HomeMy WebLinkAboutDRC-2025-000460Deq submit <dwmrcsubmit@utah.gov>
Fwd: CQA/QC Manual Specification 163, Lifts ARG10-ARB10 of Cover Construction,
is ready for inspection for -8 material
1 message
LLRW DWMRC <llrw@utah.gov>Mon, Feb 10, 2025 at 3:36 PM
To: Deq submit <dwmrcsubmit@utah.gov>
DRC-2024
---------- Forwarded message ---------
From: Carlo Romano <cromano@utah.gov>
Date: Mon, Oct 7, 2024 at 9:26 PM
Subject: Re: CQA/QC Manual Specification 163, Lifts ARG10-ARB10 of Cover Construction, is ready for inspection for -8
material
To: Shauna L. Watkins <slwatkins@energysolutions.com>
Cc: LLrw@utah.gov <LLrw@utah.gov>, Todd L. Stewart <tlstewart@energysolutions.com>, Dave Booth
<dbooth@energysolutions.com>, Garrett Q. Dutson <gqdutson@energysolutions.com>, James M. Cason
<jmcason@energysolutions.com>, Marissa R. Sotelo <mrsotelo@energysolutions.com>, Larry Kellum
<lkellum@utah.gov>, Douglas Hansen <djhansen@utah.gov>
Good evening,
The Division of Waste Management and Radiation Control (Division) has received your request dated
October 3, 2024 for Request for Director Approval (RFA) in accordance with the LLRW and 11e.(2)
Construction Quality Assurance/Quality Control (CQA/QC) Manual (revision 28c) (CQA/QC Manual)
Specification 163 Director Approval and 48 Hour Notification for placement of next design layer over
finished Radon Barrier.
A Division representative, Carlo Romano (writer), has conducted regular site visits to observe construction
earthwork operations, record overall progress, and review documentation. During these visits, specifications
were discussed with representatives of EnergySolutions to address requirements in the CQA/QC Manual that
are necessary for the RFA. As a result, physical documentation was provided to the Division during each site
visit and emailed intermittently between visits. This process ensured that all documentation was reviewed by
the Division in concurrence with construction.
Based on the site visits and the reviewed documentation, the construction and field testing of the Radon
Barrier including the 1x10-6 and 5x10-8 material lifts associated with Lots B10, C10, D10, E10, F10, and
G10 appear to be in accordance with the project specifications outlined in the CQA/QC Manual. The
constructed Radon Barrier Lots B10, C10, D10, E10, F10, and G10 and supplemental documentation are
hereby approved and EnergySolutions may continue placing material atop this lot lift. All other
specifications concerning construction and post-construction of the radon barrier and final cover as presented
in the referenced plans and specifications remain applicable and are required to be followed. Remaining Lots
ARA9 and ARA10 remain subjected to review and are not approved for placement of material atop these lift
lots at this time and require following seperate RFA submission.
Thank you,
2/10/25, 3:47 PM State of Utah Mail - Fwd: CQA/QC Manual Specification 163, Lifts ARG10-ARB10 of Cover Construction, is ready for inspection for …
https://mail.google.com/mail/b/AEoRXRTVTdiWjBZF1D_qm1uIo6l_bO7NRfgic76S8ClRsGCXYkrO/u/0/?ik=adf9d5e615&view=pt&search=all&permthid…1/3
Carlo Romano, PE
Environmental Engineer III
Division of Waste Management and Radiation Control
Phone: 385-977-7573 |
wasteandradiation.utah.gov
Emails to and from this email address may be considered public records and thus subject to
Utah GRAMA requirements.
Statements made in this email do not constitute the official position of the Director of the
Division of Waste Management and Radiation Control. If you desire a statement of the
Division Director’s position, please submit a written request to the Director, including copies of
documents relevant to your request.
On Thu, Oct 3, 2024 at 3:06 PM Shauna L. Watkins <slwatkins@energysolutions.com> wrote:
All,
In accordance with the EnergySolutions LLRW & 11e.(2) CQA/QC Manual Revision 28c, Specification 163,
notice of Lifts ARG10, ARF10, ARE10, ARD10, ARC10 and ARB10 in Class A West, Phase VI Cover project is ready for
inspection of the -8 material.
Please feel free to contact me if you have any questions or concerns regarding this notification.
Attachments; Survey and photo’s.
Sincerely,
SHAUNA WATKINS
Quality Assurance Specialist
2/10/25, 3:47 PM State of Utah Mail - Fwd: CQA/QC Manual Specification 163, Lifts ARG10-ARB10 of Cover Construction, is ready for inspection for …
https://mail.google.com/mail/b/AEoRXRTVTdiWjBZF1D_qm1uIo6l_bO7NRfgic76S8ClRsGCXYkrO/u/0/?ik=adf9d5e615&view=pt&search=all&permthid…2/3
ENERGYSOLUTIONS LLC
299 South Main Street, Suite 1700
Salt Lake City, Utah 84111
O: 801-649-2072
C: 435-882-7841
slwatkins@energysolutions.com
2/10/25, 3:47 PM State of Utah Mail - Fwd: CQA/QC Manual Specification 163, Lifts ARG10-ARB10 of Cover Construction, is ready for inspection for …
https://mail.google.com/mail/b/AEoRXRTVTdiWjBZF1D_qm1uIo6l_bO7NRfgic76S8ClRsGCXYkrO/u/0/?ik=adf9d5e615&view=pt&search=all&permthid…3/3