Loading...
HomeMy WebLinkAboutDERR-2025-001671Utah Department of Environmental Quality - UST Release Detection TANK OWNERSHIP Name WEST HAVEN TRUCK STOP Address 2105 S 1100 W WEST HAVEN, UT 84401 Contact WEST HAVEN TRUCK STOP Phone Email kornercstore@gmail.com TANK LOCATION Name WEST HAVEN TRUCK STOP Address 2105 S 1100 W OGDEN, UT 84401 A Operator PIYUSH (Paul) K. PATEL Phone (801) 839-6116 B Operator SAME Phone SAME Facility ID: 1200384 Inspection Date: 02/27/2025 DISPENSER DETAILS DISP ID/ALT ID SUBSTANCE UDC PIPE FLEX LOC INSTALL DATE UDC INSTALL DATE FIRE VALVE SAT PRESENT UDC TEST DISP FLEX CP TEST 1 - 1/2 Gasoline No Steel Flex Galvanic CP None None Yes No None Aug. 4, 2022 2 - 3/4 Gasoline No Steel Flex Galvanic CP None None Yes No None Aug. 4, 2022 3 - 5/6 Gasoline No Steel Flex Galvanic CP None None Yes No None Aug. 4, 2022 4 - 7/8 Gasoline No Steel Flex Galvanic CP None None Yes No None Aug. 4, 2022 5 - 9 Diesel No Steel Flex Galvanic CP None None Yes Yes None Aug. 4, 2022 6 - 10 Diesel No Steel Flex Galvanic CP None None Yes Yes None Aug. 4, 2022 7 - 11 Diesel No Steel Flex Galvanic CP None None Yes Yes None Aug. 4, 2022 8 - 12/13 Diesel No Steel Flex Galvanic CP None None Yes No None Aug. 4, 2022 9 - 14/15 Diesel No Steel Flex Galvanic CP None None Yes No None Aug. 4, 2022 10 - 9 Satellite Diesel No Steel Flex Galvanic CP None None Yes Yes None Aug. 4, 2022 11 - 10 Satellite Diesel No Steel Flex Galvanic CP None None Yes Yes None Aug. 4, 2022 12 - 11 Satellite Diesel No Steel Flex Galvanic CP None None Yes Yes None Aug. 4, 2022 TANK DETAILS Tank ID/Alt ID 1 / 1 E-Gen/AST No / No Siphon/Compart No / No Tank Status Currently In Use Installed/Cap/Loc July 8, 1989 / 12000 / Center Substance Stored Gasoline / Regular Tank Material- Mod Galvanic Cathodic Protection (STIP3)-None ATG Veeder Root / TLS-350 CSLD No Manifold LTT Test April 24, 2024 LLD Test April 24, 2024 Pipe Material- Mod Fiberglass Reinforced Plastic / None Pipe type/STP Cont Pressurized / No STP Flex Connectors Steel Flex Galvanic CP LLD Model FE Petro MLD (blue) Spill/Overfill/Sm Delivery 5 gal. Spill Bucket / Overfill alarm / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det TankATG PipeAutoLineLeakDetection / PipeLineTightness CP Tank Test Aug. 4, 2022 CP Pipe Test None 2025-02-27 Page 1 of 13 Tank ID/Alt ID 2 / 2 E-Gen/AST No / No Siphon/Compart No / No Tank Status Currently In Use Installed/Cap/Loc July 8, 1989 / 12000 / West Substance Stored Gasoline / Regular Tank Material- Mod Galvanic Cathodic Protection (STIP3)-None ATG Veeder Root / TLS-350 CSLD No Manifold LTT Test April 24, 2024 LLD Test April 24, 2024 Pipe Material- Mod Fiberglass Reinforced Plastic / None Pipe type/STP Cont Pressurized / No STP Flex Connectors Steel Flex Galvanic CP LLD Model FE Petro MLD (blue) Spill/Overfill/Sm Delivery 5 gal. Spill Bucket / Overfill alarm / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det TankATG PipeAutoLineLeakDetection / PipeLineTightness CP Tank Test Aug. 4, 2022 CP Pipe Test None Tank ID/Alt ID 3 / 3 E-Gen/AST No / No Siphon/Compart No / No Tank Status Currently In Use Installed/Cap/Loc July 8, 1989 / 6000 / East Substance Stored Gasoline / Premium Tank Material- Mod Galvanic Cathodic Protection (STIP3)-None ATG Veeder Root / TLS-350 CSLD No Manifold LTT Test April 24, 2024 LLD Test April 24, 2024 Pipe Material- Mod Fiberglass Reinforced Plastic / None Pipe type/STP Cont Pressurized / No STP Flex Connectors Steel Flex Galvanic CP LLD Model FE Petro MLD (blue) Spill/Overfill/Sm Delivery 5 gal. Spill Bucket / Overfill alarm / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det TankATG PipeAutoLineLeakDetection / PipeLineTightness CP Tank Test Aug. 4, 2022 CP Pipe Test None Tank ID/Alt ID 4 / 4 E-Gen/AST No / No Siphon/Compart No / No Tank Status Currently In Use Installed/Cap/Loc July 8, 1989 / 12000 / East Substance Stored Diesel / Diesel #2 (U.L.S.) Tank Material- Mod Galvanic Cathodic Protection (STIP3)-None ATG Veeder Root / TLS-350 CSLD No Manifold LTT Test April 24, 2024 LLD Test April 24, 2024 Pipe Material- Mod Fiberglass Reinforced Plastic / None Pipe type/STP Cont Pressurized / No STP Flex Connectors Steel Flex Galvanic CP LLD Model Red Jacket / VR FX1DV Spill/Overfill/Sm Delivery 5 gal. Spill Bucket / Overfill alarm / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det TankATG PipeAutoLineLeakDetection / PipeLineTightness CP Tank Test Aug. 4, 2022 CP Pipe Test None 2025-02-27 Page 2 of 13 Tank ID/Alt ID 5 / 5 E-Gen/AST No / No Siphon/Compart No / No Tank Status Currently In Use Installed/Cap/Loc July 8, 1989 / 12000 / Center Substance Stored Diesel / Diesel #2 (U.L.S.) Tank Material- Mod Galvanic Cathodic Protection (STIP3)-None ATG Veeder Root / TLS-350 CSLD No Manifold LTT Test April 24, 2024 LLD Test April 24, 2024 Pipe Material- Mod Fiberglass Reinforced Plastic / None Pipe type/STP Cont Pressurized / No STP Flex Connectors Steel Flex Galvanic CP LLD Model Red Jacket / VR FX1V Spill/Overfill/Sm Delivery 5 gal. Spill Bucket / Overfill alarm / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det TankATG PipeAutoLineLeakDetection / PipeLineTightness CP Tank Test Aug. 4, 2022 CP Pipe Test None Tank ID/Alt ID 6 / 6 E-Gen/AST No / No Siphon/Compart No / No Tank Status Currently In Use Installed/Cap/Loc July 8, 1989 / 6000 / West Substance Stored Diesel / Off-road Diesel Tank Material- Mod Galvanic Cathodic Protection (STIP3)-None ATG Veeder Root / TLS-350 CSLD No Manifold LTT Test April 24, 2024 LLD Test April 24, 2024 Pipe Material- Mod Fiberglass Reinforced Plastic / None Pipe type/STP Cont Pressurized / No STP Flex Connectors Steel Flex Galvanic CP LLD Model Red Jacket / VR FX1V Spill/Overfill/Sm Delivery 5 gal. Spill Bucket / Overfill alarm / No PST Fund/Other Type Yes / None Tank/Pipe Rel Det TankATG PipeAutoLineLeakDetection / PipeLineTightness CP Tank Test Aug. 4, 2022 CP Pipe Test None INSPECTION COMMENTS None 2025-02-27 Page 3 of 13 FACILITY RESPONSES The above accurately represents the facility's release detection records Yes Operator Training A Operator current?Yes B Operator current?Yes Monthly checklist available and complete?Yes Is the site unmanned?No C Operators trained?Yes Cathodic Protection The results of the last two cathodic protection tests are available (within six months of installation and every three years thereafter)? Yes Financial Responsibility Financial responsibility method is ok?Yes TANK RESPONSES Tank 1 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes If an overfill alarm is being used is it properly located so the delivery driver can hear or see it, and is clearly identified? No Tank 1 ATG/IM ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes ATG - The tank was filled to at least the minimum level required to ensure a valid leak test, and the tank size is within the allowed upper and lower size limits? Yes Tank 1 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Tank 1 Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank 1 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank 2 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Tank 2 Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes 2025-02-27 Page 4 of 13 Tank 1 ATG/IM Does the ATG system have a valid annual test?Yes Tank 2 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes If an overfill alarm is being used is it properly located so the delivery driver can hear or see it, and is clearly identified? No Tank 2 ATG/IM ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes ATG - The tank was filled to at least the minimum level required to ensure a valid leak test, and the tank size is within the allowed upper and lower size limits? Yes Tank 2 ATG/IM Does the ATG system have a valid annual test?Yes Tank 2 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank 3 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Tank 3 Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank 3 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank 4 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Tank 4 Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank 4 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank 5 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes 2025-02-27 Page 5 of 13 Tank 3 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes If an overfill alarm is being used is it properly located so the delivery driver can hear or see it, and is clearly identified? No Tank 3 ATG/IM ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes ATG - The tank was filled to at least the minimum level required to ensure a valid leak test, and the tank size is within the allowed upper and lower size limits? Yes Tank 3 ATG/IM Does the ATG system have a valid annual test?Yes Tank 4 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes If an overfill alarm is being used is it properly located so the delivery driver can hear or see it, and is clearly identified? No Tank 5 Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank 5 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank 6 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Tank 6 Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank 6 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes 2025-02-27 Page 6 of 13 Tank 4 ATG/IM ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes ATG - The tank was filled to at least the minimum level required to ensure a valid leak test, and the tank size is within the allowed upper and lower size limits? Yes Tank 4 ATG/IM Does the ATG system have a valid annual test?Yes Tank 5 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes If an overfill alarm is being used is it properly located so the delivery driver can hear or see it, and is clearly identified? No 2025-02-27 Page 7 of 13 Tank 5 ATG/IM ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes ATG - The tank was filled to at least the minimum level required to ensure a valid leak test, and the tank size is within the allowed upper and lower size limits? Yes Tank 5 ATG/IM Does the ATG system have a valid annual test?Yes Tank 6 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes If an overfill alarm is being used is it properly located so the delivery driver can hear or see it, and is clearly identified? No 2025-02-27 Page 8 of 13 Tank 6 ATG/IM ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes ATG - The tank was filled to at least the minimum level required to ensure a valid leak test, and the tank size is within the allowed upper and lower size limits? Yes Tank 6 ATG/IM Does the ATG system have a valid annual test?Yes DISPENSER RESPONSES Dispenser 3/4 Flex connectors at the dispensers are protected from corrosion?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 7/8 Flex connectors at the dispensers are protected from corrosion?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 1/2 Flex connectors at the dispensers are protected from corrosion?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 5/6 Flex connectors at the dispensers are protected from corrosion?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes 2025-02-27 Page 9 of 13 Dispenser 10 Flex connectors at the dispensers are protected from corrosion?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 12/13 Flex connectors at the dispensers are protected from corrosion?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 9 Satellite Flex connectors at the dispensers are protected from corrosion?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 11 Satellite Flex connectors at the dispensers are protected from corrosion?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 9 Flex connectors at the dispensers are protected from corrosion?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 11 Flex connectors at the dispensers are protected from corrosion?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 14/15 Flex connectors at the dispensers are protected from corrosion?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 10 Satellite Flex connectors at the dispensers are protected from corrosion?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes 2025-02-27 Page 10 of 13 MONTHLY LEAK DETECTION MONITORING Feb '24 Mar '24 Apr '24 May '24 Jun '24 Jul '24 Aug '24 Sep '24 Oct '24 Nov '24 Dec '24 Jan '25 Tank 1 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Tank 2 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Tank 3 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Tank 4 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Tank 5 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Tank 6 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl NON-COMPLIANCE ITEMS TANK 1 Question:If an overfill alarm is being used is it properly located so the delivery driver can hear or see it, and is clearly identified? Comments:label overfill alarm TANK 2 Question:If an overfill alarm is being used is it properly located so the delivery driver can hear or see it, and is clearly identified? Comments:label overfill alarm TANK 3 Question:If an overfill alarm is being used is it properly located so the delivery driver can hear or see it, and is clearly identified? Comments:label overfill alarm TANK 4 2025-02-27 Page 11 of 13 Question:If an overfill alarm is being used is it properly located so the delivery driver can hear or see it, and is clearly identified? Comments:label overfill alarm TANK 5 Question:If an overfill alarm is being used is it properly located so the delivery driver can hear or see it, and is clearly identified? Comments:label overfill alarm TANK 6 Question:If an overfill alarm is being used is it properly located so the delivery driver can hear or see it, and is clearly identified? Comments:label overfill alarm 2025-02-27 Page 12 of 13 Prepared by fueloperator.com Inspection Information Inspector:Ottley, Melissa Record Created:Feb. 27, 2025, 9:52 a.m. Inspection Date:Feb. 27, 2025 2025-02-27 Page 13 of 13