HomeMy WebLinkAboutDAQ-2025-001273\r*cJatqHr
Huntlngton Powor Plant
8 miles west of Hwthgton, Utah on IIwy. 3I
P.O. Box 6E0
Huntington, Utah 84528
Fcbruary 13,2025
Mr. Bryce Blrd, Director
Utrah Department of Environmental Quality
Division of Alr Quality
195 North 1950 West
P.O. Box 1448i20
Salt lake Clty, UT 841144f,i20
And
Dlrector, USEPA Reglon VIll
8 ENF.AT
1595 Wynkoop St.
Denver, CO 80202 -112p^
i--.--urAJt DFT,AR r MF NT ot---I Er.lvlttoNMENTAL QUALTTYI i.- -____---t
llii r_ I
RE:
I DtvtstoN oF AtR ouALtry
qlT8 $tartqrly.Qomptlance Repoil, 40 CFR 03 Subpart UUUUU, Hunttngton Powrr plant
(Tltle V Permlt #1501001005) Boflcr Unttr I and 2.
Dear Mr. Blrd:
Huntington Power Plant's Title V Permit Condltions 11.8.2.9.3 and 11.B,3.f.3 requlre the Huntington plant tosubmit Compllance Reports accordlng to the requlrements of 40 CFR 56A.lOdgtO). This submitta!oovens f}9 p€riod ftom October 1, N24, to December 31,2O24. and is intendeO tb-satsry tfroserequirements.
I am authorized to make thle eubmission on behatf of the ovners and operators of the dectod sounoe orafiected units for whlch the submission is made. I cert(f under penalty'of law that t have pereonatty
examined, and am famlllar with, the statements and informatlon submftted in this document and all itsattachments. Baaed on my lnqulry of those indivlduals with primary responstbillty for obtaining th;inbrmatbn, l.cerUfy that the statements and lnbrmatlon are to the-b€8t of my kn6dedgo and-bellef tnre,acqJrate, and complete. I am awano that there are slgnlflcant penalties for submttfing tilse sbtementsand lnformatlon, or omltting stiatements and information, lnclucilng the posslblllty of fiie or imprlsonment.
Should you !9ve any questions regarding thie information, please contact Terry Guthrle, Hunter andHuntington Plant Envlronmental Manager (43s) 6s7-4394 or ms at (495) 6s7j2i 1.
REVIEWED
Initials JBR Date 3/6/25
Comp Status Meets
File # 10238 Blue 2
units 1&2 rpt. Meets
LEE and 5U
Endosutu:afi2
,*, f,of"t
Mcru4y and Alr Tubc Anrtc*y Compllarrce Report wlh atdlln nb A thru C - Unlb I
Youn Joo KIm - USEPA Reglon Vlll#endocuro
Joeh Serdl - NTO w/o cncloourc
Scatlet Jackron - NTO w/o endoeurc
Rtrsc Wllson - Huntlngbn Plant - Flleg
YI%cIFIEoRP
Huntington Power Plant
MATS Quarterly Compliance Report Unit 1
40 CFR 63.10031(g)
October t,2024 - December 31,2024
l) i:l'ttt: t'f,f t,ru-ll7-r rl,,1l ! { 1-\lyli_r: lll,l,.l -Q!Ai
I
1
:i 'l \,'!'t'
.
ii.---____----
i )l',/i::ll.)N OF AIR .-.'ilAt
lE(r
le)
r,i l'/'r: l-, /l-.1.f ilif ---l
N, 1..,,1:l,i ll,l Qrr,\t ITY IJil
Section 1.0 - Unit I Report Summary
Huntington Power Plant, 8 miles west of Huntington Utah on Hwy 3l
P.O. Box 680
Huntington, Utah 84528
Identification of each hazardous air pollutant monitored at the affected source
t.Non-Mercury HAPS metals using a quarterly filterable particulate matter (PM) stack
test as a surrogate to demonstrate compliance. On April3,20l8 the Utah Department
of Environmental Quality - Division of Air Quality agreed that the Huntington Plant
Unit I met the requirements to qualifu as a low emitting EGU (LEE) unit. The
Huntington Plant submitted a summary table showing three years of quarterly test data.
Each particulate matter (PM) testing result was below one-half of the 0.030 lb/MMBtu
limit or 0.015 lb/MMBtu as required by the subpart.
Acid gases using sulfur dioxide (SOz) as a surrogate to demonstrate compliance by an
SOz continuous emissions monitoring system (CEMS).
Mercury (Hg), compliance demonstrated by an annual EPA Method 30B sorbent trap
test to re-confirm LEE status.
A brief description of the process unit
I.Huntington Unit I is an Electric Utility Steam Generating Unit, designed as a bottom
tangentially-fired boiler, designed by Babcock and Wilcox.
i. Rated Heat Input Capacity of 4,960 MMBtu/hr.
ii. The unit is equipped with the following add-on controls:
L Pulse Jet Fabric Filter (baghouse)
2. Wet Flue Gas Desulfurization (wet scrubber)
3. Low-NOx burner technology, with separated over-fire air
iii. Fuels used are sub-bituminous coal using #2 fuel oil for startup fuel when
needed.
