Loading...
HomeMy WebLinkAboutDWQ-2025-002362April 1, 2025 Cassady Kristensen Rio Tinto Kennecott Environment Business Partner 4700 Daybreak Parkway South Jordan, Utah 84009 Cassady.Kristensen@riotinto.com Subject: Approval to Use - South East Waste Rock Dump Optimization Project Dear Ms. Kristensen: The Division of Water Quality (“Division”) issued a Construction Permit for the South East Waste Rock Dump Optimization Project (SEWOP) on March 28, 2024. The Division performed a final inspection on March 4, 2025. On February 14, 2025, the Division received the As-Built Drawing Set entitled SEW Optimization Toe Drain Extension prepared by Sunrise Engineering. Based on the final inspection and the review of the As-Built Drawing Set, DWQ approves the use of the SEWOP. If you have any questions about this letter please contact me at (801) 536-4353 or wwcampbell@utah.gov. Sincerely, Woodrow W. Campbell, P.E. Environmental Engineer Ground Water Section WWC/DLB/ cc: Via Email Erdenebayar Naran, Rio Tinto (Erdenebayer.Naran@riotinto.com) Jay Quintanilla, Rio Tinto (Jay.Quintanilla@riotinto.com) Nathan Christensen, Sunrise Engineering (nchristensen@sunrise-eng.com) Mazie Cox, DERR Wayne Western, DOGM DWQ-2025-002362