Loading...
HomeMy WebLinkAboutDSHW-2024-008064Deq submit <dwmrcsubmit@utah.gov> Fwd: Clarifications? 1 message Matt Sullivan <msullivan@utah.gov>Wed, Aug 28, 2024 at 9:34 AM To: Deq submit <dwmrcsubmit@utah.gov> Summit County, Three Mile Canyon Landfill, SW205 Updated Permit Application ---------- Forwarded message --------- From: Issa Hamud <issahamud@yahoo.com> Date: Mon, Feb 26, 2024 at 11:06 AM Subject: Re: Clarifications? To: Matt Sullivan <msullivan@utah.gov> Matt, Attached is the updated document. Thank you for the prompt review. Issa Issa A Hamud, P.E. Five Star Engineers LLC corrected-DSHW-2022-026312-Issa-pages 1-103.pdf 23643K 8/29/24, 6:56 PM State of Utah Mail - Fwd: Clarifications? https://mail.google.com/mail/b/AEoRXRS0rrGK4Ed_VWQNFRIRPWI-b5C8UEPsqpP4j7WCnESyCxma/u/0/?ik=adf9d5e615&view=pt&search=all&per…1/1 DSHW-2024-008064 Part II – Three Mile Landfill Permit Application 18 November 2022 Since the application of select waste over the protective layer of soil on the side slopes will take place incrementally as the level of MSW within the cell raises, specific measures will be followed to minimize the potential of liner damage. The following procedure will be followed to ensure protection of the liner over the side slopes:  All Spotters and Equipment Operators involved with the placement of select MSW will have annual training delineating the screening and placement of the select MSW. The annual training documentation will identify the person receiving the training, date of training, and the name of the person providing the training. All training documents will be included in the operation record.  General MSW will be placed in the new lined cells only after the placement of the protective soil has been completed. As the waste is placed, landfill Equipment Operators will spread the select MSW in a layer of approximately 1’-2’ thick. The Equipment Operator will perform the initial screening of the MSW as he/she spreads the MSW into the 1’-2’ thick layer.  A dedicated Spotter will perform the second screening of the MSW for objects capable of causing damage to the liner by penetrating the protective soil layer. All materials with the potential of damaging the liner through the two (2) foot thick soil layer will be removed from the MSW.  Once the MSW has been screened by the Spotter and deemed adequate for use as the select MSW layer, the Landfill Superintendent will be notified.  The Equipment Operator will screen the MSW another time as he/she places the select MSW layer over the two (2) foot thick protective soil layer. The Superintendent will periodically observe the placement of the select MSW layer on the side slopes as a final screening of the select MSW. 3.2.2.2 Development of Cell 2 Construction Cell 2 will be constructed on 2024/2025 and begin accepting waste in 2025. Soil generated from the Cell 2 excavation will be used to construct site access roads and for daily landfill operational cover. Any excess soil will be stockpiled for use as daily, intermediate, or final landfill cover construction in the Phase A Closure area.