Exception Granted: R309-550-7(1) | The basis for your request for an exception to R309-550-7(1) is that during the design of the 24 - inch
Transmission Line proposed water line, it was discovered that at Station 18+40 (5400 South), the design cannot meet the required minimum
separations. The existing shallow 8-inch PVC sewer main has only 5-feet of cover. This is insufficient depth to permit the installation of the waterline
above the sewer.
Exception Granted: R309-550-7(1) Minimum Separation Requirements | The basis for your request for an exception to R309-550-7(1) is that the
proposed sewer is located
in a crowded utility corridor (4800 West) and at times must cross over existing water
infrastructure. Additionally, the constrained nature of the gravity design portion of the project
required reduced clearance. Several other sewer design alternatives were evaluated, with none
deemed feasible. There are 2 crossings impacting the Taylorsville-Bennion ID (TBID):
¿ Approximately 4800 West and 5865 (Project STA 116+74)
o The proposed 12-inch HDPE force main passes over an existing 18-inch TBID
waterline. The proposed sewer is a 12-inch butt fused HDPE force main. Vertical
separation is 0.98 feet, with the sewer crossing over the water line. The existing
water line is quite deep with the invert approximately 8-9 feet below grade. This
makes crossing under the water line impractical, expensive, and potentially
damaging to the existing infrastructure.
¿ 4800 West, north of 5780 South (Project STA 125+35)
o The proposed 15-inch SDR-35 gravity sewer line passes under an existing 24-inch
TBID waterline. Vertical separation is 1.29 feet with the sewer crossing under the
water line. This crossing is constrained by the gravity design of the sewer and
required cover of the existing water line.
A geotechnical report was prepared for the new lift station associated with (and located adjacent
to) the proposed sewer, groundwater was not encountered with drilling was done to a depth of
26.9 feet below ground surface.
Exception Granted: R309-550-7 | 280 feet of the approximate 2,286 feet of 8-inch PVC water line in the Brewski Bay and shared driveway of the
Glenmore Village subdivision was mistakenly installed between 6 and 8 feet from the sewer line instead of the designed 10 feet.
Exception Granted: R309-550-7 | Presences ofother utilities in the impacted corridor preclude formulating a desigrr meeting the standard.
Exception Granted: R309-550-7 | An existing 12” sanitary sewer line, which is very shallow and in the bank of the Brighton Canal, was located at
the outset of construction and was not accounted for in the design. The location of the sewer line was, until recently, unaccounted for in the design
of the waterline as its location was unknown. The water line can not be constructed over the sewer line due to its shallow depth.
Exception Granted: R309-550-7 | 18-inch minimum vertical separation between existing 20-inch shotcoat steel water line owned by Granger Hunter
Improvement District and the proposed 12-inch PVC SDR-35 sewer line owned by Taylorsville Bennion Improvement District
Exception Granted: R309-550-7(1) | Seperation of 10 horizontal feet and 18 inches between water main and sewer line.
Exception Granted: null | In 2013 TBID water replacement project, about 600 feet of waterline starting from station 10+00 to 16+50 can’t meet
horizontal separation of 10 feet from the sewer line. This is because the existing road is relatively congested with utilities and UDOT traffic control
Site Visit Date Surveyor Name
02/18/2025 Chris Bowles
TAYLORSVILLE-BENNION ID PWS ID: UTAH18021 Rating: Approved 03/11/1980 Active
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 1 of 145
and planning process.
Exception Granted: R309-550-8(8)(b) | The requirement for restrained pipe joints at the surface water crossing for the
Valley Well Water Line Project
1 Admin Contact (AC) [ eMail address is REQUIRED ]
MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be
designated as the owner of the system and name, address and phone number of such
be supplied to the Division.
*First Name: SHAWN DAVID
*Last Name: ROBINSON
*Organization:
*Address: Redacted
*City: RIVERTON
*State: UT
*Zip: 84065
*Email: shawn@tbid.gov
*Phone: 801-580-6175
2 Legal Contact (LC) [ if no eMail address is available, enter NoeMail@utah.gov ]
MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be
designated as the owner of the system and name, address and phone number of such
be supplied to the Division.
*First Name:
*Last Name:
*Organization: TAYLORSVILLE-BENNION
IMPROVEMENT DIST
*Address: P.O. Box 18579
*City: TAYLORSVILLE
*State: UT
*Zip: 84118-0579
*Email: company@tbid.gov
*Phone: 801-968-9081
3 Owner Contact (OW) [ if no eMail address is available, enter NoeMail@utah.gov ]
MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be
designated as the owner of the system and name, address and phone number of such
be supplied to the Division.
*First Name:
*Last Name:
*Organization: TAYLORSVILLE-BENNION
IMPROVEMENT DIST
*Address: P.O. Box 18579
*City: TAYLORSVILLE
*State: UT
*Zip: 84118-0579
*Email: company@tbid.gov
*Phone: 801-968-9081
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 2 of 145
Site Visit Info
4 Direct Operator in Charge (DO) [ if no eMail address is available, enter
NoeMail@utah.gov ]
MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be
designated as the owner of the system and name, address and phone number of such
be supplied to the Division.
*First Name: Karl
*Last Name: Slade
*Organization:
*Address: P.O. Box 18579
*City: Taylorsville
*State: UT
*Zip: 84118-0579
*Email: karl@tbid.gov
*Phone: 801-968-9081
Emergency Phone: 801-560-4946
5 Does the system serve a Residential population?Y
5A Population - Residential 67098
5B Operating Period (Start Date) - Residential 01/01
5C Operating Period (End Date) - Residential 12/31
6 Does the system serve a Transient population? (A transient population is a rotating
population that is served by a water system that does not remain in the jurisdiction of
the water system for long periods of time. Examples of a transient population include,
but are not limited to, campers at a campground, users of a highway rest stop, skiers
at a ski resort, guests at a hotel, or patrons of a restaurant or a shopping center.)
N
7 Does the system serve a Non-Transient population? (A non-transient population is a
population served by a water system that is the same population being served by the
system for at least six months of the year, but is not a resident in the system.
Examples of a non-transient population include, but are not limited to, employees of a
restaurant, shop, or ski resort; teachers and students at a school, day-care center, or
church; doctors, nurses, and other employees at a hospital or healthcare clinic.)
N
8 Population - Wholesale :3280
9 Residential Connections:16733
10 Commercial Connections:521
11 Industrial Connections:5
12 Agricultural Connections:0
13 Date of Survey (First Day of Field Work)02/18/2025
14 Date of Survey (Last Day of Field Work) ** this should match the Date of Survey in the
header **
02/18/2025
15 Date final report sent to system (questionnaire, deficiency report and capacity
spreadsheet)
02/23/2025
16 Water system representative present during the survey:Y (Notes: Shawn, Randy, Curtis, Tom
McOmie, and Chris Bowles)
17 How much time was spent to prepare survey documents prior to field survey? (Round
up to nearest quarter hour)
2
18 How much time was spent to complete the field survey (arrival to completion; include
travel time between water system facilities)? (Round up to nearest quarter hour)
14
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 3 of 145
Management and Operations
19 How much time was spent traveling from the office to system and back again at the
end of the field survey? (Round up to nearest quarter hour)
1
20 How much time did it take to finish the Survey Report? (Round up to nearest quarter
hour)
3
21 Did you survey multiple water systems in one trip? ... if yes, answer the following
question(s)
N
22 For a community water system with water sources that require power to produce
sufficient flow, system is equipped with standby power option.
SIG | 25pts | SO | S033 | R309-515-6(2)(a) | Rule requires a community water system
without naturally flowing water sources, such as springs or flowing wells, to have one
or more of the system's sources equipped for operation during power outages. To
ensure continuous service when the primary power has been interrupted, a redundant
power supply is required. A redundant power supply may include a transfer switch for
auxiliary power such as a generator or a power supply service with coverage from two
independent substations. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
23 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through or in
process of DDW review [LIST UNDOCUMENTED FACILITIES OR DESCRIBE
MODIFICATIONS, IF APPLICABLE] [undocumented sources are covered in a
different question]
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
24 Are there any individual home booster pumps installed in the distribution system (not
for fire suppression)?
SIG | 50pts | SM | M008 | R309-550-11(3) | R309-550-11(3)
C
25 Does the system haul water?N
26 For a community system serving 100 or more connections, at least 2 water sources
are available.
SIG | 50pts | SO | TGR7 | R309-515-4(3) | Rule requires Community Water Systems
serving more than 100 connections to have a minimum of two sources except where
served by a water treatment plant. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
27 Does system have a consecutive connection to another water system not listed in the
SOURCE section of Waterlink Report? If yes, answer the following question(s)
Y
27A Name of PWS that water is purchased from: (IF MORE THAN ONE NAME, LIST
OTHERS IN COMMENTS)
JVWCD
27B ID Number of PWS that water is purchased from: (IF MORE THAN ONE, LIST
OTHERS IN COMMENTS)
18027
27C The interconnection has been approved by DDW.
SIG | 50pts | SO | M025 | R309-550-9(3) | Interconnections between different drinking
water systems must be reviewed and approved by the Director. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 4 of 145
Cross Connection and Operator Certification
28 Does the system have a deficiency meeting the required source capacity? (USE
SPREADSHEET FOR CALCULATIONS) *IF YES, SELECT CORRECT STATEMENT
FROM THE FOLLOWING AND MARK "YES"; MARK ALL OTHER STATEMENTS
"NO."
N
29 Does the system have a deficiency meeting the required storage capacity DUE
SOLELY TO FIRE SUPPRESSION NEEDS? (USE SPREADSHEET FOR
CALCULATIONS) *IF YES, SELECT CORRECT STATEMENT FROM THE
FOLLOWING AND MARK "YES"; MARK ALL OTHER STATEMENTS "NO."
N
30 Does the system have a deficiency meeting the required equalization storage capacity
for indoor/outdoor demands (but not because of fire suppression needs)? (USE
SPREADSHEET FOR CALCULATIONS) *IF YES, SELECT CORRECT STATEMENT
FROM THE FOLLOWING AND MARK "YES"; MARK ALL OTHER STATEMENTS
"NO."
N
31 Does your water system have an Emergency Response Plan?
REC | 0pts | SM | M001 | R309-105-18 | All suppliers are advised to develop
contingency plans to cope with possible emergency situations. In many areas of the
state the possibility of earthquake damage shall be realistically considered.
Y
32 Does your Emergency Response Plan address cybersecurity? (only required for
systems over 3,300 population, otherwise mark NA)
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
Y
33 Does your water system use SCADA? e.g. computers, laptops, phones, tablets, or any
other computer systems to manage, operate, or maintain the PWS?
Y
34 Does your water system use any computer systems in regular business operations
such as accounting, billing, payroll, human resources, or management?
Y
35 Legally adopted authority statement
MIN | 15pts | SM | M003 | R309-105-12(2) | Rule requires each public water system to
have a cross connection control program that includes a legally adopted and functional
local authority to enforce the program (i.e., ordinance, bylaw, or policy).
C
36 Documentation of annual public awareness and/or employee training
MIN | 15pts | SM | M004 | R309-105-12(2) | Rule requires each public water system to
have a cross connection control program that includes providing public education or
awareness material or presentations.
C (Notes: Documentation present but will be
doing more public education in future.)
37 Documentation of personnel trained to manage the program (ALL COMUNITY
WATER SYSTEMS REQUIRE A DDW CERTIFIED CCC PROGRAM
ADMINISTRATOR. ALL OTHER WATER SYSTEMS REQUIRE AT A MINIMUM
BACKFLOW 101 OR EQUIVALENT/ GREATER CCC TRAINING)
MIN | 15pts | SM | M005 | R309-105-12(2) | Rule requires each public water system to
have a cross connection control program that includes an operator with adequate
training in the area of cross connection control or backflow prevention.
C (Notes: Randy Chambers B24285)
38 Does the water system have detailed records of cross connection control activities?
(inventories of backflow assemblies, devices, and air gaps installed within the system)
MIN | 15pts | SM | M006 | R309-105-12(2) | Rule requires each public water system to
have a cross connection control program that includes written records of cross
connection control activities.
C (Notes: They are currently onboarding a
new software.)
39 Does the water system have records of on-going enforcement activities? (test history,
enforcement activities, hazard assessments)
MIN | 15pts | SM | M007 | R309-105-12(2) | Rule requires each public water system to
have a cross connection control program that includes test history and documentation
of on-going enforcement activities.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 5 of 145
General Maintenance and Environment
Distribution
40 Operator meets required level of certification for water system. ( IF NO CERTIFIED
OPERATOR IS REQUIRED MARK COMPLIANT )
SIG | 50pts | OC | C001 | R309-105-11, R309-300-5(3) | Rule requires every
community and NTNC water system and public water systems that utilize
treatment/filtration to have at least one operator certified at the classified grade of the
water system. Certification must be appropriate for the type of system operated
(treatment and/or distribution). This significant deficiency must be corrected within 120
days of notification or have a corrective action plan approved by DDW.
C
41 Certified operator is within 1 hour travel time of water system. ( IF NO CERTIFIED
OPERATOR IS REQUIRED MARK COMPLIANT )
MIN | 0pts | OC | C002 | R309-300-5(14) | Rule requires the operator to be within 1
hour travel time, under normal work and home conditions, of each drinking water
system for which he is considered in direct responsible charge.
C
42 Are there any visual indications of unsanitary conditions?
SIG | 50pts | SM | M017 | R309-200-6, R309-105-18, R309-215-4(3) | R309-200-6 The
Secondary Maximum Contaminant Levels for public water systems deals with
substances which affect the aesthetic quality of drinking water. They are presented
here as recommended limits or ranges and are not grounds for rejection. The taste of
water may be unpleasant and the usefulness of the water may be impaired if these
standards are significantly exceeded.
R309-105-18 The Director or the local health department shall be informed by
telephone by a water supplier of any "emergency situation". The term "emergency
situation...
R309-215-4(3) If the water fails to meet minimum standards, then certain public
notification procedures shall be carried out, as outlined in R309-220. Water suppliers
shall also keep analytical records in their possession, for a required length of time, as
outlined in R309-105-17.
C
43 No unprotected connection between the distribution system and a source of
contamination. (If there is an unprotected connection, describe the location in detail.)
SIG | 50pts | DS | D009 | R309-550-5(11) | R309-550-5(11)
C
44 Are air release/vacuum valves in the distribution system? ... if yes, answer the
following question(s)
Y
44A Open end of vent line covered with #14 mesh screen
SIG | 25pts | DS | D004 | R309-550-6(6)(b) | Rule states the open end of the air relief
vent pipe from automatic valves shall be provided with a #14 mesh, non-corrodible
screen and a downward elbow, and where possible, be extended to at least one foot
above grade. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 6 of 145
44B For a valve in a chamber, open end of vent pipe is at least 12 inches above grade or
one foot above distribution line in a chamber that does not flood.
SIG | 25pts | DS | D006 | R309-550-6(6)(b) | Rule states the open end of the air relief
vent pipe from automatic valves shall be provided with a #14 mesh, non-corrodible
screen and a downward elbow, and where possible, be extended to at least one foot
above grade. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
44C Chamber has drain to daylight, gravel-filled adsorption pit if not subject to flooding, or
sump pump.
SIG | 25pts | DS | D007 | R309-550-6(6)(b) and (7)(b) | Rule states chambers shall be
provided with a drain to daylight, if possible. Where this is not possible, underground
gravel-filled absorption pits may be used if the site is not subject to flooding and
conditions will assure adequate drainage. Sump pumps may also be considered if a
drain to daylight or absorption pit is not feasible. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C (Notes: Gravel floors)
44D Open end of vent line down-turned.
SIG | 25pts | DS | D006 | R309-550-6(6)(b) | Rule states the open end of the air relief
vent pipe from automatic valves shall be provided with a #14 mesh, non-corrodible
screen and a downward elbow, and where possible, be extended to at least one foot
above grade. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
45 Water system has a program to maintain, operate, or control the use of fire hydrants.
REC | 0pts | DS | D012 | N/A | Fire hydrants provide a direct access to the water in the
distribution system. In order to protect the quality and integrity of the water, fire
hydrant access should be controlled.
C
46 Blow offs or air release valves are not directly connected to a sanitary sewer line.
SIG | 50pts | DS | D013 | R309-550-6(5)(a), R309-550-6(6)(c) and (7)(a) | Rule states
blow-offs or air relief valves shall not be connected directly to a sewer. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
47 Blow offs or air release valves do not discharge below flood level in ditches or
streams.
SIG | 50pts | DS | D016 | R309-550-9(1) and (2), R309-550-13(2) | R309-550-9(1 & 3)
C
48 All water mains installed after 1995 that provide fire flow are at least 8 inches in
diameter.
MIN | 15pts | DS | D019 | R309-550-5(4) & (5) | Rule states that the minimum line size
serving a fire hydrant lateral shall be 8-inch diameter unless a hydraulic analysis
indicates that required flow and pressures can be maintained by 6-inch lines.
C
49 Distribution system capable of providing minimum pressure of 20 psi at all service
connections.
SIG | 50pts | DS | D003 | R309-105-9, R309-550-5(1) | Rule states the distribution
system shall maintain minimum pressures as required by R309-105-9 at all points of
connection under all flow conditions. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 7 of 145
General Disinfection
TP015 - LIFT STATION CHLORINATOR - Inactive (AB - ABANDONED)
TP017 - FAIRWAY CHLORINATOR - Inactive (AB - ABANDONED)
WS001 - OFFICE WELL - Inactive (AB - ABANDONED)
WS011 - WELL 1300 W 5700 S - Inactive (AB - ABANDONED)
WS013 - EL CAMINO WELL - Inactive (AB - ABANDONED)
WS014 - WELL 5750 S 5000 W - Inactive (AB - ABANDONED)
50 Was the water system constructed or new portions added after January 1, 2007? ... if
yes, answer the following question(s)
Y
50A Distribution system capable of maintaining the following pressures at all service
connections: (a) 20 psi during fire flow and fire demand during peak day demand; (b)
30 psi during peak instantaneous demand; and (c) 40 psi during peak day demand.
SIG | 50pts | DS | D010 | R309-105-9, R309-550-5(1) | Rule states that unless
otherwise specifically approved by the Director, public water systems constructed after
January 1, 2007, shall be designed and shall meet the following minimum water
pressures at points of connection: (a) 20 psi during conditions of fire flow and fire
demand experienced during peak day demand; (b) 30 psi during peak instantaneous
demand; and (c) 40 psi during peak day demand. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C (Notes: Lowest pressure in system is 45
psi)
51 Water system follows AWWA disinfection procedures for new, repaired, or seasonal
water mains and tanks.
SIG | 25pts | MR | D018 | R309-550-8(10) | All new and repaired water mains and
appurtenances shall be disinfected in accordance with AWWA Standard C651. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
52 How often do you periodically disinfect any or all parts of your water system (i.e. batch
disinfection) other than for repairs or maintenance?
SIG | 50pts | SM | G006 | R309-105-6(1)(a), R309-500-6 | R309-105-6(1) Approval of
Engineering Plans and Specifications
R309-500-6 Plan Approval Procedure.
C (Notes: Maintenance chlorinate casing
periodically at screen depths)
53 Does the water system still have physical access to this facility? Y/N Guidance:
Answer NO if sold and no longer have security access or the facility is demolished and
can not be inspected.
N (Notes: Demolished)
54 Does the water system still have physical access to this facility? Y/N Guidance:
Answer NO if sold and no longer have security access or the facility is demolished and
can not be inspected.
N (Notes: Demolished)
55 Does the water system still have physical access to this facility? Y/N Guidance:
Answer NO if sold and no longer have security access or the facility is demolished and
can not be inspected.
N (Notes: Demolished)
56 Does the water system still have physical access to this facility? Y/N Guidance:
Answer NO if sold and no longer have security access or the facility is demolished and
can not be inspected.
N (Notes: Demolished)
57 Does the water system still have physical access to this facility? Y/N Guidance:
Answer NO if sold and no longer have security access or the facility is demolished and
can not be inspected.
N (Notes: Demolished)
58 Does the water system still have physical access to this facility? Y/N Guidance:
Answer NO if sold and no longer have security access or the facility is demolished and
can not be inspected.
N
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 8 of 145
WS015 - LIFT STATION WELL - Inactive (AB - ABANDONED)
WS018 - SUNSTONE WELL - Inactive (AB - ABANDONED)
WS019 - SHAW WELL - Inactive (AB - ABANDONED)
WS020 - NELSON WELL - Inactive (AB - ABANDONED)
WS030 - BARKER EAST WELL REPL-1 - Proposed Source
WS002 - TAYLORSVILLE EAST WELL - Active
Exception Granted: R309-515-6(6a) | The Rodine 103 NPF that Taylorsville-Bennion ID plans to use is for cleaning and rehabilitating East well
(WS002) is certified by NSF; however it does not comply with their rules for Standard 60 or 61
59 Does the water system still have physical access to this facility? Y/N Guidance:
Answer NO if sold and no longer have security access or the facility is demolished and
can not be inspected.
N
60 Does the water system still have physical access to this facility? Y/N Guidance:
Answer NO if sold and no longer have security access or the facility is demolished and
can not be inspected.
N
61 Does the water system still have physical access to this facility? Y/N Guidance:
Answer NO if sold and no longer have security access or the facility is demolished and
can not be inspected.
N
62 Does the water system still have physical access to this facility? Y/N Guidance:
Answer NO if sold and no longer have security access or the facility is demolished and
can not be inspected.
N
63 Is this source in operation without an Operating Permit?
SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) |
R309-105-6(1) requires plans and specifications for all public drinking water projects to
be approved in writing by the Director prior to the commencement of construction. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
N
63A When is the anticipated date to request an Operating Permit? Explain in comments...Date not in near future
64 Is this facility Active or Inactive?A
65 Operating Period (Start Date)01/01
66 Operating Period (Ending Date)12/31
67 Undocumented sources shall not be physically connected to the drinking water
system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT")
SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) |
R309-105-6(1) requires plans and specifications for all public drinking water projects to
be approved in writing by the Director prior to the commencement of construction. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 9 of 145
68 Well casing is at least 18 inches above finished ground surface and 12 inches above
well house floor.
SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515-
6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above
the final ground surface and 12 inches above the pump house floor; at sites subject to
flooding, the top of the casing must terminate at least 3 feet above the 100-year flood
level or highest known flood elevation, whichever is higher. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
69 Wellhead is sealed to prevent contamination.
SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515-
6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and
discharge piping. This significant deficiency should be corrected within 120 days of
notification or have a corrective action plan approved by
C
70 Is the well casing vented? ... if yes, answer the following question(s)Y (Notes: Mushroom Cap)
70A Vent screened with #14 mesh screen
SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen.
C (Notes: Mushroom Cap internal
Screened)
70B Vent down-turned
SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of
surface water or rainwater.
C
70C Vent has adequate clearance to prevent contamination from entering the well
SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap.
C
71 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y
71A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim
SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line
connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood
rim. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C
71B Pump to waste line equipped with #4 non-corrodible mesh screen
SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 10 of 145
71C Pump to waste line downturned if it discharges to sewer/storm drain or allowing
complete drainage if not downturned
SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be downturned. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
72 Water level is measured and recorded periodically
MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires
provisions be made to permit periodic measurement of water levels in the completed
well.
C
73 Wellhead secured to protect quality water
SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
74 Well head or well house and equipment protected from flooding
SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515-
6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or
12” above well house floor and for sites that flood at least 3’ above 100-year flood
level or highest known flood elevation. Well casing terminating in underground vault
shall have a drain to daylight and surface runoff directed away from vault access. Well
house floor shall be sloped for drainage, and have a drain to daylight unless highly
impractical. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
C
75 There are no unprotected cross-connections in well discharge piping.
SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the
well discharge piping to be protected against the entrance of contamination. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
76 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well
house or near well head?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
77 Well discharge line has a smooth-nosed sampling tap, which samples the well water
before any chemical injection. (first item from the wellhead).
MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a
means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the
first item from the well head and the shut-off valve as the last item)
C
78 Well discharge line has a check valve.
MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 11 of 145
79 Well discharge line has a pressure gauge.
MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
80 Well discharge line has a means to measure flow.
MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
81 Well discharge line has a shut-off valve (last item from the well head).
MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
82 Is there an air/vac valve on the well discharge line? If yes, answer the following
question(s)
Y
82A Air vacuum relief valve on well discharge piping downturned
SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be down-turned.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
82B Air vacuum relief valve on well discharge piping screened with #14 mesh screen
SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be covered with a
#14 mesh corrosion-resistant screen. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
82C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance
above floor
SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be at least 6
inches above the well house floor. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
83 Wells that pump directly into a distribution system have means to release trapped air
from pump discharge piping (for example, pumps directly to a tank, has an air release
valve or pump to waste line)
MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps
directly into the distribution system be equipped with an air release/vacuum relief valve
located upstream of the check valve, unless the wellhead valve and piping provide for
pumping to waste all trapped air before water is introduced into the distribution
system.
C
84 Does well require oil-lubrication?N (Notes: water lubricated shaft)
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 12 of 145
WS003 - BARKER WELL - Active
Exception Granted: R309-515-6-(6a) | The Rodine 103 NPF the City plans to use for Baker & Taylorsville West Wells is currently certified by the
NSF; however it does not comply with their rules for Standard 60 or 61.
84A Well shaft lubricants are food grade mineral oil?
SIG | 25pts | SO | S031 | R309-105-10(7), R309-515-6(6)(a) | Rules require all oil-
lubricated pumps for drinking water wells to utilize food-grade mineral oil suitable for
human consumption as determined by the Director. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
<a href="https://www.youtube.com/watch?v=UABQMeeUz1g">Click here for addition
training</a>
C
85 Is this facility Active or Inactive?A
86 Operating Period (Start Date)04/01
87 Operating Period (Ending Date)12/31
88 Undocumented sources shall not be physically connected to the drinking water
system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT")
SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) |
R309-105-6(1) requires plans and specifications for all public drinking water projects to
be approved in writing by the Director prior to the commencement of construction. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
89 Well casing is at least 18 inches above finished ground surface and 12 inches above
well house floor.
SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515-
6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above
the final ground surface and 12 inches above the pump house floor; at sites subject to
flooding, the top of the casing must terminate at least 3 feet above the 100-year flood
level or highest known flood elevation, whichever is higher. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
90 Wellhead is sealed to prevent contamination.
SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515-
6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and
discharge piping. This significant deficiency should be corrected within 120 days of
notification or have a corrective action plan approved by
C
91 Is the well casing vented? ... if yes, answer the following question(s)Y
91A Vent screened with #14 mesh screen
SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 13 of 145
91B Vent down-turned
SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of
surface water or rainwater.
C
91C Vent has adequate clearance to prevent contamination from entering the well
SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap.
C
92 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y
92A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim
SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line
connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood
rim. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C
92B Pump to waste line equipped with #4 non-corrodible mesh screen
SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
92C Pump to waste line downturned if it discharges to sewer/storm drain or allowing
complete drainage if not downturned
SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be downturned. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
93 Water level is measured and recorded periodically
MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires
provisions be made to permit periodic measurement of water levels in the completed
well.
C
94 Wellhead secured to protect quality water
SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
95 Well head or well house and equipment protected from flooding
SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515-
6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or
12” above well house floor and for sites that flood at least 3’ above 100-year flood
level or highest known flood elevation. Well casing terminating in underground vault
shall have a drain to daylight and surface runoff directed away from vault access. Well
house floor shall be sloped for drainage, and have a drain to daylight unless highly
impractical. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 14 of 145
96 There are no unprotected cross-connections in well discharge piping.
SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the
well discharge piping to be protected against the entrance of contamination. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
97 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well
house or near well head?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
98 Well discharge line has a smooth-nosed sampling tap, which samples the well water
before any chemical injection. (first item from the wellhead).
MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a
means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the
first item from the well head and the shut-off valve as the last item)
C
99 Well discharge line has a check valve.
MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
100 Well discharge line has a pressure gauge.
MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
101 Well discharge line has a means to measure flow.
MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
102 Well discharge line has a shut-off valve (last item from the well head).
MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
103 Is there an air/vac valve on the well discharge line? If yes, answer the following
question(s)
Y
103A Air vacuum relief valve on well discharge piping downturned
SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be down-turned.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
103B Air vacuum relief valve on well discharge piping screened with #14 mesh screen
SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be covered with a
#14 mesh corrosion-resistant screen. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 15 of 145
WS005 - WELL 5300 S 1100 W -
103C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance
above floor
SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be at least 6
inches above the well house floor. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
104 Wells that pump directly into a distribution system have means to release trapped air
from pump discharge piping (for example, pumps directly to a tank, has an air release
valve or pump to waste line)
MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps
directly into the distribution system be equipped with an air release/vacuum relief valve
located upstream of the check valve, unless the wellhead valve and piping provide for
pumping to waste all trapped air before water is introduced into the distribution
system.