Unit Category
i. Unit I is an existing coal-fired unit combusting non-low rank virgin coal
demonstrating compliance with the emission limits found in Table 2 to Subpart
UUUUU of Part 63
The emission and operating parameter limitations
i. Filterable PM quarterly stack testing demonstrating compliance with a 0.030
lb/IvIMBtu emission limit. The unit has demonstrated and achieved low
emitting EGU (LEE) status.
SOz CEMS as a surrogate for acid gases reporting hourly averages in units of
lb/IvlMBtu demonstrating compliance with a 30 boiler-operating-day average
limit of 0.20 lb/IvIMBtu.
Hg annual EPA Method 30B sorbent trap test reporting hourly averages in
units of lb/TBtu demonstrating compliance with a 30 boiler-operating-day
average of 1.2 lb/TBtu.
II.
III.
II.
III.
lt.
1il.
A description of any changes in CMS, processes, or controls since the last reporting
period
No changes occurred during the reporting period that would affect compliance to MATS.
Recent performance test results
Table 1-1: Unit I Filterable Particulate Matter LEE Test Results Sr
Table l-2: Unit I Mercula LEE Test Results SummarX
Test ID Test Date
Hg rate
(lb/TBtu)
MATS
Hg
Threshold
Unit Status
2024 0613012024 0.0r 0.12
LEE Achieved.
Maintained with
0613012024 LEE test
Section 2.0 - Unit I MATS Compliance Report Root Data Elements
Table 2-1: Root Data Elements
2.1 Faciliw ORIS Code 8069
2.2 Faciliw Name Huntinston
2.3 Facilitv Reeistry ldentifier (OzuSPL)8069
2.4 Title 40 Part 63
2.5 Applicable Subnart UUUUU
umma
Test ID Test Date
Average
PM rate
(lb/mmBtu)
MATS
PM
Limit*
Average
PM
(lb/lv[W-hr)
MATS
PM
Limit*
Unit Status
2024 03n9/2024 0.0r 0 0.030 0.10 0.30
LEE
Achieved in
201 8.
Maintained
with
311912024
LEE test
*Low Emitter Limits are 0.015 Ib/MM-BTU and 0.15 lbs/I\4W-HR
2.6 Calendar Year 2024
2.7 Calendar Ouarter 4th Ouarter
2.8 Submission Comment (optional)See cover letter
Section 3.0 - Unit I Performance Stack Test Summary
For applicable elements of Appendix E Section 3 .l -3 .14, see stack testing reports submitted for the
quarter. Stack testing data is being provided in both .xml and .pdf formats.
Section 4.0 - Operating Limit Data (PM, CPMS, only)
No PM CPMS on unit. Section not applicable.
Section 5.0 - Unit I Performance Test Run Data
For applicable elements of Appendix E Section 5.1-5.8, see stack testing reports submitted for the quarter.
Stack testing data is being provided in both .xml and .pdf formats.
Section 6.0 - Unit I Conversion Parameters
For applicable elements of Appendix E Section 6.1-6.3, see stack testing reports submitted for the quarter.
Stack testing data is being provided in both .xmland .pdf formats.
Section 7 .0 - Unit I Quality Assurance Parameters
For applicable elements of Appendix E Section 7.1-7.3, see stack testing reports submitted for the quarter.
Stack testing data is being provided in both .xml and .pdf formats.
Section 8.0 - Averaging Group
Unit is not part of an averaging group.
Section 9.0 - Unit I Compliance Averages
Please see Attachment A- I which includes 30-boiler-operating-day average data for sulfur dioxide.
Section 10.0 - Unit I Information
Fuel Usage InformationSection 1 1.0 - Unit 1
Table 11-1 Quarterly Fuel Usage Information
Table 10-1: Unit Information
Section Data Element Plant Data
l0.l Unit ID;Unit I
r0.2 Date of Last Tune-upl and December 14,2022 (Next Tune-up Feb, 2025)
10.3 Emergency Bypass Information.No emerqency bypass occurred during quarter
Month #2 Fuel Oil Burned (gallons)Sub-Bituminous Coal Burned (tons)
October 10,250 58,221
November I 5,1 93 61,617
December 2,681 62,860
Total 28,124 182,698
Note: No new fuel types were combusted during the reporting period.
Section 12.0 and 13.0 - Unit 1 Malfunction, Deviations, and Monitoring
Downtime Information
Table 12-1 Monitoring Equipment Manufacturer and Model number
Pollutant Manufacturer Model Number
Sulfur Dioxide Thermo 43iQ-ACN
Carbon Dioxide
(COz)'Thermo 4r0iQ-ACN
Table 12-2: Most Recent CMS Certification or Audit
Ul CEMS Analyzer Latest RATA Date Latest Linearity Date
Carbon Dioxide (COz)413012024 t0/16t2024
Sulfur Dioxide (SOz)4t3012024 1011612024
Table 12-3: Unit Operating Time During the Reporting Period
Ul Operating Period Hours of Unit Operation
4th Quaner,2024 2,163.69
Excess Emission Summaty
Ul Excess Emissions
Summary PM SOz Hg
Total Hours of Exceedance 0 0 0
Exceedance percent of total
operating hours 0.0%0.0%0.0%
Hours during startup and
shutdown 0 0 0
Hours during control equipment
problems 0 0 0
Hours during process hours 0 0 0
Hours during other know
problems 0 0 0
Hours during unknown causes 0 0 0
Emission Limit 0.030 0.20 1.2
Emission Limitation Unit lb/Ir4MBtu lb/]vlMBtu lb/TBtu
Emission limitation averaging
period
Annual Stack
Testing
30 boiler
operating-day
Annual Stack
Testing
' The COz analyzer is used as a diluent for calculating heat input based emission limits
Downtime percent of total opcrating hours
Total hour of CMS downtime
Hours dtre to monitoring equipment malftraAions
Hours due to non-monitoring cquipment malfunctions
Hours due to qualrty assurance/quality contnol calibrations
Hours due to other known causes
Hours due to other unknown caus€s
MATS Quartedy Compliance Report - Huntington Power Plant Unit I
Table 12.5: CMS performance summlry
Ul CMS Performance Summary
For applicable elemeots of Appendix E Sections l2.L-12.3 and l3.l -13.5, see Attachm€nts B and C.
No dwiations from rule rcquireme,lrts occurred other ihan those stated on this report and attachments.
Sections 14.0 through 30.0 - Rctbrence Method Data
For applicable elements of Appendix E Sections 14-30, see stack testing reports submitted for the quarter.
Stack testing data is being providod in both .xml and .pdf formats.
Section 31.0 - Other Intbrmation for Each Test or Test Series
ln accordance with section 31.0 and to provide reporting transparency, all stack testing data
relwant to compliance with Subpart UUUUU of Part 63 is being submitted in pdf formatwith
this quarterly compliance report.
Report Certification
Responsible offEcial certifring thc accuracy of the report:
Managing Director - Huntington Power Plant
./
orte, Z /' ,/l t
{-u^H,ntslan
Attachments:
Attachment A: MATS 30-Day Rolling SOz lb/]vlMBtu Average Data
Attachment B: SOz Monitor Downtime Events Report
Attachment C: Excess Emissions Report
Attachment A - MATS 30 Day Rolling Average
Plant: HUNTINGTON Pl-Al.lT
Repoft Period: 1010U2024 Throuqh 1213112024
Source: UNIT1 Parameter: MT3SO2#B
Date l-Day Avg 30-Day Avg Total
Operatang
valid
Operatlng
Invalid
Operating
Monltor
Avallability
10t1t2024 0.07 0.05 719 719 0 100.0%
10t42024 0.07 0.05 719 719 0 100.0%
101312024 0.08 0.05 7',19 719 0 100.0%
10t412024 0.05 0.05 719 719 0 100.0%
10t5t2024 0.09 0.05 719 719 0 100.0%
10t6t2024 0.07 0.05 719 719 0 100.0%
10nD024 0.10 0.05 719 719 0 100.0%
10t8t2024 0.07 0.05 719 719 0 100.0%
10t912024 0.07 0.05 719 719 0 100.0%
10t10t2024 0.09 0.06 719 719 0 100.0%
1U11n024 0.07 0.06 719 719 0 100.0%
10t142024 0.06 0.06 719 719 0 100.0%
10t13t2024 0.05 0.06 719 719 0 100.0%
10t14t2024 0.04 0.06 717 717 0 100.0olo
10t15t2024 0.07 0.06 714 714 0 100.0%
't0t16t2024 0.()4 0.06 714 714 0 100.0%
10t17t2024 0.06 0.06 714 714 0 100.0%
10t18t2024 0.06 0.06 714 714 0 100.0%
10t19t2024 0.05 0.06 714 714 0 100.0%
10120t2024 0.03 0.06 714 714 0 100.0olo
10t2112024 0.03 0.06 714 714 0 100.0%
10t22t2024 0.05 0.06 714 714 0 100.0%
10t23t2024 0.02 0.06 714 714 0 100.0%
10n412024 0.04 0.06 714 714 0 '100.0%
1012512024 0.05 0.06 715 715 0 100.0%
10t26t2024 0.05 0.06 715 715 0 100.0%
10t27t2024 0.04 0.06 715 715 0 100.0%
10t28t2024 0.04 0.06 715 715 0 1OO.0o/o
10t29t2024 0.00 0.06 715 715 0 100.0%
10130t2024 0.00 0.06 715 715 0 100.0%
10t3'u2024 0.06 0.06 713 713 0 100.0%
11t1t2024 0.05 0.06 713 713 0 100.0%
11t2t2024 0.02 0.06 713 713 0 100.0%
11t312024 0.03 0.05 713 713 0 100.0%
1114t2024 0.06 0.05 713 713 0 100.0%
11t5t2024 0.06 0.05 713 713 0 100.0%
'11t6t2024 0.09 0.0s 7'13 713 0 100.0%
rnt2024 0.11 0.06 713 713 0 100.0%
11t8t2024 0.08 0.06 713 7',t3 0 100.0%
11t9t2024 0.05 0.05 7'.t3 713 0 100.0%
Value = Offline Data
Valuet = Averate represents a bulldlng 30D Average
Value = Exceedance
Report Generated: 05 / 23 / 24 08:38
Report Version 5.2
HTN DAHS04\\reportuser
Attachment A - MATS 30 Day Rolling Average
P|ant: HUNTINGTON PI.ANT
Report Period: t010L12024 Throuqh L213L12024
Source: UNIT1 Parameter: MT3SO2#B
11t10t2024 0.03 0.05 713 713 0 100.0%
11t1112024 0.06 0.05 713 713 0 100.0%
11t12t2024 0.05 0.05 713 713 0 100.0%
11t1312024 0.09 0.05 713 713 0 100.0%
11t14t2024 0.06 0.05 713 713 0 100.0%
11t1512024 0.06 0.05 715 715 0 100.0%
11t16t2024 0.06 0.05 718 718 0 100.0%
11t1712024 0.05 0.05 718 718 0 100.0%
11t18t2024 0.05 0.05 718 718 0 100.0%
11t19t2024 0.04 0.05 718 718 0 100.0%
11t20t2024 0.05 0.05 718 718 0 100.0%
11t21t2024 0.07 0.05 718 718 0 100.0%
t242024 0.07 0.06 718 718 0 100.0%
11t23t2024 0.07 0.06 718 718 0 '100.0%
11t24t2024 0.06 0.06 718 718 0 100.0%
11t25t2024 0.09 0.06 718 718 0 100.0%
't1t26t2024 0.08 0.06 718 718 0 100.0%
11t27t2024 0.06 0.06 718 7',tg 0 100.0%
11t28t2024 0.07 0.06 718 718 0 100.0%
11t29t2024 0.09 0.06 718 718 0 100.0%
11t30t2024 0.09 0.06 720 720 0 100.0%
1211t2024 0.08 0.06 720 720 0 100.0%
12t2t2024 0.10 0.07 720 720 0 100.0%
1?,3t2024 0.08 0.07 720 720 0 100.0%
12t4t2024 0.09 0.07 720 720 0 1OO.Oo/o
12t5D024 0.08 0.07 720 720 0 100.0%
't2,6t2024 0.09 0.07 720 720 0 100.0%
12t7t2024 0.04 0.07 720 720 0 100.0%
1?,8t2024 0.05 0.07 720 720 0 1OO.Oo/o
12t9t2024 0.07 0.07 720 720 0 100.0%
12t',t0t2024 0.08 0.07 720 720 0 100.0%
12t11t2024 0.09 0.07 720 720 0 100.0%
12t12t2024 0.10 0.07 720 720 0 100.0%
1?,13t2024 0.05 0.07 720 720 0 100.0%
12114t2024 0.02 0.07 720 720 0 100.0%
12t15t2024 0.03 0.07 720 720 0 100.0%
1U16t2024 0.05 0.07 720 720 0 100.0%
1211712024 0.06 0.07 720 720 0 100.0%
1?,18t2024 0.03 0.07 720 720 0 100.0%
1211912024 0.04 0.07 720 720 0 100.0%
12t20t2024 0.06 0.07 720 720 0 100.0%
12,21D024 0.05 0.07 720 720 0 100.0%
12t22t2024 0.03 0.07 720 720 0 100.0%
Value = Offline Data
Valuer = Average represents a buildinS 30D Average
Value = Exceedance
Report Generated 05 / 23 / 2a 08:38
Report Version 5.2
HTNDAHS04\\reportuser
Attachment A - MATS 30 Day Rolling Average
Plant: HUNTINGTON PLANT
Report Period: L010112024 Throuqh L213112024
Source: UNIT1 Parameter: tlT3SO2#B
12t23t2024 0.05 0.06 720 720 0 100.0olo
't2124t2024 0.04 0.06 720 720 0 100.0%
12t2512024 0.04 0.06 720 720 0 100.0%
't2t26t2024 0.M 0.06 720 720 0 100.0%
12t27D024 0.04 0.06 720 720 0 100.0%
12t28t2024 0.05 0.06 720 720 0 100.0%
12t29t2024 0.04 0.06 720 720 0 100.0%
1?,30D024 0.06 0.06 720 720 0 100.0%
12t31t2024 0.06 0.06 720 720 0 100.0%
Value = Offline Data
Value' = Average represents a building 30D Average
Value = Exceedance
Report Generated: o5/23/24 08:38
Report Version 5.2
HTN DAHS04\\reportuser
Attachment B
CEMS Monitor Outage Report - Iluntington Unit I
Sulfur Dioxide (SOr) System Monitor Outage (lb/lVIMBtu)
Total duration of monitor downtime I hours
Description of CausedCorrective Actions.
*Cause:724 Hours due to other known causes.
'Corrective Action: b Maintenance of another monitor required normal
sampling to be intemrpted. The system was
returned to service followinc the maintenance.
Attachment C
Unit 1 Excess Emissions Report
PM Excess Emissions
0.030 lb/MMBtu (36 Month Performance Test - LEE)
Total time for all excess emissions 0.0 hours
Total time for excess emissions occurring during startup/shutdown or malfunction 0.0
hours
Malfunction reason and corrective /preventive action taken)
No PM Excess Emissions occurred during the reporting period
No PM Malfunction occurred during the reporting period
SOz Excess Emissions
0.20 lbA{MBtu (CEMS - 30 Boiler Operating Day Average)
Total time for all excess emissions 0.0 hours
Total time for excess emissions occurring during startup/shutdown or malfunction 0.0
hours
Malfunction reason and corrective /preventive action taken)
No SOz Excess Emissions occurred during the reporting period
SOz monitor equipment malfunctions noted in Attachment B.
Excess
Emission
Incident
Number
Magnitude
of Excess
Emissions
lb/MMBtu
Date Time
Beginning
Time
Ending
Hours
Involved
Malfunction
YN Cause Corrective
Action
Excess
Emission
Incident
Number
Magnitude
of Excess
Emissions
lb/MMBiu
Date Time
Beginning
Time
Ending
Hours
lnvolved
Malfunction
YA[Cause Corrective
Action
Hg Excess Emissions
1.2 lb/TBtu - Annual, 30-day Mercury Performance Test - LEE
Total time for all excess emissions QQ hours
Total time for excess emissions occurring during startup/shutdown or malfunction 0.0
hours
Malfunction reason and corrective /preventive action taken)
No Hg Excess Emissions occurred during the reporting period
Hg monitor equipment malfunctions noted in Anachment B.
Excess
Emission
Incident
Number
Magnitude
of Excess
Emissions
Ib/MMBtu
Date Time
Beginning
Time
Ending
Hours
Involved
Malfunction
Y/N Cause Corrective
Action
l?ncrFrEoRP
Huntington Power PIant
MATS Quarterly Compliance Report Unit 2
40 cFR 63.10031(e)
October L,2024, to December 3L,2024
Section 1.0 - Unit 2 Report Summary
Name and address of the affected source
Huntington Power Plant, 6 miles west of Huntington Utah on Hwy 3 I
P.O. Box 680
Huntington, Utah 84528
Identification of eachhazardous air pollutant monitored at the affected source
Non-Mercury HAPS metals using a quarterly filterable particulate matter (PM) stack
test as a surrogate to demonstrate compliance. On April 3, 2018 the Utah Department
of Environmental Quality - Division of Air Quality agreed that the Huntington Plant
Unit2 met the requirements to qualift as a low emitting EGU (LEE) unit. The
Huntington Plant submitted a summary table showing three years of quarterly test data.
Each particulate matter (PM) testing result was below one-half of the 0.030 lb/MMBtu
limit or 0.015 lb/MMBtu as required by the subpart.
Acid gases using sulfur dioxide (SOz) as a surrogate to demonstrate compliance by an
SOz continuous emissions monitoring system (CEMS).
III. Mercury (Hg), compliance demonstrated by an annual EPA Method 30B sorbent trap
test to re-confirm LEE status.
A brief description of the process unit
Huntington Unit2 is an Electric Utility Steam Generating Unit, designed as a bottom
tangentially-fired boiler, designed by Babcock and Wilcox.
i. Rated Heat Input Capacity of 4,960 MMBtu/hr.
ii. The unit is equipped with the following add-on controls:
l. Pulse Jet Fabric Filter (baghouse)
2. Wet FIue Gas Desulfurization (wet scrubber)
3. Low-NOx burner technology, with separated over-fire air
iii. Fuels used are sub-bituminous coal using #2 fuel oil for startup fuel when
needed.
Unit Category
i. Unit I is an existing coal-fired unit combusting non-low rank virgin coal
demonstrating compliance with the emission limits found in Table 2 to Subpart
UUUUU of Part 63
The emission and operating parameter limitationsi. Filterable PM quarterly stack testing demonstrating compliance with a 0.030
lb/Tr4MBtu emission limit. The unit has demonstrated and achieved low
emitting EGU (LEE) status.
ii. SOz CEMS as a surrogate for acid gases reporting hourly averages in units of
lb/tlMBtu demonstrating compliance with a 30 boiler-operating-day average
limit of 0.20 lb/Ir4MBtu.
I.
II.
I.
II.
III,
iii. Hg annual EPA Method 308 sorbent trap test reporting hourly averages in
units of lb/TBtu demonstrating compliance with a 30 boiler-operating-day
average of 1.2 lb/TBtu.
A description of any changes in CMS, processes, or controls since the last reporting
period
No changes occurred during the reporting period that would affect compliance to MATS.
Recent performance test results
Table l-1: Unit 2 Filterable Particulate Matter LEE Test Results Summary
Test ID Test Date
Average
PM rate
(lb/mmBtu)
MATS
PM
Limit*
Average
PM
(lb/IvIW-hr)
MATS
PM
Limit*
Unit Status
2024 0410912024 0.009 0,030 0.08 0.30
LEE
Achieved in
2018.
Maintained
with
41912024
LEE test
tl-ow Emitter Limits are 0.015 lbA,lM-BTU and 0.15 lbs/TvIW-HR
Table l-2: Unit 2 Mercury LEE Test Results Summara
Test ID Test Date
Hg rate
(lb/TBtu)
MATS
Hg
Threshold
Unit Status
2024 0412912024 0.01 0.12
LEE Achieved.
