HomeMy WebLinkAboutDAQ-2025-001442FILIEEIFI
BUILD'NG SYSTEMS - UTA,H. LLC
Date: January 2,2025
Subpart XXXXXX Coordinator
Division of Air Quality
Utah Department of Environmental Quality
P.O. Box 144820
Salt Lake city, UT 84114-4820
PO Box 907
Brigham City, UT 84302
www.nucorbuildingsystems.com
Phone: 435-919-3100
-- -!1[1]
I rFnn'il.rt= N r oF
ENVi i:IONMENTAL QUALITYi -- -- -- -l
II ,__i ?.125:
Ii_-_l
t)l\/lslloN oF AIR ol,nl ITY
Subject:Annual Certification and Compliance Report
Under 40 C.F.R. Part 63. Subpart XXXXXX
Dear Sir or Madam:
This document is submitted to meet the requirements for Annual Certification and Compliance
Reports as specified in 40 C.F.R. Part 63, Subpart XXXXXX (40 C.F.R. 63.1151g(bx1).
40 CFR 63.11519(b)(2) Dates:
(i-iii) Applicable dates
This report covers the following reporting period:
Start date: January 1,2024
End date: December 31,2024
40 CFR 63.11519(b)(3) Alternate dates:
Not applicable.
40 CFR 63.11519O)@ General requirements:
(i) Company's name and address
Owner and Operator:
Nucor Building Systems, Utah, LLC
P.O. Box 907
1050 N. Watery Lane
Brigham City, UT 84302
--rtt*E*;tm ACCREDTTED
REVIEWEDInitials: Date: Feb 19, 2025Compliancde Status: OKFile #: 10028 (B2)
FIIJEEFT PO Box 907
Brigham City, UT 84302
www.nucorbuildingsystems.com
Phone: 435-919-3100BU'LDING SYSTEMS - UTA,H, LLC
(ii) A statement by e responsible official with that official's name, title, and signature,
certfuing the truth, accuracy, and completeness of the contents of this report;
I hereby certiff the truth, accuracy, and completeness of this annual report.
i,lr./lSlON OF AIR QIJALITY
(iii) Date of Report, and beginning and ending dates of the reporting period
Date of report: January 5,2025
Start date: January 1,2024
End date: December 31,2024
40 CFR 63.11519(b)(5) Visual determination offugitive emissions requirements
(i) Date of every visual determination offugitive emissions which resulted in detection of
visible emissions;
No visible emissions were observed during the reporting period.
(ii) Description of corrective actions taken subseqaent to the test
No visible emissions were observed during the reporting period. Therefore, no corrective actions
were required.
(iii) Date and results offollow-up visual determination offugitive emissions performed after
the corrective actions.
No visible emissions were observed during the reporting period. Therefore, no corrective
actions, or follow-up visual determinations were required.
40 CFR 63.11519(b)(6) Visual determination of emissions opacity requirements
No visible emissions were observed during the reporting period. Therefore, no opacity
measurements were required.
Nucor Building Systems, Utah, LLC General Manager
-.--;T*H;TH ACCREDTTED
FIUEEIFI PO Box 907
Brigham City, UT 84302
www.nucorbuildingsystems.com
Phone: 435-919-3100BU'LDING .SYSTEMS - UTA,H, LLC
40 CFR 63.11519(b)(7) Reserved
Not applicable.
40 CFR 63.11519(b)(8) Exceedences of 20 percent opacityfor welding affected sources
No visible emissions were observed during the reporting period. Therefore, no opacity
measurements were required.
40 CFR 63.11519(b)(9) Site-specific Welding Emissions Management Plan reporting
No visible emissions were observed during the reporting period. No opacity measurements were
required. Therefore, a Site-specific Welding Emissions Management Plan was not required.
Kris Kutterer
General Manager
Nucor Building Systems, Utah, LLC
CC: US EPA Region 8
REVIEWEDInitials: Date: Feb 19, 2025Compliancde Status: OKFile #: 10028 (B2)