C
105 Does well require oil-lubrication?N (Notes: Water lubricated)
105A Well shaft lubricants are food grade mineral oil?
SIG | 25pts | SO | S031 | R309-105-10(7), R309-515-6(6)(a) | Rules require all oil-
lubricated pumps for drinking water wells to utilize food-grade mineral oil suitable for
human consumption as determined by the Director. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
<a href="https://www.youtube.com/watch?v=UABQMeeUz1g">Click here for addition
training</a>
C
106 Is this facility Active or Inactive?I
106A Explain why this facility is Inactive (Is this facility in stand-by mode?)Not needed at this time.
107 Operating Period (Start Date)12/01
108 Operating Period (Ending Date)12/31
109 Undocumented sources shall not be physically connected to the drinking water
system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT")
SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) |
R309-105-6(1) requires plans and specifications for all public drinking water projects to
be approved in writing by the Director prior to the commencement of construction. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
110 Well casing is at least 18 inches above finished ground surface and 12 inches above
well house floor.
SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515-
6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above
the final ground surface and 12 inches above the pump house floor; at sites subject to
flooding, the top of the casing must terminate at least 3 feet above the 100-year flood
level or highest known flood elevation, whichever is higher. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 16 of 145
111 Wellhead is sealed to prevent contamination.
SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515-
6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and
discharge piping. This significant deficiency should be corrected within 120 days of
notification or have a corrective action plan approved by
C
112 Is the well casing vented? ... if yes, answer the following question(s)N
113 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y
113A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim
SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line
connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood
rim. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C
113B Pump to waste line equipped with #4 non-corrodible mesh screen
SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
113C Pump to waste line downturned if it discharges to sewer/storm drain or allowing
complete drainage if not downturned
SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be downturned. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
114 Water level is measured and recorded periodically
MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires
provisions be made to permit periodic measurement of water levels in the completed
well.
C
115 Wellhead secured to protect quality water
SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
116 Well head or well house and equipment protected from flooding
SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515-
6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or
12” above well house floor and for sites that flood at least 3’ above 100-year flood
level or highest known flood elevation. Well casing terminating in underground vault
shall have a drain to daylight and surface runoff directed away from vault access. Well
house floor shall be sloped for drainage, and have a drain to daylight unless highly
impractical. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 17 of 145
117 There are no unprotected cross-connections in well discharge piping.
SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the
well discharge piping to be protected against the entrance of contamination. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
118 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well
house or near well head?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
119 Well discharge line has a smooth-nosed sampling tap, which samples the well water
before any chemical injection. (first item from the wellhead).
MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a
means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the
first item from the well head and the shut-off valve as the last item)
C
120 Well discharge line has a check valve.
MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
121 Well discharge line has a pressure gauge.
MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
122 Well discharge line has a means to measure flow.
MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
123 Well discharge line has a shut-off valve (last item from the well head).
MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
124 Is there an air/vac valve on the well discharge line? If yes, answer the following
question(s)
N
125 Wells that pump directly into a distribution system have means to release trapped air
from pump discharge piping (for example, pumps directly to a tank, has an air release
valve or pump to waste line)
MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps
directly into the distribution system be equipped with an air release/vacuum relief valve
located upstream of the check valve, unless the wellhead valve and piping provide for
pumping to waste all trapped air before water is introduced into the distribution
system.
C
126 Does well require oil-lubrication?Y
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 18 of 145
WS006 - HIGH ZONE WEST WELL -
126A Well shaft lubricants are food grade mineral oil?
SIG | 25pts | SO | S031 | R309-105-10(7), R309-515-6(6)(a) | Rules require all oil-
lubricated pumps for drinking water wells to utilize food-grade mineral oil suitable for
human consumption as determined by the Director. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
<a href="https://www.youtube.com/watch?v=UABQMeeUz1g">Click here for addition
training</a>
C
127 Is this facility Active or Inactive?I
127A Explain why this facility is Inactive (Is this facility in stand-by mode?)Not needed at this time.
128 Operating Period (Start Date)01/01
129 Operating Period (Ending Date)01/01
130 Undocumented sources shall not be physically connected to the drinking water
system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT")
SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) |
R309-105-6(1) requires plans and specifications for all public drinking water projects to
be approved in writing by the Director prior to the commencement of construction. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
131 Well casing is at least 18 inches above finished ground surface and 12 inches above
well house floor.
SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515-
6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above
the final ground surface and 12 inches above the pump house floor; at sites subject to
flooding, the top of the casing must terminate at least 3 feet above the 100-year flood
level or highest known flood elevation, whichever is higher. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
132 Wellhead is sealed to prevent contamination.
SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515-
6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and
discharge piping. This significant deficiency should be corrected within 120 days of
notification or have a corrective action plan approved by
D (Notes: The conduit is in need of repair
and a mouse or something could get into the
well head.)
133 Is the well casing vented? ... if yes, answer the following question(s)N
134 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y
134A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim
SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line
connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood
rim. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 19 of 145
134B Pump to waste line equipped with #4 non-corrodible mesh screen
SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
D (Notes: The line is disconnected so the
piping is exposed. I let them know they need
to screen it or connect it.)
134C Pump to waste line downturned if it discharges to sewer/storm drain or allowing
complete drainage if not downturned
SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be downturned. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
135 Water level is measured and recorded periodically
MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires
provisions be made to permit periodic measurement of water levels in the completed
well.
C
136 Wellhead secured to protect quality water
SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
137 Well head or well house and equipment protected from flooding
SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515-
6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or
12” above well house floor and for sites that flood at least 3’ above 100-year flood
level or highest known flood elevation. Well casing terminating in underground vault
shall have a drain to daylight and surface runoff directed away from vault access. Well
house floor shall be sloped for drainage, and have a drain to daylight unless highly
impractical. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
C
138 There are no unprotected cross-connections in well discharge piping.
SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the
well discharge piping to be protected against the entrance of contamination. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
139 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well
house or near well head?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
140 Well discharge line has a smooth-nosed sampling tap, which samples the well water
before any chemical injection. (first item from the wellhead).
MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a
means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the
first item from the well head and the shut-off valve as the last item)
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 20 of 145
WS007 - KEARNS WELL -
141 Well discharge line has a check valve.
MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
142 Well discharge line has a pressure gauge.
MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
143 Well discharge line has a means to measure flow.
MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
144 Well discharge line has a shut-off valve (last item from the well head).
MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
145 Is there an air/vac valve on the well discharge line? If yes, answer the following
question(s)
N
146 Wells that pump directly into a distribution system have means to release trapped air
from pump discharge piping (for example, pumps directly to a tank, has an air release
valve or pump to waste line)
MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps
directly into the distribution system be equipped with an air release/vacuum relief valve
located upstream of the check valve, unless the wellhead valve and piping provide for
pumping to waste all trapped air before water is introduced into the distribution
system.
C
147 Does well require oil-lubrication?Y
147A Well shaft lubricants are food grade mineral oil?
SIG | 25pts | SO | S031 | R309-105-10(7), R309-515-6(6)(a) | Rules require all oil-
lubricated pumps for drinking water wells to utilize food-grade mineral oil suitable for
human consumption as determined by the Director. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
<a href="https://www.youtube.com/watch?v=UABQMeeUz1g">Click here for addition
training</a>
C
148 Is this facility Active or Inactive?I
148A Explain why this facility is Inactive (Is this facility in stand-by mode?)Not needed at this time.
149 Operating Period (Start Date)01/01
150 Operating Period (Ending Date)01/01
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 21 of 145
151 Undocumented sources shall not be physically connected to the drinking water
system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT")
SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) |
R309-105-6(1) requires plans and specifications for all public drinking water projects to
be approved in writing by the Director prior to the commencement of construction. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
152 Well casing is at least 18 inches above finished ground surface and 12 inches above
well house floor.
SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515-
6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above
the final ground surface and 12 inches above the pump house floor; at sites subject to
flooding, the top of the casing must terminate at least 3 feet above the 100-year flood
level or highest known flood elevation, whichever is higher. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
153 Wellhead is sealed to prevent contamination.
SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515-
6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and
discharge piping. This significant deficiency should be corrected within 120 days of
notification or have a corrective action plan approved by
C
154 Is the well casing vented? ... if yes, answer the following question(s)N
155 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y
155A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim
SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line
connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood
rim. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C
155B Pump to waste line equipped with #4 non-corrodible mesh screen
SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
155C Pump to waste line downturned if it discharges to sewer/storm drain or allowing
complete drainage if not downturned
SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be downturned. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
156 Water level is measured and recorded periodically
MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires
provisions be made to permit periodic measurement of water levels in the completed
well.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 22 of 145
157 Wellhead secured to protect quality water
SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
158 Well head or well house and equipment protected from flooding
SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515-
6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or
12” above well house floor and for sites that flood at least 3’ above 100-year flood
level or highest known flood elevation. Well casing terminating in underground vault
shall have a drain to daylight and surface runoff directed away from vault access. Well
house floor shall be sloped for drainage, and have a drain to daylight unless highly
impractical. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
C
159 There are no unprotected cross-connections in well discharge piping.
SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the
well discharge piping to be protected against the entrance of contamination. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
160 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well
house or near well head?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
161 Well discharge line has a smooth-nosed sampling tap, which samples the well water
before any chemical injection. (first item from the wellhead).
MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a
means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the
first item from the well head and the shut-off valve as the last item)
C
162 Well discharge line has a check valve.
MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
163 Well discharge line has a pressure gauge.
MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
164 Well discharge line has a means to measure flow.
MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
165 Well discharge line has a shut-off valve (last item from the well head).
MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 23 of 145
WS008 - WHITE WELL #1 -
166 Is there an air/vac valve on the well discharge line? If yes, answer the following
question(s)
N
167 Wells that pump directly into a distribution system have means to release trapped air
from pump discharge piping (for example, pumps directly to a tank, has an air release
valve or pump to waste line)
MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps
directly into the distribution system be equipped with an air release/vacuum relief valve
located upstream of the check valve, unless the wellhead valve and piping provide for
pumping to waste all trapped air before water is introduced into the distribution
system.
C
168 Does well require oil-lubrication?Y
168A Well shaft lubricants are food grade mineral oil?
SIG | 25pts | SO | S031 | R309-105-10(7), R309-515-6(6)(a) | Rules require all oil-
lubricated pumps for drinking water wells to utilize food-grade mineral oil suitable for
human consumption as determined by the Director. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
<a href="https://www.youtube.com/watch?v=UABQMeeUz1g">Click here for addition
training</a>
C
169 Is this facility Active or Inactive?I
169A Explain why this facility is Inactive (Is this facility in stand-by mode?)Not needed at this time.
170 Operating Period (Start Date)01/01
171 Operating Period (Ending Date)12/31
172 Undocumented sources shall not be physically connected to the drinking water
system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT")
SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) |
R309-105-6(1) requires plans and specifications for all public drinking water projects to
be approved in writing by the Director prior to the commencement of construction. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
173 Well casing is at least 18 inches above finished ground surface and 12 inches above
well house floor.
SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515-
6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above
the final ground surface and 12 inches above the pump house floor; at sites subject to
flooding, the top of the casing must terminate at least 3 feet above the 100-year flood
level or highest known flood elevation, whichever is higher. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 24 of 145
174 Wellhead is sealed to prevent contamination.
SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515-
6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and
discharge piping. This significant deficiency should be corrected within 120 days of
notification or have a corrective action plan approved by
C
175 Is the well casing vented? ... if yes, answer the following question(s)N
176 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y
176A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim
SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line
connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood
rim. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C
176B Pump to waste line equipped with #4 non-corrodible mesh screen
SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
176C Pump to waste line downturned if it discharges to sewer/storm drain or allowing
complete drainage if not downturned
SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be downturned. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
177 Water level is measured and recorded periodically
MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires
provisions be made to permit periodic measurement of water levels in the completed
well.
C
178 Wellhead secured to protect quality water
SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
179 Well head or well house and equipment protected from flooding
SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515-
6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or
12” above well house floor and for sites that flood at least 3’ above 100-year flood
level or highest known flood elevation. Well casing terminating in underground vault
shall have a drain to daylight and surface runoff directed away from vault access. Well
house floor shall be sloped for drainage, and have a drain to daylight unless highly
impractical. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 25 of 145
180 There are no unprotected cross-connections in well discharge piping.
SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the
well discharge piping to be protected against the entrance of contamination. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
181 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well
house or near well head?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
182 Well discharge line has a smooth-nosed sampling tap, which samples the well water
before any chemical injection. (first item from the wellhead).
MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a
means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the
first item from the well head and the shut-off valve as the last item)
C
183 Well discharge line has a check valve.
MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
184 Well discharge line has a pressure gauge.
MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
185 Well discharge line has a means to measure flow.
MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
186 Well discharge line has a shut-off valve (last item from the well head).
MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
187 Is there an air/vac valve on the well discharge line? If yes, answer the following
question(s)
N
188 Wells that pump directly into a distribution system have means to release trapped air
from pump discharge piping (for example, pumps directly to a tank, has an air release
valve or pump to waste line)
MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps
directly into the distribution system be equipped with an air release/vacuum relief valve
located upstream of the check valve, unless the wellhead valve and piping provide for
pumping to waste all trapped air before water is introduced into the distribution
system.
C
189 Does well require oil-lubrication?Y
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 26 of 145
WS009 - WHITE WELL #2 -
189A Well shaft lubricants are food grade mineral oil?
SIG | 25pts | SO | S031 | R309-105-10(7), R309-515-6(6)(a) | Rules require all oil-
lubricated pumps for drinking water wells to utilize food-grade mineral oil suitable for
human consumption as determined by the Director. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
<a href="https://www.youtube.com/watch?v=UABQMeeUz1g">Click here for addition
training</a>
C
190 Is this facility Active or Inactive?I
190A Explain why this facility is Inactive (Is this facility in stand-by mode?)Not needed at this time.
191 Operating Period (Start Date)01/01
192 Operating Period (Ending Date)01/01
193 Undocumented sources shall not be physically connected to the drinking water
system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT")
SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) |
R309-105-6(1) requires plans and specifications for all public drinking water projects to
be approved in writing by the Director prior to the commencement of construction. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
194 Well casing is at least 18 inches above finished ground surface and 12 inches above
well house floor.
SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515-
6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above
the final ground surface and 12 inches above the pump house floor; at sites subject to
flooding, the top of the casing must terminate at least 3 feet above the 100-year flood
level or highest known flood elevation, whichever is higher. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
195 Wellhead is sealed to prevent contamination.
SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515-
6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and
discharge piping. This significant deficiency should be corrected within 120 days of
notification or have a corrective action plan approved by
C
196 Is the well casing vented? ... if yes, answer the following question(s)N
197 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y
197A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim
SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line
connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood
rim. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 27 of 145
197B Pump to waste line equipped with #4 non-corrodible mesh screen
SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
197C Pump to waste line downturned if it discharges to sewer/storm drain or allowing
complete drainage if not downturned
SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be downturned. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
198 Water level is measured and recorded periodically
MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires
provisions be made to permit periodic measurement of water levels in the completed
well.
C
199 Wellhead secured to protect quality water
SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
200 Well head or well house and equipment protected from flooding
SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515-
6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or
12” above well house floor and for sites that flood at least 3’ above 100-year flood
level or highest known flood elevation. Well casing terminating in underground vault
shall have a drain to daylight and surface runoff directed away from vault access. Well
house floor shall be sloped for drainage, and have a drain to daylight unless highly
impractical. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
C
201 There are no unprotected cross-connections in well discharge piping.
SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the
well discharge piping to be protected against the entrance of contamination. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
202 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well
house or near well head?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
203 Well discharge line has a smooth-nosed sampling tap, which samples the well water
before any chemical injection. (first item from the wellhead).
MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a
means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the
first item from the well head and the shut-off valve as the last item)
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 28 of 145
WS010 - FINLAYSON WELL -
204 Well discharge line has a check valve.
MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
205 Well discharge line has a pressure gauge.
MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
206 Well discharge line has a means to measure flow.
MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
207 Well discharge line has a shut-off valve (last item from the well head).
MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
208 Is there an air/vac valve on the well discharge line? If yes, answer the following
question(s)
N
209 Wells that pump directly into a distribution system have means to release trapped air
from pump discharge piping (for example, pumps directly to a tank, has an air release
valve or pump to waste line)
MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps
directly into the distribution system be equipped with an air release/vacuum relief valve
located upstream of the check valve, unless the wellhead valve and piping provide for
pumping to waste all trapped air before water is introduced into the distribution
system.
C
210 Does well require oil-lubrication?Y
210A Well shaft lubricants are food grade mineral oil?
SIG | 25pts | SO | S031 | R309-105-10(7), R309-515-6(6)(a) | Rules require all oil-
lubricated pumps for drinking water wells to utilize food-grade mineral oil suitable for
human consumption as determined by the Director. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
<a href="https://www.youtube.com/watch?v=UABQMeeUz1g">Click here for addition
training</a>
C
211 Is this facility Active or Inactive?A
212 Operating Period (Start Date)01/01
213 Operating Period (Ending Date)12/31
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 29 of 145
214 Undocumented sources shall not be physically connected to the drinking water
system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT")
SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) |
R309-105-6(1) requires plans and specifications for all public drinking water projects to
be approved in writing by the Director prior to the commencement of construction. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
215 Well casing is at least 18 inches above finished ground surface and 12 inches above
well house floor.
SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515-
6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above
the final ground surface and 12 inches above the pump house floor; at sites subject to
flooding, the top of the casing must terminate at least 3 feet above the 100-year flood
level or highest known flood elevation, whichever is higher. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
216 Wellhead is sealed to prevent contamination.
SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515-
6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and
discharge piping. This significant deficiency should be corrected within 120 days of
notification or have a corrective action plan approved by
C
217 Is the well casing vented? ... if yes, answer the following question(s)Y
217A Vent screened with #14 mesh screen
SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen.
C
217B Vent down-turned
SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of
surface water or rainwater.
C
217C Vent has adequate clearance to prevent contamination from entering the well
SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap.
C
218 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y
218A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim
SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line
connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood
rim. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 30 of 145
218B Pump to waste line equipped with #4 non-corrodible mesh screen
SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
218C Pump to waste line downturned if it discharges to sewer/storm drain or allowing
complete drainage if not downturned
SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be downturned. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
219 Water level is measured and recorded periodically
MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires
provisions be made to permit periodic measurement of water levels in the completed
well.
C
220 Wellhead secured to protect quality water
SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
221 Well head or well house and equipment protected from flooding
SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515-
6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or
12” above well house floor and for sites that flood at least 3’ above 100-year flood
level or highest known flood elevation. Well casing terminating in underground vault
shall have a drain to daylight and surface runoff directed away from vault access. Well
house floor shall be sloped for drainage, and have a drain to daylight unless highly
impractical. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
C
222 There are no unprotected cross-connections in well discharge piping.
SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the
well discharge piping to be protected against the entrance of contamination. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
223 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well
house or near well head?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
224 Well discharge line has a smooth-nosed sampling tap, which samples the well water
before any chemical injection. (first item from the wellhead).
MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a
means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the
first item from the well head and the shut-off valve as the last item)
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 31 of 145
225 Well discharge line has a check valve.
MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
226 Well discharge line has a pressure gauge.
MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
227 Well discharge line has a means to measure flow.
MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
228 Well discharge line has a shut-off valve (last item from the well head).
MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
229 Is there an air/vac valve on the well discharge line? If yes, answer the following
question(s)
Y
229A Air vacuum relief valve on well discharge piping downturned
SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be down-turned.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
229B Air vacuum relief valve on well discharge piping screened with #14 mesh screen
SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be covered with a
#14 mesh corrosion-resistant screen. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
229C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance
above floor
SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be at least 6
inches above the well house floor. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
230 Wells that pump directly into a distribution system have means to release trapped air
from pump discharge piping (for example, pumps directly to a tank, has an air release
valve or pump to waste line)
MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps
directly into the distribution system be equipped with an air release/vacuum relief valve
located upstream of the check valve, unless the wellhead valve and piping provide for
pumping to waste all trapped air before water is introduced into the distribution
system.
C
231 Does well require oil-lubrication?Y
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 32 of 145
WS016 - MEADOWBROOK NORTH WELL -
231A Well shaft lubricants are food grade mineral oil?
SIG | 25pts | SO | S031 | R309-105-10(7), R309-515-6(6)(a) | Rules require all oil-
lubricated pumps for drinking water wells to utilize food-grade mineral oil suitable for
human consumption as determined by the Director. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
<a href="https://www.youtube.com/watch?v=UABQMeeUz1g">Click here for addition
training</a>
C
232 Is this facility Active or Inactive?A
233 Operating Period (Start Date)01/01
234 Operating Period (Ending Date)12/31
235 Undocumented sources shall not be physically connected to the drinking water
system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT")
SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) |
R309-105-6(1) requires plans and specifications for all public drinking water projects to
be approved in writing by the Director prior to the commencement of construction. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
236 Well casing is at least 18 inches above finished ground surface and 12 inches above
well house floor.
SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515-
6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above
the final ground surface and 12 inches above the pump house floor; at sites subject to
flooding, the top of the casing must terminate at least 3 feet above the 100-year flood
level or highest known flood elevation, whichever is higher. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
237 Wellhead is sealed to prevent contamination.
SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515-
6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and
discharge piping. This significant deficiency should be corrected within 120 days of
notification or have a corrective action plan approved by
C
238 Is the well casing vented? ... if yes, answer the following question(s)Y
238A Vent screened with #14 mesh screen
SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen.
C
238B Vent down-turned
SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of
surface water or rainwater.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 33 of 145
238C Vent has adequate clearance to prevent contamination from entering the well
SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap.
C
239 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y
239A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim
SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line
connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood
rim. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C
239B Pump to waste line equipped with #4 non-corrodible mesh screen
SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
239C Pump to waste line downturned if it discharges to sewer/storm drain or allowing
complete drainage if not downturned
SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be downturned. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
240 Water level is measured and recorded periodically
MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires
provisions be made to permit periodic measurement of water levels in the completed
well.
C
241 Wellhead secured to protect quality water
SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
242 Well head or well house and equipment protected from flooding
SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515-
6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or
12” above well house floor and for sites that flood at least 3’ above 100-year flood
level or highest known flood elevation. Well casing terminating in underground vault
shall have a drain to daylight and surface runoff directed away from vault access. Well
house floor shall be sloped for drainage, and have a drain to daylight unless highly
impractical. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
C
243 There are no unprotected cross-connections in well discharge piping.
SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the
well discharge piping to be protected against the entrance of contamination. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 34 of 145
244 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well
house or near well head?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
245 Well discharge line has a smooth-nosed sampling tap, which samples the well water
before any chemical injection. (first item from the wellhead).
MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a
means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the
first item from the well head and the shut-off valve as the last item)
C
246 Well discharge line has a check valve.
MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
247 Well discharge line has a pressure gauge.
MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
248 Well discharge line has a means to measure flow.
MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
249 Well discharge line has a shut-off valve (last item from the well head).
MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
250 Is there an air/vac valve on the well discharge line? If yes, answer the following
question(s)
Y
250A Air vacuum relief valve on well discharge piping downturned
SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be down-turned.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
250B Air vacuum relief valve on well discharge piping screened with #14 mesh screen
SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be covered with a
#14 mesh corrosion-resistant screen. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
250C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance
above floor
SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be at least 6
inches above the well house floor. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 35 of 145
WS017 - FAIRWAY WELL -
251 Wells that pump directly into a distribution system have means to release trapped air
from pump discharge piping (for example, pumps directly to a tank, has an air release
valve or pump to waste line)
MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps
directly into the distribution system be equipped with an air release/vacuum relief valve
located upstream of the check valve, unless the wellhead valve and piping provide for
pumping to waste all trapped air before water is introduced into the distribution
system.
C
252 Does well require oil-lubrication?Y
252A Well shaft lubricants are food grade mineral oil?
SIG | 25pts | SO | S031 | R309-105-10(7), R309-515-6(6)(a) | Rules require all oil-
lubricated pumps for drinking water wells to utilize food-grade mineral oil suitable for
human consumption as determined by the Director. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
<a href="https://www.youtube.com/watch?v=UABQMeeUz1g">Click here for addition
training</a>
C
253 Is this facility Active or Inactive?I
253A Explain why this facility is Inactive (Is this facility in stand-by mode?)Not needed and pumps hi TDS water
254 Operating Period (Start Date)01/01
255 Operating Period (Ending Date)01/01
256 Undocumented sources shall not be physically connected to the drinking water
system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT")
SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) |
R309-105-6(1) requires plans and specifications for all public drinking water projects to
be approved in writing by the Director prior to the commencement of construction. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
257 Well casing is at least 18 inches above finished ground surface and 12 inches above
well house floor.
SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515-
6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above
the final ground surface and 12 inches above the pump house floor; at sites subject to
flooding, the top of the casing must terminate at least 3 feet above the 100-year flood
level or highest known flood elevation, whichever is higher. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
258 Wellhead is sealed to prevent contamination.
SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515-
6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and
discharge piping. This significant deficiency should be corrected within 120 days of
notification or have a corrective action plan approved by
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 36 of 145
259 Is the well casing vented? ... if yes, answer the following question(s)Y
259A Vent screened with #14 mesh screen
SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen.
C
259B Vent down-turned
SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of
surface water or rainwater.
C
259C Vent has adequate clearance to prevent contamination from entering the well
SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap.
C
260 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y
260A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim
SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line
connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood
rim. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C
260B Pump to waste line equipped with #4 non-corrodible mesh screen
SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
260C Pump to waste line downturned if it discharges to sewer/storm drain or allowing
complete drainage if not downturned
SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be downturned. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
261 Water level is measured and recorded periodically
MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires
provisions be made to permit periodic measurement of water levels in the completed
well.
C
262 Wellhead secured to protect quality water
SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 37 of 145
263 Well head or well house and equipment protected from flooding
SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515-
6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or
12” above well house floor and for sites that flood at least 3’ above 100-year flood
level or highest known flood elevation. Well casing terminating in underground vault
shall have a drain to daylight and surface runoff directed away from vault access. Well
house floor shall be sloped for drainage, and have a drain to daylight unless highly
impractical. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
C
264 There are no unprotected cross-connections in well discharge piping.
SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the
well discharge piping to be protected against the entrance of contamination. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
265 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well
house or near well head?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
266 Well discharge line has a smooth-nosed sampling tap, which samples the well water
before any chemical injection. (first item from the wellhead).
MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a
means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the
first item from the well head and the shut-off valve as the last item)
C
267 Well discharge line has a check valve.
MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
268 Well discharge line has a pressure gauge.
MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
269 Well discharge line has a means to measure flow.
MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
270 Well discharge line has a shut-off valve (last item from the well head).
MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
271 Is there an air/vac valve on the well discharge line? If yes, answer the following
question(s)
Y
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 38 of 145
WS021 - TAYLORSVLLE WEST WELL - Active
Exception Granted: R309-515-6(6)(a) | All substances introduced into the well during construction or development shall be certified to comply with
ANSI/NSF Standard 60
271A Air vacuum relief valve on well discharge piping downturned
SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be down-turned.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
271B Air vacuum relief valve on well discharge piping screened with #14 mesh screen
SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be covered with a
#14 mesh corrosion-resistant screen. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
271C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance
above floor
SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be at least 6
inches above the well house floor. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
272 Wells that pump directly into a distribution system have means to release trapped air
from pump discharge piping (for example, pumps directly to a tank, has an air release
valve or pump to waste line)
MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps
directly into the distribution system be equipped with an air release/vacuum relief valve
located upstream of the check valve, unless the wellhead valve and piping provide for
pumping to waste all trapped air before water is introduced into the distribution
system.
C
273 Does well require oil-lubrication?Y
273A Well shaft lubricants are food grade mineral oil?
SIG | 25pts | SO | S031 | R309-105-10(7), R309-515-6(6)(a) | Rules require all oil-
lubricated pumps for drinking water wells to utilize food-grade mineral oil suitable for
human consumption as determined by the Director. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
<a href="https://www.youtube.com/watch?v=UABQMeeUz1g">Click here for addition
training</a>
C
274 Is this facility Active or Inactive?A
275 Operating Period (Start Date)01/01
276 Operating Period (Ending Date)12/31
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 39 of 145
277 Undocumented sources shall not be physically connected to the drinking water
system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT")
SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) |
R309-105-6(1) requires plans and specifications for all public drinking water projects to
be approved in writing by the Director prior to the commencement of construction. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
278 Well casing is at least 18 inches above finished ground surface and 12 inches above
well house floor.
SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515-
6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above
the final ground surface and 12 inches above the pump house floor; at sites subject to
flooding, the top of the casing must terminate at least 3 feet above the 100-year flood
level or highest known flood elevation, whichever is higher. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
279 Wellhead is sealed to prevent contamination.
SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515-
6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and
discharge piping. This significant deficiency should be corrected within 120 days of
notification or have a corrective action plan approved by
C
280 Is the well casing vented? ... if yes, answer the following question(s)Y
280A Vent screened with #14 mesh screen
SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen.
C
280B Vent down-turned
SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of
surface water or rainwater.
C
280C Vent has adequate clearance to prevent contamination from entering the well
SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap.
C
281 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y
281A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim
SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line
connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood
rim. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 40 of 145
281B Pump to waste line equipped with #4 non-corrodible mesh screen
SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
281C Pump to waste line downturned if it discharges to sewer/storm drain or allowing
complete drainage if not downturned
SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be downturned. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
282 Water level is measured and recorded periodically
MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires
provisions be made to permit periodic measurement of water levels in the completed
well.
C
283 Wellhead secured to protect quality water
SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
284 Well head or well house and equipment protected from flooding
SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515-
6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or
12” above well house floor and for sites that flood at least 3’ above 100-year flood
level or highest known flood elevation. Well casing terminating in underground vault
shall have a drain to daylight and surface runoff directed away from vault access. Well
house floor shall be sloped for drainage, and have a drain to daylight unless highly
impractical. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
C
285 There are no unprotected cross-connections in well discharge piping.
SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the
well discharge piping to be protected against the entrance of contamination. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
286 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well
house or near well head?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
287 Well discharge line has a smooth-nosed sampling tap, which samples the well water
before any chemical injection. (first item from the wellhead).
MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a
means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the
first item from the well head and the shut-off valve as the last item)
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 41 of 145
288 Well discharge line has a check valve.
MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
289 Well discharge line has a pressure gauge.
MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
290 Well discharge line has a means to measure flow.
MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
291 Well discharge line has a shut-off valve (last item from the well head).
MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
292 Is there an air/vac valve on the well discharge line? If yes, answer the following
question(s)
Y
292A Air vacuum relief valve on well discharge piping downturned
SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be down-turned.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
292B Air vacuum relief valve on well discharge piping screened with #14 mesh screen
SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be covered with a
#14 mesh corrosion-resistant screen. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
292C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance
above floor
SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be at least 6
inches above the well house floor. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
293 Wells that pump directly into a distribution system have means to release trapped air
from pump discharge piping (for example, pumps directly to a tank, has an air release
valve or pump to waste line)
MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps
directly into the distribution system be equipped with an air release/vacuum relief valve
located upstream of the check valve, unless the wellhead valve and piping provide for
pumping to waste all trapped air before water is introduced into the distribution
system.
C
294 Does well require oil-lubrication?Y
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 42 of 145
WS022 - BARKER EAST WELL -
294A Well shaft lubricants are food grade mineral oil?
SIG | 25pts | SO | S031 | R309-105-10(7), R309-515-6(6)(a) | Rules require all oil-
lubricated pumps for drinking water wells to utilize food-grade mineral oil suitable for
human consumption as determined by the Director. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
<a href="https://www.youtube.com/watch?v=UABQMeeUz1g">Click here for addition
training</a>
C
295 Is this facility Active or Inactive?I
295A Explain why this facility is Inactive (Is this facility in stand-by mode?)Proposed Abandoning and drilling new
replacement facility.
296 Operating Period (Start Date)01/01
297 Operating Period (Ending Date)01/01
298 Undocumented sources shall not be physically connected to the drinking water
system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT")
SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) |
R309-105-6(1) requires plans and specifications for all public drinking water projects to
be approved in writing by the Director prior to the commencement of construction. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
299 Well casing is at least 18 inches above finished ground surface and 12 inches above
well house floor.
SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515-
6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above
the final ground surface and 12 inches above the pump house floor; at sites subject to
flooding, the top of the casing must terminate at least 3 feet above the 100-year flood
level or highest known flood elevation, whichever is higher. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
300 Wellhead is sealed to prevent contamination.
SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515-
6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and
discharge piping. This significant deficiency should be corrected within 120 days of
notification or have a corrective action plan approved by
C
301 Is the well casing vented? ... if yes, answer the following question(s)Y
301A Vent screened with #14 mesh screen
SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 43 of 145
301B Vent down-turned
SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of
surface water or rainwater.
C
301C Vent has adequate clearance to prevent contamination from entering the well
SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap.
C
302 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y
302A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim
SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line
connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood
rim. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C
302B Pump to waste line equipped with #4 non-corrodible mesh screen
SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
302C Pump to waste line downturned if it discharges to sewer/storm drain or allowing
complete drainage if not downturned
SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be downturned. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
303 Water level is measured and recorded periodically
MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires
provisions be made to permit periodic measurement of water levels in the completed
well.
C
304 Wellhead secured to protect quality water
SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
305 Well head or well house and equipment protected from flooding
SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515-
6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or
12” above well house floor and for sites that flood at least 3’ above 100-year flood
level or highest known flood elevation. Well casing terminating in underground vault
shall have a drain to daylight and surface runoff directed away from vault access. Well
house floor shall be sloped for drainage, and have a drain to daylight unless highly
impractical. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 44 of 145
306 There are no unprotected cross-connections in well discharge piping.
SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the
well discharge piping to be protected against the entrance of contamination. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
307 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well
house or near well head?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
308 Well discharge line has a smooth-nosed sampling tap, which samples the well water
before any chemical injection. (first item from the wellhead).
MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a
means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the
first item from the well head and the shut-off valve as the last item)
C
309 Well discharge line has a check valve.
MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
310 Well discharge line has a pressure gauge.
MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
311 Well discharge line has a means to measure flow.
MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
312 Well discharge line has a shut-off valve (last item from the well head).
MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
313 Is there an air/vac valve on the well discharge line? If yes, answer the following
question(s)
Y
313A Air vacuum relief valve on well discharge piping downturned
SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be down-turned.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
313B Air vacuum relief valve on well discharge piping screened with #14 mesh screen
SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be covered with a
#14 mesh corrosion-resistant screen. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 45 of 145
WS023 - ATHERTON EAST WELL - Active
Exception Granted: Rule R309-515-6(6)(a) | The Rodine 103 NPF the City plans to use for the Atherton East Well is currently certified by the NSF;
however, it does not comply with thir rules for Standard 60 or 61.
313C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance
above floor
SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be at least 6
inches above the well house floor. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
314 Wells that pump directly into a distribution system have means to release trapped air
from pump discharge piping (for example, pumps directly to a tank, has an air release
valve or pump to waste line)
MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps
directly into the distribution system be equipped with an air release/vacuum relief valve
located upstream of the check valve, unless the wellhead valve and piping provide for
pumping to waste all trapped air before water is introduced into the distribution
system.
C
315 Does well require oil-lubrication?Y
315A Well shaft lubricants are food grade mineral oil?
SIG | 25pts | SO | S031 | R309-105-10(7), R309-515-6(6)(a) | Rules require all oil-
lubricated pumps for drinking water wells to utilize food-grade mineral oil suitable for
human consumption as determined by the Director. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
<a href="https://www.youtube.com/watch?v=UABQMeeUz1g">Click here for addition
training</a>
C
316 Is this facility Active or Inactive?A
317 Operating Period (Start Date)01/01
318 Operating Period (Ending Date)12/31
319 Undocumented sources shall not be physically connected to the drinking water
system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT")
SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) |
R309-105-6(1) requires plans and specifications for all public drinking water projects to
be approved in writing by the Director prior to the commencement of construction. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 46 of 145
320 Well casing is at least 18 inches above finished ground surface and 12 inches above
well house floor.
SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515-
6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above
the final ground surface and 12 inches above the pump house floor; at sites subject to
flooding, the top of the casing must terminate at least 3 feet above the 100-year flood
level or highest known flood elevation, whichever is higher. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
321 Wellhead is sealed to prevent contamination.
SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515-
6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and
discharge piping. This significant deficiency should be corrected within 120 days of
notification or have a corrective action plan approved by
C
322 Is the well casing vented? ... if yes, answer the following question(s)Y
322A Vent screened with #14 mesh screen
SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen.
C
322B Vent down-turned
SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of
surface water or rainwater.
C
322C Vent has adequate clearance to prevent contamination from entering the well
SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap.
C
323 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y
323A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim
SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line
connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood
rim. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C
323B Pump to waste line equipped with #4 non-corrodible mesh screen
SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 47 of 145
323C Pump to waste line downturned if it discharges to sewer/storm drain or allowing
complete drainage if not downturned
SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be downturned. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
324 Water level is measured and recorded periodically
MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires
provisions be made to permit periodic measurement of water levels in the completed
well.
C
325 Wellhead secured to protect quality water
SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
326 Well head or well house and equipment protected from flooding
SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515-
6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or
12” above well house floor and for sites that flood at least 3’ above 100-year flood
level or highest known flood elevation. Well casing terminating in underground vault
shall have a drain to daylight and surface runoff directed away from vault access. Well
house floor shall be sloped for drainage, and have a drain to daylight unless highly
impractical. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
C
327 There are no unprotected cross-connections in well discharge piping.
SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the
well discharge piping to be protected against the entrance of contamination. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
328 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well
house or near well head?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
329 Well discharge line has a smooth-nosed sampling tap, which samples the well water
before any chemical injection. (first item from the wellhead).
MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a
means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the
first item from the well head and the shut-off valve as the last item)
C
330 Well discharge line has a check valve.
MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 48 of 145
331 Well discharge line has a pressure gauge.
MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
332 Well discharge line has a means to measure flow.
MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
333 Well discharge line has a shut-off valve (last item from the well head).
MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
334 Is there an air/vac valve on the well discharge line? If yes, answer the following
question(s)
Y
334A Air vacuum relief valve on well discharge piping downturned
SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be down-turned.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
334B Air vacuum relief valve on well discharge piping screened with #14 mesh screen
SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be covered with a
#14 mesh corrosion-resistant screen. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
334C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance
above floor
SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be at least 6
inches above the well house floor. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
335 Wells that pump directly into a distribution system have means to release trapped air
from pump discharge piping (for example, pumps directly to a tank, has an air release
valve or pump to waste line)
MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps
directly into the distribution system be equipped with an air release/vacuum relief valve
located upstream of the check valve, unless the wellhead valve and piping provide for
pumping to waste all trapped air before water is introduced into the distribution
system.
C
336 Does well require oil-lubrication?Y
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 49 of 145
WS024 - ATHERTON WEST WELL - Active
Exception Granted: R309-515-6-(6a) | The Rodine 103 NPF the City plans to use for the Atherton West Well is currently certified by the NSF;
however it does not comply with their rules for Standard 60 or 61.
336A Well shaft lubricants are food grade mineral oil?
SIG | 25pts | SO | S031 | R309-105-10(7), R309-515-6(6)(a) | Rules require all oil-
lubricated pumps for drinking water wells to utilize food-grade mineral oil suitable for
human consumption as determined by the Director. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
<a href="https://www.youtube.com/watch?v=UABQMeeUz1g">Click here for addition
training</a>
C
337 Is this facility Active or Inactive?A
338 Operating Period (Start Date)01/01
339 Operating Period (Ending Date)12/31
340 Undocumented sources shall not be physically connected to the drinking water
system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT")
SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) |
R309-105-6(1) requires plans and specifications for all public drinking water projects to
be approved in writing by the Director prior to the commencement of construction. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
341 Well casing is at least 18 inches above finished ground surface and 12 inches above
well house floor.
SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515-
6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above
the final ground surface and 12 inches above the pump house floor; at sites subject to
flooding, the top of the casing must terminate at least 3 feet above the 100-year flood
level or highest known flood elevation, whichever is higher. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
342 Wellhead is sealed to prevent contamination.
SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515-
6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and
discharge piping. This significant deficiency should be corrected within 120 days of
notification or have a corrective action plan approved by
C
343 Is the well casing vented? ... if yes, answer the following question(s)Y
343A Vent screened with #14 mesh screen
SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 50 of 145
343B Vent down-turned
SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of
surface water or rainwater.
C
343C Vent has adequate clearance to prevent contamination from entering the well
SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap.
C
344 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y
344A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim
SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line
connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood
rim. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C
344B Pump to waste line equipped with #4 non-corrodible mesh screen
SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
344C Pump to waste line downturned if it discharges to sewer/storm drain or allowing
complete drainage if not downturned
SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be downturned. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
345 Water level is measured and recorded periodically
MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires
provisions be made to permit periodic measurement of water levels in the completed
well.
C
346 Wellhead secured to protect quality water
SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
347 Well head or well house and equipment protected from flooding
SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515-
6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or
12” above well house floor and for sites that flood at least 3’ above 100-year flood
level or highest known flood elevation. Well casing terminating in underground vault
shall have a drain to daylight and surface runoff directed away from vault access. Well
house floor shall be sloped for drainage, and have a drain to daylight unless highly
impractical. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 51 of 145
348 There are no unprotected cross-connections in well discharge piping.
SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the
well discharge piping to be protected against the entrance of contamination. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
349 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well
house or near well head?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
350 Well discharge line has a smooth-nosed sampling tap, which samples the well water
before any chemical injection. (first item from the wellhead).
MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a
means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the
first item from the well head and the shut-off valve as the last item)
C
351 Well discharge line has a check valve.
MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
352 Well discharge line has a pressure gauge.
MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
353 Well discharge line has a means to measure flow.
MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
354 Well discharge line has a shut-off valve (last item from the well head).
MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
355 Is there an air/vac valve on the well discharge line? If yes, answer the following
question(s)
Y
355A Air vacuum relief valve on well discharge piping downturned
SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be down-turned.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
355B Air vacuum relief valve on well discharge piping screened with #14 mesh screen
SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be covered with a
#14 mesh corrosion-resistant screen. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 52 of 145
WS025 - HIGH ZONE EAST WELL -
355C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance
above floor
SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be at least 6
inches above the well house floor. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
356 Wells that pump directly into a distribution system have means to release trapped air
from pump discharge piping (for example, pumps directly to a tank, has an air release
valve or pump to waste line)
MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps
directly into the distribution system be equipped with an air release/vacuum relief valve
located upstream of the check valve, unless the wellhead valve and piping provide for
pumping to waste all trapped air before water is introduced into the distribution
system.
C
357 Does well require oil-lubrication?Y
357A Well shaft lubricants are food grade mineral oil?
SIG | 25pts | SO | S031 | R309-105-10(7), R309-515-6(6)(a) | Rules require all oil-
lubricated pumps for drinking water wells to utilize food-grade mineral oil suitable for
human consumption as determined by the Director. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
<a href="https://www.youtube.com/watch?v=UABQMeeUz1g">Click here for addition
training</a>
C
358 Is this facility Active or Inactive?I
358A Explain why this facility is Inactive (Is this facility in stand-by mode?)Not needed at this time.
359 Operating Period (Start Date)01/01
360 Operating Period (Ending Date)01/01
361 Undocumented sources shall not be physically connected to the drinking water
system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT")
SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) |
R309-105-6(1) requires plans and specifications for all public drinking water projects to
be approved in writing by the Director prior to the commencement of construction. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
362 Well casing is at least 18 inches above finished ground surface and 12 inches above
well house floor.
SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515-
6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above
the final ground surface and 12 inches above the pump house floor; at sites subject to
flooding, the top of the casing must terminate at least 3 feet above the 100-year flood
level or highest known flood elevation, whichever is higher. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 53 of 145
363 Wellhead is sealed to prevent contamination.
SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515-
6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and
discharge piping. This significant deficiency should be corrected within 120 days of
notification or have a corrective action plan approved by
C
364 Is the well casing vented? ... if yes, answer the following question(s)Y
364A Vent screened with #14 mesh screen
SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen.
C
364B Vent down-turned
SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of
surface water or rainwater.
C
364C Vent has adequate clearance to prevent contamination from entering the well
SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap.
C
365 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y
365A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim
SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line
connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood
rim. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C
365B Pump to waste line equipped with #4 non-corrodible mesh screen
SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
365C Pump to waste line downturned if it discharges to sewer/storm drain or allowing
complete drainage if not downturned
SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be downturned. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
366 Water level is measured and recorded periodically
MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires
provisions be made to permit periodic measurement of water levels in the completed
well.
C
367 Wellhead secured to protect quality water
SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 54 of 145
368 Well head or well house and equipment protected from flooding
SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515-
6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or
12” above well house floor and for sites that flood at least 3’ above 100-year flood
level or highest known flood elevation. Well casing terminating in underground vault
shall have a drain to daylight and surface runoff directed away from vault access. Well
house floor shall be sloped for drainage, and have a drain to daylight unless highly
impractical. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
C
369 There are no unprotected cross-connections in well discharge piping.
SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the
well discharge piping to be protected against the entrance of contamination. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
370 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well
house or near well head?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
371 Well discharge line has a smooth-nosed sampling tap, which samples the well water
before any chemical injection. (first item from the wellhead).
MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a
means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the
first item from the well head and the shut-off valve as the last item)
C
372 Well discharge line has a check valve.
MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
373 Well discharge line has a pressure gauge.
MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
374 Well discharge line has a means to measure flow.
MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
375 Well discharge line has a shut-off valve (last item from the well head).
MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
376 Is there an air/vac valve on the well discharge line? If yes, answer the following
question(s)
Y
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 55 of 145
WS026 - RAWSON WELL - Active
376A Air vacuum relief valve on well discharge piping downturned
SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be down-turned.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
376B Air vacuum relief valve on well discharge piping screened with #14 mesh screen
SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be covered with a
#14 mesh corrosion-resistant screen. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
376C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance
above floor
SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be at least 6
inches above the well house floor. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
377 Wells that pump directly into a distribution system have means to release trapped air
from pump discharge piping (for example, pumps directly to a tank, has an air release
valve or pump to waste line)
MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps
directly into the distribution system be equipped with an air release/vacuum relief valve
located upstream of the check valve, unless the wellhead valve and piping provide for
pumping to waste all trapped air before water is introduced into the distribution
system.
C
378 Does well require oil-lubrication?Y
378A Well shaft lubricants are food grade mineral oil?
SIG | 25pts | SO | S031 | R309-105-10(7), R309-515-6(6)(a) | Rules require all oil-
lubricated pumps for drinking water wells to utilize food-grade mineral oil suitable for
human consumption as determined by the Director. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
<a href="https://www.youtube.com/watch?v=UABQMeeUz1g">Click here for addition
training</a>
C
379 Is this facility Active or Inactive?A
380 Operating Period (Start Date)01/01
381 Operating Period (Ending Date)12/31
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 56 of 145
382 Undocumented sources shall not be physically connected to the drinking water
system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT")
SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) |
R309-105-6(1) requires plans and specifications for all public drinking water projects to
be approved in writing by the Director prior to the commencement of construction. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
383 Well casing is at least 18 inches above finished ground surface and 12 inches above
well house floor.
SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515-
6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above
the final ground surface and 12 inches above the pump house floor; at sites subject to
flooding, the top of the casing must terminate at least 3 feet above the 100-year flood
level or highest known flood elevation, whichever is higher. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
384 Wellhead is sealed to prevent contamination.
SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515-
6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and
discharge piping. This significant deficiency should be corrected within 120 days of
notification or have a corrective action plan approved by
C
385 Is the well casing vented? ... if yes, answer the following question(s)Y
385A Vent screened with #14 mesh screen
SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen.
C
385B Vent down-turned
SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of
surface water or rainwater.
C (Notes: Mushroom cap)
385C Vent has adequate clearance to prevent contamination from entering the well
SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap.
C
386 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y
386A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim
SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line
connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood
rim. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 57 of 145
386B Pump to waste line equipped with #4 non-corrodible mesh screen
SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
386C Pump to waste line downturned if it discharges to sewer/storm drain or allowing
complete drainage if not downturned
SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be downturned. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
387 Water level is measured and recorded periodically
MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires
provisions be made to permit periodic measurement of water levels in the completed
well.
C
388 Wellhead secured to protect quality water
SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
389 Well head or well house and equipment protected from flooding
SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515-
6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or
12” above well house floor and for sites that flood at least 3’ above 100-year flood
level or highest known flood elevation. Well casing terminating in underground vault
shall have a drain to daylight and surface runoff directed away from vault access. Well
house floor shall be sloped for drainage, and have a drain to daylight unless highly
impractical. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
C
390 There are no unprotected cross-connections in well discharge piping.
SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the
well discharge piping to be protected against the entrance of contamination. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
391 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well
house or near well head?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
392 Well discharge line has a smooth-nosed sampling tap, which samples the well water
before any chemical injection. (first item from the wellhead).
MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a
means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the
first item from the well head and the shut-off valve as the last item)
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 58 of 145
393 Well discharge line has a check valve.
MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
394 Well discharge line has a pressure gauge.
MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
395 Well discharge line has a means to measure flow.
MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
396 Well discharge line has a shut-off valve (last item from the well head).
MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
397 Is there an air/vac valve on the well discharge line? If yes, answer the following
question(s)
Y
397A Air vacuum relief valve on well discharge piping downturned
SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be down-turned.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
397B Air vacuum relief valve on well discharge piping screened with #14 mesh screen
SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be covered with a
#14 mesh corrosion-resistant screen. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
397C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance
above floor
SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be at least 6
inches above the well house floor. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
398 Wells that pump directly into a distribution system have means to release trapped air
from pump discharge piping (for example, pumps directly to a tank, has an air release
valve or pump to waste line)
MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps
directly into the distribution system be equipped with an air release/vacuum relief valve
located upstream of the check valve, unless the wellhead valve and piping provide for
pumping to waste all trapped air before water is introduced into the distribution
system.
C
399 Does well require oil-lubrication?Y
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 59 of 145
WS027 - PIONEER WELL - Active
Exception Granted: R309-600-13(3) | Sewers Within DWSP Zones and Management Areas
399A Well shaft lubricants are food grade mineral oil?
SIG | 25pts | SO | S031 | R309-105-10(7), R309-515-6(6)(a) | Rules require all oil-
lubricated pumps for drinking water wells to utilize food-grade mineral oil suitable for
human consumption as determined by the Director. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
<a href="https://www.youtube.com/watch?v=UABQMeeUz1g">Click here for addition
training</a>
C
400 Is this facility Active or Inactive?A
401 Operating Period (Start Date)06/01
402 Operating Period (Ending Date)08/31
403 Undocumented sources shall not be physically connected to the drinking water
system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT")
SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) |
R309-105-6(1) requires plans and specifications for all public drinking water projects to
be approved in writing by the Director prior to the commencement of construction. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
404 Well casing is at least 18 inches above finished ground surface and 12 inches above
well house floor.
SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515-
6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above
the final ground surface and 12 inches above the pump house floor; at sites subject to
flooding, the top of the casing must terminate at least 3 feet above the 100-year flood
level or highest known flood elevation, whichever is higher. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
405 Wellhead is sealed to prevent contamination.
SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515-
6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and
discharge piping. This significant deficiency should be corrected within 120 days of
notification or have a corrective action plan approved by
C
406 Is the well casing vented? ... if yes, answer the following question(s)Y
406A Vent screened with #14 mesh screen
SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 60 of 145
406B Vent down-turned
SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of
surface water or rainwater.
C
406C Vent has adequate clearance to prevent contamination from entering the well
SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap.
C
407 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y
407A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim
SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line
connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood
rim. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C
407B Pump to waste line equipped with #4 non-corrodible mesh screen
SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
407C Pump to waste line downturned if it discharges to sewer/storm drain or allowing
complete drainage if not downturned
SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be downturned. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
408 Water level is measured and recorded periodically
MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires
provisions be made to permit periodic measurement of water levels in the completed
well.
C
409 Wellhead secured to protect quality water
SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
410 Well head or well house and equipment protected from flooding
SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515-
6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or
12” above well house floor and for sites that flood at least 3’ above 100-year flood
level or highest known flood elevation. Well casing terminating in underground vault
shall have a drain to daylight and surface runoff directed away from vault access. Well
house floor shall be sloped for drainage, and have a drain to daylight unless highly
impractical. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 61 of 145
411 There are no unprotected cross-connections in well discharge piping.
SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the
well discharge piping to be protected against the entrance of contamination. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
412 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well
house or near well head?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
413 Well discharge line has a smooth-nosed sampling tap, which samples the well water
before any chemical injection. (first item from the wellhead).
MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a
means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the
first item from the well head and the shut-off valve as the last item)
C
414 Well discharge line has a check valve.
MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
415 Well discharge line has a pressure gauge.
MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
416 Well discharge line has a means to measure flow.
MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
417 Well discharge line has a shut-off valve (last item from the well head).
MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
418 Is there an air/vac valve on the well discharge line? If yes, answer the following
question(s)
Y
418A Air vacuum relief valve on well discharge piping downturned
SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be down-turned.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
418B Air vacuum relief valve on well discharge piping screened with #14 mesh screen
SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be covered with a
#14 mesh corrosion-resistant screen. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 62 of 145
WS028 - VALLEY WELL - Active
418C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance
above floor
SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be at least 6
inches above the well house floor. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
419 Wells that pump directly into a distribution system have means to release trapped air
from pump discharge piping (for example, pumps directly to a tank, has an air release
valve or pump to waste line)
MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps
directly into the distribution system be equipped with an air release/vacuum relief valve
located upstream of the check valve, unless the wellhead valve and piping provide for
pumping to waste all trapped air before water is introduced into the distribution
system.
C
420 Does well require oil-lubrication?Y
420A Well shaft lubricants are food grade mineral oil?
SIG | 25pts | SO | S031 | R309-105-10(7), R309-515-6(6)(a) | Rules require all oil-
lubricated pumps for drinking water wells to utilize food-grade mineral oil suitable for
human consumption as determined by the Director. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
<a href="https://www.youtube.com/watch?v=UABQMeeUz1g">Click here for addition
training</a>
C
421 Is this facility Active or Inactive?A
422 Operating Period (Start Date)01/01
423 Operating Period (Ending Date)12/31
424 Undocumented sources shall not be physically connected to the drinking water
system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT")
SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) |
R309-105-6(1) requires plans and specifications for all public drinking water projects to
be approved in writing by the Director prior to the commencement of construction. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
425 Well casing is at least 18 inches above finished ground surface and 12 inches above
well house floor.
SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515-
6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above
the final ground surface and 12 inches above the pump house floor; at sites subject to
flooding, the top of the casing must terminate at least 3 feet above the 100-year flood
level or highest known flood elevation, whichever is higher. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 63 of 145
426 Wellhead is sealed to prevent contamination.
SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515-
6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and
discharge piping. This significant deficiency should be corrected within 120 days of
notification or have a corrective action plan approved by
C
427 Is the well casing vented? ... if yes, answer the following question(s)Y
427A Vent screened with #14 mesh screen
SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen.
C (Notes: Mushroom cap)
427B Vent down-turned
SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of
surface water or rainwater.
C
427C Vent has adequate clearance to prevent contamination from entering the well
SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap.
C
428 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y
428A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim
SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line
connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood
rim. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C
428B Pump to waste line equipped with #4 non-corrodible mesh screen
SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
428C Pump to waste line downturned if it discharges to sewer/storm drain or allowing
complete drainage if not downturned
SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be downturned. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
429 Water level is measured and recorded periodically
MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires
provisions be made to permit periodic measurement of water levels in the completed
well.
C
430 Wellhead secured to protect quality water
SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 64 of 145
431 Well head or well house and equipment protected from flooding
SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515-
6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or
12” above well house floor and for sites that flood at least 3’ above 100-year flood
level or highest known flood elevation. Well casing terminating in underground vault
shall have a drain to daylight and surface runoff directed away from vault access. Well
house floor shall be sloped for drainage, and have a drain to daylight unless highly
impractical. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
C
432 There are no unprotected cross-connections in well discharge piping.
SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the
well discharge piping to be protected against the entrance of contamination. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
433 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well
house or near well head?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
434 Well discharge line has a smooth-nosed sampling tap, which samples the well water
before any chemical injection. (first item from the wellhead).
MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a
means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the
first item from the well head and the shut-off valve as the last item)
C
435 Well discharge line has a check valve.
MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C (Notes: Pressure Sustaining valve also
has pressure relief)
436 Well discharge line has a pressure gauge.
MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
437 Well discharge line has a means to measure flow.
MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
438 Well discharge line has a shut-off valve (last item from the well head).
MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
439 Is there an air/vac valve on the well discharge line? If yes, answer the following
question(s)
Y
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 65 of 145
WS029 - SWENSEN WELL - Active
439A Air vacuum relief valve on well discharge piping downturned
SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be down-turned.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
439B Air vacuum relief valve on well discharge piping screened with #14 mesh screen
SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be covered with a
#14 mesh corrosion-resistant screen. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
439C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance
above floor
SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be at least 6
inches above the well house floor. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
440 Wells that pump directly into a distribution system have means to release trapped air
from pump discharge piping (for example, pumps directly to a tank, has an air release
valve or pump to waste line)
MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps
directly into the distribution system be equipped with an air release/vacuum relief valve
located upstream of the check valve, unless the wellhead valve and piping provide for
pumping to waste all trapped air before water is introduced into the distribution
system.
C
441 Does well require oil-lubrication?Y
441A Well shaft lubricants are food grade mineral oil?
SIG | 25pts | SO | S031 | R309-105-10(7), R309-515-6(6)(a) | Rules require all oil-
lubricated pumps for drinking water wells to utilize food-grade mineral oil suitable for
human consumption as determined by the Director. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
<a href="https://www.youtube.com/watch?v=UABQMeeUz1g">Click here for addition
training</a>
C
442 Is this facility Active or Inactive?A
443 Operating Period (Start Date)01/01
444 Operating Period (Ending Date)12/31
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 66 of 145
445 Undocumented sources shall not be physically connected to the drinking water
system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT")
SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) |
R309-105-6(1) requires plans and specifications for all public drinking water projects to
be approved in writing by the Director prior to the commencement of construction. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
446 Well casing is at least 18 inches above finished ground surface and 12 inches above
well house floor.
SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515-
6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above
the final ground surface and 12 inches above the pump house floor; at sites subject to
flooding, the top of the casing must terminate at least 3 feet above the 100-year flood
level or highest known flood elevation, whichever is higher. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
447 Wellhead is sealed to prevent contamination.
SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515-
6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and
discharge piping. This significant deficiency should be corrected within 120 days of
notification or have a corrective action plan approved by
C
448 Is the well casing vented? ... if yes, answer the following question(s)Y
448A Vent screened with #14 mesh screen
SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen.
C
448B Vent down-turned
SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of
surface water or rainwater.
C
448C Vent has adequate clearance to prevent contamination from entering the well
SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap.
C
449 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y
449A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim
SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line
connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood
rim. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 67 of 145
449B Pump to waste line equipped with #4 non-corrodible mesh screen
SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
449C Pump to waste line downturned if it discharges to sewer/storm drain or allowing
complete drainage if not downturned
SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be downturned. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
450 Water level is measured and recorded periodically
MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires
provisions be made to permit periodic measurement of water levels in the completed
well.
C
451 Wellhead secured to protect quality water
SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
452 Well head or well house and equipment protected from flooding
SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515-
6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or
12” above well house floor and for sites that flood at least 3’ above 100-year flood
level or highest known flood elevation. Well casing terminating in underground vault
shall have a drain to daylight and surface runoff directed away from vault access. Well
house floor shall be sloped for drainage, and have a drain to daylight unless highly
impractical. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
C
453 There are no unprotected cross-connections in well discharge piping.
SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the
well discharge piping to be protected against the entrance of contamination. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
454 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well
house or near well head?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
455 Well discharge line has a smooth-nosed sampling tap, which samples the well water
before any chemical injection. (first item from the wellhead).
MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a
means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the
first item from the well head and the shut-off valve as the last item)
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 68 of 145
ST001 - LOW ZONE NORTH #1 - Active
456 Well discharge line has a check valve.
MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
457 Well discharge line has a pressure gauge.
MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
458 Well discharge line has a means to measure flow.
MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
459 Well discharge line has a shut-off valve (last item from the well head).
MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
460 Is there an air/vac valve on the well discharge line? If yes, answer the following
question(s)
Y
460A Air vacuum relief valve on well discharge piping downturned
SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be down-turned.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
460B Air vacuum relief valve on well discharge piping screened with #14 mesh screen
SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be covered with a
#14 mesh corrosion-resistant screen. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
460C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance
above floor
SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be at least 6
inches above the well house floor. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
461 Wells that pump directly into a distribution system have means to release trapped air
from pump discharge piping (for example, pumps directly to a tank, has an air release
valve or pump to waste line)
MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps
directly into the distribution system be equipped with an air release/vacuum relief valve
located upstream of the check valve, unless the wellhead valve and piping provide for
pumping to waste all trapped air before water is introduced into the distribution
system.
C
462 Does well require oil-lubrication?N (Notes: Water)
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 69 of 145
463 Is this facility Active or Inactive?A
464 Storage tank capacity in gallons (from SDWIS; if different explain why in the
comments)
500000
465 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through DDW
review
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
466 Ladders, ladder guards, platform railings, or safely located entrance hatches are
provided.
MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards,
platform railings, and safely located entrance hatches where applicable for water
storage tanks and requires safety practices to conform to pertinent laws and
regulations of the Utah Occupational Safety and Health Division.
C
467 Tank is vented.
SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to
be vented. Overflows cannot be considered or used as vents. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
468 Are air vents present? ... if yes, answer the following question(s)Y
468A Vent is either down-turned or shielded from contaminants (at least 2 inches below the
bottom of the opening)
SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water
storage tanks to be down-turned a minimum of 2 inches below any opening and
shielded to prevent the entrance of contaminants. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
468B End of vent terminates at least 24 inches above earthen cover (buried tank) and is
located and sized to avoid blockage during winter.
MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the
end of the vent discharge to be a minimum of 24 inches above the earthen covering.
C
468C Vent covered with #14 or finer non-corrodible mesh screen.
SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to
be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in
diameter to be fitted with additional heavy gauge screen or substantial covering to
protect the #14 mesh screen from vandalism or damage. This significant deficiency
must be corrected within 120 days of notification or have a compliance action plan
approved by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 70 of 145
468D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or
substantial covering.
MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter
or greater to be fitted with additional heavy gauge screen or substantial covering,
which will protect the No. 14 mesh screen against vandalism or damage.
C
469 Are access openings present? ... if yes, answer the following question(s)
MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water
storage tanks to be designed with reasonably convenient access to the interior for
cleaning and maintenance.
Y
469A Access opening framed at least 4 inches above roof surface or 18 inches above
earthen cover.
MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be
framed at least 4 inches above the surface of the roof, or on a buried tank, to be at
least 18 inches above any earthen cover over the tank.
C
469B Access opening shoe box type with at least 2 inches of overlap
SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access
opening to be provided with a close fitting solid shoebox type cover which extends
down around the frame at least two inches and is furnished with a gasket(s) between
the lid and frame. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
469C Access opening lid properly gasketed
SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank
to be furnished with a gasket between the lid and frame. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
470 Access opening locked
SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access
opening to have a locking device. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
471 Roof or wall penetrations sealed
SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a
storage tank roof or top, designed to accommodate control apparatus or pump
columns, to be welded, gasketed, or curbed and sleeved and to have additional proper
shielding to prevent vandalism. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
472 Area surrounding ground-level or buried storage tank is graded to prevent surface
water from standing within 50 feet.
SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a
ground-level or buried water storage tank be graded in a manner to prevent surface
water from standing within 50 feet of the tank. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 71 of 145
ST002 - LOW ZONE NORTH #2 - Active
473 Storage tank roof is sloped to prevent ponding
MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs
to eliminate water ponding.
C
474 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the
following options)
N
475 Is a tank overflow present? ... if yes, answer the following question(s)
SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided
with an overflow that discharges at an an elevation between 12 and 24 inches above
the ground surface or the rim of the receiving basin. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
Y
475A Overflow line discharges at least 12 inches above ground or the flood rim of receiving
basin?
SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be
provided with an overflow that discharges at an elevation between 12 and 24 inches
above the ground surface or the rim of the receiving basin.
C
475B Overflow line covered with #4 mesh non-corrodible screen
SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be
screened with #4 mesh non-corrodible screens installed at a location least susceptible
to damage by vandalism. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
475C Overflow line connected or discharges to a sanitary sewer drain?
SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from
connecting to, or discharging into, a sanitary sewer system. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
476 Are the drain line and overflow combined?N
476A Drain line shall terminate at least 12 inches above ground or flood rim of receiving
basin
SIG | 25pts | FW | V016 | R309-545-10(1)(d) | If the local authority allows discharge to
a storm drain, the rule requires the drain discharge to have a physical clearance of at
least 12 inches between the discharge end of the pipe and the overflow rim of the
receiving basin. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
477 Is this facility Active or Inactive?A
478 Storage tank capacity in gallons (from SDWIS; if different explain why in the
comments)
1000000
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 72 of 145
479 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through DDW
review
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
480 Ladders, ladder guards, platform railings, or safely located entrance hatches are
provided.
MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards,
platform railings, and safely located entrance hatches where applicable for water
storage tanks and requires safety practices to conform to pertinent laws and
regulations of the Utah Occupational Safety and Health Division.
C
481 Tank is vented.
SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to
be vented. Overflows cannot be considered or used as vents. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
482 Are air vents present? ... if yes, answer the following question(s)Y
482A Vent is either down-turned or shielded from contaminants (at least 2 inches below the
bottom of the opening)
SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water
storage tanks to be down-turned a minimum of 2 inches below any opening and
shielded to prevent the entrance of contaminants. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
482B End of vent terminates at least 24 inches above earthen cover (buried tank) and is
located and sized to avoid blockage during winter.
MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the
end of the vent discharge to be a minimum of 24 inches above the earthen covering.
C
482C Vent covered with #14 or finer non-corrodible mesh screen.
SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to
be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in
diameter to be fitted with additional heavy gauge screen or substantial covering to
protect the #14 mesh screen from vandalism or damage. This significant deficiency
must be corrected within 120 days of notification or have a compliance action plan
approved by DDW.
C
482D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or
substantial covering.
MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter
or greater to be fitted with additional heavy gauge screen or substantial covering,
which will protect the No. 14 mesh screen against vandalism or damage.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 73 of 145
483 Are access openings present? ... if yes, answer the following question(s)
MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water
storage tanks to be designed with reasonably convenient access to the interior for
cleaning and maintenance.
Y
483A Access opening framed at least 4 inches above roof surface or 18 inches above
earthen cover.
MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be
framed at least 4 inches above the surface of the roof, or on a buried tank, to be at
least 18 inches above any earthen cover over the tank.
C
483B Access opening shoe box type with at least 2 inches of overlap
SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access
opening to be provided with a close fitting solid shoebox type cover which extends
down around the frame at least two inches and is furnished with a gasket(s) between
the lid and frame. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
483C Access opening lid properly gasketed
SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank
to be furnished with a gasket between the lid and frame. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
484 Access opening locked
SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access
opening to have a locking device. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
485 Roof or wall penetrations sealed
SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a
storage tank roof or top, designed to accommodate control apparatus or pump
columns, to be welded, gasketed, or curbed and sleeved and to have additional proper
shielding to prevent vandalism. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
486 Area surrounding ground-level or buried storage tank is graded to prevent surface
water from standing within 50 feet.
SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a
ground-level or buried water storage tank be graded in a manner to prevent surface
water from standing within 50 feet of the tank. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
487 Storage tank roof is sloped to prevent ponding
MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs
to eliminate water ponding.
C
488 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the
following options)
N
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 74 of 145
ST003 - LOW ZONE NORTH #3 - Active
Exception Granted: R309-545-14(1) | The access hatch is only 3 to 4-inches above the storage tank lid. The Rule requires a minimum 4 inches.
489 Is a tank overflow present? ... if yes, answer the following question(s)
SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided
with an overflow that discharges at an an elevation between 12 and 24 inches above
the ground surface or the rim of the receiving basin. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
Y
489A Overflow line discharges at least 12 inches above ground or the flood rim of receiving
basin?
SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be
provided with an overflow that discharges at an elevation between 12 and 24 inches
above the ground surface or the rim of the receiving basin.
C
489B Overflow line covered with #4 mesh non-corrodible screen
SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be
screened with #4 mesh non-corrodible screens installed at a location least susceptible
to damage by vandalism. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
489C Overflow line connected or discharges to a sanitary sewer drain?
SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from
connecting to, or discharging into, a sanitary sewer system. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
490 Are the drain line and overflow combined?N
490A Drain line shall terminate at least 12 inches above ground or flood rim of receiving
basin
SIG | 25pts | FW | V016 | R309-545-10(1)(d) | If the local authority allows discharge to
a storm drain, the rule requires the drain discharge to have a physical clearance of at
least 12 inches between the discharge end of the pipe and the overflow rim of the
receiving basin. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
491 Is this facility Active or Inactive?A
492 Storage tank capacity in gallons (from SDWIS; if different explain why in the
comments)
1000000
493 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through DDW
review
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 75 of 145
494 Ladders, ladder guards, platform railings, or safely located entrance hatches are
provided.
MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards,
platform railings, and safely located entrance hatches where applicable for water
storage tanks and requires safety practices to conform to pertinent laws and
regulations of the Utah Occupational Safety and Health Division.
C
495 Tank is vented.
SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to
be vented. Overflows cannot be considered or used as vents. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
496 Are air vents present? ... if yes, answer the following question(s)Y
496A Vent is either down-turned or shielded from contaminants (at least 2 inches below the
bottom of the opening)
SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water
storage tanks to be down-turned a minimum of 2 inches below any opening and
shielded to prevent the entrance of contaminants. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
496B End of vent terminates at least 24 inches above earthen cover (buried tank) and is
located and sized to avoid blockage during winter.
MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the
end of the vent discharge to be a minimum of 24 inches above the earthen covering.
C
496C Vent covered with #14 or finer non-corrodible mesh screen.
SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to
be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in
diameter to be fitted with additional heavy gauge screen or substantial covering to
protect the #14 mesh screen from vandalism or damage. This significant deficiency
must be corrected within 120 days of notification or have a compliance action plan
approved by DDW.
C
496D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or
substantial covering.
MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter
or greater to be fitted with additional heavy gauge screen or substantial covering,
which will protect the No. 14 mesh screen against vandalism or damage.
C
497 Are access openings present? ... if yes, answer the following question(s)
MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water
storage tanks to be designed with reasonably convenient access to the interior for
cleaning and maintenance.
Y
497A Access opening framed at least 4 inches above roof surface or 18 inches above
earthen cover.
MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be
framed at least 4 inches above the surface of the roof, or on a buried tank, to be at
least 18 inches above any earthen cover over the tank.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 76 of 145
497B Access opening shoe box type with at least 2 inches of overlap
SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access
opening to be provided with a close fitting solid shoebox type cover which extends
down around the frame at least two inches and is furnished with a gasket(s) between
the lid and frame. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
497C Access opening lid properly gasketed
SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank
to be furnished with a gasket between the lid and frame. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
498 Access opening locked
SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access
opening to have a locking device. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
499 Roof or wall penetrations sealed
SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a
storage tank roof or top, designed to accommodate control apparatus or pump
columns, to be welded, gasketed, or curbed and sleeved and to have additional proper
shielding to prevent vandalism. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
500 Area surrounding ground-level or buried storage tank is graded to prevent surface
water from standing within 50 feet.
SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a
ground-level or buried water storage tank be graded in a manner to prevent surface
water from standing within 50 feet of the tank. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
501 Storage tank roof is sloped to prevent ponding
MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs
to eliminate water ponding.
C
502 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the
following options)
N
503 Is a tank overflow present? ... if yes, answer the following question(s)
SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided
with an overflow that discharges at an an elevation between 12 and 24 inches above
the ground surface or the rim of the receiving basin. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
Y
503A Overflow line discharges at least 12 inches above ground or the flood rim of receiving
basin?
SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be
provided with an overflow that discharges at an elevation between 12 and 24 inches
above the ground surface or the rim of the receiving basin.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 77 of 145
ST004 - LOW ZONE NORTH #4 - Active
503B Overflow line covered with #4 mesh non-corrodible screen
SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be
screened with #4 mesh non-corrodible screens installed at a location least susceptible
to damage by vandalism. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
503C Overflow line connected or discharges to a sanitary sewer drain?
SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from
connecting to, or discharging into, a sanitary sewer system. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
504 Are the drain line and overflow combined?N
504A Drain line shall terminate at least 12 inches above ground or flood rim of receiving
basin
SIG | 25pts | FW | V016 | R309-545-10(1)(d) | If the local authority allows discharge to
a storm drain, the rule requires the drain discharge to have a physical clearance of at
least 12 inches between the discharge end of the pipe and the overflow rim of the
receiving basin. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
505 Is this facility Active or Inactive?A
506 Storage tank capacity in gallons (from SDWIS; if different explain why in the
comments)
1000000
507 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through DDW
review
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
508 Ladders, ladder guards, platform railings, or safely located entrance hatches are
provided.
MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards,
platform railings, and safely located entrance hatches where applicable for water
storage tanks and requires safety practices to conform to pertinent laws and
regulations of the Utah Occupational Safety and Health Division.
C
509 Tank is vented.
SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to
be vented. Overflows cannot be considered or used as vents. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
510 Are air vents present? ... if yes, answer the following question(s)Y
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 78 of 145
510A Vent is either down-turned or shielded from contaminants (at least 2 inches below the
bottom of the opening)
SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water
storage tanks to be down-turned a minimum of 2 inches below any opening and
shielded to prevent the entrance of contaminants. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
510B End of vent terminates at least 24 inches above earthen cover (buried tank) and is
located and sized to avoid blockage during winter.
MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the
end of the vent discharge to be a minimum of 24 inches above the earthen covering.
C
510C Vent covered with #14 or finer non-corrodible mesh screen.
SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to
be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in
diameter to be fitted with additional heavy gauge screen or substantial covering to
protect the #14 mesh screen from vandalism or damage. This significant deficiency
must be corrected within 120 days of notification or have a compliance action plan
approved by DDW.
C
510D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or
substantial covering.
MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter
or greater to be fitted with additional heavy gauge screen or substantial covering,
which will protect the No. 14 mesh screen against vandalism or damage.
C
511 Are access openings present? ... if yes, answer the following question(s)
MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water
storage tanks to be designed with reasonably convenient access to the interior for
cleaning and maintenance.
Y
511A Access opening framed at least 4 inches above roof surface or 18 inches above
earthen cover.
Exception Granted: R309-545-14(1) | The access hatch is only 3 to 4-inches above
the storage tank lid. The Rule requires a minimum 4 inches.
MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be
framed at least 4 inches above the surface of the roof, or on a buried tank, to be at
least 18 inches above any earthen cover over the tank.
C
511B Access opening shoe box type with at least 2 inches of overlap
SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access
opening to be provided with a close fitting solid shoebox type cover which extends
down around the frame at least two inches and is furnished with a gasket(s) between
the lid and frame. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
511C Access opening lid properly gasketed
SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank
to be furnished with a gasket between the lid and frame. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 79 of 145
512 Access opening locked
SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access
opening to have a locking device. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
513 Roof or wall penetrations sealed
SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a
storage tank roof or top, designed to accommodate control apparatus or pump
columns, to be welded, gasketed, or curbed and sleeved and to have additional proper
shielding to prevent vandalism. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
D (Notes: The SCADA junction box on the
west side of the roof is broken and needs to
be replaced. A mouse could possible access
the opening and get into the tank.)
514 Area surrounding ground-level or buried storage tank is graded to prevent surface
water from standing within 50 feet.
SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a
ground-level or buried water storage tank be graded in a manner to prevent surface
water from standing within 50 feet of the tank. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
515 Storage tank roof is sloped to prevent ponding
MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs
to eliminate water ponding.
C
516 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the
following options)
N
517 Is a tank overflow present? ... if yes, answer the following question(s)
SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided
with an overflow that discharges at an an elevation between 12 and 24 inches above
the ground surface or the rim of the receiving basin. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
Y
517A Overflow line discharges at least 12 inches above ground or the flood rim of receiving
basin?
SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be
provided with an overflow that discharges at an elevation between 12 and 24 inches
above the ground surface or the rim of the receiving basin.
C
517B Overflow line covered with #4 mesh non-corrodible screen
SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be
screened with #4 mesh non-corrodible screens installed at a location least susceptible
to damage by vandalism. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
517C Overflow line connected or discharges to a sanitary sewer drain?
SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from
connecting to, or discharging into, a sanitary sewer system. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
518 Are the drain line and overflow combined?N
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 80 of 145
ST005 - LOW ZONE SOUTH #1 - Active
518A Drain line shall terminate at least 12 inches above ground or flood rim of receiving
basin
SIG | 25pts | FW | V016 | R309-545-10(1)(d) | If the local authority allows discharge to
a storm drain, the rule requires the drain discharge to have a physical clearance of at
least 12 inches between the discharge end of the pipe and the overflow rim of the
receiving basin. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
519 Is this facility Active or Inactive?A
520 Storage tank capacity in gallons (from SDWIS; if different explain why in the
comments)
4500000
521 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through DDW
review
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
522 Ladders, ladder guards, platform railings, or safely located entrance hatches are
provided.
MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards,
platform railings, and safely located entrance hatches where applicable for water
storage tanks and requires safety practices to conform to pertinent laws and
regulations of the Utah Occupational Safety and Health Division.
C
523 Tank is vented.
SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to
be vented. Overflows cannot be considered or used as vents. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
524 Are air vents present? ... if yes, answer the following question(s)Y
524A Vent is either down-turned or shielded from contaminants (at least 2 inches below the
bottom of the opening)
SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water
storage tanks to be down-turned a minimum of 2 inches below any opening and
shielded to prevent the entrance of contaminants. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
524B End of vent terminates at least 24 inches above earthen cover (buried tank) and is
located and sized to avoid blockage during winter.
MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the
end of the vent discharge to be a minimum of 24 inches above the earthen covering.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 81 of 145
524C Vent covered with #14 or finer non-corrodible mesh screen.
SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to
be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in
diameter to be fitted with additional heavy gauge screen or substantial covering to
protect the #14 mesh screen from vandalism or damage. This significant deficiency
must be corrected within 120 days of notification or have a compliance action plan
approved by DDW.
C
524D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or
substantial covering.
MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter
or greater to be fitted with additional heavy gauge screen or substantial covering,
which will protect the No. 14 mesh screen against vandalism or damage.
C
525 Are access openings present? ... if yes, answer the following question(s)
MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water
storage tanks to be designed with reasonably convenient access to the interior for
cleaning and maintenance.
Y
525A Access opening framed at least 4 inches above roof surface or 18 inches above
earthen cover.
MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be
framed at least 4 inches above the surface of the roof, or on a buried tank, to be at
least 18 inches above any earthen cover over the tank.
C
525B Access opening shoe box type with at least 2 inches of overlap
SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access
opening to be provided with a close fitting solid shoebox type cover which extends
down around the frame at least two inches and is furnished with a gasket(s) between
the lid and frame. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
525C Access opening lid properly gasketed
SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank
to be furnished with a gasket between the lid and frame. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
526 Access opening locked
SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access
opening to have a locking device. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
527 Roof or wall penetrations sealed
SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a
storage tank roof or top, designed to accommodate control apparatus or pump
columns, to be welded, gasketed, or curbed and sleeved and to have additional proper
shielding to prevent vandalism. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 82 of 145
528 Area surrounding ground-level or buried storage tank is graded to prevent surface
water from standing within 50 feet.
SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a
ground-level or buried water storage tank be graded in a manner to prevent surface
water from standing within 50 feet of the tank. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
529 Storage tank roof is sloped to prevent ponding
MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs
to eliminate water ponding.
C
530 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the
following options)
N
531 Is a tank overflow present? ... if yes, answer the following question(s)
SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided
with an overflow that discharges at an an elevation between 12 and 24 inches above
the ground surface or the rim of the receiving basin. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
Y
531A Overflow line discharges at least 12 inches above ground or the flood rim of receiving
basin?
Exception Granted: R309-545-13 | Tank overflows and drains discharging into storm
drain boxes that don't daylight. The tank shall be provided with an overflow that
discharges at an elevation between 12 and 24 inches above the ground surface or the
rim of the receiving basin. Also, the drain discharge shall have a physical clearance of
at least 12 inches between the discharge end of the pipe and the overflow rim of the
receiving basin.
SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be
provided with an overflow that discharges at an elevation between 12 and 24 inches
above the ground surface or the rim of the receiving basin.
C
531B Overflow line covered with #4 mesh non-corrodible screen
SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be
screened with #4 mesh non-corrodible screens installed at a location least susceptible
to damage by vandalism. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
531C Overflow line connected or discharges to a sanitary sewer drain?
SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from
connecting to, or discharging into, a sanitary sewer system. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
532 Are the drain line and overflow combined?N
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 83 of 145
ST006 - LOW ZONE SOUTH #2 - Active
532A Drain line shall terminate at least 12 inches above ground or flood rim of receiving
basin
Exception Granted: R309-545-10(1)(d) | Tank overflows and drains discharging into
storm drain boxes that don't daylight. The tank shall be provided with an overflow that
discharges at an elevation between 12 and 24 inches above the ground surface or the
rim of the receiving basin. Also, the drain discharge shall have a physical clearance of
at least 12 inches between the discharge end of the pipe and the overflow rim of the
receiving basin.
SIG | 25pts | FW | V016 | R309-545-10(1)(d) | If the local authority allows discharge to
a storm drain, the rule requires the drain discharge to have a physical clearance of at
least 12 inches between the discharge end of the pipe and the overflow rim of the
receiving basin. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
533 Is this facility Active or Inactive?A
534 Storage tank capacity in gallons (from SDWIS; if different explain why in the
comments)
4500000
535 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through DDW
review
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
536 Ladders, ladder guards, platform railings, or safely located entrance hatches are
provided.
MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards,
platform railings, and safely located entrance hatches where applicable for water
storage tanks and requires safety practices to conform to pertinent laws and
regulations of the Utah Occupational Safety and Health Division.
C
537 Tank is vented.
SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to
be vented. Overflows cannot be considered or used as vents. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
538 Are air vents present? ... if yes, answer the following question(s)Y
538A Vent is either down-turned or shielded from contaminants (at least 2 inches below the
bottom of the opening)
SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water
storage tanks to be down-turned a minimum of 2 inches below any opening and
shielded to prevent the entrance of contaminants. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 84 of 145
538B End of vent terminates at least 24 inches above earthen cover (buried tank) and is
located and sized to avoid blockage during winter.
MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the
end of the vent discharge to be a minimum of 24 inches above the earthen covering.
C
538C Vent covered with #14 or finer non-corrodible mesh screen.
SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to
be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in
diameter to be fitted with additional heavy gauge screen or substantial covering to
protect the #14 mesh screen from vandalism or damage. This significant deficiency
must be corrected within 120 days of notification or have a compliance action plan
approved by DDW.
C
538D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or
substantial covering.
MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter
or greater to be fitted with additional heavy gauge screen or substantial covering,
which will protect the No. 14 mesh screen against vandalism or damage.
C
539 Are access openings present? ... if yes, answer the following question(s)
MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water
storage tanks to be designed with reasonably convenient access to the interior for
cleaning and maintenance.
Y
539A Access opening framed at least 4 inches above roof surface or 18 inches above
earthen cover.
MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be
framed at least 4 inches above the surface of the roof, or on a buried tank, to be at
least 18 inches above any earthen cover over the tank.
C
539B Access opening shoe box type with at least 2 inches of overlap
SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access
opening to be provided with a close fitting solid shoebox type cover which extends
down around the frame at least two inches and is furnished with a gasket(s) between
the lid and frame. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
539C Access opening lid properly gasketed
SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank
to be furnished with a gasket between the lid and frame. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
540 Access opening locked
SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access
opening to have a locking device. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 85 of 145
541 Roof or wall penetrations sealed
SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a
storage tank roof or top, designed to accommodate control apparatus or pump
columns, to be welded, gasketed, or curbed and sleeved and to have additional proper
shielding to prevent vandalism. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
542 Area surrounding ground-level or buried storage tank is graded to prevent surface
water from standing within 50 feet.
SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a
ground-level or buried water storage tank be graded in a manner to prevent surface
water from standing within 50 feet of the tank. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
543 Storage tank roof is sloped to prevent ponding
MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs
to eliminate water ponding.
C
544 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the
following options)
N
545 Is a tank overflow present? ... if yes, answer the following question(s)
SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided
with an overflow that discharges at an an elevation between 12 and 24 inches above
the ground surface or the rim of the receiving basin. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
Y
545A Overflow line discharges at least 12 inches above ground or the flood rim of receiving
basin?
