HomeMy WebLinkAboutDAQ-2025-001283A
.>l-..i
Utah Gas Corp
UGC Midstream
I125 Escalante Drive
Rangely, CO 81648
Phone 970.675.4400
January 24,2025
Utah Department of Environmental Quality
Division of Air Quality - Compliance Section
195 North 1950 West
Salt Lake City, UT 841l6
RE
JTArI CAS CCt?)
r,t,* ljo t4
NSPS KKK Semiannual Report
Harley Dome NGL Extraction Facility
Grand County, Utah
*f
' ,.,, 1,. /
Dear Sir/Jvladam.
UGC Midstream, LTD, LLC (UGC Midstream) operates the Harley Dome NGL Extraction Facility
(Harley Dome) located in Grand County, Utah. UGC Midstream is submitting this semiannual compliance
report for the period of July l, 2024, through December 31, 2024, in accordance with 40 CFR Part 60,
Subpart KKK.
During July through December 2024, Trihydro Corporation (Trihydro) completed routine monthly
monitoring for fugitive emissions as required by the Leak Detection and Repair (LDAR) program for the
Harley Dome facility The monitoring activities were completed to satisfy the requirements of the New
Source Performance Standard (NSPS) Subpart KKK regulation.
NSPS Subpart KKK Requirements
Subpart KKK requires that a semiannual report be submitted for each process unit and month within the
reporting period. The semiannual report must include:
o The number of valves, pressure-relief devices @RDs), pumps, and compressors for which leaks
were detected.
o The number of valves, PRDs, pumps, and compressors for which leaks were not repaired as
required or placed on the delay of repair (DOR) list.
o The facility is required to report the reason for each DOR, the dates of process unit shutdowns that
occurred within the reporting period, and revisions to the component inventory.
Results
In accordance with USEPA Method 2l protocol, Trihydro personnel monitored components in volatile
organic compound (VOC) service or in wet gas service. There were no leaks detected from components
monitored during the 6-month reporting period, as reported in Attachment A.
There were two (2) components added, and no components removed from the inventory during the
reporting period. The revisions in the inventory are reported in Attachment A
The facility was shut down August 12 through August 19,2025.
If you have any questions or need any other information, please contact me at (970) 307-5032 or by email
at tweiner@utaheascorp. com.
Sincerely,
Utah Gas Corp
e'- h)tu;
Taryn Weiner
Manager, Air and Sustainability
Attachment A: Harley DomeNSPS KKK Semi-Annual Report
ATTACHMENT A
NSPS KKK REPORT DATA
Semi-Annual Report
urAr GAS coRP From:7l1l2o24To:12t31t2024, Rule: NSPS - KKK
UGC Midstream - Harley Dome
Unit: Red Rock Gathering - Harley Dome
No Delay of Repairs Performed.
Late Repairs:
No Late Repairs.
signature: Z*'T fu;^
F Components:
# Added.
# Perm. OOS:
Valves: 393
2
0
Pumps: 3
0
0
Compressors:0
0
0
PRVs:3
0
0
Month:LeakirB:
l.lot Repaired in
Repair Period:Leahng:
l.lot Repaired in
Repair Period:l-eakirB:
l,ld Repaired in
Repair Period:LeakirB:
l.ld Repaired in
Repair Period:
July 2024 0 0 0 0 0 0 0 0
Augurtfr24 0 0 0 0 0 0 0 0
September 2@4 0 0 0 0 0 0 0 0
October2o.24 0 0 0 0 0 0 0 0
November 2@4 0 0 0 0 0 0 0 0
December 2@4 0 0 0 0 0 0 0 0
Delay of Repairs: