Loading...
HomeMy WebLinkAboutDAQ-2025-001215YragflsgsP Hunter Plant 1000 South Highway l0 P.O. Box 569 Castle Dale, UT 84513 January 10,2025 Mr. Bryce Bird, Director Utah Department of Environmental Quality Division of Air Quality 195 North 1950 West P.O. Box 144820 Salt Lake city, uT 84114-4820 RE: Quarterly Compliance Report 40 CFR 63 SubPart UUUUU, Hunter Power Plant (Title V Permit #1500f01004) Dear Mr. Bird: FiB 1 B 2025 The reporting requirements for periodic compliance reports changed beginning on January l, 2024. $63. I 003 I (g) requires MATS affected sources to begin submitting quarterly compliance reports beginning with the first calendar quarter of 2024 using applicable data elements found in Appendix E to Subpart UUWU. Appendix E section 1.0 states that the "applicable data elements in sections 2 through 13 of this appendix must be reported in the quarterly compliance reports required under $63.10031(g), in an .xml format prescribed by the Administrator." The existing Emissions Collection And Monitoring Plan System (ECMPS) 1.0 application was to be upgraded to ECMPS 2.0, a web-based platform and was to include the new quarterly MATS reporting requirements. Because of the uncertainty caused by the delay of ECMPS 2.0 and the lack of a.xml reporting schema provided by EPA for the reporting of MATS data, PacifiCorp contacted EPA Region 8 via telephone on February 29,2024 to ask for guidance. Based on this, and a subsequent discussion on March 4,2024 between PacifiCorp and EPA Region 8 representatives, it was suggested that PacifiCorp continue to submit compliance data in a file format that is most suitable for demonstrating compliance with the MATS rule and applicable elements of appendix E to Subpart UUUUU until further guidance andl/or reporting schema are provided by EPA. PacifiCorp was directed to discuss the reporting format and filetype with Department of Environmental Quality contacts for each affected source and has done so. Please reference PacifiCorp's March 26,2024letter regarding this subject. Until further guidance or reporting schema are provided by EPA, PacifiCorp plans to continue to submit all compliance data required by the MATS rule in accordance with $63.10031(g) beginning with a quarterly compliance report for the first quarter,2024 in .pdf format. PacifiCorp will submit .xml files, where applicable, generated using the Electronic Reporting Tool to ECMPS 1.0, with the report. The Hunter Plant will continue to comply with all MATS related requirements for each of its affected sources. I am authorized to make this submission on behalf of the owners and operators of the aflected source or affected units for which the submission is made. I certifu under penalty of law that I DIVISION OFAIR OUALITY REVIEWED Initials JBR Date 3/3/25 Comp Status Meets File # 10237 Blue 2 all within limits. have personally examined, and am familiar with, the statements and information submitted in this document and all its attachments. Based on my inquiry of those individuals with primary responsibility for obtaining the information, I certift that the statements and information are to the best of my knowledge and belief tnre, accurate, and complete. I am aware that there are significant penalties for submitting false statements and information, or omitting statements and information, including the possibility of fine or imprisonment. Should you have any questions regarding this information, please contact Terry Guthrie, Environmental , Hunter & Huntington Power Plants at (435) 748-6059 or me at (435) 748-621r. Sincerely, ng Director Hunter Power Plants Enclosures: Mercury and Air Toxics Semiannual Compliance Report with attachments A thru C - Unit I Mercury and Air Toxics Semiannual Compliance Report with attachments A thru C - Unit 2 Mercury and Air Toxics Semiannual Compliance Report with attachments A thru C - Unit 3 cc: Eve Paulson - 310 NTO Terry Guthrie - Hunter Power Plant TAH DEPARTMENT OF E NVI RON M E NTAL ! UALITY FEB 1 I 2025 DlVISION OF AIR OUALITY PncIFICoRP Hunter Power Plant MATS Quarterly Compliance Report Unit 1 40 cFR 53.10031(e) October L, 2024 - December 3L, 2024 't' Section I .0 - tlnit I Report Summary Name and address of the affected source Hunter Power Plant, 1000 S. Highway l0 Castle Dale Utah P.O. Box 569 Castle Dale, Utah 84528 Identification of eachhazardous air pollutant monitored at the affected source I. Non-Mercury FIAPS metals using a quarterly filterable particulate matter (PM) stack test as a surrogate to demonstrate compliance. On April 6,2018 the Utah Department of Environmental Quality - Division of Air Quality agreed that the Hunter Plant Unit I met the requirements to qualifr as a low emitting EGU (LEE) unit. The Hunter Plant submitted a summary table showing three years of quarterly test data. Each particulate matter (PM) testing result was below one-half of the 0.030 lb/MMBtu limit or 0.015 lb/IVIMBtu as required by the subpart. II. Acid gases using sulfur dioxide (SOz) as a surrogate to demonsfate compliance by an SOz continuous emissions monitoring system (CEMS). UI. Mercury (Hg), compliance demonstrated by an annual EPA Method 30B sorbent trap test to re-confirm LEE status. A brief desciiption of the process unit Hunter Unit I is an Electric Utility Steam Generating Unit, designed as a dry bottom tangentially-fi red boiler, designed by Combustion Engineering.i. Rated Heat Input Capacity of 4,750 MMBtu/hr. ii. The unit is equipped with the following add-on controls: l. Pulse Jet Fabric Filter (baghouse) 2. Wet Lime Flue Gas Desulfurization (wet scrubber) 3. Low-NOx burner technolory, with closed-coupled over-fire air iii. Fuels used are sub-bituminous coal using #2 fuel oil for startup fuel when needed. Unit Category i. Unit I is an existing coal-fired unit combusting non-low rank virgin coal demonstrating compliance with the emission limits found in Table 2 to Subpart UUWU of Part 63 The emission and operating parameter limitationsi. Filterable PM quarterly stack testing demonstrating compliance with a 0.030 lbA,IMBtu emission limit. The unit has demonstrated and achieved low emitting EGU (LEE) status. I. II. III. ii. SOz CEMS as a surrogate for acid gases reporting hourly averages in units of lb/It4MBtu demonstrating compliance with a 30 boiler-operating-day average limit of 0.20 lb/I\4MBtu. iii. Hg annual EPA Method 30B sorbent ffap test reporting hourly averages in units of Ib/TBtu demonstrating compliance with a 30 boiler-operating-day average of 1.2 lb/TBtu. A description of any changes in CMS, processes, or controls since the last reporting period No changes occurred during the reporting period that would affect compliance to MATS. Recent performance test results Table l-2: Unit I Mercury LEE Test Results Summara Table 1-1: Unit I Filterable Particulate Matter LEE Test Results Summary Test ID Test Date Average PM rate (lb/mmBtu) MATS PM Limit* Average PM (tb/1vIW-hr) MATS PM Limit* Unit Status 2024 0211412024 0.003 0.030 0.03 0.30 LEE Achieved in 201 8. Maintained with 211412024 LEE test *Low Emitter Limits are 0.015 IbA,IM-BTU and 0.15 lbs/]vIW-HR Test ID Test Date Hg rate (lb/TBtu) MATS Hg Threshold Unit Status 2024 1U1712024 0.01 0.12 LEE Achieved. Maintained with 1l/1712024 LEE test Section 2.0 - unit I MATS Compliance Report Root Data Elements Table 2-1: Root Data Elements 2.1 Facilitv ORIS Code 6165 2.2 Facilitv Name Hunter 2.3 Facility Registry Identifier (OzuSPL)8069 2.4 Title 40 Part 63 2.5 Applicable Subpart UUUW 2.6 Calendar Year 2024 2.7 Calendar Quarter 4th Ouarter 2.8 Submission Comment (optional)See cover letter Section 3.0 - Unit I Performance Stack Test Summary For applicable elements of Appendix E Section 3.1-3.14, see stack testing reports submitted for the quarter. Stack testing data is being provided in both .xml and .pdf formats. Section 4.0 - Operating Limit Data (PM, CPMS, only) No PM CPMS on unit. Section not applicable. Section 5.0 - Unit I Performance Test Run Data For applicable elements of Appendix E Section 5.1-5.8, see stack testing reports submitted for the quarter. Stack testing data is being provided in both .xml and .pdf formats. Section 6.0 - Unit I Conversion Parameters For applicable elements of Appendix E Section 6.1-6.3, see stack testing reports submitted for the quarter. Stack testing data is being provided in both .xml and .pdf formats. Section 7.0 - Unit I Quality Assurance Parameters For applicable elements of Appendix E Section 7.1-7.3, see stack testing reports submitted for the quarter. Stack testing data is being provided in both .xmland .pdf formats. Section 8.0 - Averaging Group Unit is not part of an averaging group. Section 9.0 - Unit I Compliance Averages Please see Attachment A-1 which includes 30-boiler-operating-day average data for sulfur dioxide. Section 10.0 - Unit I Information Section I 1.0 - Unit I Fuel Usage Information Table 11-l Quarterly Fuel Usage Information 4 Table lG'l: Unit Information Section Data Element Plant Data l0.l Unit ID;Unit I 10.2 Date of Last Tune-up; and Burner Tin Inspection June 6. 2024: March 20. 2024 10.3 Emergency Bypass Information.No emersencv bvoass occurred durine ouarter Month #2 FuelOil Burned (gallons)Sub-Bituminous Coal Burned (tons) October 1,244 79,593 November 0 80,041 December 1,806 78,791 Total 3,050 238,425 Note: No new fuel types were combusted during the reporting period. Section 12.0 and 13.0 - Unit I Malfunction, Deviations, and Monitoring Downtime Information Table l2-l Monitoring Equipment Manufacturer and Model number Pollutant Manufacturer Model Number Sulfur Dioxide Thermo 43iQ Carbon Dioxide (COz)t Thermo 4rOiQ Table 12-2: Most Recent CMS Certilication or Audit UI CEMS Analyzer Latest RATA Date Latest Linearity Date Carbon Dioxide (COz)10115/2024 t0122/2024 Sulfur Dioxide (SOz)t0/15t2024 10122t2024 Table l2-3: Unit Operating Time During the Reporting Period Ul Operating Period llours of Unit Operation 4b Quarter,2024 2,208 Table 12-4: Excess Emission Summaly I The COz analyzer is used as a diluent for calculating heat input-based emission limits 5 Ul Excess Emissions Summara PM SOz Hg Total Hours of Exceedance 0 0 0 Exceedance percent of total operating hours 0.0 0.0%0.0 Hours during startup and shutdown 0 0 0 Hours during control equipment problems 0 0 0 Hours during process hours 0 0 0 Hours during other know problems 0 0 0 Hours during unknown causes 0 0 0 Emission Limit 0.030 0.20 t.2 Em ssion Limitation Unit lb/lvlMBtu lb/lvlMBtu LblTBtu Em ission lim itation averaging period Quarterly Stack Testing 30 boiler operating-day 30 boiler operating-day Table 12-5: CMS performance summary Uf CMS Performance Summaly SOz Downtime percent of total operating hours 0.09 % Total hour of CMS downtime r.98 Hours due to monitoring equipment malfunctions 0 Hours due to non-monitoring equipment malfunctions 0 Hours due to quality assurance/quality control calibrations 0 Hours due to other known causes 1.98 Hours due to other unknown causes 0 For applicable elements of Appendix E Sections 12.1-12.3 and l3.l-13.5, see Attachments B and C. No deviations from rule requirements occurred other than those stated on this report and attachments. Sections 14.0 through 30.0 - Reference Method Data For applicable elements of Appendix E Sections 14-30, see stack testing repofts submitted for the quarter. Stack testing data is being provided in both .xml and .pdf formats. Section 3l .0 - Other Information for Each Test or Test Series In accordance with section 3l.0 and to provide reporting transparency, all stack testing data relevant to compliance with Subpart UUWU of Part 63 is being submitted in pdf format with this quarterly compliance report. Report Certification of the report: 6v*r*Responsible Official Managing Director - Hunter Power Plant Attachments: Attachment A: MATS 30-Day Rolling SOz lb/lvlMBtu Average Data Attaphment B: SOz Monitor Downtime Events Report Attachment C: Excess Emissions Report Attachment A MATS 30-Day Rotting SO2 tb/MMBtu Average Data Value = Offline Data Valuea = Average represents a building 30D Average Value = Exceedance Report Generated: 02/tO/25 09:28 MATS 30 Day Rolling Average Plant: HUNTER PI-ANT Repoft Period: 1010U2024 Through LZ|3U2024 Source: UNIT1 Parameter: SO2RMATS Report Version 5.2 HTRDAHS04\\reportus€r Date 1-Day Avg 3O-Day Avg Total OperaUng Valid Operating Hours Invalid Operating Monitor Availability 1011t2024 0.075 0.076 720 716 4 s9.4% 10t2t2024 0.076 0.076 720 716 4 99.40/o 10t3t2024 0.072 0.076 720 7',t6 4 99.4% 10t4t2024 0.061 0.075 720 716 4 99.4o/o 10t5t2024 0.08 0.075 720 7'.t6 4 99.4% 10t6t2024 0.o77 0.075 720 716 4 99.40 10t712024 0.0s1 0.076 720 7',t6 4 99.40/o 101812024 0.08 0.076 720 716 4 99.4% 1019t2024 0.08 0.076 720 716 4 99.4o/o 10110t2024 0.08 0.076 720 716 4 99.4Vo 10t11t2024 0.074 0.076 720 716 4 99.4Yo 10t142024 0.081 0.077 720 716 4 99.4Yo 10t13t2024 0.08 0.077 720 716 4 99.4o/o 10t14t2024 0.075 o.o77 720 714 6 99.2o/o 10t15t2024 0.076 0.077 720 714 6 99.2o/o 10t't6t2024 0.08 0.077 720 7',t4 6 99.2% 10t17t2024 0.08 0.077 720 717 3 99.6% 't0t18t2024 0.075 0.078 720 718 2 99.7Yo 10t19t2024 0.079 0.078 720 714 2 99.70/ 10120t2024 0.074 0.078 720 7',18 2 99.7o/o 10t21t2024 0.076 0.078 720 7',tB 2 99.7o/. 10t22t2024 0.082 0.078 720 718 2 99.7% 10t23t2024 0.076 0.078 720 718 2 99.7o/o 10t24t2024 0.078 0.078 720 718 2 99.7% 10t25t2024 0.076 0.077 720 718 2 99.7o/o 10t26t2024 0.076 0.077 720 7 I 2 99.7o/o 10127t2024 0.077 o.o77 720 7 8 2 99.7o/o 10t28t2024 0.07 o.077 720 7 I 2 99.lYo 10t29t2024 0.076 o.o77 720 7 8 2 99.7% 10130t2024 0.079 o.077 720 718 2 99.7o/o 10131t2024 0.076 o.077 720 718 2 99.7o/o 11t1t2024 0.073 o.077 720 718 2 99.7o/o 1 t2t2024 0.081 0.077 720 718 2 99.7o/o ,|t3t2024 0.067 0.078 720 718 2 99.7o/o 1 t4t2024 0.069 0.077 720 718 2 99.7% 1 t5t2024 0.068 0.077 720 7',tg 2 99.70/ 1 t6t2024 0.067 0.076 720 7',tg 2 99.7% 1 1712024 o.o77 0.076 720 718 2 99.7% 1 t8t2024 0.078 0.076 720 718 2 99.7o/o 1 1912024 0.078 0.076 720 718 2 99.7o/o Value = Offline Data valuer = Averate represents a building 30D Average Value = Exceedance Report Generate d: 02 / LO / 25 09 :28 MATS 30 Day Rolling Average P|ant: HUNTER PLANT Repoft Period: LO|0U2024 Throuqh LZl3t/2024 Source: UNIT1 Parameter: SO2RMATS Report Version 5.2 HTRDAHS04\\reportuser 11t10t2024 0.075 0.076 720 718 2 99.70/o 1"U1112024 0.082 0.076 720 718 2 99.70/ 11t12t2024 0.08 0.076 720 7',18 2 99.7o/o 11113t2024 0.077 0.076 720 720 0 100.0% 1111412024 0.07 0.076 720 720 0 't00.0% 11t15t2024 0.o77 0.076 720 720 0 100.0% '11t16t2024 0.076 0.076 720 720 0 100.0% 11117t2024 0.078 0.076 720 720 0 't00.0% 1111812024 0.077 0.076 720 720 0 1OO.Oo/. 11t19t2024 0.079 0.076 720 720 0 100.0% 1112012024 0.08 0.076 720 720 0 100.0% 11t2112024 0.083 0.076 720 720 0 100.0% 1',U2212024 0.084 0.076 720 720 0 100.0% 11t23t2024 0.o77 0.076 720 720 0 100.0% 11t24t2024 0.085 0.076 720 720 0 100.0% 1112512024 0.067 0.076 720 720 0 100.0% 11t26t2024 o.o74 0.076 720 720 0 100.0% 11t27t2024 0.071 0.076 720 720 0 100.0% 1112812024 0_067 0.076 720 720 0 100.0% 11t29t2024 0.o77 0.076 720 720 0 100.0% 11130t2024 0.076 0.076 720 720 0 100.0% 1211t2024 0.072 0.076 720 720 0 100.0% 121212024 0.065 0.075 720 720 0 100.0% 12t312024 0.079 0.075 720 720 0 100.0% 12t4t2024 0.082 0.076 720 720 0 100.0% 12t5t2024 0.082 0.076 720 720 0 100.0% 121612024 0.082 o.o77 720 720 0 100.0% 12t7t2024 0.078 0.077 720 720 0 100.0% 12t812024 0.079 0.077 720 720 0 100.0% 121912024 0.083 0.077 720 720 0 100.0% 12t10t2024 0.083 o.077 720 720 0 100.0% 12t11t2024 0.083 o.o77 720 720 0 100.0% 12t12t2024 0.082 0.078 720 720 0 100.0% 12t13t2024 0.075 o.o77 720 720 0 100.0% 12t14t2024 0.078 0.078 720 720 0 '100.0% 1211512024 0.083 0.078 720 720 0 100.0% 12t16t2024 0.08 0.078 720 720 0 100.0% 12t17t2024 0.o74 0.078 720 720 0 100.0% 12t18t2024 0.07 0.078 720 720 0 100.0% 12119t2024 0.072 0.077 720 720 0 100.0% 12t20t2024 0.065 o.o77 720 720 0 100.07o 12t21t2024 0.074 o.077 720 720 0 100.0% MATS 30 Day Rolling Average Plant: HUNTER PIANT Repoft Period: L010U2024 Throuqh LZl3Ll2024 Source: UNIT1 Parameter: SO2RMATS Value = Offline Data value' = Average represents a buildint 30D Averate Value = Exceedance Report Version 5.2 Report Generate d: O2ltO/25 O9:28 HTRDAHSO4\\reportuser 12t242024 0.081 0.077 720 720 0 100.0% 12123t2024 0.067 0.076 720 720 0 100.0o/o 12124t2024 0.078 0.076 720 720 0 100.070 1212512024 o.077 0.076 720 720 0 1OO-Oo/o 1212612024 0.075 0.076 720 720 0 100.0% 12t2712024 o.074 0.076 720 720 0 100.0% 1A242024 0.062 0.076 720 720 0 '100.00/o 12t2912024 0.075 0.076 720 720 0 100.0% 1213012024 0.081 0.076 720 720 0 100.0% 12131t2024 0.081 0.077 720 720 0 100.00/o Attachment B SO, Monitor Downtime Events Report Downtime Events - Duration Plant: HUNTER PLANT Report Period: 1010112024 00:00 Through 1213112024 23:59 Time Online Criteria: 1 minute(s) Source: Pararneter: lnterval: UNITl SO2RMATS 001H lncident lD Start Date/Time End Date/Time Duration (dd:hh:mm) Reason Code - Desaipflon Action Code - Descrlptlon 10t't412024'17:00 1O11412024 18:59 0d-2h-0m 00 00 - Default - (default) NumberofEventc: 1 Total Duratlon: 0d - 2h - 0m ' lndicates duration incident could have additional data prior to the start dato or following the end date. Report Generated:02110125 09:45 Report Version 4.0 HTRDAHS04\reportuser Attachment C Excess Emissions Report Attachment C Unit I Excess Emissions Report PM Excess Emissions 0.030 lbA,IMBtu (Quarterly Stack Testing) Total time for all excess emissions 0.0 hours Total time for excess emissions occurring during startup/shutdown or malfunction 0.0 hours Malfunction reason and corrective /preventive action taken) No PM Excess Emissions occurred during the reporting period No PM Malfunction occurred during the reporting period SOz Excess Emissions 0.20 lbA{MBtu (30 Boiler Operating Day Average) Total time for all excess emissions !Q hours Total time for excess emissions occurring during startup/shutdown or malfunction 0.0 hours Malfunction reason and corrective /preventive action taken) No SOz Excess Emissions occurred during the reporting period SOz monitor equipment malfunctions noted in Attachment B. Excess Emission Incident Number Magnitude of Excess Emissions lb/MMBtu Date Time Beginning Time Ending Hours Involved Malfunction YAI Cause Corrective Action Excess Emission Incident Number Magnitude of Excess Emissions lb/MMBtu Date Time Beginning Time Ending Hours Involved Malfunction Y/N Cause Corrective Action Hg Excess Emissions 1.2 lb/TBtu (30 Boiler Operating Day Average) Total time for all excess emissions QQ hours Total time for excess emissions occurring during startup/shutdown or malfunction 0.0 hours Malfunction reason and corrective /preventive action taken) No Hg Excess Emissions occurred during the reporting period Hg monitor equipment malfunctions noted in Attachment B. Excess Emission Incident Number Magnitude of Excess Emissions lb/tIMBtu Date Time Beginning Time Ending Hours Involved Malfunction YA{Cause Corrective Action TTAx DTPARTMENT oF ENy!reIM-ENTAL ouAqY FEB 1 I 2025 DIVISION OF AIR OUALITY l?ncrFtCoRP Hunter Power Plant MATS Quarterly Compliance Report Unit 2 40 CFR 63.10031(e) October t,2024 - December 3L,2O24 Section I .0 - Unit 2 Report Summary Name and address of the affbcted source Hunter Power Plant, 1000 S. Highway 10 Castle Dale Utah P.O. Box 569 Castle Dale, Utah 84528 Identification of each hazardous air pollutant monitored at the affected source I. Non-Mercury HAPS metals using a quarterly filterable particulate matter (PM) stack test as a surrogate to demonstrate compliance. On June 6, 2018 the Utah Department of Environmental Quality - Division of Air Quality agreed that the Hunter Plant Unit 2 met the requirements to quali$ as a low emitting EGU (LEE) unit. The Hunter Plant submitted a summary table showing three years of quarterly test data. Each particulate matter (PM) testing result was below one-half of the 0.030 lb/MMBtu limit or 0.015 lb/IvIMBtu as required by the subpart. II. Acid gases using sulfur dioxide (SOz) as a surrogate to demonstrate compliance by an SOz continuous emissions monitoring system (CEMS). III. Mercury (Hg), compliance demonstrated by an annual EPA Method 30B sorbent trap test to re-confirm LEE status. A brief description of the process unit Hunter Unit 2 is an Electric Utility Steam Generating Unit, designed as a dry bottom tangentially-fired boiler, designed by Combustion Engineering and Wilcox. i. Rated Heat Input Capacity of 4,750 MMBtu/hr. ii. The unit is equipped with the following add-on controls: 1. Pulse Jet Fabric Filter (baghouse) 2. Wet Lime Glue Gas Desulfurization (wet scrubber) 3. Low-NOx burner technology, with separated over-fire air iii. Fuels used are sub-bituminous coal using #2 fuel oil for startup fuel when needed. Unit Category i. Unit 2 is an existing coal-fired unit combusting non-low rank virgin coal demonstrating compliance with the emission limits found in Table 2 to Subpart UUUUU of Part 63 The emission and operating parameter limitationsi. Filterable PM quarterly stack testing demonstrating compliance with a 0.030 lb/IvIMBtu emission limit. The unit has demonstrated and achieved low emitting EGU (LEE) status. I. II. III. SOz CEMS as a surrogate for acid gases reporting hourly averages in units of lb/IvIMBtu demonstrating compliance with a 30 boiler-operating-day average limit of 0.20lba4MBtu. Hg annual EPA Method 30B sorbent trap test reporting hourly averages in units of lb/TBtu demonstrating compliance with a 30 boiler-operating-day average of 1.2 lb/TBtu. A description of any changes in CMS, processes, or controls since the last reporting period No changes occurred during the reporting period that would affect compliance to MATS. Recent perforrnance test results il. Iil. Table 1-1: Unit 2 Filterable Particulate Matter LEE Test Results Summary Test ID Test Date Average PM rate (lb/mmBtu) MATS PM Limit* Average PM (b/lvlW-hr) MATS PM Limit* Unit Status 2024 02t13t2024 0.00s 0.030 0.05 0.30 LEE Achieved in 201 8. Maintained with 2113/2024 LEE test *[,ow Emitter Limits are 0.015 IbA4M-BTU and 0.15 lbs/l\'IW-HR Table l-2: Unit 2 Mercury LEE Test Results Sum nlt712024 LEE Achieved. Maintained with 1112912023 LEE test Section 2.0 - Unit 2 MATS Compliance Report Root Data Elements Table 2-l: Root Data Elements 2.1 Faciliry oRIS Code 6165 2.2 Faciliry Name Hunter 2.3 Facili8 Reeistrv Identifier (ORISPL)8069 2.4 Title 40 Part 63 2.5 Aoolicable Suboart TruUUU 2.6 Calendar Year 2024 2.7 Calendar Ouarter 4s Ouarter 2.8 Submission Comment (ootional)See cover letter Section 3.0 - Unit 2 Performance Stack Test Summary For applicable elements of Appendix E Section 3.1-3.14, see stack testing reports submitted for the quarter. Stack testing data is being provided in both .xml and .pdf formats. Section 4.0 - Operating Limit Data (PM, CPMS, only) No PM CPMS on unit. Section not applicable. Section 5.0 - Unit 2 Performance Test Run Data For applicable elements of Appendix E Section 5. I -5.8, see stack testing reports submitted for the quarter. Stack testing data is being provided in both .xml and .pdf formats. Section 6.0 - Unit 2 Conversion Parameters For applicable elements of Appendix E Section 6.1-6.3, see stack testing reports submitted for the quarter. Stack testing data is being provided in both .xml and .pdf formats. Section 7 .0 - Unit 2 Quality Assurance Parameters For applicable elements of Appendix E Section 7.1-7.3, see stack testing reports submitted for the quarter. Stack testing data is being provided in both .xml and .pdf formats. Section 8.0 - Averaging Group Unit is not part of an averaging group. Section 9.0 - Unit 2 Compliance Averages Please see Attachment A-l which includes 30-boiler-operating-day average data for sulfur dioxide. Section 10.0 - Unit 2 Information Section I 1.0 - Unit 2 Fuel Usage Information Table 11- Table 10-l: Unit Information Section Data Element Plant Data l0.l Unit ID Unit 2 t0.2 Date of Last Tune-up; Burner Insoection Mav 26. 2023 : March I 0. 2023 10.3 Emergency Bypass Information.No emergencv bvoass occurred durins ouarter 1 Fuel Information Month #2 Fuel Oil Burned (gallons)Sub-'Bituminous Coal Burned (tons) October 1,759 76,854 November 6,880 75,244 December 9,559 69,820 Total 18,198 221,918 Note: No new fuel types were combusted during the reporting period. Section 12.0 and 13.0 - tJnit 2 Malfunction, Deviations, and Monitoring Downtime Information Table l2-1 Monitoring Equipment Manufacturer and Model number Pollutant Manufacturer Model Number Sulfur Dioxide Thermo 43iQ Carbon Dioxide (COz)'Thermo 41OiQ Table l2-2: Most Recent CMS Certification or Audit U2 CEMS Analyzer Latest RATA Date Latest Linearity Date Carbon Dioxide (COz)t0/1612024 t0/22/2024 Sulfur Dioxide (SOz)t0/1612024 10/22t2024 Table l2-3: Unit Operating Time During the Reporting Period U2 Operating Period Hours of Unit Operation 3'd Quarter,2024 2,1 90 Table 12-4: Excess Emission Summary I The COz analyzer is used as a diluent for calculating heat input based emission limits 5 U2 Excess Emissions Summary PM SOz Irg Total Hours of Exceedance 0 0 0 Exceedance percent of total operating hours 0.0 0.0%0.0 Hours during startup and shutdown 0 0 0 Hours during control equipment problems 0 0 0 Hours during process hours 0 0 0 Hours during other know problems 0 0 0 Hours during unknown causes 0 0 0 Emission Limit 0.030 0.20 1.2 Emission Limitation Unit lb/I4MBtu lb/TvIMBtu LblTBtu Emission limitation averaging period Quarterly Stack Testing 30 boiler operating-day 30 boiler operating-day Table 12-5: CMS performance summa U2 CMS Performance Summary SOz Downtime percent of total operating hours 0.27 Yo Totalhour of CMS downtime 5.9 Hours due to monitoring equipment malfunctions J Hours due to non-monitoring equipment malfunctions 0 Hours due to quality assurance/quality control calibrations 2.9 Hours due to other known causes 0 Hours due to other unknown causes 0 For applicable elements of Appendix E Sections l2.l-12.3 and 13.1-13.5, see Attachments B and C. No deviations from rule requirements occurred other than those stated on this report and attachments. Sections 14.0 through 30.0 - Reference Method Data For applicable elements of Appendix E Sections 14-30, see stack testing reports submitted for the quarter. Stack testing data is being provided in both .xml and .pdf formats. Section 3l .0 - Other Information for Each Test or Test Series In accordance with section 31.0 and to provide reporting transparency, all stack testing data relevant to compliance with Subpart UUUUU of Part 63 is being submitted in pdf format with this quarterly compliance report. Responsible Official Managing Director - Hunter Power Plant Report Certification uracy ofthe report: Date: February 10.2024 r,l \', i C, --' ' .