Exception Granted: R309-545-13 | Tank overflows and drains discharging into storm
drain boxes that don't daylight. The tank shall be provided with an overflow that
discharges at an elevation between 12 and 24 inches above the ground surface or the
rim of the receiving basin. Also, the drain discharge shall have a physical clearance of
at least 12 inches between the discharge end of the pipe and the overflow rim of the
receiving basin.
SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be
provided with an overflow that discharges at an elevation between 12 and 24 inches
above the ground surface or the rim of the receiving basin.
C
545B Overflow line covered with #4 mesh non-corrodible screen
SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be
screened with #4 mesh non-corrodible screens installed at a location least susceptible
to damage by vandalism. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
545C Overflow line connected or discharges to a sanitary sewer drain?
SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from
connecting to, or discharging into, a sanitary sewer system. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 86 of 145
ST007 - LOW ZONE SOUTH #3 - Active
546 Are the drain line and overflow combined?N
546A Drain line shall terminate at least 12 inches above ground or flood rim of receiving
basin
Exception Granted: R309-545-10(1)(d) | Tank overflows and drains discharging into
storm drain boxes that don't daylight. The tank shall be provided with an overflow that
discharges at an elevation between 12 and 24 inches above the ground surface or the
rim of the receiving basin. Also, the drain discharge shall have a physical clearance of
at least 12 inches between the discharge end of the pipe and the overflow rim of the
receiving basin.
SIG | 25pts | FW | V016 | R309-545-10(1)(d) | If the local authority allows discharge to
a storm drain, the rule requires the drain discharge to have a physical clearance of at
least 12 inches between the discharge end of the pipe and the overflow rim of the
receiving basin. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
547 Is this facility Active or Inactive?A
548 Storage tank capacity in gallons (from SDWIS; if different explain why in the
comments)
4500000
549 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through DDW
review
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
550 Ladders, ladder guards, platform railings, or safely located entrance hatches are
provided.
MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards,
platform railings, and safely located entrance hatches where applicable for water
storage tanks and requires safety practices to conform to pertinent laws and
regulations of the Utah Occupational Safety and Health Division.
C
551 Tank is vented.
SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to
be vented. Overflows cannot be considered or used as vents. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
552 Are air vents present? ... if yes, answer the following question(s)Y
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 87 of 145
552A Vent is either down-turned or shielded from contaminants (at least 2 inches below the
bottom of the opening)
SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water
storage tanks to be down-turned a minimum of 2 inches below any opening and
shielded to prevent the entrance of contaminants. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
552B End of vent terminates at least 24 inches above earthen cover (buried tank) and is
located and sized to avoid blockage during winter.
MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the
end of the vent discharge to be a minimum of 24 inches above the earthen covering.
C
552C Vent covered with #14 or finer non-corrodible mesh screen.
SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to
be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in
diameter to be fitted with additional heavy gauge screen or substantial covering to
protect the #14 mesh screen from vandalism or damage. This significant deficiency
must be corrected within 120 days of notification or have a compliance action plan
approved by DDW.
C
552D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or
substantial covering.
MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter
or greater to be fitted with additional heavy gauge screen or substantial covering,
which will protect the No. 14 mesh screen against vandalism or damage.
C
553 Are access openings present? ... if yes, answer the following question(s)
MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water
storage tanks to be designed with reasonably convenient access to the interior for
cleaning and maintenance.
Y
553A Access opening framed at least 4 inches above roof surface or 18 inches above
earthen cover.
MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be
framed at least 4 inches above the surface of the roof, or on a buried tank, to be at
least 18 inches above any earthen cover over the tank.
C
553B Access opening shoe box type with at least 2 inches of overlap
SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access
opening to be provided with a close fitting solid shoebox type cover which extends
down around the frame at least two inches and is furnished with a gasket(s) between
the lid and frame. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
553C Access opening lid properly gasketed
SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank
to be furnished with a gasket between the lid and frame. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 88 of 145
554 Access opening locked
SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access
opening to have a locking device. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
555 Roof or wall penetrations sealed
SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a
storage tank roof or top, designed to accommodate control apparatus or pump
columns, to be welded, gasketed, or curbed and sleeved and to have additional proper
shielding to prevent vandalism. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
556 Area surrounding ground-level or buried storage tank is graded to prevent surface
water from standing within 50 feet.
SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a
ground-level or buried water storage tank be graded in a manner to prevent surface
water from standing within 50 feet of the tank. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
557 Storage tank roof is sloped to prevent ponding
MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs
to eliminate water ponding.
C
558 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the
following options)
N
559 Is a tank overflow present? ... if yes, answer the following question(s)
SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided
with an overflow that discharges at an an elevation between 12 and 24 inches above
the ground surface or the rim of the receiving basin. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
Y
559A Overflow line discharges at least 12 inches above ground or the flood rim of receiving
basin?
Exception Granted: R309-545-13 | Tank overflows and drains discharging into storm
drain boxes that don't daylight. The tank shall be provided with an overflow that
discharges at an elevation between 12 and 24 inches above the ground surface or the
rim of the receiving basin. Also, the drain discharge shall have a physical clearance of
at least 12 inches between the discharge end of the pipe and the overflow rim of the
receiving basin.
SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be
provided with an overflow that discharges at an elevation between 12 and 24 inches
above the ground surface or the rim of the receiving basin.
C
559B Overflow line covered with #4 mesh non-corrodible screen
SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be
screened with #4 mesh non-corrodible screens installed at a location least susceptible
to damage by vandalism. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 89 of 145
ST008 - LOW ZONE SOUTH #4 - Active
559C Overflow line connected or discharges to a sanitary sewer drain?
SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from
connecting to, or discharging into, a sanitary sewer system. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
560 Are the drain line and overflow combined?N
560A Drain line shall terminate at least 12 inches above ground or flood rim of receiving
basin
Exception Granted: R309-545-10(1)(d) | Tank overflows and drains discharging into
storm drain boxes that don't daylight. The tank shall be provided with an overflow that
discharges at an elevation between 12 and 24 inches above the ground surface or the
rim of the receiving basin. Also, the drain discharge shall have a physical clearance of
at least 12 inches between the discharge end of the pipe and the overflow rim of the
receiving basin.
SIG | 25pts | FW | V016 | R309-545-10(1)(d) | If the local authority allows discharge to
a storm drain, the rule requires the drain discharge to have a physical clearance of at
least 12 inches between the discharge end of the pipe and the overflow rim of the
receiving basin. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
561 Is this facility Active or Inactive?A
562 Storage tank capacity in gallons (from SDWIS; if different explain why in the
comments)
4500000
563 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through DDW
review
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
564 Ladders, ladder guards, platform railings, or safely located entrance hatches are
provided.
MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards,
platform railings, and safely located entrance hatches where applicable for water
storage tanks and requires safety practices to conform to pertinent laws and
regulations of the Utah Occupational Safety and Health Division.
C
565 Tank is vented.
SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to
be vented. Overflows cannot be considered or used as vents. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
566 Are air vents present? ... if yes, answer the following question(s)Y
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 90 of 145
566A Vent is either down-turned or shielded from contaminants (at least 2 inches below the
bottom of the opening)
SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water
storage tanks to be down-turned a minimum of 2 inches below any opening and
shielded to prevent the entrance of contaminants. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
566B End of vent terminates at least 24 inches above earthen cover (buried tank) and is
located and sized to avoid blockage during winter.
MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the
end of the vent discharge to be a minimum of 24 inches above the earthen covering.
C
566C Vent covered with #14 or finer non-corrodible mesh screen.
SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to
be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in
diameter to be fitted with additional heavy gauge screen or substantial covering to
protect the #14 mesh screen from vandalism or damage. This significant deficiency
must be corrected within 120 days of notification or have a compliance action plan
approved by DDW.
C
566D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or
substantial covering.
MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter
or greater to be fitted with additional heavy gauge screen or substantial covering,
which will protect the No. 14 mesh screen against vandalism or damage.
C
567 Are access openings present? ... if yes, answer the following question(s)
MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water
storage tanks to be designed with reasonably convenient access to the interior for
cleaning and maintenance.
Y
567A Access opening framed at least 4 inches above roof surface or 18 inches above
earthen cover.
MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be
framed at least 4 inches above the surface of the roof, or on a buried tank, to be at
least 18 inches above any earthen cover over the tank.
C
567B Access opening shoe box type with at least 2 inches of overlap
SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access
opening to be provided with a close fitting solid shoebox type cover which extends
down around the frame at least two inches and is furnished with a gasket(s) between
the lid and frame. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
567C Access opening lid properly gasketed
SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank
to be furnished with a gasket between the lid and frame. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 91 of 145
568 Access opening locked
SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access
opening to have a locking device. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
569 Roof or wall penetrations sealed
SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a
storage tank roof or top, designed to accommodate control apparatus or pump
columns, to be welded, gasketed, or curbed and sleeved and to have additional proper
shielding to prevent vandalism. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
570 Area surrounding ground-level or buried storage tank is graded to prevent surface
water from standing within 50 feet.
SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a
ground-level or buried water storage tank be graded in a manner to prevent surface
water from standing within 50 feet of the tank. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
571 Storage tank roof is sloped to prevent ponding
MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs
to eliminate water ponding.
C
572 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the
following options)
N
573 Is a tank overflow present? ... if yes, answer the following question(s)
SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided
with an overflow that discharges at an an elevation between 12 and 24 inches above
the ground surface or the rim of the receiving basin. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
Y
573A Overflow line discharges at least 12 inches above ground or the flood rim of receiving
basin?
Exception Granted: R309-545-13 | Tank overflows and drains discharging into storm
drain boxes that don't daylight. The tank shall be provided with an overflow that
discharges at an elevation between 12 and 24 inches above the ground surface or the
rim of the receiving basin. Also, the drain discharge shall have a physical clearance of
at least 12 inches between the discharge end of the pipe and the overflow rim of the
receiving basin.
SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be
provided with an overflow that discharges at an elevation between 12 and 24 inches
above the ground surface or the rim of the receiving basin.
C
573B Overflow line covered with #4 mesh non-corrodible screen
SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be
screened with #4 mesh non-corrodible screens installed at a location least susceptible
to damage by vandalism. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 92 of 145
ST009 - MIDDLE ZONE #1 - Active
Exception Granted: R309-545-10(1) | The drain and overflow lines tie into a drainage system in 5 MG Reservoir at Middle Zone North Project
573C Overflow line connected or discharges to a sanitary sewer drain?
SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from
connecting to, or discharging into, a sanitary sewer system. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
574 Are the drain line and overflow combined?N
574A Drain line shall terminate at least 12 inches above ground or flood rim of receiving
basin
Exception Granted: R309-545-10(1)(d) | Tank overflows and drains discharging into
storm drain boxes that don't daylight. The tank shall be provided with an overflow that
discharges at an elevation between 12 and 24 inches above the ground surface or the
rim of the receiving basin. Also, the drain discharge shall have a physical clearance of
at least 12 inches between the discharge end of the pipe and the overflow rim of the
receiving basin.
SIG | 25pts | FW | V016 | R309-545-10(1)(d) | If the local authority allows discharge to
a storm drain, the rule requires the drain discharge to have a physical clearance of at
least 12 inches between the discharge end of the pipe and the overflow rim of the
receiving basin. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
575 Is this facility Active or Inactive?A
576 Storage tank capacity in gallons (from SDWIS; if different explain why in the
comments)
5000000
577 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through DDW
review
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
578 Ladders, ladder guards, platform railings, or safely located entrance hatches are
provided.
MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards,
platform railings, and safely located entrance hatches where applicable for water
storage tanks and requires safety practices to conform to pertinent laws and
regulations of the Utah Occupational Safety and Health Division.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 93 of 145
579 Tank is vented.
SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to
be vented. Overflows cannot be considered or used as vents. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
580 Are air vents present? ... if yes, answer the following question(s)Y
580A Vent is either down-turned or shielded from contaminants (at least 2 inches below the
bottom of the opening)
SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water
storage tanks to be down-turned a minimum of 2 inches below any opening and
shielded to prevent the entrance of contaminants. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
580B End of vent terminates at least 24 inches above earthen cover (buried tank) and is
located and sized to avoid blockage during winter.
MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the
end of the vent discharge to be a minimum of 24 inches above the earthen covering.
C
580C Vent covered with #14 or finer non-corrodible mesh screen.
SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to
be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in
diameter to be fitted with additional heavy gauge screen or substantial covering to
protect the #14 mesh screen from vandalism or damage. This significant deficiency
must be corrected within 120 days of notification or have a compliance action plan
approved by DDW.
C
580D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or
substantial covering.
MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter
or greater to be fitted with additional heavy gauge screen or substantial covering,
which will protect the No. 14 mesh screen against vandalism or damage.
C
581 Are access openings present? ... if yes, answer the following question(s)
MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water
storage tanks to be designed with reasonably convenient access to the interior for
cleaning and maintenance.
Y
581A Access opening framed at least 4 inches above roof surface or 18 inches above
earthen cover.
MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be
framed at least 4 inches above the surface of the roof, or on a buried tank, to be at
least 18 inches above any earthen cover over the tank.
C
581B Access opening shoe box type with at least 2 inches of overlap
SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access
opening to be provided with a close fitting solid shoebox type cover which extends
down around the frame at least two inches and is furnished with a gasket(s) between
the lid and frame. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 94 of 145
581C Access opening lid properly gasketed
SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank
to be furnished with a gasket between the lid and frame. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
582 Access opening locked
SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access
opening to have a locking device. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
583 Roof or wall penetrations sealed
SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a
storage tank roof or top, designed to accommodate control apparatus or pump
columns, to be welded, gasketed, or curbed and sleeved and to have additional proper
shielding to prevent vandalism. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
584 Area surrounding ground-level or buried storage tank is graded to prevent surface
water from standing within 50 feet.
SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a
ground-level or buried water storage tank be graded in a manner to prevent surface
water from standing within 50 feet of the tank. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
585 Storage tank roof is sloped to prevent ponding
MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs
to eliminate water ponding.
C
586 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the
following options)
N
587 Is a tank overflow present? ... if yes, answer the following question(s)
SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided
with an overflow that discharges at an an elevation between 12 and 24 inches above
the ground surface or the rim of the receiving basin. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
Y
587A Overflow line discharges at least 12 inches above ground or the flood rim of receiving
basin?
Exception Granted: R309-545-13 | Tank overflows and drains discharging into storm
drain boxes that don't daylight. The tank shall be provided with an overflow that
discharges at an elevation between 12 and 24 inches above the ground surface or the
rim of the receiving basin. Also, the drain discharge shall have a physical clearance of
at least 12 inches between the discharge end of the pipe and the overflow rim of the
receiving basin.
SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be
provided with an overflow that discharges at an elevation between 12 and 24 inches
above the ground surface or the rim of the receiving basin.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 95 of 145
ST010 - MIDDLE ZONE #2 - Active
587B Overflow line covered with #4 mesh non-corrodible screen
SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be
screened with #4 mesh non-corrodible screens installed at a location least susceptible
to damage by vandalism. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
587C Overflow line connected or discharges to a sanitary sewer drain?
SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from
connecting to, or discharging into, a sanitary sewer system. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
588 Are the drain line and overflow combined?N
588A Drain line shall terminate at least 12 inches above ground or flood rim of receiving
basin
Exception Granted: R309-545-10(1)(d) | Tank overflows and drains discharging into
storm drain boxes that don't daylight. The tank shall be provided with an overflow that
discharges at an elevation between 12 and 24 inches above the ground surface or the
rim of the receiving basin. Also, the drain discharge shall have a physical clearance of
at least 12 inches between the discharge end of the pipe and the overflow rim of the
receiving basin.
SIG | 25pts | FW | V016 | R309-545-10(1)(d) | If the local authority allows discharge to
a storm drain, the rule requires the drain discharge to have a physical clearance of at
least 12 inches between the discharge end of the pipe and the overflow rim of the
receiving basin. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
589 Is this facility Active or Inactive?A
590 Storage tank capacity in gallons (from SDWIS; if different explain why in the
comments)
4500000
591 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through DDW
review
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
592 Ladders, ladder guards, platform railings, or safely located entrance hatches are
provided.
MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards,
platform railings, and safely located entrance hatches where applicable for water
storage tanks and requires safety practices to conform to pertinent laws and
regulations of the Utah Occupational Safety and Health Division.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 96 of 145
593 Tank is vented.
SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to
be vented. Overflows cannot be considered or used as vents. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
594 Are air vents present? ... if yes, answer the following question(s)Y
594A Vent is either down-turned or shielded from contaminants (at least 2 inches below the
bottom of the opening)
SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water
storage tanks to be down-turned a minimum of 2 inches below any opening and
shielded to prevent the entrance of contaminants. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
594B End of vent terminates at least 24 inches above earthen cover (buried tank) and is
located and sized to avoid blockage during winter.
MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the
end of the vent discharge to be a minimum of 24 inches above the earthen covering.
C
594C Vent covered with #14 or finer non-corrodible mesh screen.
SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to
be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in
diameter to be fitted with additional heavy gauge screen or substantial covering to
protect the #14 mesh screen from vandalism or damage. This significant deficiency
must be corrected within 120 days of notification or have a compliance action plan
approved by DDW.
C
594D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or
substantial covering.
MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter
or greater to be fitted with additional heavy gauge screen or substantial covering,
which will protect the No. 14 mesh screen against vandalism or damage.
C
595 Are access openings present? ... if yes, answer the following question(s)
MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water
storage tanks to be designed with reasonably convenient access to the interior for
cleaning and maintenance.
Y
595A Access opening framed at least 4 inches above roof surface or 18 inches above
earthen cover.
MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be
framed at least 4 inches above the surface of the roof, or on a buried tank, to be at
least 18 inches above any earthen cover over the tank.
C
595B Access opening shoe box type with at least 2 inches of overlap
SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access
opening to be provided with a close fitting solid shoebox type cover which extends
down around the frame at least two inches and is furnished with a gasket(s) between
the lid and frame. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 97 of 145
595C Access opening lid properly gasketed
SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank
to be furnished with a gasket between the lid and frame. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
596 Access opening locked
SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access
opening to have a locking device. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
597 Roof or wall penetrations sealed
SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a
storage tank roof or top, designed to accommodate control apparatus or pump
columns, to be welded, gasketed, or curbed and sleeved and to have additional proper
shielding to prevent vandalism. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
598 Area surrounding ground-level or buried storage tank is graded to prevent surface
water from standing within 50 feet.
SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a
ground-level or buried water storage tank be graded in a manner to prevent surface
water from standing within 50 feet of the tank. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
599 Storage tank roof is sloped to prevent ponding
MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs
to eliminate water ponding.
C
600 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the
following options)
N
601 Is a tank overflow present? ... if yes, answer the following question(s)
SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided
with an overflow that discharges at an an elevation between 12 and 24 inches above
the ground surface or the rim of the receiving basin. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
Y
601A Overflow line discharges at least 12 inches above ground or the flood rim of receiving
basin?
Exception Granted: R309-545-13 | Tank overflows and drains discharging into storm
drain boxes that don't daylight. The tank shall be provided with an overflow that
discharges at an elevation between 12 and 24 inches above the ground surface or the
rim of the receiving basin. Also, the drain discharge shall have a physical clearance of
at least 12 inches between the discharge end of the pipe and the overflow rim of the
receiving basin.
SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be
provided with an overflow that discharges at an elevation between 12 and 24 inches
above the ground surface or the rim of the receiving basin.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 98 of 145
ST011 - MIDDLE ZONE #3 - Active
601B Overflow line covered with #4 mesh non-corrodible screen
SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be
screened with #4 mesh non-corrodible screens installed at a location least susceptible
to damage by vandalism. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
601C Overflow line connected or discharges to a sanitary sewer drain?
SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from
connecting to, or discharging into, a sanitary sewer system. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
602 Are the drain line and overflow combined?N
602A Drain line shall terminate at least 12 inches above ground or flood rim of receiving
basin
Exception Granted: R309-545-10(1)(d) | Tank overflows and drains discharging into
storm drain boxes that don't daylight. The tank shall be provided with an overflow that
discharges at an elevation between 12 and 24 inches above the ground surface or the
rim of the receiving basin. Also, the drain discharge shall have a physical clearance of
at least 12 inches between the discharge end of the pipe and the overflow rim of the
receiving basin.
SIG | 25pts | FW | V016 | R309-545-10(1)(d) | If the local authority allows discharge to
a storm drain, the rule requires the drain discharge to have a physical clearance of at
least 12 inches between the discharge end of the pipe and the overflow rim of the
receiving basin. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
603 Is this facility Active or Inactive?A
604 Storage tank capacity in gallons (from SDWIS; if different explain why in the
comments)
5000000
605 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through DDW
review
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
606 Ladders, ladder guards, platform railings, or safely located entrance hatches are
provided.
MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards,
platform railings, and safely located entrance hatches where applicable for water
storage tanks and requires safety practices to conform to pertinent laws and
regulations of the Utah Occupational Safety and Health Division.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 99 of 145
607 Tank is vented.
SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to
be vented. Overflows cannot be considered or used as vents. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
608 Are air vents present? ... if yes, answer the following question(s)Y
608A Vent is either down-turned or shielded from contaminants (at least 2 inches below the
bottom of the opening)
SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water
storage tanks to be down-turned a minimum of 2 inches below any opening and
shielded to prevent the entrance of contaminants. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
608B End of vent terminates at least 24 inches above earthen cover (buried tank) and is
located and sized to avoid blockage during winter.
MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the
end of the vent discharge to be a minimum of 24 inches above the earthen covering.
C
608C Vent covered with #14 or finer non-corrodible mesh screen.
SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to
be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in
diameter to be fitted with additional heavy gauge screen or substantial covering to
protect the #14 mesh screen from vandalism or damage. This significant deficiency
must be corrected within 120 days of notification or have a compliance action plan
approved by DDW.
C
608D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or
substantial covering.
MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter
or greater to be fitted with additional heavy gauge screen or substantial covering,
which will protect the No. 14 mesh screen against vandalism or damage.
C
609 Are access openings present? ... if yes, answer the following question(s)
MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water
storage tanks to be designed with reasonably convenient access to the interior for
cleaning and maintenance.
Y
609A Access opening framed at least 4 inches above roof surface or 18 inches above
earthen cover.
MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be
framed at least 4 inches above the surface of the roof, or on a buried tank, to be at
least 18 inches above any earthen cover over the tank.
C
609B Access opening shoe box type with at least 2 inches of overlap
SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access
opening to be provided with a close fitting solid shoebox type cover which extends
down around the frame at least two inches and is furnished with a gasket(s) between
the lid and frame. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 100 of 145
609C Access opening lid properly gasketed
SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank
to be furnished with a gasket between the lid and frame. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
610 Access opening locked
SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access
opening to have a locking device. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
611 Roof or wall penetrations sealed
SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a
storage tank roof or top, designed to accommodate control apparatus or pump
columns, to be welded, gasketed, or curbed and sleeved and to have additional proper
shielding to prevent vandalism. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
612 Area surrounding ground-level or buried storage tank is graded to prevent surface
water from standing within 50 feet.
SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a
ground-level or buried water storage tank be graded in a manner to prevent surface
water from standing within 50 feet of the tank. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
613 Storage tank roof is sloped to prevent ponding
MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs
to eliminate water ponding.
C
614 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the
following options)
N
615 Is a tank overflow present? ... if yes, answer the following question(s)
SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided
with an overflow that discharges at an an elevation between 12 and 24 inches above
the ground surface or the rim of the receiving basin. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
Y
615A Overflow line discharges at least 12 inches above ground or the flood rim of receiving
basin?
Exception Granted: R309-545-13 | Tank overflows and drains discharging into storm
drain boxes that don't daylight. The tank shall be provided with an overflow that
discharges at an elevation between 12 and 24 inches above the ground surface or the
rim of the receiving basin. Also, the drain discharge shall have a physical clearance of
at least 12 inches between the discharge end of the pipe and the overflow rim of the
receiving basin.
SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be
provided with an overflow that discharges at an elevation between 12 and 24 inches
above the ground surface or the rim of the receiving basin.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 101 of 145
ST012 - HIGH ZONE #1 STORAGE - Active
615B Overflow line covered with #4 mesh non-corrodible screen
SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be
screened with #4 mesh non-corrodible screens installed at a location least susceptible
to damage by vandalism. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
615C Overflow line connected or discharges to a sanitary sewer drain?
SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from
connecting to, or discharging into, a sanitary sewer system. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
616 Are the drain line and overflow combined?N
616A Drain line shall terminate at least 12 inches above ground or flood rim of receiving
basin
Exception Granted: R309-545-10(1)(d) | Tank overflows and drains discharging into
storm drain boxes that don't daylight. The tank shall be provided with an overflow that
discharges at an elevation between 12 and 24 inches above the ground surface or the
rim of the receiving basin. Also, the drain discharge shall have a physical clearance of
at least 12 inches between the discharge end of the pipe and the overflow rim of the
receiving basin.
SIG | 25pts | FW | V016 | R309-545-10(1)(d) | If the local authority allows discharge to
a storm drain, the rule requires the drain discharge to have a physical clearance of at
least 12 inches between the discharge end of the pipe and the overflow rim of the
receiving basin. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
617 Is this facility Active or Inactive?A
618 Storage tank capacity in gallons (from SDWIS; if different explain why in the
comments)
1000000
619 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through DDW
review
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
620 Ladders, ladder guards, platform railings, or safely located entrance hatches are
provided.
MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards,
platform railings, and safely located entrance hatches where applicable for water
storage tanks and requires safety practices to conform to pertinent laws and
regulations of the Utah Occupational Safety and Health Division.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 102 of 145
621 Tank is vented.
SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to
be vented. Overflows cannot be considered or used as vents. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
622 Are air vents present? ... if yes, answer the following question(s)Y
622A Vent is either down-turned or shielded from contaminants (at least 2 inches below the
bottom of the opening)
SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water
storage tanks to be down-turned a minimum of 2 inches below any opening and
shielded to prevent the entrance of contaminants. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
622B End of vent terminates at least 24 inches above earthen cover (buried tank) and is
located and sized to avoid blockage during winter.
MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the
end of the vent discharge to be a minimum of 24 inches above the earthen covering.
C
622C Vent covered with #14 or finer non-corrodible mesh screen.
SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to
be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in
diameter to be fitted with additional heavy gauge screen or substantial covering to
protect the #14 mesh screen from vandalism or damage. This significant deficiency
must be corrected within 120 days of notification or have a compliance action plan
approved by DDW.
C
622D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or
substantial covering.
MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter
or greater to be fitted with additional heavy gauge screen or substantial covering,
which will protect the No. 14 mesh screen against vandalism or damage.
C
623 Are access openings present? ... if yes, answer the following question(s)
MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water
storage tanks to be designed with reasonably convenient access to the interior for
cleaning and maintenance.
Y
623A Access opening framed at least 4 inches above roof surface or 18 inches above
earthen cover.
Exception Granted: R309-545-14(1) | The access hatch is only 3 to 4-inches above
the storage tank lid. The Rule requires a minimum 4 inches.
MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be
framed at least 4 inches above the surface of the roof, or on a buried tank, to be at
least 18 inches above any earthen cover over the tank.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 103 of 145
623B Access opening shoe box type with at least 2 inches of overlap
SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access
opening to be provided with a close fitting solid shoebox type cover which extends
down around the frame at least two inches and is furnished with a gasket(s) between
the lid and frame. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
623C Access opening lid properly gasketed
SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank
to be furnished with a gasket between the lid and frame. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
624 Access opening locked
SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access
opening to have a locking device. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
625 Roof or wall penetrations sealed
SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a
storage tank roof or top, designed to accommodate control apparatus or pump
columns, to be welded, gasketed, or curbed and sleeved and to have additional proper
shielding to prevent vandalism. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
626 Area surrounding ground-level or buried storage tank is graded to prevent surface
water from standing within 50 feet.
SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a
ground-level or buried water storage tank be graded in a manner to prevent surface
water from standing within 50 feet of the tank. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
627 Storage tank roof is sloped to prevent ponding
MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs
to eliminate water ponding.
C
628 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the
following options)
N
629 Is a tank overflow present? ... if yes, answer the following question(s)
SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided
with an overflow that discharges at an an elevation between 12 and 24 inches above
the ground surface or the rim of the receiving basin. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
Y
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 104 of 145
ST013 - HIGH ZONE #2 - Active
629A Overflow line discharges at least 12 inches above ground or the flood rim of receiving
basin?
Exception Granted: R309-545-13 | Tank overflows and drains discharging into storm
drain boxes that don't daylight. The tank shall be provided with an overflow that
discharges at an elevation between 12 and 24 inches above the ground surface or the
rim of the receiving basin. Also, the drain discharge shall have a physical clearance of
at least 12 inches between the discharge end of the pipe and the overflow rim of the
receiving basin.
SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be
provided with an overflow that discharges at an elevation between 12 and 24 inches
above the ground surface or the rim of the receiving basin.
C
629B Overflow line covered with #4 mesh non-corrodible screen
SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be
screened with #4 mesh non-corrodible screens installed at a location least susceptible
to damage by vandalism. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
629C Overflow line connected or discharges to a sanitary sewer drain?
SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from
connecting to, or discharging into, a sanitary sewer system. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
630 Are the drain line and overflow combined?N
630A Drain line shall terminate at least 12 inches above ground or flood rim of receiving
basin
Exception Granted: R309-545-10(1)(d) | Tank overflows and drains discharging into
storm drain boxes that don't daylight. The tank shall be provided with an overflow that
discharges at an elevation between 12 and 24 inches above the ground surface or the
rim of the receiving basin. Also, the drain discharge shall have a physical clearance of
at least 12 inches between the discharge end of the pipe and the overflow rim of the
receiving basin.
SIG | 25pts | FW | V016 | R309-545-10(1)(d) | If the local authority allows discharge to
a storm drain, the rule requires the drain discharge to have a physical clearance of at
least 12 inches between the discharge end of the pipe and the overflow rim of the
receiving basin. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
631 Is this facility Active or Inactive?A
632 Storage tank capacity in gallons (from SDWIS; if different explain why in the
comments)
4500000
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 105 of 145
633 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through DDW
review
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
634 Ladders, ladder guards, platform railings, or safely located entrance hatches are
provided.
MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards,
platform railings, and safely located entrance hatches where applicable for water
storage tanks and requires safety practices to conform to pertinent laws and
regulations of the Utah Occupational Safety and Health Division.
C
635 Tank is vented.
SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to
be vented. Overflows cannot be considered or used as vents. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
636 Are air vents present? ... if yes, answer the following question(s)Y
636A Vent is either down-turned or shielded from contaminants (at least 2 inches below the
bottom of the opening)
SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water
storage tanks to be down-turned a minimum of 2 inches below any opening and
shielded to prevent the entrance of contaminants. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
636B End of vent terminates at least 24 inches above earthen cover (buried tank) and is
located and sized to avoid blockage during winter.
MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the
end of the vent discharge to be a minimum of 24 inches above the earthen covering.
C
636C Vent covered with #14 or finer non-corrodible mesh screen.
SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to
be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in
diameter to be fitted with additional heavy gauge screen or substantial covering to
protect the #14 mesh screen from vandalism or damage. This significant deficiency
must be corrected within 120 days of notification or have a compliance action plan
approved by DDW.
C
636D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or
substantial covering.
MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter
or greater to be fitted with additional heavy gauge screen or substantial covering,
which will protect the No. 14 mesh screen against vandalism or damage.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 106 of 145
637 Are access openings present? ... if yes, answer the following question(s)
MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water
storage tanks to be designed with reasonably convenient access to the interior for
cleaning and maintenance.
Y
637A Access opening framed at least 4 inches above roof surface or 18 inches above
earthen cover.
MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be
framed at least 4 inches above the surface of the roof, or on a buried tank, to be at
least 18 inches above any earthen cover over the tank.
C
637B Access opening shoe box type with at least 2 inches of overlap
SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access
opening to be provided with a close fitting solid shoebox type cover which extends
down around the frame at least two inches and is furnished with a gasket(s) between
the lid and frame. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
637C Access opening lid properly gasketed
SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank
to be furnished with a gasket between the lid and frame. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
638 Access opening locked
SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access
opening to have a locking device. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
639 Roof or wall penetrations sealed
SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a
storage tank roof or top, designed to accommodate control apparatus or pump
columns, to be welded, gasketed, or curbed and sleeved and to have additional proper
shielding to prevent vandalism. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
640 Area surrounding ground-level or buried storage tank is graded to prevent surface
water from standing within 50 feet.
SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a
ground-level or buried water storage tank be graded in a manner to prevent surface
water from standing within 50 feet of the tank. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
641 Storage tank roof is sloped to prevent ponding
MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs
to eliminate water ponding.
C
642 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the
following options)
N
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 107 of 145
ST014 - HIGH ZONE #3 - Active
643 Is a tank overflow present? ... if yes, answer the following question(s)
SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided
with an overflow that discharges at an an elevation between 12 and 24 inches above
the ground surface or the rim of the receiving basin. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
Y
643A Overflow line discharges at least 12 inches above ground or the flood rim of receiving
basin?
Exception Granted: R309-545-13 | Tank overflows and drains discharging into storm
drain boxes that don't daylight. The tank shall be provided with an overflow that
discharges at an elevation between 12 and 24 inches above the ground surface or the
rim of the receiving basin. Also, the drain discharge shall have a physical clearance of
at least 12 inches between the discharge end of the pipe and the overflow rim of the
receiving basin.
SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be
provided with an overflow that discharges at an elevation between 12 and 24 inches
above the ground surface or the rim of the receiving basin.
C
643B Overflow line covered with #4 mesh non-corrodible screen
SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be
screened with #4 mesh non-corrodible screens installed at a location least susceptible
to damage by vandalism. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
643C Overflow line connected or discharges to a sanitary sewer drain?
SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from
connecting to, or discharging into, a sanitary sewer system. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
644 Are the drain line and overflow combined?N
644A Drain line shall terminate at least 12 inches above ground or flood rim of receiving
basin
Exception Granted: R309-545-10(1)(d) | Tank overflows and drains discharging into
storm drain boxes that don't daylight. The tank shall be provided with an overflow that
discharges at an elevation between 12 and 24 inches above the ground surface or the
rim of the receiving basin. Also, the drain discharge shall have a physical clearance of
at least 12 inches between the discharge end of the pipe and the overflow rim of the
receiving basin.
SIG | 25pts | FW | V016 | R309-545-10(1)(d) | If the local authority allows discharge to
a storm drain, the rule requires the drain discharge to have a physical clearance of at
least 12 inches between the discharge end of the pipe and the overflow rim of the
receiving basin. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
645 Is this facility Active or Inactive?A
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 108 of 145
646 Storage tank capacity in gallons (from SDWIS; if different explain why in the
comments)
4500000
647 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through DDW
review
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
648 Ladders, ladder guards, platform railings, or safely located entrance hatches are
provided.
MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards,
platform railings, and safely located entrance hatches where applicable for water
storage tanks and requires safety practices to conform to pertinent laws and
regulations of the Utah Occupational Safety and Health Division.
C
649 Tank is vented.
SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to
be vented. Overflows cannot be considered or used as vents. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
650 Are air vents present? ... if yes, answer the following question(s)Y
650A Vent is either down-turned or shielded from contaminants (at least 2 inches below the
bottom of the opening)
SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water
storage tanks to be down-turned a minimum of 2 inches below any opening and
shielded to prevent the entrance of contaminants. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
650B End of vent terminates at least 24 inches above earthen cover (buried tank) and is
located and sized to avoid blockage during winter.
MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the
end of the vent discharge to be a minimum of 24 inches above the earthen covering.
C
650C Vent covered with #14 or finer non-corrodible mesh screen.
SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to
be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in
diameter to be fitted with additional heavy gauge screen or substantial covering to
protect the #14 mesh screen from vandalism or damage. This significant deficiency
must be corrected within 120 days of notification or have a compliance action plan
approved by DDW.
C
650D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or
substantial covering.
MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter
or greater to be fitted with additional heavy gauge screen or substantial covering,
which will protect the No. 14 mesh screen against vandalism or damage.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 109 of 145
651 Are access openings present? ... if yes, answer the following question(s)
MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water
storage tanks to be designed with reasonably convenient access to the interior for
cleaning and maintenance.
Y
651A Access opening framed at least 4 inches above roof surface or 18 inches above
earthen cover.
MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be
framed at least 4 inches above the surface of the roof, or on a buried tank, to be at
least 18 inches above any earthen cover over the tank.
C
651B Access opening shoe box type with at least 2 inches of overlap
SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access
opening to be provided with a close fitting solid shoebox type cover which extends
down around the frame at least two inches and is furnished with a gasket(s) between
the lid and frame. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
651C Access opening lid properly gasketed
SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank
to be furnished with a gasket between the lid and frame. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
652 Access opening locked
SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access
opening to have a locking device. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
653 Roof or wall penetrations sealed
SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a
storage tank roof or top, designed to accommodate control apparatus or pump
columns, to be welded, gasketed, or curbed and sleeved and to have additional proper
shielding to prevent vandalism. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
654 Area surrounding ground-level or buried storage tank is graded to prevent surface
water from standing within 50 feet.
SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a
ground-level or buried water storage tank be graded in a manner to prevent surface
water from standing within 50 feet of the tank. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
655 Storage tank roof is sloped to prevent ponding
MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs
to eliminate water ponding.
C
656 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the
following options)
N
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 110 of 145
ST015 - LOW ZONE SOUTH #5 - Active
657 Is a tank overflow present? ... if yes, answer the following question(s)
SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided
with an overflow that discharges at an an elevation between 12 and 24 inches above
the ground surface or the rim of the receiving basin. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
Y
657A Overflow line discharges at least 12 inches above ground or the flood rim of receiving
basin?
Exception Granted: R309-545-13 | Tank overflows and drains discharging into storm
drain boxes that don't daylight. The tank shall be provided with an overflow that
discharges at an elevation between 12 and 24 inches above the ground surface or the
rim of the receiving basin. Also, the drain discharge shall have a physical clearance of
at least 12 inches between the discharge end of the pipe and the overflow rim of the
receiving basin.
SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be
provided with an overflow that discharges at an elevation between 12 and 24 inches
above the ground surface or the rim of the receiving basin.
C
657B Overflow line covered with #4 mesh non-corrodible screen
SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be
screened with #4 mesh non-corrodible screens installed at a location least susceptible
to damage by vandalism. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
657C Overflow line connected or discharges to a sanitary sewer drain?
SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from
connecting to, or discharging into, a sanitary sewer system. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
658 Are the drain line and overflow combined?N
658A Drain line shall terminate at least 12 inches above ground or flood rim of receiving
basin
Exception Granted: R309-545-10(1)(d) | Tank overflows and drains discharging into
storm drain boxes that don't daylight. The tank shall be provided with an overflow that
discharges at an elevation between 12 and 24 inches above the ground surface or the
rim of the receiving basin. Also, the drain discharge shall have a physical clearance of
at least 12 inches between the discharge end of the pipe and the overflow rim of the
receiving basin.
SIG | 25pts | FW | V016 | R309-545-10(1)(d) | If the local authority allows discharge to
a storm drain, the rule requires the drain discharge to have a physical clearance of at
least 12 inches between the discharge end of the pipe and the overflow rim of the
receiving basin. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
659 Is this facility Active or Inactive?A
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 111 of 145
660 Storage tank capacity in gallons (from SDWIS; if different explain why in the
comments)
4500000
661 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through DDW
review
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
662 Ladders, ladder guards, platform railings, or safely located entrance hatches are
provided.
MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards,
platform railings, and safely located entrance hatches where applicable for water
storage tanks and requires safety practices to conform to pertinent laws and
regulations of the Utah Occupational Safety and Health Division.
C
663 Tank is vented.
SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to
be vented. Overflows cannot be considered or used as vents. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
664 Are air vents present? ... if yes, answer the following question(s)Y
664A Vent is either down-turned or shielded from contaminants (at least 2 inches below the
bottom of the opening)
SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water
storage tanks to be down-turned a minimum of 2 inches below any opening and
shielded to prevent the entrance of contaminants. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
664B End of vent terminates at least 24 inches above earthen cover (buried tank) and is
located and sized to avoid blockage during winter.
MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the
end of the vent discharge to be a minimum of 24 inches above the earthen covering.
C
664C Vent covered with #14 or finer non-corrodible mesh screen.
SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to
be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in
diameter to be fitted with additional heavy gauge screen or substantial covering to
protect the #14 mesh screen from vandalism or damage. This significant deficiency
must be corrected within 120 days of notification or have a compliance action plan
approved by DDW.
C
664D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or
substantial covering.
MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter
or greater to be fitted with additional heavy gauge screen or substantial covering,
which will protect the No. 14 mesh screen against vandalism or damage.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 112 of 145
665 Are access openings present? ... if yes, answer the following question(s)
MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water
storage tanks to be designed with reasonably convenient access to the interior for
cleaning and maintenance.
Y
665A Access opening framed at least 4 inches above roof surface or 18 inches above
earthen cover.
MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be
framed at least 4 inches above the surface of the roof, or on a buried tank, to be at
least 18 inches above any earthen cover over the tank.
C
665B Access opening shoe box type with at least 2 inches of overlap
SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access
opening to be provided with a close fitting solid shoebox type cover which extends
down around the frame at least two inches and is furnished with a gasket(s) between
the lid and frame. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
665C Access opening lid properly gasketed
SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank
to be furnished with a gasket between the lid and frame. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
666 Access opening locked
SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access
opening to have a locking device. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
667 Roof or wall penetrations sealed
SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a
storage tank roof or top, designed to accommodate control apparatus or pump
columns, to be welded, gasketed, or curbed and sleeved and to have additional proper
shielding to prevent vandalism. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
668 Area surrounding ground-level or buried storage tank is graded to prevent surface
water from standing within 50 feet.
SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a
ground-level or buried water storage tank be graded in a manner to prevent surface
water from standing within 50 feet of the tank. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
669 Storage tank roof is sloped to prevent ponding
MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs
to eliminate water ponding.
C
670 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the
following options)
N
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 113 of 145
ST016 - MIDDLE ZONE #4 - Active
671 Is a tank overflow present? ... if yes, answer the following question(s)
SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided
with an overflow that discharges at an an elevation between 12 and 24 inches above
the ground surface or the rim of the receiving basin. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
Y
671A Overflow line discharges at least 12 inches above ground or the flood rim of receiving
basin?
Exception Granted: R309-545-13 | Tank overflows and drains discharging into storm
drain boxes that don't daylight. The tank shall be provided with an overflow that
discharges at an elevation between 12 and 24 inches above the ground surface or the
rim of the receiving basin. Also, the drain discharge shall have a physical clearance of
at least 12 inches between the discharge end of the pipe and the overflow rim of the
receiving basin.
SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be
provided with an overflow that discharges at an elevation between 12 and 24 inches
above the ground surface or the rim of the receiving basin.
C
671B Overflow line covered with #4 mesh non-corrodible screen
SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be
screened with #4 mesh non-corrodible screens installed at a location least susceptible
to damage by vandalism. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
671C Overflow line connected or discharges to a sanitary sewer drain?
SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from
connecting to, or discharging into, a sanitary sewer system. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
672 Are the drain line and overflow combined?N
672A Drain line shall terminate at least 12 inches above ground or flood rim of receiving
basin
Exception Granted: R309-545-10(1)(d) | Tank overflows and drains discharging into
storm drain boxes that don't daylight. The tank shall be provided with an overflow that
discharges at an elevation between 12 and 24 inches above the ground surface or the
rim of the receiving basin. Also, the drain discharge shall have a physical clearance of
at least 12 inches between the discharge end of the pipe and the overflow rim of the
receiving basin.
SIG | 25pts | FW | V016 | R309-545-10(1)(d) | If the local authority allows discharge to
a storm drain, the rule requires the drain discharge to have a physical clearance of at
least 12 inches between the discharge end of the pipe and the overflow rim of the
receiving basin. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
673 Is this facility Active or Inactive?A
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 114 of 145
674 Storage tank capacity in gallons (from SDWIS; if different explain why in the
comments)
5000000
675 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through DDW
review
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
676 Ladders, ladder guards, platform railings, or safely located entrance hatches are
provided.
MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards,
platform railings, and safely located entrance hatches where applicable for water
storage tanks and requires safety practices to conform to pertinent laws and
regulations of the Utah Occupational Safety and Health Division.
C
677 Tank is vented.
SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to
be vented. Overflows cannot be considered or used as vents. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
678 Are air vents present? ... if yes, answer the following question(s)Y
678A Vent is either down-turned or shielded from contaminants (at least 2 inches below the
bottom of the opening)
SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water
storage tanks to be down-turned a minimum of 2 inches below any opening and
shielded to prevent the entrance of contaminants. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
678B End of vent terminates at least 24 inches above earthen cover (buried tank) and is
located and sized to avoid blockage during winter.
MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the
end of the vent discharge to be a minimum of 24 inches above the earthen covering.
C
678C Vent covered with #14 or finer non-corrodible mesh screen.
SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to
be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in
diameter to be fitted with additional heavy gauge screen or substantial covering to
protect the #14 mesh screen from vandalism or damage. This significant deficiency
must be corrected within 120 days of notification or have a compliance action plan
approved by DDW.
C
678D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or
substantial covering.
MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter
or greater to be fitted with additional heavy gauge screen or substantial covering,
which will protect the No. 14 mesh screen against vandalism or damage.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 115 of 145
679 Are access openings present? ... if yes, answer the following question(s)
MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water
storage tanks to be designed with reasonably convenient access to the interior for
cleaning and maintenance.
Y
679A Access opening framed at least 4 inches above roof surface or 18 inches above
earthen cover.
MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be
framed at least 4 inches above the surface of the roof, or on a buried tank, to be at
least 18 inches above any earthen cover over the tank.
C
679B Access opening shoe box type with at least 2 inches of overlap
SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access
opening to be provided with a close fitting solid shoebox type cover which extends
down around the frame at least two inches and is furnished with a gasket(s) between
the lid and frame. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
679C Access opening lid properly gasketed
SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank
to be furnished with a gasket between the lid and frame. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
680 Access opening locked
SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access
opening to have a locking device. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
681 Roof or wall penetrations sealed
SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a
storage tank roof or top, designed to accommodate control apparatus or pump
columns, to be welded, gasketed, or curbed and sleeved and to have additional proper
shielding to prevent vandalism. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
682 Area surrounding ground-level or buried storage tank is graded to prevent surface
water from standing within 50 feet.
SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a
ground-level or buried water storage tank be graded in a manner to prevent surface
water from standing within 50 feet of the tank. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
683 Storage tank roof is sloped to prevent ponding
MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs
to eliminate water ponding.
C
684 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the
following options)
N
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 116 of 145
PF001 - LOW ZONE NORTH PUMP STATION -- Pump Stations - Active
685 Is a tank overflow present? ... if yes, answer the following question(s)
SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided
with an overflow that discharges at an an elevation between 12 and 24 inches above
the ground surface or the rim of the receiving basin. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
Y
685A Overflow line discharges at least 12 inches above ground or the flood rim of receiving
basin?
Exception Granted: R309-545-13 | Tank overflows and drains discharging into storm
drain boxes that don't daylight. The tank shall be provided with an overflow that
discharges at an elevation between 12 and 24 inches above the ground surface or the
rim of the receiving basin. Also, the drain discharge shall have a physical clearance of
at least 12 inches between the discharge end of the pipe and the overflow rim of the
receiving basin.
SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be
provided with an overflow that discharges at an elevation between 12 and 24 inches
above the ground surface or the rim of the receiving basin.
C
685B Overflow line covered with #4 mesh non-corrodible screen
SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be
screened with #4 mesh non-corrodible screens installed at a location least susceptible
to damage by vandalism. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
685C Overflow line connected or discharges to a sanitary sewer drain?
SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from
connecting to, or discharging into, a sanitary sewer system. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
686 Are the drain line and overflow combined?N
686A Drain line shall terminate at least 12 inches above ground or flood rim of receiving
basin
Exception Granted: R309-545-10(1)(d) | Tank overflows and drains discharging into
storm drain boxes that don't daylight. The tank shall be provided with an overflow that
discharges at an elevation between 12 and 24 inches above the ground surface or the
rim of the receiving basin. Also, the drain discharge shall have a physical clearance of
at least 12 inches between the discharge end of the pipe and the overflow rim of the
receiving basin.
SIG | 25pts | FW | V016 | R309-545-10(1)(d) | If the local authority allows discharge to
a storm drain, the rule requires the drain discharge to have a physical clearance of at
least 12 inches between the discharge end of the pipe and the overflow rim of the
receiving basin. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
687 Is this facility Active or Inactive?A
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 117 of 145
PF002 - LOW ZONE SOUTH PUMP STATION -- Pump Stations - Active
688 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through DDW
review
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
689 Pump Type (Centrifugal, Hand pump, Jet, Positive Displacement, Screw, Submersible,
Vertical turbine)
Vertical turbine
690 If the pump station is used to pressurize the distribution system, does it have at least
two functioning pumping units? ... if yes, answer the following question(s)
SIG | 25pts | PU | PS18 | R309-540-5(4)(b) | Rule states inline booster pumps,
withdrawing water directly from distribution lines without storage and feeding water
directly into distribution lines, shall have at least two pumping units. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
NA (Notes: It pumps into a tank.)
691 Pump station building and equipment are protected from flooding.
MIN | 15pts | PU | PS13 | R309-540-5(1)(a)(ii), R309-540-5(2)(a)(iii) | Pump station
access shall be 6" above surrounding ground and located at least 3’ above 100-year
flood elevation or highest recorded flood elevation; station is accessible at all times
unless it can be taken out of service when inaccessible.
C
692 There are no unprotected cross-connections in the pump station.
Exception Granted: R309-550-9(2) | During the 2019 sanitary survey, air handler
systems were identified in three pump facilities including the Low Zone North Pump
Station (PF001), Low Zone South Pump Station (PF002), and Kearns Booster Station
(PF003). The air handler systems in each of these pump facilities use water to cool the
pump facility then return the water into the distribution system. These air handler
systems are not NSF-approved.
SIG | 50pts | PU | PS15 | R309-105-12(1) | Cross connections are not allowed unless
controlled by an approved and properly operating backflow prevention assembly or
device. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C
693 Discharge piping has a pressure gauge.
MIN | 15pts | PU | PS03 | R309-540-5 (6)(c)(i) | Rule requires that a standard pressure
gauge be installed on the pump discharge line.
C
694 Does the pumping facility have an air relief valve located on the discharge piping? ... if
yes, answer the following question(s)
N
695 Pump station properly secured
MIN | 15pts | PU | PS33 | R309-540-5(1)(a)(v) | The pump station is protected to
prevent vandalism and entrance by animals or unauthorized persons.
C
696 Is this facility Active or Inactive?A
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 118 of 145
PF003 - KEARNS BOOSTER -- Pump Stations - Active
697 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through DDW
review
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
698 Pump Type (Centrifugal, Hand pump, Jet, Positive Displacement, Screw, Submersible,
Vertical turbine)
Vertical turbine
699 If the pump station is used to pressurize the distribution system, does it have at least
two functioning pumping units? ... if yes, answer the following question(s)
SIG | 25pts | PU | PS18 | R309-540-5(4)(b) | Rule states inline booster pumps,
withdrawing water directly from distribution lines without storage and feeding water
directly into distribution lines, shall have at least two pumping units. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
NA (Notes: Pumps to a tank.)
700 Pump station building and equipment are protected from flooding.
MIN | 15pts | PU | PS13 | R309-540-5(1)(a)(ii), R309-540-5(2)(a)(iii) | Pump station
access shall be 6" above surrounding ground and located at least 3’ above 100-year
flood elevation or highest recorded flood elevation; station is accessible at all times
unless it can be taken out of service when inaccessible.
C
701 There are no unprotected cross-connections in the pump station.
SIG | 50pts | PU | PS15 | R309-105-12(1) | Cross connections are not allowed unless
controlled by an approved and properly operating backflow prevention assembly or
device. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C
702 Discharge piping has a pressure gauge.
MIN | 15pts | PU | PS03 | R309-540-5 (6)(c)(i) | Rule requires that a standard pressure
gauge be installed on the pump discharge line.
C
703 Does the pumping facility have an air relief valve located on the discharge piping? ... if
yes, answer the following question(s)
N
704 Pump station properly secured
MIN | 15pts | PU | PS33 | R309-540-5(1)(a)(v) | The pump station is protected to
prevent vandalism and entrance by animals or unauthorized persons.
C
705 Is this facility Active or Inactive?A
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 119 of 145
PF004 - 5200 WEST PUMP STATION -- Pump Stations - Active
706 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through DDW
review
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
707 Pump Type (Centrifugal, Hand pump, Jet, Positive Displacement, Screw, Submersible,
Vertical turbine)
Vertical turbine
708 If the pump station is used to pressurize the distribution system, does it have at least
two functioning pumping units? ... if yes, answer the following question(s)
SIG | 25pts | PU | PS18 | R309-540-5(4)(b) | Rule states inline booster pumps,
withdrawing water directly from distribution lines without storage and feeding water
directly into distribution lines, shall have at least two pumping units. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
NA (Notes: Pumps into a tank)
709 Pump station building and equipment are protected from flooding.
MIN | 15pts | PU | PS13 | R309-540-5(1)(a)(ii), R309-540-5(2)(a)(iii) | Pump station
access shall be 6" above surrounding ground and located at least 3’ above 100-year
flood elevation or highest recorded flood elevation; station is accessible at all times
unless it can be taken out of service when inaccessible.
C
710 There are no unprotected cross-connections in the pump station.
SIG | 50pts | PU | PS15 | R309-105-12(1) | Cross connections are not allowed unless
controlled by an approved and properly operating backflow prevention assembly or
device. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C
711 Discharge piping has a pressure gauge.
MIN | 15pts | PU | PS03 | R309-540-5 (6)(c)(i) | Rule requires that a standard pressure
gauge be installed on the pump discharge line.
C
712 Does the pumping facility have an air relief valve located on the discharge piping? ... if
yes, answer the following question(s)
N
713 Pump station properly secured
MIN | 15pts | PU | PS33 | R309-540-5(1)(a)(v) | The pump station is protected to
prevent vandalism and entrance by animals or unauthorized persons.
C
714 Is this facility Active or Inactive?A
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 120 of 145
TP001 - BARKER CHLORINATOR -- Treatment - Chlorination General - Active
715 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through DDW
review
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
716 Pump Type (Centrifugal, Hand pump, Jet, Positive Displacement, Screw, Submersible,
Vertical turbine)
Vertical turbine
717 If the pump station is used to pressurize the distribution system, does it have at least
two functioning pumping units? ... if yes, answer the following question(s)
SIG | 25pts | PU | PS18 | R309-540-5(4)(b) | Rule states inline booster pumps,
withdrawing water directly from distribution lines without storage and feeding water
directly into distribution lines, shall have at least two pumping units. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
NA (Notes: Pumps into a tank)
718 Pump station building and equipment are protected from flooding.
MIN | 15pts | PU | PS13 | R309-540-5(1)(a)(ii), R309-540-5(2)(a)(iii) | Pump station
access shall be 6" above surrounding ground and located at least 3’ above 100-year
flood elevation or highest recorded flood elevation; station is accessible at all times
unless it can be taken out of service when inaccessible.
C
719 There are no unprotected cross-connections in the pump station.
SIG | 50pts | PU | PS15 | R309-105-12(1) | Cross connections are not allowed unless
controlled by an approved and properly operating backflow prevention assembly or
device. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C
720 Discharge piping has a pressure gauge.
MIN | 15pts | PU | PS03 | R309-540-5 (6)(c)(i) | Rule requires that a standard pressure
gauge be installed on the pump discharge line.
C
721 Does the pumping facility have an air relief valve located on the discharge piping? ... if
yes, answer the following question(s)
N
722 Pump station properly secured
MIN | 15pts | PU | PS33 | R309-540-5(1)(a)(v) | The pump station is protected to
prevent vandalism and entrance by animals or unauthorized persons.
C
723 Is this facility Active or Inactive?A
724 Is system required to provide primary disinfection? Prompt - If system knows they are
required to chlorinate based on water quality issues and/or knows they are required to
provide a minimum CT then follow-up by DDW is needed.
Y
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 121 of 145
724A If yes, no new connections have been added prior to approved first connection that
would change the disinfection CT calculation.
SIG | 50pts | TR | TD26 | R309-505-7(2), R309-520-4 and 6(4) | Point of application of
disinfectants shall be at a location that will achieve the required disinfection CT prior to
the first service connection. This significant deficiency must be corrected within 120
days of notification or have a corrective action plan approved by DDW.
C
725 When chlorination is required, disinfection has operated uninterrupted during the past
year while supplying drinking water.
SIG | 50pts | TR | TD25 | R309-520-6 | Rule requires continuous disinfection of
groundwater sources that do not consistently meet bacteriological quality standards,
all surface water sources, and groundwater sources under the direct influence of
surface water. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
726 Chlorine (gas & hypochlorite solution, tablets, granules, ) and chemicals used to
generate chlorine solutions and chlorine dioxide meet ANSI/NSF 60.
SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to
drinking water, including chlorine, chloramines and chemicals used to generate
hypochlorite solutions and chlorine dioxide, shall be certified as complying with
ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
727 If chemical dilution or dissolution is needed, cross-connection control is provided on
water lines feeding solution tanks.
SIG | 50pts | TR | TX07 | R309-525-11(2)(c), R309-525-11(9)(b)(i) to (iv) | Cross
connection control shall be provided on make-up water lines feeding solution tanks.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C (Notes: RP on potable supplies)
728 Water flow rate is measured to control chemical feed?
SIG | 25pts | TR | TD79 | R309-525-11(7)(d)(ii) and (iii), R309-525-11(7)(a)(i) |
Chemical feed rates shall be proportional to flows and a means to measure water flow
rate shall be provided. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
729 Solution tanks and tank refilling line entry points are properly labeled to identify the
chemicals
MIN | 15pts | TR | TG03 | R309-525-11(8)(c)(vii) | Rule requires tanks to be properly
labeled to designate the chemical contained.
C
730 Free chlorine residual test equipment on-site or available?
MIN | 15pts | TR | TD78 | R309-520-7(1)(j) | Rule requires chlorine residual test
equipment available capable of measuring residuals to the nearest 0.1 mg/l in the
range below 0.5 mg/l, to the nearest 0.3 mg/l between 0.5 mg/l and 1.0 mg/l and to the
nearest 0.5 mg/l above 1.0 mg/l.
C (Notes: Analyzers)
731 Spare parts are available to replace parts subject to wear and breakage
MIN | 15pts | TR | TD75 | Standard Method 334.0 Determination of Residual Chlorine
in Drinking Water Using an Online Chlorine Analyzer. [EPA 815-B-09-013 September
2009 11.1.1.2 Page 13] | Spare parts shall be provided and maintained for all
chlorinators to repair parts subject to wear and breakage.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 122 of 145
TP002 - TAY-EAST CHLORINATOR -- Treatment - Chlorination General - Active
732 Is chlorine chemical dose rate adjusted due to different water demand flow rates
and/or changing water quality?
Y
732A If yes, which water flow rate is used? e.g. influent flow, effluent flow, filter flow.effluent
733 Is there a designated chlorine Point of Entry (POE) sample location?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
734 POE is before first connection/customer?
SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d)
C
735 Chlorine residual records are maintained and available... if yes answer following
SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d)
Y
735A System is sampling distribution residuals throughout entire distribution system
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
735B Distribution chlorine residuals meet minimum concentration requirement
SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d)
C
735C "What is the maximum free chlorine residual measure? This value never exceeds 4.0
mg/L? "
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
735D System collects at least three distribution chlorine residual samples a week?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
735E System is sampling distribution residuals in accordance with monitoring schedule
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
736 Treatment plant properly secured to protect the quality of the treated water. R309-520-
7(2)(f)
SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the
directive, the Director may assess 25 to 200 points to the water system. Points shall
be assessed based upon the severity of the non-compliance, the threat to public
health and the underlying basis for the original directive.
C
737 Daily operating records reflect chemical dosages and total quantities used
SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using
chemical addition or specialized equipment for the treatment of drinking water to
regularly complete operational reports. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
738 Is this facility Active or Inactive?A
739 Is system required to provide primary disinfection? Prompt - If system knows they are
required to chlorinate based on water quality issues and/or knows they are required to
provide a minimum CT then follow-up by DDW is needed.
Y
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 123 of 145
739A If yes, no new connections have been added prior to approved first connection that
would change the disinfection CT calculation.
SIG | 50pts | TR | TD26 | R309-505-7(2), R309-520-4 and 6(4) | Point of application of
disinfectants shall be at a location that will achieve the required disinfection CT prior to
the first service connection. This significant deficiency must be corrected within 120
days of notification or have a corrective action plan approved by DDW.
C
740 When chlorination is required, disinfection has operated uninterrupted during the past
year while supplying drinking water.
SIG | 50pts | TR | TD25 | R309-520-6 | Rule requires continuous disinfection of
groundwater sources that do not consistently meet bacteriological quality standards,
all surface water sources, and groundwater sources under the direct influence of
surface water. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
741 Chlorine (gas & hypochlorite solution, tablets, granules, ) and chemicals used to
generate chlorine solutions and chlorine dioxide meet ANSI/NSF 60.
SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to
drinking water, including chlorine, chloramines and chemicals used to generate
hypochlorite solutions and chlorine dioxide, shall be certified as complying with
ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
742 If chemical dilution or dissolution is needed, cross-connection control is provided on
water lines feeding solution tanks.
SIG | 50pts | TR | TX07 | R309-525-11(2)(c), R309-525-11(9)(b)(i) to (iv) | Cross
connection control shall be provided on make-up water lines feeding solution tanks.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
743 Water flow rate is measured to control chemical feed?
SIG | 25pts | TR | TD79 | R309-525-11(7)(d)(ii) and (iii), R309-525-11(7)(a)(i) |
Chemical feed rates shall be proportional to flows and a means to measure water flow
rate shall be provided. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
744 Solution tanks and tank refilling line entry points are properly labeled to identify the
chemicals
MIN | 15pts | TR | TG03 | R309-525-11(8)(c)(vii) | Rule requires tanks to be properly
labeled to designate the chemical contained.
C
745 Free chlorine residual test equipment on-site or available?
MIN | 15pts | TR | TD78 | R309-520-7(1)(j) | Rule requires chlorine residual test
equipment available capable of measuring residuals to the nearest 0.1 mg/l in the
range below 0.5 mg/l, to the nearest 0.3 mg/l between 0.5 mg/l and 1.0 mg/l and to the
nearest 0.5 mg/l above 1.0 mg/l.
C
746 Spare parts are available to replace parts subject to wear and breakage
MIN | 15pts | TR | TD75 | Standard Method 334.0 Determination of Residual Chlorine
in Drinking Water Using an Online Chlorine Analyzer. [EPA 815-B-09-013 September
2009 11.1.1.2 Page 13] | Spare parts shall be provided and maintained for all
chlorinators to repair parts subject to wear and breakage.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 124 of 145
TP005 - WL- MILRACE 5400 S 1100 W CHLORINATOR -- Treatment - Chlorination General - Active
747 Is chlorine chemical dose rate adjusted due to different water demand flow rates
and/or changing water quality?
Y
747A If yes, which water flow rate is used? e.g. influent flow, effluent flow, filter flow.effluent
748 Is there a designated chlorine Point of Entry (POE) sample location?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
749 POE is before first connection/customer?
SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d)
C
750 Chlorine residual records are maintained and available... if yes answer following
SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d)
Y
750A System is sampling distribution residuals throughout entire distribution system
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
750B Distribution chlorine residuals meet minimum concentration requirement
SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d)
C
750C "What is the maximum free chlorine residual measure? This value never exceeds 4.0
mg/L? "
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
750D System collects at least three distribution chlorine residual samples a week?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
750E System is sampling distribution residuals in accordance with monitoring schedule
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
751 Treatment plant properly secured to protect the quality of the treated water. R309-520-
7(2)(f)
SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the
directive, the Director may assess 25 to 200 points to the water system. Points shall
be assessed based upon the severity of the non-compliance, the threat to public
health and the underlying basis for the original directive.
C
752 Daily operating records reflect chemical dosages and total quantities used
SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using
chemical addition or specialized equipment for the treatment of drinking water to
regularly complete operational reports. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
753 Is this facility Active or Inactive?A
754 Is system required to provide primary disinfection? Prompt - If system knows they are
required to chlorinate based on water quality issues and/or knows they are required to
provide a minimum CT then follow-up by DDW is needed.
Y
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 125 of 145
754A If yes, no new connections have been added prior to approved first connection that
would change the disinfection CT calculation.
SIG | 50pts | TR | TD26 | R309-505-7(2), R309-520-4 and 6(4) | Point of application of
disinfectants shall be at a location that will achieve the required disinfection CT prior to
the first service connection. This significant deficiency must be corrected within 120
days of notification or have a corrective action plan approved by DDW.
C
755 When chlorination is required, disinfection has operated uninterrupted during the past
year while supplying drinking water.
SIG | 50pts | TR | TD25 | R309-520-6 | Rule requires continuous disinfection of
groundwater sources that do not consistently meet bacteriological quality standards,
all surface water sources, and groundwater sources under the direct influence of
surface water. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
756 Chlorine (gas & hypochlorite solution, tablets, granules, ) and chemicals used to
generate chlorine solutions and chlorine dioxide meet ANSI/NSF 60.
SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to
drinking water, including chlorine, chloramines and chemicals used to generate
hypochlorite solutions and chlorine dioxide, shall be certified as complying with
ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
757 If chemical dilution or dissolution is needed, cross-connection control is provided on
water lines feeding solution tanks.
SIG | 50pts | TR | TX07 | R309-525-11(2)(c), R309-525-11(9)(b)(i) to (iv) | Cross
connection control shall be provided on make-up water lines feeding solution tanks.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
758 Water flow rate is measured to control chemical feed?
SIG | 25pts | TR | TD79 | R309-525-11(7)(d)(ii) and (iii), R309-525-11(7)(a)(i) |
Chemical feed rates shall be proportional to flows and a means to measure water flow
rate shall be provided. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
759 Solution tanks and tank refilling line entry points are properly labeled to identify the
chemicals
MIN | 15pts | TR | TG03 | R309-525-11(8)(c)(vii) | Rule requires tanks to be properly
labeled to designate the chemical contained.
C
760 Free chlorine residual test equipment on-site or available?
MIN | 15pts | TR | TD78 | R309-520-7(1)(j) | Rule requires chlorine residual test
equipment available capable of measuring residuals to the nearest 0.1 mg/l in the
range below 0.5 mg/l, to the nearest 0.3 mg/l between 0.5 mg/l and 1.0 mg/l and to the
nearest 0.5 mg/l above 1.0 mg/l.
C
761 Spare parts are available to replace parts subject to wear and breakage
MIN | 15pts | TR | TD75 | Standard Method 334.0 Determination of Residual Chlorine
in Drinking Water Using an Online Chlorine Analyzer. [EPA 815-B-09-013 September
2009 11.1.1.2 Page 13] | Spare parts shall be provided and maintained for all
chlorinators to repair parts subject to wear and breakage.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 126 of 145
TP016 - PLYMOUTH VIEW CHLORINATOR -- Treatment - Chlorination General - Active
762 Is chlorine chemical dose rate adjusted due to different water demand flow rates
and/or changing water quality?
Y
762A If yes, which water flow rate is used? e.g. influent flow, effluent flow, filter flow.effluent
763 Is there a designated chlorine Point of Entry (POE) sample location?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
764 POE is before first connection/customer?
SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d)
C
765 Chlorine residual records are maintained and available... if yes answer following
SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d)
Y
765A System is sampling distribution residuals throughout entire distribution system
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
765B Distribution chlorine residuals meet minimum concentration requirement
SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d)
C
765C "What is the maximum free chlorine residual measure? This value never exceeds 4.0
mg/L? "
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
765D System collects at least three distribution chlorine residual samples a week?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
765E System is sampling distribution residuals in accordance with monitoring schedule
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
766 Treatment plant properly secured to protect the quality of the treated water. R309-520-
7(2)(f)
SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the
directive, the Director may assess 25 to 200 points to the water system. Points shall
be assessed based upon the severity of the non-compliance, the threat to public
health and the underlying basis for the original directive.
C
767 Daily operating records reflect chemical dosages and total quantities used
SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using
chemical addition or specialized equipment for the treatment of drinking water to
regularly complete operational reports. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
768 Is this facility Active or Inactive?A
769 Is system required to provide primary disinfection? Prompt - If system knows they are
required to chlorinate based on water quality issues and/or knows they are required to
provide a minimum CT then follow-up by DDW is needed.
Y
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 127 of 145
769A If yes, no new connections have been added prior to approved first connection that
would change the disinfection CT calculation.
SIG | 50pts | TR | TD26 | R309-505-7(2), R309-520-4 and 6(4) | Point of application of
disinfectants shall be at a location that will achieve the required disinfection CT prior to
the first service connection. This significant deficiency must be corrected within 120
days of notification or have a corrective action plan approved by DDW.
C
770 When chlorination is required, disinfection has operated uninterrupted during the past
year while supplying drinking water.
SIG | 50pts | TR | TD25 | R309-520-6 | Rule requires continuous disinfection of
groundwater sources that do not consistently meet bacteriological quality standards,
all surface water sources, and groundwater sources under the direct influence of
surface water. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
771 Chlorine (gas & hypochlorite solution, tablets, granules, ) and chemicals used to
generate chlorine solutions and chlorine dioxide meet ANSI/NSF 60.
SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to
drinking water, including chlorine, chloramines and chemicals used to generate
hypochlorite solutions and chlorine dioxide, shall be certified as complying with
ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
772 If chemical dilution or dissolution is needed, cross-connection control is provided on
water lines feeding solution tanks.
SIG | 50pts | TR | TX07 | R309-525-11(2)(c), R309-525-11(9)(b)(i) to (iv) | Cross
connection control shall be provided on make-up water lines feeding solution tanks.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
773 Water flow rate is measured to control chemical feed?
SIG | 25pts | TR | TD79 | R309-525-11(7)(d)(ii) and (iii), R309-525-11(7)(a)(i) |
Chemical feed rates shall be proportional to flows and a means to measure water flow
rate shall be provided. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
774 Solution tanks and tank refilling line entry points are properly labeled to identify the
chemicals
MIN | 15pts | TR | TG03 | R309-525-11(8)(c)(vii) | Rule requires tanks to be properly
labeled to designate the chemical contained.
C
775 Free chlorine residual test equipment on-site or available?
MIN | 15pts | TR | TD78 | R309-520-7(1)(j) | Rule requires chlorine residual test
equipment available capable of measuring residuals to the nearest 0.1 mg/l in the
range below 0.5 mg/l, to the nearest 0.3 mg/l between 0.5 mg/l and 1.0 mg/l and to the
nearest 0.5 mg/l above 1.0 mg/l.
C
776 Spare parts are available to replace parts subject to wear and breakage
MIN | 15pts | TR | TD75 | Standard Method 334.0 Determination of Residual Chlorine
in Drinking Water Using an Online Chlorine Analyzer. [EPA 815-B-09-013 September
2009 11.1.1.2 Page 13] | Spare parts shall be provided and maintained for all
chlorinators to repair parts subject to wear and breakage.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 128 of 145
TP026 - RAWSON CHLORINATOR -- Treatment - Chlorination General - Active
777 Is chlorine chemical dose rate adjusted due to different water demand flow rates
and/or changing water quality?
Y
777A If yes, which water flow rate is used? e.g. influent flow, effluent flow, filter flow.effluent
778 Is there a designated chlorine Point of Entry (POE) sample location?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
779 POE is before first connection/customer?
SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d)
C
780 Chlorine residual records are maintained and available... if yes answer following
SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d)
Y
780A System is sampling distribution residuals throughout entire distribution system
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
780B Distribution chlorine residuals meet minimum concentration requirement
SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d)
C
780C "What is the maximum free chlorine residual measure? This value never exceeds 4.0
mg/L? "
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
780D System collects at least three distribution chlorine residual samples a week?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
780E System is sampling distribution residuals in accordance with monitoring schedule
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
781 Treatment plant properly secured to protect the quality of the treated water. R309-520-
7(2)(f)
SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the
directive, the Director may assess 25 to 200 points to the water system. Points shall
be assessed based upon the severity of the non-compliance, the threat to public
health and the underlying basis for the original directive.
C
782 Daily operating records reflect chemical dosages and total quantities used
SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using
chemical addition or specialized equipment for the treatment of drinking water to
regularly complete operational reports. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
783 Is this facility Active or Inactive?A
784 Is system required to provide primary disinfection? Prompt - If system knows they are
required to chlorinate based on water quality issues and/or knows they are required to
provide a minimum CT then follow-up by DDW is needed.
Y
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 129 of 145
784A If yes, no new connections have been added prior to approved first connection that
would change the disinfection CT calculation.
SIG | 50pts | TR | TD26 | R309-505-7(2), R309-520-4 and 6(4) | Point of application of
disinfectants shall be at a location that will achieve the required disinfection CT prior to
the first service connection. This significant deficiency must be corrected within 120
days of notification or have a corrective action plan approved by DDW.
C
785 When chlorination is required, disinfection has operated uninterrupted during the past
year while supplying drinking water.
SIG | 50pts | TR | TD25 | R309-520-6 | Rule requires continuous disinfection of
groundwater sources that do not consistently meet bacteriological quality standards,
all surface water sources, and groundwater sources under the direct influence of
surface water. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
786 Chlorine (gas & hypochlorite solution, tablets, granules, ) and chemicals used to
generate chlorine solutions and chlorine dioxide meet ANSI/NSF 60.
SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to
drinking water, including chlorine, chloramines and chemicals used to generate
hypochlorite solutions and chlorine dioxide, shall be certified as complying with
ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
787 If chemical dilution or dissolution is needed, cross-connection control is provided on
water lines feeding solution tanks.
SIG | 50pts | TR | TX07 | R309-525-11(2)(c), R309-525-11(9)(b)(i) to (iv) | Cross
connection control shall be provided on make-up water lines feeding solution tanks.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
788 Water flow rate is measured to control chemical feed?
SIG | 25pts | TR | TD79 | R309-525-11(7)(d)(ii) and (iii), R309-525-11(7)(a)(i) |
Chemical feed rates shall be proportional to flows and a means to measure water flow
rate shall be provided. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
789 Solution tanks and tank refilling line entry points are properly labeled to identify the
chemicals
MIN | 15pts | TR | TG03 | R309-525-11(8)(c)(vii) | Rule requires tanks to be properly
labeled to designate the chemical contained.
C
790 Free chlorine residual test equipment on-site or available?
MIN | 15pts | TR | TD78 | R309-520-7(1)(j) | Rule requires chlorine residual test
equipment available capable of measuring residuals to the nearest 0.1 mg/l in the
range below 0.5 mg/l, to the nearest 0.3 mg/l between 0.5 mg/l and 1.0 mg/l and to the
nearest 0.5 mg/l above 1.0 mg/l.
C
791 Spare parts are available to replace parts subject to wear and breakage
MIN | 15pts | TR | TD75 | Standard Method 334.0 Determination of Residual Chlorine
in Drinking Water Using an Online Chlorine Analyzer. [EPA 815-B-09-013 September
2009 11.1.1.2 Page 13] | Spare parts shall be provided and maintained for all
chlorinators to repair parts subject to wear and breakage.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 130 of 145
TP001 - BARKER CHLORINATOR -- On-Site Generation - Active
792 Is chlorine chemical dose rate adjusted due to different water demand flow rates
and/or changing water quality?
Y
792A If yes, which water flow rate is used? e.g. influent flow, effluent flow, filter flow.effluent
793 Is there a designated chlorine Point of Entry (POE) sample location?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
794 POE is before first connection/customer?
SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d)
C
795 Chlorine residual records are maintained and available... if yes answer following
SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d)
Y
795A System is sampling distribution residuals throughout entire distribution system
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
795B Distribution chlorine residuals meet minimum concentration requirement
SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d)
C
795C "What is the maximum free chlorine residual measure? This value never exceeds 4.0
mg/L? "
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
795D System collects at least three distribution chlorine residual samples a week?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
795E System is sampling distribution residuals in accordance with monitoring schedule
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
796 Treatment plant properly secured to protect the quality of the treated water. R309-520-
7(2)(f)
SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the
directive, the Director may assess 25 to 200 points to the water system. Points shall
be assessed based upon the severity of the non-compliance, the threat to public
health and the underlying basis for the original directive.
C
797 Daily operating records reflect chemical dosages and total quantities used
SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using
chemical addition or specialized equipment for the treatment of drinking water to
regularly complete operational reports. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
798 Is this facility Active or Inactive?A
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 131 of 145
TP005 - WL- MILRACE 5400 S 1100 W CHLORINATOR -- On-Site Generation - Active
799 On-site hypochlorite generation system is certified to meet ANSI/NSF 61
SIG | 25pts | DS | D001 | R309-550-6(1) & R309-550-6(3) | Rule states all materials
that may contact drinking water, including pipes, gaskets, lubricants and O-rings shall
be ANSI-certified as meeting the requirements of NSF Standard 61. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
800 Make-up water used for on-site generation is of drinking water quality
SIG | 25pts | TR | TD70 | R309-520-7(1)(h)(i), R309-520-7(3)(c)(iii) | Rule requires
make-up water used in on-site generation of hypochlorite solution to be of drinking
water quality. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
801 Hydrogen gas generated in electrolytic cell is vented upward outside of building
SIG | 50pts | TR | TD71 | R309-520-7(3)(c)(iv) | Rule requires hydrogen gas generated
in the electrolytic cell of the on-site generation system to be vented upward to the
outside of the building in a dedicated, unobstructed line. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
802 Solution tank is covered to minimize corrosive vapors
MIN | 5pts | TR | TD64 | R309-525-11(8)(b)(iii) | Chemical solutions shall be kept
covered.
C
803 Where concentrated hypochlorite solutions (5% or greater) are handled in containers
LARGER than 55 gallons: emergency eyewash station and a safety shower present
SIG | 25pts | TR | TD66 | R309-520-7(3)(a)(i) | Where hypochlorite solutions are used
at remote locations or in quantities of 55 gallons or less on site, safety showers are not
required and alternative emergency eyewash may be provided. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
804 Where concentrated hypochlorite solutions are handled in containers of 55 gallons or
LESS: some method of emergency eyewash provided (an eyewash station is not
required)
REC | 0pts | TR | TD65 | R309-520-7(3)(a)(i) | States Emergency eyewash stations
and safety showers shall be provided at all hypochlorite installations where
concentrated hypochlorite solutions, containing 5% or greater available chlorine by
volume, are handled in containers greater than 55 gallons
C
805 Hypochlorite solution storage area is protected from excessive heat and direct sunlight
MIN | 5pts | TR | TD67 | R309-520-7(3)(a)(ii) | States Storage and injection areas shall
be designed to minimize the decay in strength of concentrated hypochlorite solutions
from excessive heat or direct sunlight.
C
806 Means are used to minimize the use of decayed hypochlorite solution, such as
solution strength testing and delivery records
MIN | 5pts | TR | TD68 | R309-520-7(3)(b) | Rule requires the water system to provide
an operational means, such as keeping records of the delivery date of the hypochlorite
solution, to avoid the injection of significantly decayed hypochlorite solutions.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 132 of 145
TP016 - PLYMOUTH VIEW CHLORINATOR -- On-Site Generation - Active
807 Is this facility Active or Inactive?A
808 On-site hypochlorite generation system is certified to meet ANSI/NSF 61
SIG | 25pts | DS | D001 | R309-550-6(1) & R309-550-6(3) | Rule states all materials
that may contact drinking water, including pipes, gaskets, lubricants and O-rings shall
be ANSI-certified as meeting the requirements of NSF Standard 61. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
809 Make-up water used for on-site generation is of drinking water quality
SIG | 25pts | TR | TD70 | R309-520-7(1)(h)(i), R309-520-7(3)(c)(iii) | Rule requires
make-up water used in on-site generation of hypochlorite solution to be of drinking
water quality. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
810 Hydrogen gas generated in electrolytic cell is vented upward outside of building
SIG | 50pts | TR | TD71 | R309-520-7(3)(c)(iv) | Rule requires hydrogen gas generated
in the electrolytic cell of the on-site generation system to be vented upward to the
outside of the building in a dedicated, unobstructed line. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
811 Solution tank is covered to minimize corrosive vapors
MIN | 5pts | TR | TD64 | R309-525-11(8)(b)(iii) | Chemical solutions shall be kept
covered.
C
812 Where concentrated hypochlorite solutions (5% or greater) are handled in containers
LARGER than 55 gallons: emergency eyewash station and a safety shower present
SIG | 25pts | TR | TD66 | R309-520-7(3)(a)(i) | Where hypochlorite solutions are used
at remote locations or in quantities of 55 gallons or less on site, safety showers are not
required and alternative emergency eyewash may be provided. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
813 Where concentrated hypochlorite solutions are handled in containers of 55 gallons or
LESS: some method of emergency eyewash provided (an eyewash station is not
required)
REC | 0pts | TR | TD65 | R309-520-7(3)(a)(i) | States Emergency eyewash stations
and safety showers shall be provided at all hypochlorite installations where
concentrated hypochlorite solutions, containing 5% or greater available chlorine by
volume, are handled in containers greater than 55 gallons
C
814 Hypochlorite solution storage area is protected from excessive heat and direct sunlight
MIN | 5pts | TR | TD67 | R309-520-7(3)(a)(ii) | States Storage and injection areas shall
be designed to minimize the decay in strength of concentrated hypochlorite solutions
from excessive heat or direct sunlight.
C
815 Means are used to minimize the use of decayed hypochlorite solution, such as
solution strength testing and delivery records
MIN | 5pts | TR | TD68 | R309-520-7(3)(b) | Rule requires the water system to provide
an operational means, such as keeping records of the delivery date of the hypochlorite
solution, to avoid the injection of significantly decayed hypochlorite solutions.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 133 of 145
TP002 - TAY-EAST CHLORINATOR -- Tablet Hypochlorination - Active
816 Is this facility Active or Inactive?A
817 On-site hypochlorite generation system is certified to meet ANSI/NSF 61
SIG | 25pts | DS | D001 | R309-550-6(1) & R309-550-6(3) | Rule states all materials
that may contact drinking water, including pipes, gaskets, lubricants and O-rings shall
be ANSI-certified as meeting the requirements of NSF Standard 61. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
818 Make-up water used for on-site generation is of drinking water quality
SIG | 25pts | TR | TD70 | R309-520-7(1)(h)(i), R309-520-7(3)(c)(iii) | Rule requires
make-up water used in on-site generation of hypochlorite solution to be of drinking
water quality. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
819 Hydrogen gas generated in electrolytic cell is vented upward outside of building
SIG | 50pts | TR | TD71 | R309-520-7(3)(c)(iv) | Rule requires hydrogen gas generated
in the electrolytic cell of the on-site generation system to be vented upward to the
outside of the building in a dedicated, unobstructed line. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
820 Solution tank is covered to minimize corrosive vapors
MIN | 5pts | TR | TD64 | R309-525-11(8)(b)(iii) | Chemical solutions shall be kept
covered.
C
821 Where concentrated hypochlorite solutions (5% or greater) are handled in containers
LARGER than 55 gallons: emergency eyewash station and a safety shower present
SIG | 25pts | TR | TD66 | R309-520-7(3)(a)(i) | Where hypochlorite solutions are used
at remote locations or in quantities of 55 gallons or less on site, safety showers are not
required and alternative emergency eyewash may be provided. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
822 Where concentrated hypochlorite solutions are handled in containers of 55 gallons or
LESS: some method of emergency eyewash provided (an eyewash station is not
required)
REC | 0pts | TR | TD65 | R309-520-7(3)(a)(i) | States Emergency eyewash stations
and safety showers shall be provided at all hypochlorite installations where
concentrated hypochlorite solutions, containing 5% or greater available chlorine by
volume, are handled in containers greater than 55 gallons
C
823 Hypochlorite solution storage area is protected from excessive heat and direct sunlight
MIN | 5pts | TR | TD67 | R309-520-7(3)(a)(ii) | States Storage and injection areas shall
be designed to minimize the decay in strength of concentrated hypochlorite solutions
from excessive heat or direct sunlight.
C
824 Means are used to minimize the use of decayed hypochlorite solution, such as
solution strength testing and delivery records
MIN | 5pts | TR | TD68 | R309-520-7(3)(b) | Rule requires the water system to provide
an operational means, such as keeping records of the delivery date of the hypochlorite
solution, to avoid the injection of significantly decayed hypochlorite solutions.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 134 of 145
TP026 - RAWSON CHLORINATOR -- Tablet Hypochlorination - Active
825 Is this facility Active or Inactive?A
826 Hypochlorite dissolution equipment is certified to meet ANSI/NSF 61
SIG | 25pts | DS | D001 | R309-550-6(1) & R309-550-6(3) | Rule states all materials
that may contact drinking water, including pipes, gaskets, lubricants and O-rings shall
be ANSI-certified as meeting the requirements of NSF Standard 61. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
827 Hypochlorite tablets are stored in cool, dry and well ventilated area
MIN | 5pts | TR | TD72 | R309-520-7(3)(d)(iii) | Rule requires hypochlorite tablets to be
stored in accordance with manufacturer's safety guidelines and in their original
containers is a coll, dry, well-ventilated area.
