Loading...
HomeMy WebLinkAboutDERR-2025-001833 SITE VISIT REPORT DATE: 3/10/2025 SITE: Chromalox SITE ADDRESS: 2150 North Rulon White Boulevard, Ogden, UT PREPARED BY: Allison Stanley Utah Department of Environmental Quality Division of Environmental Response and Remediation 195 North 1950 West Salt Lake City, UT 84116 ATTENDEES: Allison Stanley (DERR), Michael Ozier (Tetra Tech), Molly Wabel (Chromalox) ARRIVAL TIME: 2:00 PM - DEPARTURE TIME: 3:30 PM Split Samples Collected: No Is the work being performed in a manner consistent with the accepted workplan? Yes SUMMARY: The purpose of this visit was to observe the low-flow groundwater sampling for the first bi-annual groundwater event for 2025. The DERR arrived on-site at 2:00 PM and met with Michael Ozier from Tetra Tech. The DERR was present for the purging and sampling of monitoring well 10b, along the eastern boundary. It was originally thought that the well ran dry during purging, but water returned once Michael switched out the tubing. No other issues were reported for the well and all samples were bagged and placed on ice. At the time of the visit, Michael was about half way through the monitoring wells. He let me know that MW-12D is still missing, and MW-16 was obstructed, both likely a result from the recent construction. However, he was able to collect a sample from MW-19. The DERR also met with Molly Wabel from Chromalox on-site to discuss the recent expansion. All work was being performed in a manner consistent with the accepted workplan and QAPP. PHOTO LOG: Photo 1: Replacing tubing for MW-10b. Photo 2: Sampling for MW-10b. Photo 3: Samples are immediately placed on ice. Photo 4: Distance from the new building expansion to the east-adjoining property. Monitoring wells are approximately 5-10 feet from eastern boundary.