TO: FILE – SCOUT ENERGY MANAGEMENT LLC – S Wells Drw 16-5T-9-16
THROUGH: Rik Ombach, Minor Source Oil and Gas Section Manager
FROM: Chris Jensen, Environmental Scientist
DATE: March 6, 2025
SUBJECT: OIL AND GAS PERMIT-BY-RULE EVALUATION
INSPECTION DATE: February 26, 2025
SOURCE LOCATION: Lat: -110.136737 Long: 40.05507
Duchesne County
Business Office:
Scout Energy Management, LLC
13800 Montfort Drive, Suite 100
Dallas, TX 75240
SOURCE TYPE: Oil Well
API: 4301332433, 4301350638
SOURCE CONTACTS: Chris Breitling, Corporate Environmental Contact
Phone: 469-485-3418, Email: chris.breitling@scoutep.com
Kevan Stevens, Field Contact
OPERATING STATUS: Shut in
PROCESS DESCRIPTION: Oil and gas products are brought to the surface. These products
go through a separator where the oil and any water products are
sent to storage tanks (off lease) and the gas is used to power
equipment on site (pump jack engine, tank heater, separator,
flare, combustor, etc.) Any remaining gas is sent to a pipeline
that feeds a local gas plant. The oil and process water in the
storage tanks is loaded into tanker trucks and hauled off site for
processing and disposal.
APPLICABLE REGULATIONS: Utah Administrative Code (UAC) R307-500 Series for the Oil
and Gas Industry, and UAC R307-201: Emission Standards:
General Emission Standards; and UAC R307-150: Emission
Inventories. Federal Subpart: 40 CFR 60 Subpart JJJJ.
# - $ . ) . )
2
SOURCE EVALUATION: Site Type: PBR-Uncontrolled
No Flare Controls, Site powered by Engine.
DOGM current 12 month rolling production is: 0 BBLs.
This well has been shut in this year or longer.
Utah Statute R307-506 requires a source with throughput
greater than 8,000 BBLs to have controls.
REGISTERED EQUIPMENT: Engine - Natural Gas 2-Stroke Lean Burn Make - Arrow
(Lufkin) Model - L-795 Mfg Year - 2011 Horse Power - 65
Combustion - Natural Gas, Pneumatic
General Provisions Visible emissions are within the following opacity limits: VOC Control Devices and Gasoline engines 0%, Diesel engines 20%, Natural Gas Engines and Boilers, Treater burners & Tank burners 10%, Mobile source dust 10%. [ R307-201-3] In Compliance. No visible emissions were detected by use of the USEPA Method 9. VOC emissions are, at all times, minimized as reasonably practicable by equipment design, maintenance and operation practices. [R307-501-4(1)] In Compliance. Associated gas is routed to a sales gathering line. Tanks all have thief hatches and PRV's that are closed and not leaking. The expected components were found installed. All natural gas-driven pneumatic controllers are in compliance with 40CFR 60.5390 or 60.5390a as applicable. Tagging and record keeping requirements are not required. [R307-502-4] In Compliance. The natural gas-driven pneumatic controllers at this source are not continuous bleed but are low-bleed or snap acting. Natural Gas Engines Temporary Emergency Generators, in use for less than 100 days, have an operational hour meter and log book (onsite) recording hours used and maintenance performed. [40 CFR 60 Subpart IIII, JJJJ] Not Applicable. No electrical generation at this location. Associated Gas Flaring Associated gas is routed to a process unit for combustion, a sales pipeline or an operating VOC control device, except in an emergency. An emergency release is unanticipated, temporary, infrequent, unavoidable, =24 hrs. and is not due to operator negligence. Low pressure gas from working loss, breathing loss and oil flashing is not "associated gas". [R307-511-4(1)] In Compliance. Production piped off lease. There are no tanks or production equipment installed. Recordkeeping Requirements Emission Inventory An emissions inventory has been submitted within the past three years. [R307-150-9(1)] In Compliance. The operator submitted for the 2023 emissions inventory.
3
Oil and Gas Industry Registration Requirement The source is registered with the DAQ. [R307-505-3(3)] In Compliance. Registration has been updated within 30 days of a company name change, removal or addition of control devices, or termination of operations. [R307-505-3(3)] In Compliance. Natural Gas Engines Engines subject to R307-510 shall be certified or have an initial performance test per CFR 60.4244. [R307-510-4(2)] Not Applicable. This well was drilled before 2016 and the pumpjack engine is instead subject to the performance standards in NSPS (60) JJJJ. Engine certifications or initial performance tests required are kept for the life of the engine at the source. [R307-510-5] Not Applicable. This well was drilled before 2016 and the pumpjack engine is instead subject to the performance standards in NSPS (60) JJJJ. Certified and non-certified engines are regularly maintained according to the Engine manufacturer's Schedule or the Maintenance Plan. [40 CFR 60 Subpart IIII, JJJJ, 63 Subpart ZZZZ] In Compliance. A maintenance plan has been drafted and followed. Associated Gas Flaring The following records are kept: The time and date of event Volume of emissions Any corrective action taken for 3 years. [R307-511-5(1)(a)(b)] In Compliance. No reported breakdowns or releases. Applicable Federal Regulations NSPS (Part 60) JJJJ: Standards of Performance for Stationary Spark Ignition Internal Combustion Engines. In Compliance. The engine installed at this source is not certified and may have not had an initial performance test. The retention time for this document has expired. A maintenance plan has been drafted and followed.
4
PREVIOUS ENFORCEMENT
ACTIONS: None in the past 5 years.
COMPLIANCE STATUS &
RECOMMENDATIONS: In Compliance. Inclement weather conditions were outside of
reliable detection parameters for the use of an OGI camera. The
DAQ conducted a review of the rules requiring recordkeeping
and looked for installation/operation issues onsite. The operator's
representatives were pleasant and cooperative. Requested
records were provided in a timely manner and reviewed at the
local field office.
RECOMMENDATION FOR
NEXT INSPECTION: The DAQ has no recommendations for the next inspector other
than what are customary. The DAQ was joined by Scout
personnel during the site inspection.
RECOMMENDATIONS FOR NSR: None