Fwd: CQA/QC Manual Specification 163, Lift AWA8 of Cover Construction, is ready
for inspection for -8 material
1 message
LLRW DWMRC <llrw@utah.gov>Mon, Feb 10, 2025 at 3:34 PM
To: Deq submit <dwmrcsubmit@utah.gov>
DRC-2024
---------- Forwarded message ---------
From: Carlo Romano <cromano@utah.gov>
Date: Wed, Oct 2, 2024 at 9:45 AM
Subject: Re: CQA/QC Manual Specification 163, Lift AWA8 of Cover Construction, is ready for inspection for -8 material
To: Shauna L. Watkins <slwatkins@energysolutions.com>
Cc: LLrw@utah.gov <LLrw@utah.gov>, Garrett Q. Dutson <gqdutson@energysolutions.com>, Todd L. Stewart
<tlstewart@energysolutions.com>, James M. Cason <jmcason@energysolutions.com>, Marissa R. Sotelo
<mrsotelo@energysolutions.com>, Dave Booth <dbooth@energysolutions.com>, Larry Kellum <lkellum@utah.gov>,
Douglas Hansen <djhansen@utah.gov>
Good morning Shauna,
The Division of Waste Management and Radiation Control (Division) has received your request dated
September 30, 2024 for Request for Director Approval (RFA) in accordance with the LLRW and 11e.(2)
Construction Quality Assurance/Quality Control (CQA/QC) Manual (revision 28c) (CQA/QC Manual)
Specification 163 Director Approval and 48 Hour Notification for placement of next design layer over
finished Radon Barrier.
A Division representative, Carlo Romano (writer), has conducted regular site visits to observe construction
earthwork operations, record overall progress, and review Quality Control/Assurance documentation.
During these visits, specifications were discussed with representatives of EnergySolutions to address
requirements in the CQA/QC Manual that are necessary for the RFA. As a result, physical documentation
was provided to the Division during each site visit and emailed intermittently between visits. This process
ensured that all documentation was reviewed by the Division in concurrence with construction.
Based on the site visits and the reviewed documentation, the construction and field testing of the Radon
Barrier including the 1x10-6 and 5x10-8 material lifts associated with Lot ARA8 appear to be in accordance
with the project specifications outlined in the CQA/QC Manual. The constructed Radon Barrier portion of
Lot ARA8 (as delineated by the map attached to the original RFA email) and supplemental
documentation are hereby approved and EnergySolutions may continue placing material atop this lot lift. All
other specifications concerning construction and post-construction of the radon barrier and final cover as
presented in the referenced plans and specifications remain applicable and are required to be
followed. Remaining Lots ARA9, ARA10, B10, C10, D10, E10, F10, G10, H10, I10, and J10, remain
subjected to review and are not approved for placement of material atop these lift lots at this time and require
following seperate RFA submission.
Please contact me if you have any questions or concerns.
Thank you,
2/10/25, 3:45 PM State of Utah Mail - Fwd: CQA/QC Manual Specification 163, Lift AWA8 of Cover Construction, is ready for inspection for -8 material
https://mail.google.com/mail/b/AEoRXRTVTdiWjBZF1D_qm1uIo6l_bO7NRfgic76S8ClRsGCXYkrO/u/0/?ik=adf9d5e615&view=pt&search=all&permthid…1/3
Carlo Romano, PE
Environmental Engineer III
Division of Waste Management and Radiation Control
Phone: 385-977-7573 |
wasteandradiation.utah.gov
Emails to and from this email address may be considered public records and thus subject to
Utah GRAMA requirements.
Statements made in this email do not constitute the official position of the Director of the
Division of Waste Management and Radiation Control. If you desire a statement of the
Division Director’s position, please submit a written request to the Director, including copies of
documents relevant to your request.
On Mon, Sep 30, 2024 at 10:42 AM Shauna L. Watkins <slwatkins@energysolutions.com> wrote:
All,
In accordance with the EnergySolutions LLRW & 11e.(2) CQA/QC Manual Revision 28c, Specification 163,
notice of Lift AWA8 Class A West, Phase VI Cover project is ready for inspection of the -8 material.
Please feel free to contact me if you have any questions or concerns regarding this notification.
Sincerely,
SHAUNA WATKINS
Quality Assurance Specialist
ENERGYSOLUTIONS LLC
299 South Main Street, Suite 1700
Salt Lake City, Utah 84111
O: 801-649-2072
C: 435-882-7841
slwatkins@energysolutions.com
2/10/25, 3:45 PM State of Utah Mail - Fwd: CQA/QC Manual Specification 163, Lift AWA8 of Cover Construction, is ready for inspection for -8 material
https://mail.google.com/mail/b/AEoRXRTVTdiWjBZF1D_qm1uIo6l_bO7NRfgic76S8ClRsGCXYkrO/u/0/?ik=adf9d5e615&view=pt&search=all&permthid…2/3
2/10/25, 3:45 PM State of Utah Mail - Fwd: CQA/QC Manual Specification 163, Lift AWA8 of Cover Construction, is ready for inspection for -8 material
https://mail.google.com/mail/b/AEoRXRTVTdiWjBZF1D_qm1uIo6l_bO7NRfgic76S8ClRsGCXYkrO/u/0/?ik=adf9d5e615&view=pt&search=all&permthid…3/3