Maintained with
412912024 LEE test
Section 2.0 - Unit 2 MATS Compliance Report Root Data Elements
Table 2-1: Root Data Elements
2.1 Facilitv ORIS Code 8069
2.2 Facilitv Name Huntineton
2.3 Facilitv Reeistrv Identifi er (OzuSPL)8069
2.4 Title 40 Part 63
2.5 Aoolicable Suboart UUUUU
2.6 Calendar Year 2024
2.7 Calendar Ouarter 4th Ouarter
2.8 Submission Comment (ootional)See cover letter
Section 3.0 - Unit 2 Performance Stack Test Summary
For applicable elements of Appendix E Section 3.1-3.14, see stack testing reports submitted for the
quarter. Stack testing data is being provided in both .xmland .pdf formats.
Section 4.0 - Operating Limit Data (PM, CPMS, only)
No PM CPMS on unit. Section not applicable.
Section 5.0 - Unit 2 Performance Test Run Data
For applicable elements of Appendix E Section 5.1-5.8, see stack testing reports submitted for the quarter.
Stack testing data is being provided in both .xml and .pdf formats.
Section 6.0 - Unit 2 Conversion Parameters
For applicable elements of Appendix E Section 6.1-6.3, see stack testing reports submitted for the quarter.
Stack testing data is being provided in both .xml and .pdf formats.
Section 7 .0 - Unit 2 Quality Assurance Parameters
For applicable elements of Appendix E Section 7.1-7.3, see stack testing reports submitted for the quarter.
Stack testing data is being provided in both .xml and .pdf formats.
Section 8.0 - Averaging Group
Unit is not part of an averaging group.
Section 9.0 - Unit 2 Compliance Averages
Please see Attachment A-l which includes 30-boiler-operating-day average data for sulfur dioxide.
Section 10.0 - Unit 2 Information
Section I 1.0 - Unit 2 Fuel Usage Information
Table 1l-l Quarterly X'uel Usage Information
Table 10-l: Unit Information
Section Data Element Plant Data
l0.l Unit TD Unit 2
10.2 Date of Last Tune-up December 4.2023
10.3 Emergency Bypass Information.No emergency bypass occurred durine quarter
Month #2 Fuel Oil Burned (gallons)Sub-Bituminous Coal Bumed (tons)
October 12,021 58,221
November 19,996 61,617
December 3,047 62,860
Total 35,064 182,698
Note: No new fuel types were combusted during the reporting period.
Equipment Manufacturer and Model number
Model Number
Sulfur Dioxide 43iQ-ACN
4l0iQ-ACN
Section 12.0 and 13.0 - Unit 2 Malfunction, Deviations, and Monitoring
Downtime Information
Table 12-1
Table 12-2: Most Recent CMS Certification or Audit
Table 12-3: Unit Operating Time During the Reporting Period
U2 Operating Period Hourc of Unit Operation
4th Quarter,2024 2,112.77
Table 12-4: Excess Emission Summary
t The COz analyzer is used as a diluent for calculating heat input based emission limits
5
U2 CEMS Analyzer Latest RATA Date Latest Linearity Date
Carbon Dioxide (COz)4t1t/2024 10t23t2024
Sulfur Dioxide (SOz)4t1112024 1012312024
U2 Excess Emissions
Summaly PM SOz Hg
Total Hours of Exceedance 0 0 0
Exceedance percent of total
operating hours 0.0%0.0Y"0.0%
Hours during startup and
shutdown 0 0 0
Hours during control equipment
problems 0 0 0
Hours during process hours 0 0 0
Hours during other know
problems 0 0 0
Hours during unknown causes 0 0 0
Emission Limit 0.030 0.20 t.2
Emission Limitation Unit lbs/MMBtu lbs/MMBtu lbs/TBtu
Emission limitation averaging
period
Annual Stack
Testing
30 boiler
operating-day
Annual Stack
Testing
Downtime pe,rc€ot of total opcrating hours
Total hornof CMS downtime
Hours due to monitoring equipment malfunc-tions
Hours dtrc to quality assurance/quality contrrol calibrations
Hours duc to othcr known causes
Hours due to other unknown causeg
MATS Quarterly Compliance Report -- Huntington Power Plant Unit 2
Trble 12.5: CMS
For applicable elements of Appcndix E Sectioos l2.l-12.3 and l3.l-13.5, see Attachmeots B andC.
No deviatioas from rulc requircments occurred othcrthan thosc statodon thie rcport md attachments.
Sections 14.0 through 30.0 - Reference Method Data
For applicable elemeote of Appe,udix E Sections 14-30, see stack testing reports nrbmitted for the quarter.
Stack testing data is being provided in both .xml and .pdf formats.
Section 31.0 - Other Information for Each Test or Test Series
In accordance with section 31.0 and to provide reporting transpanency, all stack testing data
relevant to compliance with Subpart LJITUW of Part 63 is being submitted in pdf forrrat with
this quarterly compliance report.
