Loading...
HomeMy WebLinkAboutDAQ-2025-001283A .>l-..i Utah Gas Corp UGC Midstream I125 Escalante Drive Rangely, CO 81648 Phone 970.675.4400 January 24,2025 Utah Department of Environmental Quality Division of Air Quality - Compliance Section 195 North 1950 West Salt Lake City, UT 841l6 RE JTArI CAS CCt?) r,t,* ljo t4 NSPS KKK Semiannual Report Harley Dome NGL Extraction Facility Grand County, Utah *f ' ,.,, 1,. / Dear Sir/Jvladam. UGC Midstream, LTD, LLC (UGC Midstream) operates the Harley Dome NGL Extraction Facility (Harley Dome) located in Grand County, Utah. UGC Midstream is submitting this semiannual compliance report for the period of July l, 2024, through December 31, 2024, in accordance with 40 CFR Part 60, Subpart KKK. During July through December 2024, Trihydro Corporation (Trihydro) completed routine monthly monitoring for fugitive emissions as required by the Leak Detection and Repair (LDAR) program for the Harley Dome facility The monitoring activities were completed to satisfy the requirements of the New Source Performance Standard (NSPS) Subpart KKK regulation. NSPS Subpart KKK Requirements Subpart KKK requires that a semiannual report be submitted for each process unit and month within the reporting period. The semiannual report must include: o The number of valves, pressure-relief devices @RDs), pumps, and compressors for which leaks were detected. o The number of valves, PRDs, pumps, and compressors for which leaks were not repaired as required or placed on the delay of repair (DOR) list. o The facility is required to report the reason for each DOR, the dates of process unit shutdowns that occurred within the reporting period, and revisions to the component inventory. Results In accordance with USEPA Method 2l protocol, Trihydro personnel monitored components in volatile organic compound (VOC) service or in wet gas service. There were no leaks detected from components monitored during the 6-month reporting period, as reported in Attachment A. There were two (2) components added, and no components removed from the inventory during the reporting period. The revisions in the inventory are reported in Attachment A The facility was shut down August 12 through August 19,2025. If you have any questions or need any other information, please contact me at (970) 307-5032 or by email at tweiner@utaheascorp. com. Sincerely, Utah Gas Corp e'- h)tu; Taryn Weiner Manager, Air and Sustainability Attachment A: Harley DomeNSPS KKK Semi-Annual Report ATTACHMENT A NSPS KKK REPORT DATA Semi-Annual Report urAr GAS coRP From:7l1l2o24To:12t31t2024, Rule: NSPS - KKK UGC Midstream - Harley Dome Unit: Red Rock Gathering - Harley Dome No Delay of Repairs Performed. Late Repairs: No Late Repairs. signature: Z*'T fu;^ F Components: # Added. # Perm. OOS: Valves: 393 2 0 Pumps: 3 0 0 Compressors:0 0 0 PRVs:3 0 0 Month:LeakirB: l.lot Repaired in Repair Period:Leahng: l.lot Repaired in Repair Period:l-eakirB: l,ld Repaired in Repair Period:LeakirB: l.ld Repaired in Repair Period: July 2024 0 0 0 0 0 0 0 0 Augurtfr24 0 0 0 0 0 0 0 0 September 2@4 0 0 0 0 0 0 0 0 October2o.24 0 0 0 0 0 0 0 0 November 2@4 0 0 0 0 0 0 0 0 December 2@4 0 0 0 0 0 0 0 0 Delay of Repairs: