March 17, 2025
Matthew Kennard
Heber City Water System
749 West 300 South
Heber City, Utah 84032
Subject:Approval of 2025 Water Line Installation Standards per R309-500-7;Heber City Water System, System #26006, File #13580
This Approval expires on June 30, 2030.
Dear Matthew Kennard:
The Division of Drinking Water (the Division) received the following documents on March 5, 2025:
The 2025 water line installation drawings and specifications for Heber City Water System, stamped and signed by Russell Funk, P.E., and dated March 4, 2025.
The completed application form signed by Russell Funk and dated March 3, 2025, which formally designates:
Russell Funk, P.E., as the Professional Engineer (PE) having direct responsibility for the design of the entire water system, and
Willa Motley, P.E., as the PE responsible for oversight of the hydraulic analysis of the entire water system.
We completed our review of the 2025 water line installation drawings and specifications, and find they basically comply with the applicable portions of Utah's Rules for Public Drinking
Water Systems in R309-550. On this basis, the Heber City 2025 Water Line Installation Drawings and Specificationsare hereby approved.
Heber City Water System has met the criteria in R309-500-7 to install water lines up to 16inches in diameter and is not required to obtain Plan Approval or an Operating Permit for the
qualified water line projects.
Please note the following restrictions to this approval:
1. This approval does not apply to booster pump stations.
2. If minimum separation between water and sewer lines cannot meet the requirements in R309-550-8, an exception must be obtained prior to water line construction.This Approval expires
on June 30, 2030. You must notify the Division if there is a change to standard installation drawings and specifications or the designated PE for design or hydraulic analysis during
the term of this Approval. To continue using standard installation drawings and specifications for water transmission and distribution lines after the expiration date, you must submit
a complete renewal application to the Division.Please maintain a copy of this letter with your permanent records for future reference.
If you have any questions regarding this approval, please contact Julie Cobleigh, P.E., of this office, at (385) 214-9770, or me at (385) 515-1464.
Sincerely,
Michael Newberry, P.E.
Permitting and Engineering Support Manager
JJC/mrn/mdbcc:Tracy Richardson, Wasatch County Health Department, trichardson@wasatch.utah.govMatthew Kennard, Heber City, mkennard@heberut.govKyle Turnbow, Heber City, kturnbow@heberut.govRussell