-: Aftachments: Attachment A: MATS 30-Day Rolling SOz lb/IvIMBtu Average Data Attachment B: SOz Monitor Downtime Events Report Attachment C: Excess Emissions Report Attachment A MATS 30-Day Rotting SO2 tb/MMBtu Average Data MATS 30 Day Rolling Average Plant: HUNTER PI-ANT Repoft Period: L010t12024 Throush L213L12024 Source: UNIT2 Parameter: SO2RMATS Date l-Day Avg 3O-Day Avg Total OperaUng Valid Operating Houls Invalad Operating Monator Availability 10t112024 0.068 o.074 720 718 2 99.7o/o 10t2t2024 0.064 0.073 720 7',tg 2 99.7o/" 10t312024 0.069 0.073 720 7',tg 2 99.7o/o 10t412024 0.065 0.072 720 718 2 99.7Yo 10tst2024 o.o74 o.o72 720 718 2 99.7o/o 10t6t2024 0.072 o.072 720 718 2 99.7o/o 10t712024 0.077 o.o72 720 7'.t8 2 99-7o/" 10t812024 o.077 0.072 720 718 2 99.7% 101912024 0.078 0.072 720 718 2 99.7o/o 10t10t2024 0.08 0.073 720 718 2 99.7o/o 10t't1t2024 0.073 0.072 720 718 2 99.7o/o 10t12t2024 0.079 0.073 720 7',tB 2 99.7o/" 10t13t2024 0.078 0.072 720 7'.tg 2 99.7o/o 10t14t2024 0.076 0.073 720 7't8 2 99.7Yo 1011512024 0_067 0.072 720 718 2 99.70h 10t16t2024 0.076 0.072 720 718 2 99.7o/o 10117t2024 0.078 o.o72 720 718 2 99.7o/o 10t18t2024 0.067 0.072 720 720 0 100.0% 't011912024 0.078 0.073 720 720 0 100.0% 10t20t2024 0.071 0.073 720 720 0 100.0% 10t21t2024 0.073 0.073 720 720 0 '100.0% 10t22t2024 0.104 o.074 720 7',tg 1 99.9olo 10t23t2024 0.076 0.074 720 719 1 99.9olo 10t24t2024 o.o77 0.075 720 7',19 1 99.9% 1012512024 0.073 0.075 720 719 1 99.9% 10t26t2024 0.07 0.074 720 719 I 99.9% 10127t2024 0.075 0.074 720 719 1 99.9olo 10128t2024 0.075 o.o74 720 719 I 99.9% 10t29t2024 0.076 0.074 720 719 1 99.9% 10130t2024 0.075 0.075 720 719 1 99.9% 10t31t2024 o.074 0.075 720 719 1 99.9% 11t1t2024 o.o74 0.075 720 719 1 99.9olo 11t2t2024 0.079 0.076 720 719 1 99.9% 11t312024 0.079 0.076 720 719 1 99.9% 11t412024 0.077 0.076 720 719 1 99.9% 11t5t2024 0.081 o.o77 720 7',19 1 99.9% 11t6t2024 0.072 0.076 720 7'.tg 1 99.9% 111712024 0.073 0.076 720 719 1 99.9olo 11t$t2024 0.079 0.076 720 719 1 99.9% 11t9t2024 0.079 0.076 720 719 1 99.9% Value = Offline Data Valuer = Average represents a building 30D Average Value = Exceedance Report Version 5.2 Report Generate d: O2/tO/25 O9:3O HTRDAHS04\\reportuser Value = Offline Data valuer = Average represents a building 30D Average Value = Exceedance Report Generated: 02/lO/25 09:3O MATS 30 Day Rolling Average Plant: HUNTER PI-ANT Report Period: t010112024 Throush l2l3Ll?024 Source: UNIT2 Parameter: SO2RMATS Report Version 5.2 HTRDAHS04\\reportusel 1111012024 o.o72 o.076 720 719 1 99.9% 11t11t2024 0.081 0.076 720 719 I 99.9% 11t12t2024 o.o72 0.076 720 719 1 99.9% 1111312024 0.079 0.076 720 719 1 99.9% 1111412024 0.062 0.076 720 719 1 99.9olo 11115t2024 0.061 0.075 720 719 1 99.9% 11t16t2024 0.062 0.075 720 7',tg 1 99.9% 1111712024 0.081 0.075 720 719 1 99.9% 1111812024 0.082 0.075 720 719 1 99.9% 11119t2024 0.079 0.076 720 719 1 99.9olo 11t2012024 0.o77 0_076 720 719 'l 99.9% 11t21t2024 0.086 0.075 720 720 0 't00.0% 11t22t2024 0.088 0.076 720 720 0 100.0% 11t23t2024 0.079 0.076 720 720 0 100,0% 11124t2024 0.086 0.076 720 720 0 100.0% 11t25t2024 0.068 0.076 720 720 0 100.0% 11t2612024 0.078 0.076 720 720 0 100.0% 1',U27t2024 o.o74 0.076 720 720 0 100.0olo 11t2812024 0.069 o.076 720 720 0 100.0% 1',U29t2024 0.076 0.076 720 720 0 100.0% 1',U30t2024 0.075 0.076 720 720 0 100.0% 12t1t2024 0.081 0.076 720 720 0 100.0% 12t2t2024 0.075 0.076 720 720 0 1O0.0o/o 12t312024 0.079 0.076 720 720 0 100.0% 12t412024 0.075 0.076 706 706 0 't00.0% 12,5t2024 0.073 0.076 695 695 0 100.0% 1216t2024 0.076 0.076 695 695 0 100.0% 12t7t2024 0.08 0.076 695 69s 0 't00.0% 12t8t2024 0.08 0.076 695 695 0 '100.0% 12t9t2024 0.08 0.076 695 695 0 100.0% 1211012024 0.076 0.076 695 695 0 100.0% 12t11t2024 0.078 0.076 695 695 0 100.0% 1211212024 0.083 o.o77 695 692 3 99.6olo 1211312024 0.079 0.077 695 692 3 99.6% 1211412024 0.08 o.077 695 692 3 99.6% 12t15t2024 0.083 0.078 695 692 3 99.6% 1211612024 0.081 0.079 695 692 3 99.6% 1211712024 0.079 0.079 695 691 4 99.40/ 12t18t2024 0.075 0.078 695 690 5 99.3% 12t19t2024 0.074 0.078 695 690 5 99.3% 12t20t2024 0.076 0.078 695 690 5 99.3% 12t21t2024 0.069 0.078 695 690 5 99.3% Value = Offline Data valuer = Average represents a bulldint 30D Average Value = Exceedance Report Generated: 02/LO/25 09:3O MATS 30 Day Rolling Average Plant: HUNTER PLANT Report Period: L010t12024 Throuqh 1213U2024 Source: UNIT2 Parameter: SO2RMATS Report Version 5.2 HTRDAHS04\\reportuser 1222t2024 0.083 0.077 695 690 5 99.3% 1212312024 0.079 o.077 695 690 5 99.37o 't2t24t2024 0.081 0.077 695 690 5 99.3% 12t25t2024 0.073 o.o77 695 690 5 99.3% 1212612024 0.079 0.o77 695 690 5 99.3% 12t27t2024 0.078 0.078 695 690 5 99.3% 12t28t2024 0.072 0.078 695 690 5 99.30/o 12129t2024 0.083 0.078 695 690 5 99.3% 143U2024 0.081 0.078 695 690 5 99.3% 12t3112024 0.079 0.078 695 690 5 99.3% Attachment B SO, Monitor Downtime Events Report Downtime Events - Duration Plant: HUNTER PLANT Report Period: 101012024 00:00 Through 1213'112024 23:59 Time Online Criteria: 1 minute(s) Source: UNIT2 Parameter: SO2RMATS lnterva!: 001H lncident lD Slart Date/Time End Date/Time Duration (dd:hh:mm) Reason Code - Description Action Code - Description 3 4 1012212024 O8:0O 1012212024 O8:59 0d - th - 0m 00 - Default 00 - (defauft) 1211212024 04:3,0 '1211212024 M:59 0d - th - 0m 00 - Default 00 - (default) 12t12t2024 15:'00 '1211212024 15:59 0d - th - 0m 00 - Default 00 - (default) 121212024 21:00 12i'1212O24 21:59 0d - th - 0m 00 - Defautt 00 - (default) 121712024 13:00 1211712024 13:59 0d - th - 0m 00 - Default 00 - (default) 1211812024 11:00 1211812024 '11:59 0d - th - 0m 00 - Default 00 - (default) NumberofEvents: 6 Totrl Duration: 0d - 6h - 0m ' lndicates duration incident could have additional data prior to the start date or following the end date. Report Generate d: 021 1 0 125 09:46 Report Version 4.0 HTRDAHS04\reporluser 1ot1 Attachment C Excess Emissions