and
specifications (unless no changes were made to the previously approved plans during construction)☐3.Confirmation that as-built or record drawings have been received by the water system☐4.Satisfactory
bacteriological samples as evidence of proper disinfection and flushing in accordance with the appropriate ANSI/AWWA standards:
☐ANSI/AWWA C651-14 AWWA Standard for Disinfecting Water MainsTwo consecutive sample sets at least 16 hours apart, none positive (e.g., every 1,200 feet, end-of-line, each branch)☐ANSI/AWWA
C652-11 AWWA Standard for Disinfection of Water-Storage FacilitiesOne or more samples, none positive☐ANSI/AWWA C653-13 AWWA Standard for Disinfection of Water Treatment PlantsTwo consecutive
samples per unit, none positive, no less than 30 minutes apart☐ANSI/AWWA C654-13 AWWA Standard for Disinfection of WellsTwo consecutive samples, none positive, no less than 30 minutes
apart☐5.Water quality data, where appropriate [For example, include raw and finished water data that demonstrate satisfactory performance of the treatment facility; sample should be
taken from a storage tank for residual volatile organic compounds after tank interior re-coating; etc.]☐6.If applicable, all other documentation that may have been required during the
plan review process☐7.If applicable, confirmation that the water system owner has received the O&M manual for the new facility☐8.If applicable, location data of new storage tank, treatment
facility, or source