Loading...
HomeMy WebLinkAboutDERR-2025-001845Utah Department of Environmental Quality - UST Release Detection TANK OWNERSHIP Name CENTRAL UTAH WATER CONSERV DIST Address 1426 EAST 750 NORTH SUITE 400 OREM, UT 84097 Contact CENTRAL UTAH WATER CONSERV DIST Phone Email David@cuwcd.com TANK LOCATION Name ASHLEY VALLEY WATER TREATMENT PLANT Address 3550 N 2500 W VERNAL, UT 84078 A Operator None Phone None B Operator SAME Phone SAME Facility ID: 9000291 Inspection Date: 03/11/2025 DISPENSER DETAILS DISP ID/ALT ID SUBSTANCE UDC PIPE FLEX LOC INSTALL DATE UDC INSTALL DATE FIRE VALVE SAT PRESENT UDC TEST DISP FLEX CP TEST TANK DETAILS Tank ID/Alt ID 2 / 2 E-Gen/AST Yes / Yes Siphon/Compart No / No Tank Status Currently In Use Installed/Cap/Loc Jan. 1, 1986 / 1000 / Substance Stored Diesel / Diesel #2 (U.L.S.) Tank Material-Mod Concrete- ATG / LTT Test None LLD Test None Pipe Material-Mod Bare Steel / None Pipe type/STP Cont Pressurized / No STP Flex Connectors LLD Model Spill/Overfill/Sm Delivery 5 gal. Spill Bucket / / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det TankTightness PipeLineTightness CP Tank Test None CP Pipe Test None Tank ID/Alt ID 3 / 3 E-Gen/AST Yes / Yes Siphon/Compart No / No Tank Status Currently In Use Installed/Cap/Loc April 1, 2012 / 1000 / Substance Stored Diesel / Diesel #2 (U.L.S.) Tank Material-Mod Asphalt Coated or Bare Steel- ATG / LTT Test None LLD Test None Pipe Material-Mod Bare Steel / None Pipe type/STP Cont Pressurized / No STP Flex Connectors LLD Model Spill/Overfill/Sm Delivery 5 gal. Spill Bucket / / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det TankTightness PipeLineTightness CP Tank Test None CP Pipe Test None INSPECTION COMMENTS None 2025-03-11 Page 1 of 3 FACILITY RESPONSES The above accurately represents the facility's release detection records Yes Financial Responsibility Financial responsibility method is ok?Yes TANK RESPONSES Tank 2 Pressure Piping Leak Detection Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank 3 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank 3 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Tank 2 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank 2 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Tank 3 Pressure Piping Leak Detection Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes DISPENSER RESPONSES MONTHLY LEAK DETECTION MONITORING Mar '24 Apr '24 May '24 Jun '24 Jul '24 Aug '24 Sep '24 Oct '24 Nov '24 Dec '24 Jan '25 Feb '25 Tank 2 Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Tank 3 Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl NON-COMPLIANCE ITEMS All items are in compliance. 2025-03-11 Page 2 of 3 Prepared by fueloperator.com Inspection Information Inspector:Perdue, Laura Record Created: March 11, 2025, 3:40 p.m. Inspection Date:March 11, 2025 2025-03-11 Page 3 of 3