Loading...
HomeMy WebLinkAboutDSHW-2025-001269Deq submit <dwmrcsubmit@utah.gov> Spill Report Main Canyon federal 11-10-15-23 1 message Ken McQueen <ken.mcqueen@coolskyenergy.com>Tue, Mar 4, 2025 at 9:02 AM To: "dwmrcsubmit@utah.gov" <dwmrcsubmit@utah.gov> Cc: Matt Eales <Matt.Eales@coolskyenergy.com> Please contact me if you have any questions. 2025.26.03_ARBEnergy_MainCanyonFederal11-10-15-23_SpillRemediation.docx 2232K 3/4/25, 2:56 PM State of Utah Mail - Spill Report Main Canyon federal 11-10-15-23 https://mail.google.com/mail/b/AEoRXRTsq2Lb8cAPPFCOd7Ox05nqdNoqaczcfdzfwC7_ZiSFBziD/u/0/?ik=adf9d5e615&view=pt&search=all&permthid…1/1 Spill Remediation For the Main Canyon Federal 11-10-15-23 February 2025 ARB Energy Utah, LLC 23501 Cinco Ranch Blvd. Suite B244 Katy, TX 77494 Consultants to ARB Energy Coolsky Energy, LLC 310 E. Broadway Prosper, TX 75078 CONTENTS 1 Project Description 2 2 Background 2 3 Notifications:2 4 Volume reported spilled:2 5 Spill Area 2 6 Initial Site Photo of Spill 3 7 Remediation 3 1 Project Description Operator ARB Energy Utah, LLC API Number 43-047-30639 Well Location Name Main Canyon Federal 11-10-15-23 Legal Location 39.528475, -109.33269722222222 Spill/Release Area ~1157 square feet Total Initial Remediation Area ~1300 Square Feet This document describes the spill, the extent of the spill, and the cleanup that occurred. 2 Background The release was discovered on February 3, 2025, and was the result of check valve failure and pipeline freeze and break. The release made its way down gradient across the site approximately 50 feet. There were no injuries as a result of the release. The hazards to the environment were resolved with the removal of the affected soil. 3 Notifications: The initial spill notification was sent to Mike Zucker at UDEC on February 13, 2025. 4 Volume reported spilled: As per Pumper Jonathon Denniston, approximately 5-10 barrels of produced water was spilled. 5 Spill Area Estimate of spill area is approximately 1157 sq feet. 6 Initial Site Photo of Spill 7 Remediation Area of remediation was approximately 1300 square feet. Stubbs and Stubs excavated two dump loads (approximately 20 yards) of material and brought in two dump loads of fresh material. Impacted soil was removed from location and disposed of at DHI Companies, Dalbo, INC & RN Industries – PO Box 1168 Vernal Utah. Office: 435-722-2800 Email: DHI-AR@Dalboholdings.com.