Loading...
HomeMy WebLinkAboutDSHW-2025-001376Uf EHVsp Ue Department of Environmee Quality Divi-sion of Waste Management and Radiation Gontrol P.O. Box 144880 Salt Lake City, Utah 84114-4880 Phone (801) 536-0200 Fax (801) 536-0222 INSPECTION WORKSHEET Facility Name: Costo Wholesale #484 EPA ID Number: uTR000005082 Street Address: 648 East 800 South City: Orem Ztp= 84097 Gounty: Utah Contact Person: Louis Parra Telephone #: 706-602-8666 Generator Status: LQG Number of Employees: 290 Date of Visit: BNPUT Evaluators: Alex Pashley Other Personnel: Waste Stream/Generation Process Estimated Generation Rate Per Month Hazardous Waste Code Spilled, damaged, returned, off spec, products that that can not be resold or returned to the manufacture, and are hazardous when being disposed of. Usually SQG amounts D001, D002, D003, and many others. Electronic and un lamps, and batter versal wastes, es.a Oil and grease from the cooking of foods, i.e. fat. Non-H azardous. Estimated Quantity of Hazardous Waste Generated Per Month Date' $nP0fP t -? tr RECEIVED BY Name: (Printed) Signature: DWMRC REPRESENTATIVE: Name: (Printed) Alex Pashley Signature: Title:Title: Site: Costorem EpA #: urfrooos oB2 Date , Bl7 12017 Hazardous Waste Inspection Contingency Plan and Emergency Procedures Checklist General Requirements: Have copies been distributed to all local police and fire departments, hospitals, and State and local emergency response teams that may be called upon for assistance? R3l s-262-34@)@) 40 cFR 26s.s3 Content of the Contingency Plan: l. Does the contingency plan describe the actions facility personnel will take to minimize the hazard to human health or the environment when responding to fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste? 2. Does the contingency plan describe arrangements agreed to by local police and fire departments, hospitals, contractors, and State and local emergency response teams? 3. Does the contingency plan list the names, addresses, and phone numbers (office and home) of primary and all other persons qualified to act as emergency coordinator? 4. Does the contingency plan include a list of all emergency equipment at the facility? The list must be kept up-to-date, and include the location and a physical description of each item on the list, and a brief outline of the equipment's capab il ity. 5. Does the contingency plan include an evacuation plan for the facility? This plan must include a description of signal(s) to be used to begin an evacuation, evacuation routes, and alternate evacuation routes. 40 CFR 26s.52(a) 40 CFR 26s.s2(c) 40 cFR 26s.sz(d) 40 CFR 26s.s2(e) 40 cFR 26s.s2(f) qL, YDoes the facility have a least one employee on-site or on-call at all time who is qualified to act as the emergency coordinator?40 cFR 265.5s Does the contingency plan include procedures for activation of the internal alarm by the emergency coordinator? Does the contingency plan include provision for notiffing the appropriate State and\or local response agencies? 40 CFR 26s.56(a)(l) 40 CFR 265.s6(a)(2) ) June 2017 Page 1 of 3 Inspectors Initials Site Costco Orft ,TD000o05olEPA #: uTDoooo(Date.8l7 12017 Hazardous Waste Inspection Contingency Plan and Emergency Procedures Checklist Does the contingency plan outline the procedure(s) that the emergency coordinator will follow to immediately identify the character, source, amount, and extent of released material? 40 cFR 26s.56(b) Does the contingency plan include procedures for the emergency coordinator to follow in order to assess possible hazards to human health or the environment? 40 CFR 26s.56(c)) If it is determined that the incident could threaten human health or the environment, outside the facility, the emergency coordinator must notify the appropriate local, State and Federal agencies. Does the contingency plan include provision for notiffing the appropriate agencies? Do the notification measures include information to be reported (name and telephone # of reporter, name and address of facility, name and quantity of material(s) involved, extent of injuries, and possibility of exposure outside the facility), and identify the National Response Center and the State as parties to be notified? ro cFR 26s.s6(dxl) & (dx2 Does the plan include procedure to prevent the spread of the incident to oth er hazardous waste at the facility? 40 CFR 26s.56(e) Are measures included to monitor for leaks, pressure buildup, Bas generation, or ruptures in valves, pipes, or other equipment, when it is necessary to shut-down operations as a response to an incident? 