Loading...
HomeMy WebLinkAboutDERR-2025-001756 SITE VISIT REPORT DATE: 03/07/2025 SITE: Redwood Road Dump SITE ADDRESS: 1850 West Indiana Avenue, Salt Lake City, UT PREPARED BY: Allison Stanley Utah Department of Environmental Quality Division of Environmental Response and Remediation 195 North 1950 West Salt Lake City, UT 84116 ATTENDEES: Allison Stanley (DERR); Nancy Saunders (Terracon); Stephen Maliszeski (Terracon) ARRIVAL TIME: 10:30 AM - DEPARTURE TIME: 11:00 AM Is the work being performed in a manner consistent with the accepted workplan? Yes SUMMARY: The purpose of this visit was to discuss the installation plan for the vapor barrier at the Medical Building. The vapor barrier product (20 mil Drago Wrap) is consistent with the barrier used in other buildings at the Site. The primary concern was how to properly seal the vapor barrier to the concrete foundation with a foam layer present. Terracon and the contractor will collaborate to determine the best installation method. Installation is scheduled for mid-next week. The design for this building includes a vapor barrier only with a layer of gravel aggregate underneath. PHOTO LOG: Photo 1: Foam layer on the inside of the concrete foundation. The foam is not glued to the wall. Photo 3: Another view of the foam attached (not glued) to the concrete foundation. Photo 3: Portion of the Medical Building footprint.