Loading...
HomeMy WebLinkAboutDRC-2025-000461Deq submit <dwmrcsubmit@utah.gov> Fwd: CQA/QC Manual Specification 163, Lift ARJ10,ARI10 and ARH10 of Cover Construction, is ready for inspection for -8 material 1 message LLRW DWMRC <llrw@utah.gov>Mon, Feb 10, 2025 at 3:37 PM To: Deq submit <dwmrcsubmit@utah.gov> DRC-2024 ---------- Forwarded message --------- From: Carlo Romano <cromano@utah.gov> Date: Wed, Oct 9, 2024 at 8:25 AM Subject: Re: CQA/QC Manual Specification 163, Lift ARJ10,ARI10 and ARH10 of Cover Construction, is ready for inspection for -8 material To: Shauna L. Watkins <slwatkins@energysolutions.com> Cc: LLrw@utah.gov <LLrw@utah.gov>, Dave Booth <dbooth@energysolutions.com>, Garrett Q. Dutson <gqdutson@energysolutions.com>, James M. Cason <jmcason@energysolutions.com>, Todd L. Stewart <tlstewart@energysolutions.com>, Marissa R. Sotelo <mrsotelo@energysolutions.com>, Karen Kirkwood <kxkirkwood@energysolutions.com>, Kristina M. Garcia <kmgarcia@energysolutions.com>, Larry Kellum <lkellum@utah.gov>, Douglas Hansen <djhansen@utah.gov> Good morning Shauna, The Division of Waste Management and Radiation Control (Division) has received your request dated October 4, 2024 for Request for Director Approval (RFA) in accordance with the LLRW and 11e.(2) Construction Quality Assurance/Quality Control (CQA/QC) Manual (revision 28c) (CQA/QC Manual) Specification 163 Director Approval and 48 Hour Notification for placement of next design layer over finished Radon Barrier. A Division representative, Carlo Romano (writer), has conducted regular site visits to observe construction earthwork operations, record overall progress, and review documentation. During these visits, specifications were discussed with representatives of EnergySolutions to address requirements in the CQA/QC Manual that are necessary for the RFA. As a result, physical documentation was provided to the Division during each site visit and emailed intermittently between visits. This process ensured that all documentation was reviewed by the Division in concurrence with construction. Based on the site visits and the reviewed documentation, the construction and field testing of the Radon Barrier including the 1x10-6 and 5x10-8 material lifts associated with Radon Barrier Lots A9 and A10 (ARA9 and ARA10) appear to be in accordance with the project specifications outlined in the CQA/QC Manual. The constructed Radon Barrier Lots ARA9 and ARA10 and supplemental documentation are hereby approved and EnergySolutions may continue placing material atop this lot lift. All other specifications concerning construction and post-construction of the radon barrier and final cover as presented in the referenced plans and specifications remain applicable and are required to be followed. Thank you, 2/10/25, 3:47 PM State of Utah Mail - Fwd: CQA/QC Manual Specification 163, Lift ARJ10,ARI10 and ARH10 of Cover Construction, is ready for insp… https://mail.google.com/mail/b/AEoRXRTVTdiWjBZF1D_qm1uIo6l_bO7NRfgic76S8ClRsGCXYkrO/u/0/?ik=adf9d5e615&view=pt&search=all&permthid…1/3 Carlo Romano, PE Environmental Engineer III Division of Waste Management and Radiation Control Phone: 385-977-7573 | wasteandradiation.utah.gov Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. Statements made in this email do not constitute the official position of the Director of the Division of Waste Management and Radiation Control. If you desire a statement of the Division Director’s position, please submit a written request to the Director, including copies of documents relevant to your request. On Fri, Oct 4, 2024 at 6:24 AM Shauna L. Watkins <slwatkins@energysolutions.com> wrote: All, In accordance with the EnergySolutions LLRW & 11e.(2) CQA/QC Manual Revision 28c, Specification 163, notice of Lifts ARA9 and ARA10, side slope in Class A West, Phase VI Cover project is ready for inspection of the -8 material. Several points are in the ARA8 previously inspected area. Point 46 is point 5 in the ARA8 buy off survey. Please feel free to contact me if you have any questions or concerns regarding this notification. Attachment- survey, photos Sincerely,   SHAUNA WATKINS Quality Assurance Specialist   2/10/25, 3:47 PM State of Utah Mail - Fwd: CQA/QC Manual Specification 163, Lift ARJ10,ARI10 and ARH10 of Cover Construction, is ready for insp… https://mail.google.com/mail/b/AEoRXRTVTdiWjBZF1D_qm1uIo6l_bO7NRfgic76S8ClRsGCXYkrO/u/0/?ik=adf9d5e615&view=pt&search=all&permthid…2/3 ENERGYSOLUTIONS LLC 299 South Main Street, Suite 1700 Salt Lake City, Utah 84111 O: 801-649-2072 C: 435-882-7841 slwatkins@energysolutions.com 2/10/25, 3:47 PM State of Utah Mail - Fwd: CQA/QC Manual Specification 163, Lift ARJ10,ARI10 and ARH10 of Cover Construction, is ready for insp… https://mail.google.com/mail/b/AEoRXRTVTdiWjBZF1D_qm1uIo6l_bO7NRfgic76S8ClRsGCXYkrO/u/0/?ik=adf9d5e615&view=pt&search=all&permthid…3/3