Loading...
HomeMy WebLinkAboutDSHW-2025-001447From: Blake Downey <bd@wasatch-environmental.com> Date: Mon, Mar 10, 2025 at 6:10 PM Subject: RE: [EXTERNAL] Crown Plating Additional SI Work To: Brad Lauchnor <blauchnor@utah.gov> Cc: Paige Walton <pwalton@utah.gov> Brad, I will make those changes. The wipe sampling is being taken care of as a part of a separate project that Chris is going to do, not part of this one. Yes, the sump and oil/water separator are the same one you mention below. I will clarify. Thank you! Blake Downey, P.G. Vice President and Senior Project Hydrogeologist Wasatch Environmental 2410 West California Avenue Salt Lake City, Utah 84104 Cell: 435-760-8269 Office: 801-972-8400 Email: BD@wasatch-environmental.com From: Brad Lauchnor <blauchnor@utah.gov> Sent: Monday, March 10, 2025 11:03 AM To: Blake Downey <bd@wasatch-environmental.com> Cc: Paige Walton <pwalton@utah.gov> Subject: [EXTERNAL] Crown Plang Addional SI Work Hi Blake, I've read through the recently submitted work plan for additional work at Crown Plating. I have a couple of things that need clarification or changing as follows: The confirmation sampling in the Sump walls and floor need to be at least 5 point composites. In section 2.2 Wasatch identifies several "Data Gaps" for the site. Will you please discuss the data gaps that are not being addressed in this plan and when they might be addressed in the future. Interior wipe sampling stands out as something that will be needed before occupation by a tenant is safe. I also want to clarify that references to the "Sump" in the plan are discussing the "Oil/water separator" and that these references all refer to the same sump/oil-water separator directly east of the proposed SG-1 sample. Please update the plan and resubmit it to dwmrcsubmit@utah.gov. Thanks, Brad Brad Lauchnor P.E., P.G. Environmental Engineer | Hazardous Waste Cleanup Program Division of Waste Management and Radiation Control Phone: (385) 499-0266 | Front Desk: (801)-536-0200 Work Hours M-Th 8:00 am - 6:00 pm wasteandradiation.utah.gov 3/13/25, 1:52 PM Fwd: [EXTERNAL] Crown Plating Additional SI Work - kmcneill1@utah.gov - State of Utah Mail https://mail.google.com/mail/u/0/?tab=rm&ogbl#inbox/FMfcgzQZTgRMrtnHDJnRfJrDnLpRvmxL?compose=DmwnWslzDPFFTnDkqbRZqncSMwlgDzM…1/2 Emails to and from this email address may be considered public records and thus subject to UtahGRAMA requirements.Statements made in this email do not constitute the official position of theDirector of the Division of Waste Management and Radiation Control. If you desire a statement of theDivision Director’s position, please submit a written request to the Director, including copies ofdocuments relevant to your request." 3/13/25, 1:52 PM Fwd: [EXTERNAL] Crown Plating Additional SI Work - kmcneill1@utah.gov - State of Utah Mail https://mail.google.com/mail/u/0/?tab=rm&ogbl#inbox/FMfcgzQZTgRMrtnHDJnRfJrDnLpRvmxL?compose=DmwnWslzDPFFTnDkqbRZqncSMwlgDzM…2/2