40 cFR 26s.56(0 /k Does the contingency plan provide procedures to follow to manage the hazardous waste generated as a result of an incident? 40 CFR 26s.56(e)L,^.n Following implementation of the contingency plan, are provisions included to ensure that in the affected area(s): l. No waste that may be incompatible with the released material is treated, stored, or disposed of until the cleanup is complete. 2. That all equipment listed in the contingency plan is cleaned and fit for use prior to resuming activities at the facility. 40 cFR 26s.s6(h) 40 cFR 26s.56(hxl) 40 cFR 26s.56(hx2) June 2017 Page 2 of 3 Inspectors Initials Site Costco Gem uTD0000(EPA #: 'TDooooo*'Date .817 12017 Hazardous Waste Inspection Contingency Plan and Emergency Procedures Checklist Does the contingency plan include provisions for notiffing the appropriate federal, State and local authorities that the facility is in compliance with 40 CFR 265.56(h) prior to resuming operations in the affected area? 40 cFR 265.56(i) The contingency plan must include provision for recording the incident requiring implementation of the contingency plan and specifying information that will be recorded and reported. The requirements are as follows: l. Will a written report on the incident be provided to the Utah State Department of Environmental Quality within l5 days? 2. The following information needs to be recorded and reported: a) The name, address, and telephone # of the owner/operator; b) The name address, and telephone # of the facility; c) Date, time, and type of incident; d) Name and quantity of material(s) involved; e) Extent of injury, if any; 0 An assessment of the actual or potential hazard to human health or the environment; and g) An estimate of the quantity and disposition of recovered material(s) that resulted from the incident. 40 cFR 26s.s6(i) 40 cFR 26s.56(i) 40 CFR 265.560)(l) thru (,)(7) Page 3 of 3June 2017 Inspectors Initiar, M site, CoOt EpA #: urD;oooso 82 Date . BlTt2O17 WASTE MANAGEMENT & RADIATION CONTROL Hazardous Waste Inspection Personnel Training Checklist Facility personnel must successfully complete classroom instruction or on-the-job training which teaches them to perform their jobs, such that the facility is operated in compliance with the applicable hazardous waste management requirements. R3I s-262-3a(a)(a) 40 CFR 26s.16(aXl) OK Is the program directed by a person trained in hazar dous waste management procedures?40 CFR 26s.16(aX2)ok Does the training teach facility personnel hazardous waste management and contingency plan implementation procedures? 40 CFR 26s. l6(a)(2)Yes Does the training program include, at a minimum, the following, where applicable: l. Procedures for using, inspecting, repairing, and replacing facility emergency equipment; 2. Key parameters for automatic waste cut-off systems; 3. Communications or alarm systems; Response to fires or explosions; 5. Response to groundwater contamination incidents ; 6. Shutdown of operations; and Evacuation of personnel procedures. 40 CFR 26s.16(a)(3) 40 CFR 265.16(a)(3)(i) 40 CFR 265.16(aX3)(ii 40 CFR 26s.16(aX3)(iii) 40 CFR 26s.16(a)(3)(i 40 CFR 26s.16(a)(3)(v) l0 CFR 26s.16(a)(3Xvi ,Where applicable Have facility personnel successfully completed the personnel training program within six months of the date of their employment or assignment to the facility? 40 cFR 26s. r6(b) ok Do the facility personnel receive an annual review of their initial training?40 CFR 265.16(c)Yes June 2017 Page 1 of 2 Inspectors Initial, A Site Costco ot,urDooooouoO Date ,gfr12017EPA #: Hazardous Waste Inspection Personnel Training Checklist The owner/operator of the facility must maintain the following documents at the facility: l. The job title for each position at the facility related to hazardous waste management, and the name of the employee filling each job; 2. A written job description for each position listed under # l; 3. A written description of the type and amount of both introductory and continuing training that will be given to the employees listed in # l, and; 4. Records that document that employees have the training or job experience required by paragraphs 265.16 (a), (b), and (c). 40 cFR 26s.16 (d) 40 cFR 26s. l6(dx l ) 40 cFR 26s.16 (dX2) 40 cFR 26s.16 (dX3) 40 cFR 26s.16 (dX3) Are training records maintained at the facility for current employees and for at least three years for employees that have left the company? 40 CFR 26s-16(e) June 2017 Page 2 of 2 Inspectors Initiarr(