HomeMy WebLinkAboutDRC-2025-000135 CLIVE SITE
LETTER OF TRANSMITTAL DATE: 1/7/2025 ATTN: LLRW
CC; Treesa Parker Karen Kirkwood RE: Transmittal 2025-002
Description of Documents Transmitted Qty
See attached for update to GWQDP. GWQDP forms update. 1 ------------------------------------------------------------------------------------------------------------ Please replace your current procedure revisions with the documents within this Transmittal. You are not required to sign any documents to verify receipt of this distribution. However, you should make every effort to ensure that your copy of the License is current. FROM: EnergySolutions Document Control
Clive Facility
LLRW/11e.(2) MONTHLY FACILITY INSPECTION – Form 3
Date of Inspection: ___________________________
Source Document: Appendix J of GWQDP January 7, 2025 (Rev4)
LL
R
W
OP
S
Is there free drainage from the boot wash and emergency shower? Yes Notify Manager
19
9
5
Po
n
d
Is there leakage from the piping of the leak detection system to the pond? No Notify Manager
Is the pump operational? Yes Notify Manager
19
9
7
Po
n
d
Is there leakage from the piping of the leak detection system to the pond? No Notify Manager
Is the pump operational? Yes Notify Manager
Po
n
d
Li
f
t
Is the alarm operational? Yes Notify Manager
20
0
0
Po
n
d
Is the pump operational? Yes Notify Manager
NW
C
Po
n
d
Is the pump operational? Yes Notify Manager
NW
C
Tr
ans
f
er
Are there cracks, tears, or holes in the pad apron? No Notify Manager
Are the integrity defects on the concrete pad? No Notify Manager
IU
F
Li
f
t
Is the alarm operational? Yes Notify Manager
T
4
Ws
h
Is the alarm operational? Yes Notify Manager
Rot
Du
m
p
Is the alarm operational? Yes Notify Manager
Ea
s
t
Si
d
e
Ro
t
a
r
y
Is the alarm in Manhole 1A operational? Yes Notify Manager
Ea
s
t
S
i
d
e
Dr
a
i
n
a
g
e
Does manhole 1 alarm function properly? Yes Notify Manager
Does manhole 2 alarm function properly? Yes Notify Manager
Do the lift station alarms function properly? Yes Notify Manager
Sh
r
ed
der
Is the tank alarm operational?
Yes
Notify Manager
Date of Next Monthly Inspection: ___________________________
Printed Name of Inspector: ___________________________
Y N Signature of Inspector: ___________________________
ANY NOTIFICATIONS? Manager Notified (if yes): ___________________________
LLRW/11e.(2) MONTHLY FACILITY INSPECTION – Form 3 (page 2)
Date of Inspection: ___________________________
Source Document: Appendix J of GWQDP January 7, 2025 (Rev4)
SR
S
D
U
Do containers show evidence of leaks, corrosion, or deterioration? No Notify Manager
Are the containers properly sealed? Yes Notify Manager
Are the defects in the exposed floor integrity or grade? No Notify Manager
OUT
OF
SERV
De
c
n
Ac
c
Is the alarm operational? Yes Notify Manager
So
u
t
h
Di
t
c
h
Is the alarm functioning properly? Yes Notify Manager
COMMENTS:
Manager Approval: Q/A Review
LLRW/11e.(2) WEEKLY FACILITY INSPECTION – Form 2
Date/Time of Inspection: __________________________
Source Document: Appendix J of GWQDP January 7, 2025 (Rev5)
Ea
s
t
Si
d
e
Dr
a
i
n
Is the leak detection system operational? Yes Notify Manager
IU
F
Is water below the sump grate? Yes Notify Manager
Are there defects in the exposed concrete integrity? No Notify Manager
Is the pad free of soil, debris, etc? Yes Notify Manager
Ra
i
l
Di
g
Are there any integrity defects in the exposed surface? No Notify Manager
Tr
a
c
k
4
Wa
s
h
Is the sump operational? Yes Notify Manager
Are there any integrity defects on exposed concrete? No Notify Manager
Is the gray water discharge pump functional? Yes Notify Manager
ICW
Are the leak detection systems in Ports 1 and 2 free of fluid? Yes Notify Manager
Are there any integrity defects in the exposed surface? No Notify Manager
Rot
a
r
y
B
u
i
l
d
i
n
g
s
Any integrity defects on exposed concrete of the Thaw Building? No Notify Manager
Are there integrity defects on exposed concrete in the rotary building? No Notify Manager
Are the leak detection systems in Ports 1 and 2 free of fluid? Yes Notify Manager
Is the rotary sump operational? Yes Notify Manager
Are there integrity defects on exposed concrete in the wash building? No Notify Manager
Is the Wash Building sump operational? Yes Notify Manager
Is there free drainage of the alternate wastewater tank concrete pad? Yes Notify Manager
Are there integrity defects on the exposed concrete pad surfaces of the alt. wastewater tanks? No Notify Manager
Ea
s
t
S
i
d
e
R
o
t
a
r
y
Any integrity defects on exposed concrete of the Building? No Notify Manager
Are there integrity defects on exposed concrete in the lower level? No Notify Manager
Are there integrity defects on the north or south ramp curbing No Notify Manager
Is the sediment basin leak detection system free of fluid? Yes Notify Manager
Is the east side rotary sump operational? Yes Notify Manager
Are there integrity defects on exposed concrete of the upper wash area building? No Notify Manager
Is the Manhole 1A leak detection system operational? Yes Notify Manager
Ea
s
t
T
r
u
c
k
Un
l
o
a
d
i
n
g
Are there surface integrity defects? No Notify Manager
Are containers stored compliantly? Yes Notify Manager
Is the collection trough water level below the grate? Yes Notify Manager
Are the holding pads clean and free draining? Yes Notify Manager
Sh
r
e
d
d
e
r
Are there any integrity defects in the exposed surface? No Notify Manager
20
0
0
Tr
a
n
s
f
e
r
Pa
d
Are there any integrity defects in the exposed surface? No Notify Manager
Date of Next Weekly Inspection: __________________________
Date of Next Monthly Inspection: __________________________
Printed Name of Inspector: __________________________
Y N Signature of Inspector: __________________________
ANY NOTIFICATIONS? Manager Notified (if yes): __________________________
LLRW/11e.(2) WEEKLY FACILITY INSPECTION – Form 2 (page 2)
Date of Inspection: ___________________________
Source Document: Appendix J of GWQDP January 7, 2025 (Rev5)
OUT
OF SERV
CW
S
t
o
r
a
g
e
Pa
d
Pad free of soil, debris, etc? Yes Notify Manager
Any integrity defects on exposed asphalt? No Notify Manager
Is the sump operational and water level below the grate? Yes Notify Manager
Are containers closed, labeled, and on site < 365 days? Yes Notify Manager
Is there free drainage from pad to sump? Yes Notify Manager
OUT
OF
SERV
Bo
x
Wa
s
h
Are there any integrity defects on exposed concrete? No Notify Manager
Is the pipeline cap from the building intact? Yes Notify Manager
OUT
OF SERV
De
c
o
n
Ac
c
e
s
s
Is the tank alarm activated? No Notify Manager
Is the drop leg sight canister dry? Yes Notify Manager
Comments:
Manager Approval: Q/A Review