Report Certification
accuracy ofthe report:
Managing Director- Huntington Power Plant
Attachments:
Attachment A: MATS 30-Day Rolling SOz lb/IvIMBtu Average Data
Attachment B: SOz Monitor Downtime Events Report
Attachment C: Excess Emissions Report
7
Attachment A - MATS 30 Day Rolling Average
P|ant: HUNTINGTON PI.ANT
Report Period: L010L12024 Throuqh tZl3ll2024
Source: UNIT2 Parameter: MT3SO2#B
Date l-Day Avg 30-Day Avg Total
Operating
Valid
Operating
Invalid
Operating
llarrn
Monator
Availability
10t1t2024 0.03 0.03 719 718 1 99.9%
10t2t2024 0.03 0.03 719 718 1 99.9%
10t3t2024 0.04 0.03 719 718 1 99.9%
1014D024 0.03 0.03 719 718 1 99.9%
10t5t2024 0.04 0.03 719 718 1 99.9%
10t6t2024 o.02 0.03 719 718 1 99.9%
10n/2024 0.03 0.03 719 718 1 99.9%
10t8t2024 o.o2 0.03 719 718 1 99.9%
1019t2024 0.04 0.03 719 718 ,|99.9%
ot10t2024 0.04 0.03 715 714 1 99.9%
0t1112024 0.00 0.03 715 714 ,|99.9%
0t12t2024 0.03 0.03 701 700 1 99.9%
0t13t2024 0.02 0.03 701 700 1 99.9%
0t14t2024 0.03 0.03 701 700 1 99.9%
0t15t2024 0.03 0.03 701 700 1 99.9%
0t16t2024 0.o2 0.03 701 700 1 99.9%
0117t2024 0.03 0.03 701 700 1 99.9%
0t18t2024 0.03 0.03 701 700 1 99.9%
0t19t2024 0.02 0.03 701 700 1 99.9%
0t20t2024 0.02 0.03 701 700 1 99.9%
0t21t2024 0.01 0.03 701 701 0 100.0%
0t22t2024 0.03 0.03 701 701 0 100.0%
0t23t2024 0.03 0.03 701 701 0 100.0%
0t24t2024 0.03 0.03 701 701 0 100.0%
10t25t2024 0.04 0.03 701 701 0 00.0%
10t26t2024 0.04 0.03 702 702 0 00.0%
10t27t2024 0.04 0.03 702 702 0 00.0%
10t28t2024 0.04 0.03 702 702 0 00.0%
10t29t2024 0.03 0.03 702 702 0 00.0%
10t30t2024 0.03 0.03 702 702 0 00.0%
10t31t2024 0.04 0.03 702 702 0 00.0%
't1t1t2024 0.02 0.03 702 702 0 00.0%
11t212024 0.01 0.03 702 702 0 00.0%
11t3t2024 0.01 0.03 702 702 0 100.0%
1114D024 0.03 0.03 702 702 0 100.0%
11t512024 0.04 0.03 702 702 0 '100.0%
11t6t2024 0.02 0.03 702 702 0 100.0%
11n/2024 0.03 0.03 702 702 0 100.0%
11t8t2024 0.05 0.03 699 699 0 100.0%
11t9t2024 0.03 0.03 699 699 0 100.0%
Value = Offline Data
Valuer = Averate represents a buildlng 30D Average
Value = Exceedance
Report Generated: 08 /O9 I 24 13:72
Report Version 5.2
HTN DAHS04\\reportuset
Attachment A - MATS 30 Day Rolling Average
Plant: HUNTINGTON PLANT
Report Period: L010L12024 Throuqh LZl3Ll2O24
Source: UNIT2 Parameter: MT3SO2#B
11t1012024 0.03 0.03 703 703 0 100.0%
11t 1t2024 0.04 0.03 717 717 0 100.0%
't't I 2t2024 0.03 0.03 717 714 3 99.6%
11t 312024 0.04 0.03 717 714 3 99.6%
't't I 4t2024 0.03 0.03 717 714 3 99.6%
11t1512024 0.02 0.03 717 714 3 99.6%
11t16t2024 0.03 0.03 717 714 3 99.6%
1'.v17t2024 0.03 0.03 717 714 3 99.6%
11t18t2024 0.03 0.03 717 714 3 99.6%
11t19t2024 0.04 0.03 713 710 3 99.6%
11t20t2024 0.00 0.03 713 710 3 99.6%
f n1D024 0.00 0.03 713 710 3 99.6%
rDa2024 0.02 0.03 713 710 3 99.6%
11t2312024 0.03 0.03 713 710 3 99.6%
1',U24t2024 0.03 0.03 713 710 3 99.6%
11t25t2024 0.04 0.03 713 710 3 99.6%
11t26t2024 0.04 0.03 713 710 3 99.6%
11t27t2024 0.02 0.03 713 710 3 99.6%
11t2812024 0.02 0.03 713 710 3 99.6%
11t29t2024 0.04 0.03 7',t3 710 3 99.6%
11130t2024 0.03 0.03 713 710 3 99.6%
12t112024 0.03 0.03 713 710 3 99.6%
12t2t2024 0.03 0.03 713 710 3 99.6%
12t3t2024 0.04 0.03 713 710 3 99.6%
1AU2024 0.03 0.03 713 710 3 99.6%
1U5t2024 0.03 0.03 713 710 3 99.6%
12/612024 0.03 0.03 713 710 3 99.6%
12nD024 0.03 0.03 713 710 3 99.6%
1218t2024 0.02 0.03 713 710 3 99.6%
12t9t2024 0.04 0.03 713 7'.10 3 99.6%
12t10t2024 0.04 0.03 716 713 3 99.6%
12t11t2024 0.03 0.03 716 7 3 3 99.6%