C
828 Hypochlorite tablets are stored away from acid or combustible materials
SIG | 25pts | TR | TD73 | R309-520-7(3)(d)(iii) | Rule prohibits storage of hypochlorite
tablets near combustible materials or acids. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
829 Solution tank is covered to minimize corrosive vapors
MIN | 5pts | TR | TD64 | R309-525-11(8)(b)(iii) | Chemical solutions shall be kept
covered.
C
830 Where concentrated hypochlorite solutions (5% or greater) are handled in containers
LARGER than 55 gallons: emergency eyewash station and a safety shower present
SIG | 25pts | TR | TD66 | R309-520-7(3)(a)(i) | Where hypochlorite solutions are used
at remote locations or in quantities of 55 gallons or less on site, safety showers are not
required and alternative emergency eyewash may be provided. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
831 Where concentrated hypochlorite solutions are handled in containers of 55 gallons or
LESS: some method of emergency eyewash provided (a full eyewash station and
shower is not required)
SIG | 25pts | TR | TD66 | R309-520-7(3)(a)(i) | Where hypochlorite solutions are used
at remote locations or in quantities of 55 gallons or less on site, safety showers are not
required and alternative emergency eyewash may be provided. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
832 Hypochlorite solution storage area is protected from excessive heat and direct sunlight
MIN | 5pts | TR | TD67 | R309-520-7(3)(a)(ii) | States Storage and injection areas shall
be designed to minimize the decay in strength of concentrated hypochlorite solutions
from excessive heat or direct sunlight.
C
833 Records are kept to minimize the use of decayed hypochlorite solution
MIN | 5pts | TR | TD68 | R309-520-7(3)(b) | Rule requires the water system to provide
an operational means, such as keeping records of the delivery date of the hypochlorite
solution, to avoid the injection of significantly decayed hypochlorite solutions.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 135 of 145
TP006 - BARKER FLUORIDATION -- Fluoridation - Active
834 Is this facility Active or Inactive?A
835 Hypochlorite dissolution equipment is certified to meet ANSI/NSF 61
SIG | 25pts | DS | D001 | R309-550-6(1) & R309-550-6(3) | Rule states all materials
that may contact drinking water, including pipes, gaskets, lubricants and O-rings shall
be ANSI-certified as meeting the requirements of NSF Standard 61. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
836 Hypochlorite tablets are stored in cool, dry and well ventilated area
MIN | 5pts | TR | TD72 | R309-520-7(3)(d)(iii) | Rule requires hypochlorite tablets to be
stored in accordance with manufacturer's safety guidelines and in their original
containers is a coll, dry, well-ventilated area.
C (Notes: No Tablets on site.)
837 Hypochlorite tablets are stored away from acid or combustible materials
SIG | 25pts | TR | TD73 | R309-520-7(3)(d)(iii) | Rule prohibits storage of hypochlorite
tablets near combustible materials or acids. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C (Notes: No Tablets on site.)
838 Solution tank is covered to minimize corrosive vapors
MIN | 5pts | TR | TD64 | R309-525-11(8)(b)(iii) | Chemical solutions shall be kept
covered.
C
839 Where concentrated hypochlorite solutions (5% or greater) are handled in containers
LARGER than 55 gallons: emergency eyewash station and a safety shower present
SIG | 25pts | TR | TD66 | R309-520-7(3)(a)(i) | Where hypochlorite solutions are used
at remote locations or in quantities of 55 gallons or less on site, safety showers are not
required and alternative emergency eyewash may be provided. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
840 Where concentrated hypochlorite solutions are handled in containers of 55 gallons or
LESS: some method of emergency eyewash provided (a full eyewash station and
shower is not required)
SIG | 25pts | TR | TD66 | R309-520-7(3)(a)(i) | Where hypochlorite solutions are used
at remote locations or in quantities of 55 gallons or less on site, safety showers are not
required and alternative emergency eyewash may be provided. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
841 Hypochlorite solution storage area is protected from excessive heat and direct sunlight
MIN | 5pts | TR | TD67 | R309-520-7(3)(a)(ii) | States Storage and injection areas shall
be designed to minimize the decay in strength of concentrated hypochlorite solutions
from excessive heat or direct sunlight.
C
842 Records are kept to minimize the use of decayed hypochlorite solution
MIN | 5pts | TR | TD68 | R309-520-7(3)(b) | Rule requires the water system to provide
an operational means, such as keeping records of the delivery date of the hypochlorite
solution, to avoid the injection of significantly decayed hypochlorite solutions.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 136 of 145
843 Is this facility Active or Inactive?A
844 Background fluoride level before adding fluoride (in ppm):0.2
845 Target dose of fluoride added (in ppm):0.5
846 Typical fluoride level after adding fluoride (in ppm):0.7 (Notes: Varies .6 to .75)
847 Sampling location is present for measuring the final fluoride level (if compliant, answer
follow-up question)
MIN | 15pts | TR | TF44 | R309-535-5(2)(d)(iii) | A sampling point shall be provided
downstream of the fluoridation facility for measuring the fluoride level of treated water.
C (Notes: Sample sites down stream of
pump house)
847A Identify the sampling location of the measured final fluoride level:Sample Tap in pump house (Notes:
Designated Sample site)
848 There is a means to measure the flow of water to be treated
SIG | 25pts | TR | TF11 | R309-535-5(2)(d)(i) | A means to measure the flow of treated
water shall be provided. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
849 Fluoride concentrations, including chemical dosage and total water quantity, are
calculated daily. Daily operating records reflect chemical dosages and total quantities
used.
MIN | 15pts | TR | TF20 | R309-105-14(3) | R309-105-14(3) requires all water system
using chemical addition or specialized equipment for the treatment of drinking water
shall regularly complete operational reports. For a fluoridation facility that does not
calculate fluoride concentrations, include field and lab fluoride results.
C
850 Fluoride testing instruments are properly verified (zeroed & recorded split samples) or
calibrated
MIN | 15pts | TR | TF21 | R309-525-25(4) | R309-525-25(4) states all instrumentation
needed to verify that treatment processes are sufficient shall be properly calibrated
and maintained.
C
851 Fluoride chemicals are stored in covered or unopened shipping containers inside a
building.
MIN | 15pts | TR | TF06 | R390-535-5(2)(b)(i) | Fluoride chemicals shall be stored in
covered or sealed containers, inside a building, and away from direct sunlight and a
source of heat.
C
852 Fluoride injection point shall not be located upstream of lime-soda softening or ion
exchange softening process.
MIN | 15pts | TR | TF50 | R309-535-5(2)(g)(iii) | Added the following: The fluoride
injection point shall not be located upstream of lime softening, iron exchange, or other
processes that affect the fluoride level.
C
853 Chemicals used for fluoridation meet the NSF/ANSI 60 standard or applicable AWWA
standards
SIG | 25pts | TR | TF04 | R309-535-5(2)(a)(i) | All chemicals used for fluoridation shall
be certified to comply with ANSI/NSF Standard 60. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 137 of 145
854 Electrical outlet and cord/plug for fluoride feed pump is a non-standard receptacle type
without using an adaptor and feed pump is interconnected with a well or a service
pump (to ensure that the fluoride feed pump is turned on only when the well or service
pump is on and water is flowing in the pipe)
SIG | 100pts | TR | TF22 | R309-535-5(2)(f) | Rule requires the electrical outlet used
for fluoride feed pump to have interlock protection by being wired with the well or
service pump, such that the feed pump is only activated when the well or service
pump is on. The rule also prohibits the feed pump from being plugged into a
continuously active ("hot") electrical outlet. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
855 Acid-resistant secondary containment is provided and adequately sized for corrosive
fluoride solutions.
SIG | 25pts | TR | TF26 | R309-535-5(2)(c )(i), (ii) and (iii) | Rule requires secondary
containment: for tanks containing corrosive fluoride solutions, to be sized to contain
the maximum volume of solution handled, and to be designed to be acid resistant.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
856 Vent for the chemical storage, injection and operating areas vents to outside
atmosphere and away from air intakes.
MIN | 15pts | TR | TF24 | R309-535-5(2)(j)(iii) | The fluoride operating area shall be
vented to outside atmosphere and away from air intakes.
C
857 Incompatible chemicals are not stored in fluoride storage or injection areas.
MIN | 15pts | TR | TF28 | R309-535-5(2)(b)(i) - (iv) | Fluoride chemicals shall be stored
in covered or sealed containers, inside a building, away from direct sunlight and a
source of heat, and not be stored with incompatible chemicals. Bags or other
containers for dry materials shall be stored on pallets. Containers for dry materials
shall be kept closed to keep out moisture.
C
858 Has any electrical or SCADA work been done recently that could affect the original
design or fluoride control settings?"... If the answer is yes, answer the next question.
N (Notes: No)
859 Is fluorosilicic acid used for fluoridation? ... if yes, answer the following questions Y (Notes: 23%)
859A Acid solution tank is mounted on a scale or has other means of measuring the quantity
of fluoride used each day (such as level indicator or loss-of-weight recorder).
SIG | 25pts | TR | TF14 | R309-535-5(2)(d)(ii) | A means shall be provided to measure
the solution level in a tank and the quantity of the chemical used. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C (Notes: Day Tank is on a scale to
measure usage by weight.)
859B Solution tanks for fluorosilicic acid are vented to atmosphere outside the building
(away from air intake).
MIN | 15pts | TR | TF29 | R309-535-5(3)(b)(ii) | Rule requires solution tanks at
fluorosilicic acid installations to vent to the outside, above grade, away from air
intakes, and where least susceptible to contamination.
C
859C Neutralizing chemical is available for immediate use in case of acid spill
SIG | 25pts | TR | TF42 | R309-535-5(3)(e) | A neutralizing chemical shall be available
on site to handle small quantity accidental acid spills. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 138 of 145
TP007 - MILRACE FLUORIDATION -- Fluoridation - Active
859D Deluge shower and eyewash station are provided. The emergency shower and eye
wash station should be located close to, but outside of, the fluorosilicic acid operating
area.
SIG | 25pts | TR | TF15 | R309-535-5(3)(d) | Emergency eyewash stations and
showers shall be provided. This significant deficiency must be corrected within 120
days of notification or have a corrective action plan approved by DDW.
C (Notes: Shower and Eye wash in same
area, but discussed keeping eye wash
nozzles flushed periodically and caps on the
eye wash Aerators.)
859E Appropriate acid-resistant personal protective equipment provided for operators
(including eye or face protection gear for handling acid, acid resistant long rubber
gloves, apron or coverall, and boots)
SIG | 25pts | TR | TF13 | R309-535-5(3)(f), R309-535-5(4)(h), R309-535-5(5)(e) | The
use of personal protective equipment (PPE) is required when handling fluorisilicic acid
and dry chemicals. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
859F If acid bulk storage tank and day tank are present and there is a risk of solution
overflow from the bulk tank to the day tank, each tank is provided with separate vent.
MIN | 15pts | TR | TF31 | R309-535-5(3)(b)(iii) | Rule prohibits a bulk tank from sharing
a vent with a day tank if there is a risk of solution overflow from the bulk tank to the
day tank.
C
859G If there is a transfer pump between the acid bulk storage tank and the day tank, there
is a means to stop the transfer of acid in case of transfer pump failure.
REC | 0pts | TR | TF32 | recommendation | A means to stop the transfer pump will
protect the operator and minimize possible acid spill.
C
859H Emergency shutoff is near the entrance of the fluoride operating area to turn off the
transfer pump or injection pump in case of acid spill
REC | 0pts | TR | TF33 | recommendation | Having an emergency shutoff near the
entrance of the fluoride operating area will better protect the operator and minimize the
need of entering the operating area during acid spill.
C
859I Means provided to handle catastrophic failure of acid bulk storage tank.
REC | 0pts | TR | TF34 | recommendation | Water system should have an operation
plan in place and provide adequate training to the operators for responding to
catastrophic failure of acid bulk storage tank.
C
859J There is a seismic restraint system for the acid bulk storage tank.
REC | 0pts | TR | TF35 | recommendation | The acid bulk storage tank should be
adequately restrained to prevent catastrophic failure in case of seismic event.
C (Notes: Anchored at the base)
860 Is a saturator used for fluoridation? ... if yes, answer the following question(s)N (Notes: No)
861 Is fluoride dry feed equipment used?....if yes, answer the following questions N (Notes: No)
862 Appropriate personal protective equipment provided for operators (including NIOSH
approved respirator and chemical/dust-resistant safety goggles for saturators and dry
feeders, acid-resistant gloves, apron or coverall, and boots)
SIG | 25pts | TR | TF13 | R309-535-5(3)(f), R309-535-5(4)(h), R309-535-5(5)(e) | The
use of personal protective equipment (PPE) is required when handling fluorisilicic acid
and dry chemicals. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
863 Is this facility Active or Inactive?A (Notes: Active)
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 139 of 145
864 Background fluoride level before adding fluoride (in ppm):0.2
865 Target dose of fluoride added (in ppm):0.5
866 Typical fluoride level after adding fluoride (in ppm):0.7
867 Sampling location is present for measuring the final fluoride level (if compliant, answer
follow-up question)
MIN | 15pts | TR | TF44 | R309-535-5(2)(d)(iii) | A sampling point shall be provided
downstream of the fluoridation facility for measuring the fluoride level of treated water.
C (Notes: Sample site down stream of pump
house)
867A Identify the sampling location of the measured final fluoride level:Sample Tap (Notes: Designated Sample
Site)
868 There is a means to measure the flow of water to be treated
SIG | 25pts | TR | TF11 | R309-535-5(2)(d)(i) | A means to measure the flow of treated
water shall be provided. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
869 Fluoride concentrations, including chemical dosage and total water quantity, are
calculated daily. Daily operating records reflect chemical dosages and total quantities
used.
MIN | 15pts | TR | TF20 | R309-105-14(3) | R309-105-14(3) requires all water system
using chemical addition or specialized equipment for the treatment of drinking water
shall regularly complete operational reports. For a fluoridation facility that does not
calculate fluoride concentrations, include field and lab fluoride results.
C
870 Fluoride testing instruments are properly verified (zeroed & recorded split samples) or
calibrated
MIN | 15pts | TR | TF21 | R309-525-25(4) | R309-525-25(4) states all instrumentation
needed to verify that treatment processes are sufficient shall be properly calibrated
and maintained.
C
871 Fluoride chemicals are stored in covered or unopened shipping containers inside a
building.
MIN | 15pts | TR | TF06 | R390-535-5(2)(b)(i) | Fluoride chemicals shall be stored in
covered or sealed containers, inside a building, and away from direct sunlight and a
source of heat.
C
872 Fluoride injection point shall not be located upstream of lime-soda softening or ion
exchange softening process.
MIN | 15pts | TR | TF50 | R309-535-5(2)(g)(iii) | Added the following: The fluoride
injection point shall not be located upstream of lime softening, iron exchange, or other
processes that affect the fluoride level.
C
873 Chemicals used for fluoridation meet the NSF/ANSI 60 standard or applicable AWWA
standards
SIG | 25pts | TR | TF04 | R309-535-5(2)(a)(i) | All chemicals used for fluoridation shall
be certified to comply with ANSI/NSF Standard 60. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 140 of 145
874 Electrical outlet and cord/plug for fluoride feed pump is a non-standard receptacle type
without using an adaptor and feed pump is interconnected with a well or a service
pump (to ensure that the fluoride feed pump is turned on only when the well or service
pump is on and water is flowing in the pipe)
SIG | 100pts | TR | TF22 | R309-535-5(2)(f) | Rule requires the electrical outlet used
for fluoride feed pump to have interlock protection by being wired with the well or
service pump, such that the feed pump is only activated when the well or service
pump is on. The rule also prohibits the feed pump from being plugged into a
continuously active ("hot") electrical outlet. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
875 Acid-resistant secondary containment is provided and adequately sized for corrosive
fluoride solutions.
SIG | 25pts | TR | TF26 | R309-535-5(2)(c )(i), (ii) and (iii) | Rule requires secondary
containment: for tanks containing corrosive fluoride solutions, to be sized to contain
the maximum volume of solution handled, and to be designed to be acid resistant.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
876 Vent for the chemical storage, injection and operating areas vents to outside
atmosphere and away from air intakes.
MIN | 15pts | TR | TF24 | R309-535-5(2)(j)(iii) | The fluoride operating area shall be
vented to outside atmosphere and away from air intakes.
C
877 Incompatible chemicals are not stored in fluoride storage or injection areas.
MIN | 15pts | TR | TF28 | R309-535-5(2)(b)(i) - (iv) | Fluoride chemicals shall be stored
in covered or sealed containers, inside a building, away from direct sunlight and a
source of heat, and not be stored with incompatible chemicals. Bags or other
containers for dry materials shall be stored on pallets. Containers for dry materials
shall be kept closed to keep out moisture.
C
878 Has any electrical or SCADA work been done recently that could affect the original
design or fluoride control settings?"... If the answer is yes, answer the next question.
N (Notes: NO)
879 Is fluorosilicic acid used for fluoridation? ... if yes, answer the following questions Y (Notes: 23%)
879A Acid solution tank is mounted on a scale or has other means of measuring the quantity
of fluoride used each day (such as level indicator or loss-of-weight recorder).
SIG | 25pts | TR | TF14 | R309-535-5(2)(d)(ii) | A means shall be provided to measure
the solution level in a tank and the quantity of the chemical used. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
879B Solution tanks for fluorosilicic acid are vented to atmosphere outside the building
(away from air intake).
MIN | 15pts | TR | TF29 | R309-535-5(3)(b)(ii) | Rule requires solution tanks at
fluorosilicic acid installations to vent to the outside, above grade, away from air
intakes, and where least susceptible to contamination.
C
879C Neutralizing chemical is available for immediate use in case of acid spill
SIG | 25pts | TR | TF42 | R309-535-5(3)(e) | A neutralizing chemical shall be available
on site to handle small quantity accidental acid spills. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 141 of 145
TP008 - PLYMOUTH FLUORIDATION -- Fluoridation - Active
879D Deluge shower and eyewash station are provided. The emergency shower and eye
wash station should be located close to, but outside of, the fluorosilicic acid operating
area.
SIG | 25pts | TR | TF15 | R309-535-5(3)(d) | Emergency eyewash stations and
showers shall be provided. This significant deficiency must be corrected within 120
days of notification or have a corrective action plan approved by DDW.
C
879E Appropriate acid-resistant personal protective equipment provided for operators
(including eye or face protection gear for handling acid, acid resistant long rubber
gloves, apron or coverall, and boots)
SIG | 25pts | TR | TF13 | R309-535-5(3)(f), R309-535-5(4)(h), R309-535-5(5)(e) | The
use of personal protective equipment (PPE) is required when handling fluorisilicic acid
and dry chemicals. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
879F If acid bulk storage tank and day tank are present and there is a risk of solution
overflow from the bulk tank to the day tank, each tank is provided with separate vent.
MIN | 15pts | TR | TF31 | R309-535-5(3)(b)(iii) | Rule prohibits a bulk tank from sharing
a vent with a day tank if there is a risk of solution overflow from the bulk tank to the
day tank.
C
879G If there is a transfer pump between the acid bulk storage tank and the day tank, there
is a means to stop the transfer of acid in case of transfer pump failure.
REC | 0pts | TR | TF32 | recommendation | A means to stop the transfer pump will
protect the operator and minimize possible acid spill.
C
879H Emergency shutoff is near the entrance of the fluoride operating area to turn off the
transfer pump or injection pump in case of acid spill
REC | 0pts | TR | TF33 | recommendation | Having an emergency shutoff near the
entrance of the fluoride operating area will better protect the operator and minimize the
need of entering the operating area during acid spill.
C
879I Means provided to handle catastrophic failure of acid bulk storage tank.
REC | 0pts | TR | TF34 | recommendation | Water system should have an operation
plan in place and provide adequate training to the operators for responding to
catastrophic failure of acid bulk storage tank.
C
879J There is a seismic restraint system for the acid bulk storage tank.
REC | 0pts | TR | TF35 | recommendation | The acid bulk storage tank should be
adequately restrained to prevent catastrophic failure in case of seismic event.
C
880 Is a saturator used for fluoridation? ... if yes, answer the following question(s)N (Notes: No)
881 Is fluoride dry feed equipment used?....if yes, answer the following questions N (Notes: No)
882 Appropriate personal protective equipment provided for operators (including NIOSH
approved respirator and chemical/dust-resistant safety goggles for saturators and dry
feeders, acid-resistant gloves, apron or coverall, and boots)
SIG | 25pts | TR | TF13 | R309-535-5(3)(f), R309-535-5(4)(h), R309-535-5(5)(e) | The
use of personal protective equipment (PPE) is required when handling fluorisilicic acid
and dry chemicals. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
883 Is this facility Active or Inactive?A (Notes: Active)
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 142 of 145
884 Background fluoride level before adding fluoride (in ppm):0.3
885 Target dose of fluoride added (in ppm):0.4
886 Typical fluoride level after adding fluoride (in ppm):0.7
887 Sampling location is present for measuring the final fluoride level (if compliant, answer
follow-up question)
MIN | 15pts | TR | TF44 | R309-535-5(2)(d)(iii) | A sampling point shall be provided
downstream of the fluoridation facility for measuring the fluoride level of treated water.
C (Notes: Sample sight down stream of
pump house)
887A Identify the sampling location of the measured final fluoride level:Sample Tap (Notes: Designated Sample
Site)
888 There is a means to measure the flow of water to be treated
SIG | 25pts | TR | TF11 | R309-535-5(2)(d)(i) | A means to measure the flow of treated
water shall be provided. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
889 Fluoride concentrations, including chemical dosage and total water quantity, are
calculated daily. Daily operating records reflect chemical dosages and total quantities
used.
MIN | 15pts | TR | TF20 | R309-105-14(3) | R309-105-14(3) requires all water system
using chemical addition or specialized equipment for the treatment of drinking water
shall regularly complete operational reports. For a fluoridation facility that does not
calculate fluoride concentrations, include field and lab fluoride results.
C
890 Fluoride testing instruments are properly verified (zeroed & recorded split samples) or
calibrated
MIN | 15pts | TR | TF21 | R309-525-25(4) | R309-525-25(4) states all instrumentation
needed to verify that treatment processes are sufficient shall be properly calibrated
and maintained.
C
891 Fluoride chemicals are stored in covered or unopened shipping containers inside a
building.
MIN | 15pts | TR | TF06 | R390-535-5(2)(b)(i) | Fluoride chemicals shall be stored in
covered or sealed containers, inside a building, and away from direct sunlight and a
source of heat.
C
892 Fluoride injection point shall not be located upstream of lime-soda softening or ion
exchange softening process.
MIN | 15pts | TR | TF50 | R309-535-5(2)(g)(iii) | Added the following: The fluoride
injection point shall not be located upstream of lime softening, iron exchange, or other
processes that affect the fluoride level.
C
893 Chemicals used for fluoridation meet the NSF/ANSI 60 standard or applicable AWWA
standards
SIG | 25pts | TR | TF04 | R309-535-5(2)(a)(i) | All chemicals used for fluoridation shall
be certified to comply with ANSI/NSF Standard 60. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 143 of 145
894 Electrical outlet and cord/plug for fluoride feed pump is a non-standard receptacle type
without using an adaptor and feed pump is interconnected with a well or a service
pump (to ensure that the fluoride feed pump is turned on only when the well or service
pump is on and water is flowing in the pipe)
SIG | 100pts | TR | TF22 | R309-535-5(2)(f) | Rule requires the electrical outlet used
for fluoride feed pump to have interlock protection by being wired with the well or
service pump, such that the feed pump is only activated when the well or service
pump is on. The rule also prohibits the feed pump from being plugged into a
continuously active ("hot") electrical outlet. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
895 Acid-resistant secondary containment is provided and adequately sized for corrosive
fluoride solutions.
SIG | 25pts | TR | TF26 | R309-535-5(2)(c )(i), (ii) and (iii) | Rule requires secondary
containment: for tanks containing corrosive fluoride solutions, to be sized to contain
the maximum volume of solution handled, and to be designed to be acid resistant.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
896 Vent for the chemical storage, injection and operating areas vents to outside
atmosphere and away from air intakes.
MIN | 15pts | TR | TF24 | R309-535-5(2)(j)(iii) | The fluoride operating area shall be
vented to outside atmosphere and away from air intakes.
C
897 Incompatible chemicals are not stored in fluoride storage or injection areas.
MIN | 15pts | TR | TF28 | R309-535-5(2)(b)(i) - (iv) | Fluoride chemicals shall be stored
in covered or sealed containers, inside a building, away from direct sunlight and a
source of heat, and not be stored with incompatible chemicals. Bags or other
containers for dry materials shall be stored on pallets. Containers for dry materials
shall be kept closed to keep out moisture.
C
898 Has any electrical or SCADA work been done recently that could affect the original
design or fluoride control settings?"... If the answer is yes, answer the next question.
N
899 Is fluorosilicic acid used for fluoridation? ... if yes, answer the following questions Y
899A Acid solution tank is mounted on a scale or has other means of measuring the quantity
of fluoride used each day (such as level indicator or loss-of-weight recorder).
SIG | 25pts | TR | TF14 | R309-535-5(2)(d)(ii) | A means shall be provided to measure
the solution level in a tank and the quantity of the chemical used. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
899B Solution tanks for fluorosilicic acid are vented to atmosphere outside the building
(away from air intake).
MIN | 15pts | TR | TF29 | R309-535-5(3)(b)(ii) | Rule requires solution tanks at
fluorosilicic acid installations to vent to the outside, above grade, away from air
intakes, and where least susceptible to contamination.
C
899C Neutralizing chemical is available for immediate use in case of acid spill
SIG | 25pts | TR | TF42 | R309-535-5(3)(e) | A neutralizing chemical shall be available
on site to handle small quantity accidental acid spills. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
DEQ | Drinking Water
Run Date: 02/23/2025 14:31:47 | Rating: Approved UTAH18021 TAYLORSVILLE-BENNION ID page 144 of 145
899D Deluge shower and eyewash station are provided. The emergency shower and eye
wash station should be located close to, but outside of, the fluorosilicic acid operating
area.
SIG | 25pts | TR | TF15 | R309-535-5(3)(d) | Emergency eyewash stations and
showers shall be provided. This significant deficiency must be corrected within 120
days of notification or have a corrective action plan approved by DDW.
C
899E Appropriate acid-resistant personal protective equipment provided for operators
(including eye or face protection gear for handling acid, acid resistant long rubber
gloves, apron or coverall, and boots)
SIG | 25pts | TR | TF13 | R309-535-5(3)(f), R309-535-5(4)(h), R309-535-5(5)(e) | The
use of personal protective equipment (PPE) is required when handling fluorisilicic acid
and dry chemicals. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
899F If acid bulk storage tank and day tank are present and there is a risk of solution
overflow from the bulk tank to the day tank, each tank is provided with separate vent.
MIN | 15pts | TR | TF31 | R309-535-5(3)(b)(iii) | Rule prohibits a bulk tank from sharing
a vent with a day tank if there is a risk of solution overflow from the bulk tank to the
day tank.
C
899G If there is a transfer pump between the acid bulk storage tank and the day tank, there
is a means to stop the transfer of acid in case of transfer pump failure.
REC | 0pts | TR | TF32 | recommendation | A means to stop the transfer pump will
protect the operator and minimize possible acid spill.
C
899H Emergency shutoff is near the entrance of the fluoride operating area to turn off the
transfer pump or injection pump in case of acid spill
REC | 0pts | TR | TF33 | recommendation | Having an emergency shutoff near the
entrance of the fluoride operating area will better protect the operator and minimize the
need of entering the operating area during acid spill.
C
899I Means provided to handle catastrophic failure of acid bulk storage tank.
REC | 0pts | TR | TF34 | recommendation | Water system should have an operation
plan in place and provide adequate training to the operators for responding to
catastrophic failure of acid bulk storage tank.
C
899J There is a seismic restraint system for the acid bulk storage tank.
REC | 0pts | TR | TF35 | recommendation | The acid bulk storage tank should be
adequately restrained to prevent catastrophic failure in case of seismic event.
C
900 Is a saturator used for fluoridation? ... if yes, answer the following question(s)N (Notes: No)
901 Is fluoride dry feed equipment used?....if yes, answer the following questions N (Notes: No)
902 Appropriate personal protective equipment provided for operators (including NIOSH
approved respirator and chemical/dust-resistant safety goggles for saturators and dry
feeders, acid-resistant gloves, apron or coverall, and boots)
SIG | 25pts | TR | TF13 | R309-535-5(3)(f), R309-535-5(4)(h), R309-535-5(5)(e) | The
use of personal protective equipment (PPE) is required when handling fluorisilicic acid
and dry chemicals. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
DEQ | Drinking Water