HomeMy WebLinkAboutDERR-2025-001635Rockwell Solutions, Inc., 718 E. Bridger Lane, Elk Ridge, UT 84651 801-361-2930 rockwellutah@yahoo.com 1 Rockwell Solutions, Inc. 718 E Bridger Lane Elk Ridge, UT 84651 (801) 361-2930 March 3, 2025 Mark Smith Triple Stop Chevron 1034 West Gentile Street Layton, Utah 84041 RE: Groundwater Monitoring (NUB-28) Triple Stop Chevron, 1034 West Gentile Street, Layton, Utah 84041 Facility ID #3000500; Release NUB Dear Mr. Smith: Rockwell Solutions, Inc. submits this work plan and budget to collect groundwater samples at the above-referenced site. PST Fund payment claims will reference this work plan and specific tasks itemized below. INTRODUCTION On February 14, 2019, Layton City reported petroleum odors in the basement of a home near the intersection of Gentile and Angel streets. This prompted an investigation initiated by the Utah Department of Environmental Quality (UDEQ). On February 16, two other homeowners reported gasoline vapors in their basements. Some of the residents voluntarily left their homes until abatement actions were initiated. To mitigate vapor intrusion for the several residences, ATC, an environmental contractor to the Utah Division of Environmental Response and Remediation (DERR), installed vapor mitigation blower systems at three of the homes in an effort to abate vapor concentrations around the homes. After several years of remediation and groundwater monitoring, it appears that no further action will be required. All dissolved hydrocarbon concentrations collected on January 14, 2025, were below Initial Screening Levels. The purpose of this work plan is to confirm that hydrocarbon concentrations are below SCOPE OF WORK Groundwater Monitoring Groundwater samples will be collected from the following twenty-three monitoring wells which have had detectable concentrations over the last three to four years: Work Plan NUB-28, Groundwater Monitoring, Triple Stop Chevron, Layton, Utah. 3000500 Rockwell Solutions, Inc., 718 E. Bridger Lane, Elk Ridge, UT 84651 801-361-2930 rockwellutah@yahoo.com 2 MW-1 MW-13 MW-23 MW-31 MW-41 MW-45 MW-2 MW-18 MW-24 MW-32 MW-42 EW-3 MW-4 MW-19 MW-27 MW-35 MW-43 EW-4 MW-10 MW-21 MW-29 MW-40 MW-44 The groundwater monitoring event will include measuring the depth to groundwater and groundwater sampling. The sampling will be conducted following standard decontamination, sample collection, and sample preparation/preservation protocol. Samples will be analyzed for methyl-tert-butyl-ether (MTBE), benzene, toluene, ethyl benzene, total xylenes, and naphthalene (MBTEXN) and total petroleum hydrocarbons-gasoline range organics (TPH-GRO) using EPA Method 8260 and TPH- diesel range organics (TPH-DRO). A Utah Certified Laboratory will conduct all analyses. Report A Groundwater Monitoring Report (GMR) will be prepared after the sampling event. The GMR will include a groundwater elevation contour map and, if present above ISLs, benzene and TPH-GRO isoconcentration maps. KEY PERSONNEL Senior Geologist, Project Manager, Field Technician: David Hansen COST ESTIMATE Rockwell Solutions, Inc. estimates the cost to complete the work as described in this work plan is approximately $6,342.43. A detailed cost breakdown is presented in Table 1. The estimated budget will require adjustment if the scope of services identified herein is modified. Thank you for the opportunity to work with you on this project. If you have any questions or concerns, please feel free to contact me at your convenience. Sincerely, David Hansen Rockwell Solutions, Inc. Certified UST Consultant CC130 cc: Kevin Beery, DERR Task 1 - Work Plan Development LABOR Hours Title Code Description Rate Total 1 Prepare Work Plan and Budget 760.00$ 760.00$ Total Task 1 760.00$ Task 2 - Groundwater Monitoring Event LABOR Hours Title Code Description Rate Total 1 Professional Geologist 102 Senior Management 147.00$ 147.00$ 2 Field Scientist 104 field prep and cleanup 101.00$ 202.00$ 18 Field Scientist 104 groundwater and travel 101.00$ 1,818.00$ 2 Field Technician 106 data compilation 73.00$ 146.00$ 4 Project Manager 103 report preparation 118.00$ 472.00$ 2 PST Specialist 108 PST Claims 78.00$ 156.00$ 1 Clerical 109 Office Mgmt., Project Assistance 62.00$ 62.00$ Subtotal 3,003.00$ OTHER DIRECT COSTS Item Quantity Unit Rate Total 429 miles 0.67$ 287.43$ water level indicator 2 days 25.00$ 50.00$ sampling supplies 2 days 25.00$ 50.00$ traffic control 2 days 15.00$ 30.00$ bailers 23 each 9.00$ 207.00$ laboratory analysis (8260, 8015) 23 each 85.00$ 1,955.00$ Subtotal 2,579.43$ Total Task 2 5,582.43$ 6,342.43$ Total Work Plan Groundwater Monitoring Table 1 Triple Stop Chevron, 1034 W Gentile St., Layton, Utah Budget for Workplan NUB-28 Facility ID# 3000500 mileage to/from site and lab Rockwell Solutions, Inc. Page 1 of 1