We are submitting a deviation report in accordance with Operating Permit provision 1.S.2.b, and
Utah Administrative Code (UAC) R307-415-6a(SXcXii). The report detaits the deviation, dates of
occurrence, and the preventive actions the site is taking to prevent further occurrence.
lf you have any further questions or need more information, please contact me.
Sincerety,
Trevette Kuester
Environ mentaI Coord inator
tkuester@vu Icraft -ut.com
435-734-4458
DEPANTMENT OF
ENVIRONMENTAL OUALTTY
Nov 1 4 2024
DIVISION OF AIR OUALITY
REVIEWEDInitials: Date: Feb 19, 2025Compliance Status: OKFile #: 10028 (B2)
]-ILIEEEI,
TO: Executive Secretary, Division of Air Quatity
FROM: Vutcraft - Division of Nucor Corporation
RE: Deviation Report for Permit # 300030005
DATE: 11/8/2024
VULCRAFT UTAH
COLD FINISH UTAH
NUCOR GRATING UTAH
NUCOR BUILDING SYSTEMS UTAH, LLC
1875 West Hwy 13
Brigham City, UT 84302
UTAH DEPARTMENT OF
N0\/ 1 4 2024
ln accordance with Operating Permit provision 1.S.2.c, and Utah Administrative Code (UAC) R307-
415-5a(3XcXii), the fottowing deviation report is submitted:
1. Dates that the Deviation occurred: start: 10/2412024 End: 10/29/2024
2. Permit condition for which deviation occurred:
Permit condition ll.B.10.c(2) states that the "Emergency stationary ICE may be operated for
the purposes specified in paragraph (a) for a maximum of 100 hours per catendar year."
3. Describe the Deviation that occurred:
The facitity had a scheduted etectricat outage for 9 days from October 11-20,2024. The
emergency generator supporting overhead magnetic crane operations did not run during
this time, inctuding weekl,y scheduted readiness testing, as alt production was shut down
and the outage was ptanned. This emergency generator has a btock heater and control
panetthat continued to run off the genset batteries during this time. By October 21 the
emergency generator's batteries were dead. The facitity jumped the batteries on October
24,2024,neartheendof shiftandgottheunitstarted. Thefacitityneededtorunthe
emergency generator in order to charge the batteries, but once the site had started the
engine they faited to communicate to the next shift when to turn off the unit. As a resutt the
emergency generator continued to run untit it was turned off 5 days later. Prior to this event,
the emergency generator had run for 34 hours for maintenance checks and readiness
testing f rom January 1 through october 20,2024. This event resutted in an additionat 120
hours of operation, for a totaI of 154 hours of non-emergency operation this catendar year.
4.Wa
tr
s the deviation due to an "upset condition" as defined by Section l! of the permit?
Yes ENo l_l "rpset condition" not defined in Section ll
5. Describe the probabte cause of the deviation:
The facitity faited to devetop a process for recharging the emergency generator's battery
system. Consecutive shifts did not pass down communication that the emergency
generator had been turned on. Teammates were not trained to observe the generator "on"
status and faited to see that the unit was running.
435.734.9433
E XVE O_NU,E_ N TAL Q UAL I TY
DIVISION OF AIR QTJALITY
REVIEWEDInitials: Date: Feb 19, 2025Compliance Status: OKFile #: 10028 (B2)
FI1JEEEI,VULCRAFT UTAH
COLD FINISH UTAH
NUCOR GRATING UTAH
NUCOR BUILDING SYSTEMS UTAH, LLC
1875 West Hwy 13
Brigham City, UT 84302
435.734.9433
6. Describe any corrective actions or preventive measures taken:
A process for charging the emergency generator batteries witt be developed that inctudes
monitoring the runtime of the unit during any required charging and teammates witt be
trained on this process. Responsibte teammates (receiving department) witt receive
training to monitor the generator's operationaI panet inside the buitding so they are aware of
when the generator is in operation vs. standby mode.
ln accordance with Operating Permit provision l.K and UAC R307- 415- 5d, and based on
information and betief formed after reasonabte inquiry, I certify that the statements and
information in this document are true, accurate, and comptete.
t' ls ("\
u"t"
Darin Gardner - GeneraI Manager
Print or type the name and titte of the Responsibte Officiat
ibte Officiat for the Source
REVIEWEDInitials: Date: Feb 19, 2025Compliance Status: OKFile #: 10028 (B2)