12t1212024 0.04 0.03 714 7 1 3 99.6%
12t13t2024 0.04 0.03 714 7 1 3 99.6%
1?,14t2024 0.01 0.03 714 7 4 0 100.0%
1?,15t2024 0.02 0.03 714 7 4 0 100.0%
12t16t2024 0.04 0.03 714 7 4 0 100.0%
12t17t2024 0.03 0.03 714 7 4 0 100.0%
12t18t2024 0.02 0.03 714 7 4 0 100.0%
12t19t2024 0.02 0.03 714 7 4 0 100.0%
12t20t2024 0.02 0.03 714 7't4 0 100.0%
12t21t2024 0.02 0.03 718 7'18 0 100.0%
121242024 0.02 0.03 718 718 0 100.0%
Value = Offline Data
Valuer = Average represents a building 30D Average
Value = Exceedance
Report Generated: 08 / 09 / 24 B :LZ
Report Version 5.2
HTN DAHS04\\reportuser
Attachment A - MATS 30 Day Rolling Average
Plant: HUNTINGTON PI-ANT
Report Period: L010L12024 Throuqh L213L12024
Source: UNIT2 Parameter: i"1T3SO2#B
12t23t2024 0.02 0.03 718 718 0 100.0olo
1?,2U2024 0.02 0.03 718 718 0 100.0%
1U25t2024 o.02 0.03 718 718 0 100.0o/o
12t26t2024 0.02 0.03 718 718 0 100.0%
12t2712024 o.02 0.03 718 718 0 100.0%
12t2812024 0.02 0.03 718 718 0 100.0%
12t29t2024 0.02 0.03 718 718 0 1OO.Oo/o
1i,30t2024 0.03 0.03 718 718 0 100.0%
12t31t2024 0.03 0.03 718 718 0 100.0%
Value = Offline Data
Valuer = Averate represents a building 30D Average
Value = Exceedance
Report Generated: 08/ 09 / 24 l3:L2
Report Version 5.2
HTN DAHS04\\reportuser
Attachment B
CEMS Monitor Outage Report - Huntinglon U2
SulfurDioxide (SOz) Systcm Monitor Outage (lb/MMBtu)
Total duration of monitor downtime 3 hours
Description of Causes/Conective Actions.
rCause:724 Hours due to other known causes.
'Corrective Action: k A daily calibration reference gas bottle was
empty, resulting in an invalid calibration fail. The
bottle was changed, and a second calibration
initiated.
Attachment C
Unit 2 Excess Emissions Report
PM Excess Emissions
0.030 lbA,lMBtu (36 Month Performance Test - LEE)
Total time for all excess emissions QQ hours
Total time for excess emissions occurring during startup/shutdown or malfunction 0.0
hours
Malfunction reason and corrective /preventive action taken)
No PM Excess Emissions occurred during the reporting period
No PM Malfunction occurred during the reporting period
SOz Excess f,missions
0.20 lb/MMBtu (CEMS - 30 Boiler Operating Day Average)
Total time for all excess emissions 0.0 hours
Total time for excess emissions occurring during startup/shutdown or malfunction 0.0
hours
Malfunction reason and corrective /preventive action taken)
No SOz Excess Emissions occurred during the reporting period
SOz monitor equipment malfunctions noted in Attachment B.
Excess
Emission
Incident
Number
Magnitude
of Excess
Emissions
lb/MMBtu
Date Time
Beginning
Time
Ending
Hours
Involved
Malfunction
Y/N Cause Corrective
Action
Excess
Emission
Incident
Number
Magnitude
of Excess
Emissions
lb/MMBtu
Date Time
Beginning
Time
Ending
Hours
Involved
Malfunction
Y/N Cause Corrective
Action
Excess
Emission
Incident
Number
Magnitude
of Excess
Emissions
lb/MMBtu
Date Time
Beginning
Time
Ending
Hours
Involved
Malfunction
Y/N Cause Corrective
Action
llg Excess Emissions
1.2 lb/TBtu - Annual, 30-day Mercury Performance Test - LEE
Total time for all excess emissions QQ hours
Total time for excess emissions occurring during startup/shutdown or malfunction 0.0
hours
Malfunction reason and corrective /preventive action taken)
No Hg Excess Emissions occrrred during the reporting period
Hg monitor equipment malfunctions noted in Attachment B.
L,'i All DFI)Al1'l'MlrNT OF
cj \:\,/t,?()N ll r: NiAL Q LJAL ITY
,-: ? i, :1,1\ l
-_--J. i!'rs!oN oF AIR Ol ln LlTY