Loading...
HomeMy WebLinkAboutDAQ-2025-001443FI lJEtrTEI,VULCRAFT UTAH COLD FINISH UTAH NUGOR GRATING UTAH NUCOR BUILDING SYSTEMS UTAH, LLC 1875 West Hwy 13 Brigham City, UT 84302 435.734.9433 Executive Secretary, Division of Air Qual.ity Utah Division of Air Quatity P.O. Box 144820 satt Lake city, UT 84114-4820 We are submitting a deviation report in accordance with Operating Permit provision 1.S.2.b, and Utah Administrative Code (UAC) R307-415-6a(SXcXii). The report detaits the deviation, dates of occurrence, and the preventive actions the site is taking to prevent further occurrence. lf you have any further questions or need more information, please contact me. Sincerety, Trevette Kuester Environ mentaI Coord inator tkuester@vu Icraft -ut.com 435-734-4458 DEPANTMENT OF ENVIRONMENTAL OUALTTY Nov 1 4 2024 DIVISION OF AIR OUALITY REVIEWEDInitials: Date: Feb 19, 2025Compliance Status: OKFile #: 10028 (B2) ]-ILIEEEI, TO: Executive Secretary, Division of Air Quatity FROM: Vutcraft - Division of Nucor Corporation RE: Deviation Report for Permit # 300030005 DATE: 11/8/2024 VULCRAFT UTAH COLD FINISH UTAH NUCOR GRATING UTAH NUCOR BUILDING SYSTEMS UTAH, LLC 1875 West Hwy 13 Brigham City, UT 84302 UTAH DEPARTMENT OF N0\/ 1 4 2024 ln accordance with Operating Permit provision 1.S.2.c, and Utah Administrative Code (UAC) R307- 415-5a(3XcXii), the fottowing deviation report is submitted: 1. Dates that the Deviation occurred: start: 10/2412024 End: 10/29/2024 2. Permit condition for which deviation occurred: Permit condition ll.B.10.c(2) states that the "Emergency stationary ICE may be operated for the purposes specified in paragraph (a) for a maximum of 100 hours per catendar year." 3. Describe the Deviation that occurred: The facitity had a scheduted etectricat outage for 9 days from October 11-20,2024. The emergency generator supporting overhead magnetic crane operations did not run during this time, inctuding weekl,y scheduted readiness testing, as alt production was shut down and the outage was ptanned. This emergency generator has a btock heater and control panetthat continued to run off the genset batteries during this time. By October 21 the emergency generator's batteries were dead. The facitity jumped the batteries on October 24,2024,neartheendof shiftandgottheunitstarted. Thefacitityneededtorunthe emergency generator in order to charge the batteries, but once the site had started the engine they faited to communicate to the next shift when to turn off the unit. As a resutt the emergency generator continued to run untit it was turned off 5 days later. Prior to this event, the emergency generator had run for 34 hours for maintenance checks and readiness testing f rom January 1 through october 20,2024. This event resutted in an additionat 120 hours of operation, for a totaI of 154 hours of non-emergency operation this catendar year. 4.Wa tr s the deviation due to an "upset condition" as defined by Section l! of the permit? Yes ENo l_l "rpset condition" not defined in Section ll 5. Describe the probabte cause of the deviation: The facitity faited to devetop a process for recharging the emergency generator's battery system. Consecutive shifts did not pass down communication that the emergency generator had been turned on. Teammates were not trained to observe the generator "on" status and faited to see that the unit was running. 435.734.9433 E XVE O_NU,E_ N TAL Q UAL I TY DIVISION OF AIR QTJALITY REVIEWEDInitials: Date: Feb 19, 2025Compliance Status: OKFile #: 10028 (B2) FI1JEEEI,VULCRAFT UTAH COLD FINISH UTAH NUCOR GRATING UTAH NUCOR BUILDING SYSTEMS UTAH, LLC 1875 West Hwy 13 Brigham City, UT 84302 435.734.9433 6. Describe any corrective actions or preventive measures taken: A process for charging the emergency generator batteries witt be developed that inctudes monitoring the runtime of the unit during any required charging and teammates witt be trained on this process. Responsibte teammates (receiving department) witt receive training to monitor the generator's operationaI panet inside the buitding so they are aware of when the generator is in operation vs. standby mode. ln accordance with Operating Permit provision l.K and UAC R307- 415- 5d, and based on information and betief formed after reasonabte inquiry, I certify that the statements and information in this document are true, accurate, and comptete. t' ls ("\ u"t" Darin Gardner - GeneraI Manager Print or type the name and titte of the Responsibte Officiat ibte Officiat for the Source REVIEWEDInitials: Date: Feb 19, 2025Compliance Status: OKFile #: 10028 (B2)