HomeMy WebLinkAboutDWQ-2025-002362April 1, 2025
Cassady Kristensen
Rio Tinto Kennecott
Environment Business Partner
4700 Daybreak Parkway
South Jordan, Utah 84009
Cassady.Kristensen@riotinto.com
Subject: Approval to Use - South East Waste Rock Dump Optimization Project
Dear Ms. Kristensen:
The Division of Water Quality (“Division”) issued a Construction Permit for the South East Waste Rock Dump Optimization Project (SEWOP) on March 28, 2024. The Division performed a final
inspection on March 4, 2025. On February 14, 2025, the Division received the As-Built Drawing Set entitled SEW Optimization Toe Drain Extension prepared by Sunrise Engineering.
Based on the final inspection and the review of the As-Built Drawing Set, DWQ approves the use of the SEWOP.
If you have any questions about this letter please contact me at (801) 536-4353 or wwcampbell@utah.gov.
Sincerely,
Woodrow W. Campbell, P.E.
Environmental Engineer
Ground Water Section
WWC/DLB/
cc: Via Email
Erdenebayar Naran, Rio Tinto (Erdenebayer.Naran@riotinto.com)
Jay Quintanilla, Rio Tinto (Jay.Quintanilla@riotinto.com)
Nathan Christensen, Sunrise Engineering (nchristensen@sunrise-eng.com)
Mazie Cox, DERR
Wayne Western, DOGM
DWQ-2025-002362