Loading...
HomeMy WebLinkAboutDAQ-2025-001442FILIEEIFI BUILD'NG SYSTEMS - UTA,H. LLC Date: January 2,2025 Subpart XXXXXX Coordinator Division of Air Quality Utah Department of Environmental Quality P.O. Box 144820 Salt Lake city, UT 84114-4820 PO Box 907 Brigham City, UT 84302 www.nucorbuildingsystems.com Phone: 435-919-3100 -- -!1[1] I rFnn'il.rt= N r oF ENVi i:IONMENTAL QUALITYi -- -- -- -l II ,__i ?.125: Ii_-_l t)l\/lslloN oF AIR ol,nl ITY Subject:Annual Certification and Compliance Report Under 40 C.F.R. Part 63. Subpart XXXXXX Dear Sir or Madam: This document is submitted to meet the requirements for Annual Certification and Compliance Reports as specified in 40 C.F.R. Part 63, Subpart XXXXXX (40 C.F.R. 63.1151g(bx1). 40 CFR 63.11519(b)(2) Dates: (i-iii) Applicable dates This report covers the following reporting period: Start date: January 1,2024 End date: December 31,2024 40 CFR 63.11519(b)(3) Alternate dates: Not applicable. 40 CFR 63.11519O)@ General requirements: (i) Company's name and address Owner and Operator: Nucor Building Systems, Utah, LLC P.O. Box 907 1050 N. Watery Lane Brigham City, UT 84302 --rtt*E*;tm ACCREDTTED REVIEWEDInitials: Date: Feb 19, 2025Compliancde Status: OKFile #: 10028 (B2) FIIJEEFT PO Box 907 Brigham City, UT 84302 www.nucorbuildingsystems.com Phone: 435-919-3100BU'LDING SYSTEMS - UTA,H, LLC (ii) A statement by e responsible official with that official's name, title, and signature, certfuing the truth, accuracy, and completeness of the contents of this report; I hereby certiff the truth, accuracy, and completeness of this annual report. i,lr./lSlON OF AIR QIJALITY (iii) Date of Report, and beginning and ending dates of the reporting period Date of report: January 5,2025 Start date: January 1,2024 End date: December 31,2024 40 CFR 63.11519(b)(5) Visual determination offugitive emissions requirements (i) Date of every visual determination offugitive emissions which resulted in detection of visible emissions; No visible emissions were observed during the reporting period. (ii) Description of corrective actions taken subseqaent to the test No visible emissions were observed during the reporting period. Therefore, no corrective actions were required. (iii) Date and results offollow-up visual determination offugitive emissions performed after the corrective actions. No visible emissions were observed during the reporting period. Therefore, no corrective actions, or follow-up visual determinations were required. 40 CFR 63.11519(b)(6) Visual determination of emissions opacity requirements No visible emissions were observed during the reporting period. Therefore, no opacity measurements were required. Nucor Building Systems, Utah, LLC General Manager -.--;T*H;TH ACCREDTTED FIUEEIFI PO Box 907 Brigham City, UT 84302 www.nucorbuildingsystems.com Phone: 435-919-3100BU'LDING .SYSTEMS - UTA,H, LLC 40 CFR 63.11519(b)(7) Reserved Not applicable. 40 CFR 63.11519(b)(8) Exceedences of 20 percent opacityfor welding affected sources No visible emissions were observed during the reporting period. Therefore, no opacity measurements were required. 40 CFR 63.11519(b)(9) Site-specific Welding Emissions Management Plan reporting No visible emissions were observed during the reporting period. No opacity measurements were required. Therefore, a Site-specific Welding Emissions Management Plan was not required. Kris Kutterer General Manager Nucor Building Systems, Utah, LLC CC: US EPA Region 8 REVIEWEDInitials: Date: Feb 19, 2025Compliancde Status: OKFile #: 10028 (B2)