Report Attachment C Unit 2 Excess Emissions Report PM Excess Emissions 0.030 lbA4MBtu (Quarterly Stack Testing) Total time for all excess emissions 0.0 hours Total time for excess emissions occurring during startup/shutdown or malfunction 0.0 hours Malfunction reason and corrective /preventive action taken) No PM Excess Emissions occurred during the reporting period No PM Malfunction occurred during the reporting period SOz Excess Emissions 0.20 lbA{MBtu (30 Boiler Operating Day Average) Total time for all excess emissions QQ hours Total time for excess emissions occurring during startup/shutdown or malfunction 0.0 hours Malfunction reason and corrective /preventive action taken) No SOz Excess Emissions occurred during the reporting period SOz monitor equipment malfunctions noted in Attachment B. Excess Emission Incident Number Magnitude of Excess Emissions Ib/MMBtu Date Time Beginning Time Ending Hours Involved Malfunction Y/N Cause Corrective Action Excess Emission Incident Number Magnitude of Excess Emissions lb/MMBtu Date Time Beginning Time Ending Hours Involved Malfunction Y/N Cause Corrective Action I{g Excess Emissions 1.2 lb/TBtu (30 Boiler Operating Day Average) Total time for all excess emissions QQ hours Total time for excess emissions occurring during startup/shutdown or malfunction 0.0 hours Malfunction reason and corrective /preventive action taken) No Hg Excess Emissions occurred during the reporting period Hg monitor equipment malfunctions noted in Attachment B. Excess Emission Incident Number Magnitude of Excess Emissions lb/IlIMBtu Date Time Beginning Time Ending Hours Involved Malfunction YiN Cause Corrective Action NI\i ISION OF AIR OUALITY PncIFIEORP Hunter Power Plant MATS Quarterly Compliance Report Unit 3 40 cFR 63.10031(e) October L, 2024 - December 37, 2024 Section I .0 - Unit 3 Report Summary Name and address of the affbcted source Hunter Power Plant, 1000 S. Highway l0 Castle Dale Utah P.O. Box 569 Castle Dale, Utah 84528 Identification of eachhazardous air pollutant monitored at the affected source I. Non-Mercury HAPS metals using a quarterly filterable particulate matter (PM) stack test as a surrogate to demonstrate compliance. On June 6, 2018, the Utah Department of Environmental Quality - Division of Air Quality agreed that the Hunter Plant Unit 3 met the requirements to qualifr as a low emitting EGU (LEE) unit. The Hunter Plant submitted a summary table showing three years of quarterly test data. Each particulate matter (PM) testing result was below one-half of the 0.030 lb/MMBtu limit, or 0.015 lb/IvIMBtu as required by the subpart. II. Acid gases using sulfur dioxide (SOz) as a surrogate to demonstrate compliance by an SOz continuous emissions monitoring system (CEMS). II. Mercury (Hg), compliance demonstrated by an annual EPA Method 30B sorbent trap test to re-confirm LEE status. A brief description of the process unit L Hunter Unit 3 is an Electric Utility Steam Generating Unit, designed as a dry bottom wall-fired boiler, designed by Babcock and Wilcox. i. Rated Heat Input Capacity of 4,910 MMBtu/hr. ii. The unit is equipped with the following add-on controls: l. Reverse Air Fabric Filter (baghouse) 2. Wet Lime Glue Gas Desulfurization (wet scrubber) 3. Low-NOx burner technology, with over-fire air iii. Fuels used are sub-bituminous coal using #2 fuel oil for startup fuel when needed. II. Unit Category i. Unit 3 is an existing coal-fired unit combusting non-low rank virgin coal demonstrating compliance with the emission limits found in Table 2 to Subpart UUWU of Part 63 IIL The emission and operating parameter limitationsi. Filterable PM quarterly stack testing demonstrating compliance with a 0.030 lbA,IMBtu emission limit. The unit has demonstrated and achieved low emitting EGU (LEE) status. SOz CEMS as a surogate for acid gases reporting hourly averages in units of lb/IvIMBtu demonshating compliance with a 30 boiler-operating-day average limit of 0.20 lb/I\'IMBtu. Hg annual EPA Method 30B sorbent trap test reporting hourly averages in units of lb/TBtu demonstrating compliance with a 30 boiler-operating-day average of 1.2 lb/TBtu. A description of any changes in CMS, processes. or controls since the last reporting period No changes occurred during the reporting period that would affect compliance to MATS. Recent performance test results ll. lll. Table 1-l: Unit 3 Filterable Particulate Matter LEE Test Results Summary Test ID Test Date Average PM rate (lb/mmBtu) MATS PM Limit* Average PM (lbllv[W-hr) MATS PM Limit* Unit Status 2024 06/20/2024 0.002 0.030 0.002 0.30 LEE Achieved in 2018. Maintained with 612012024 LEE test *Low Emitter Limits are 0.015 Ib.A,IM-BTU and 0.15 lbs./IvIW-HR Table 1-2: Unit 3 Mercury LEE Test Results Summary Test ID Test Date Hg rate (lb/TBtu) MATS Hg Threshold Unit Status 2024 tt/17/2024 0.07 0.t2 LEE Achieved. Maintained with 1112712023 LEE test Section 2.0 - Unit 3 MATS Compliance Report Root Data Elements Table 2-l: Root Data Elements 2.1 Facilitv ORIS Code 6165 2.2 Facilitv Name Hunter 2.3 Facili8 Registry Identifi er (ORISPL)8069 2.4 Title 40 Part 63 2.5 Applicable Subpart UUUTru 2.6 Calendar Year 2024 2.7 Calendar Quarter 46 Ouarter 2.8 Submission Comment (ontional)See cover letter Section 3.0 - Unit 3 Performance Stack Test Summary For applicable elements of Appendix E Section 3 .l-3 .14, see stack testing reports submitted for the quarter. Stack testingdata is being provided in both .xmland .pdf formats. Section 4.0 - Operating Limit Data (PM, CPMS, only) No PM CPMS on unit. Section not applicable. Section 5.0 - Unit 3 Performance Test Run Data For applicable elements of Appendix E Section 5.1-5.8, see stack testing reports submitted for the quarter. Stack testin g data is being provided in both .xml and .pdf formats. Section 6.0 - Unit 3 Conversion Parameters For applicable elements of Appendix E Section 6.1-6.3, see stack testing reports submitted for the quarter. Stack testing data is being provided in both .xml and .pdf formats. Section 7 .0 - Unit 3 Quality Assurance Parameters For applicable elements of Appendix E Section 7.1-7.3, see stack testing reports submitted for the quarter. Stack testing data is being provided in both .xml and .pdf formats. Section 8.0 - Averaging Group Unit is not part of an averaging group. Section 9.0 - Unit 3 Compliance Averages Please see Attachment A-1 which includes 30-boiler-operating-day average data for sulfur dioxide. Section 10.0 - Unit 3 Information Section I 1.0 - Unit 3 Fuel Usage Information Teble 11- Teble 10-1: Unit Information Section Data Element Plant Data l0.l Unit ID Unit 3 10.2 Date of Last Tune-up; Burner Tio Insoection June 24. 2024: March I 5 - 2024 10.3 Emergency Bypass Information.No emersencv bvoass occurred durins ouarter 1 Quarterly Fuel Information Month #2 Fuel Oil Burned (gallons)Sub-Bituminous Coal Burned (tons) October 65,934 74,015 November 68,1 l3 73,142 December 49,292 71,234 Total 183,329 218391 Note: No new fuel types were combusted during the reporting period. : Section 12.0 and I3.0 - Unit 3 Malfunction, Deviations, and Monitoring Downtime Information Table 12-l Monitoring Equipment Manufacturer and Model number Pollutant Manufacturer Model Number Sulfur Dioxide Thermo 43iQ Carbon Dioxide (COz)t Thermo 4roiQ Table l2-2: Most Recent CMS Certification or Audit U3 CEMS Analyzer Latest RATA Date Latest Linearity Date Carbon Dioxide (COz)1U20t2024 1012312024 Sulfur Dioxide (SOz)tt/20/2024 t0/2312024 Table 12-3: Unit Operating Time During the Reporting Period U3 Operating Period Houns of Unit Operation 4h Quarter,2024 2175.3 Table 12-4: Excess Emission Summary I The COz analyzer is used as a diluent for calculating heat input based emission limits. 5 l U3 Excess Emissions Summary PM SOz Hg Total Hours of Exceedance 0 0 0 Exceedance percent of total operating hours 0.0 0.0%0.0 Hours during startup and shutdown 0 0 0 Hours during control equipment problems 0 0 0 Hours during process hours 0 0 0 Hours during other know problems 0 0 0 Hours during unknown causes 0 0 0 Emission Limit 0.030 0.20 1.2 Emission Limitation Unit lb/IvfMBtu lb/\'IMBtu LblTBtu Emission limitation averaging period Quarterly Stack Testing 30 boiler operating-day 30 boiler operating-day Table 12-5: CMS performance summarT U3 CMS Performance Summary SOu Downtime percent of total operating hours 0.36% Total hour of CMS downtime 7.9 Hours due to monitoring equipment malfunctions 0 Hours due to non-monitoring equipment malfunctions 0 Hours due to quality assurance/quality control calibrations 0 Hours due to other known causes 7.9 Hours due to other unknown causes 0 For applicable elements of Appendix E Sections 12.1-12.3 and l3.l-13.5, see Attachments B and C. No deviations from rule requirements occurred other than those stated on this report and affachments. Sections 14.0 through 30.0 - Reference Method Data For applicable elements of Appendix E Sections 14-30, see stack testing reports submitted for the quarter. Stack testing data is being provided in both .xml and .pdf formats. Section 3 1.0 - O,t .. Information for Each Test or Test Series In accordance with section 31.0 and to provide reporting transparency, all stack testing data relevant to compliance with Subpart UUUUU of Part 63 is being submitted in pdf format with this quarterly compliance report. Report Certification Responsible Offrcial Managing Director - Hunter Power Plant Date: Ecbnraryl0-202[ Affachments: Attachment A: MATS 30-Day Rolling SOz lb/lvlMBtu Average Data Attachment B: SOz Monitor Downtime Events Report Attachment C: Excess Emissions Report Attachment A MATS 30-Day Rotting SO2 tb/MMBtu Average Data Value = Offline Data Valuer = Average represents a building 30D Average Value = Exceedance Report Generate d: o2 / lo I 25 09 :37 MATS 30 Day Rolling Average PIANT: HUNTER PI.ANT Report Period : 10 1 0U 2024 Th rouqh 12 1 3L 1 2024 Source: UNIT3 Parameter: SO2RMATS Report Version 5.2 HTRDAHS04\\reportuser Date 1-Day Avg 3O-Day Avg Total Operating Valid Operating Hourc Invalid Operating Monitor Availability 10t1t2024 0.087 0.083 701 700 1 99.9% 10t2t2024 0.084 0.083 701 700 1 99.9% 10t3t2024 0.087 0.084 70',l,700 I 99.9% 1014t2024 0.088 0.085 701 700 1 99.9% 10t5t2024 0.087 0.085 701 700 1 99.9% 10t6t2024 0.091 0.085 701 700 1 99.9% 't0t7t2024 0.09 0.085 701 700 1 99.9% 10t8t2024 0.088 0.085 701 700 1 99.9% 't0t9t2024 0.088 0.085 701 700 1 99.9% 10110t2024 0.085 0.085 720 719 1 99.9% 10t't1t2024 0.089 0.085 720 719 1 99.9% 10t12t2024 0.082 0.085 720 719 1 99.9olo 10t13t2024 0.084 0.085 720 719 1 99.9olo 10t14t2024 0.082 0.085 720 719 1 99.9% 10t15t2024 0.082 0.085 720 719 1 99.9% 10116t2024 0.088 0.085 720 719 1 99.9% 1011712024 0.088 0.085 720 720 0 100.0% 10118t2024 0.09 0.086 720 720 0 00.0% 10t1912024 0.089 0.086 720 720 0 00.0% 10t20t2024 0.089 0.086 720 720 0 00.0% 10t21t2024 0.089 0.086 720 720 0 00.0% 10t2212024 0.089 0.086 720 720 0 00.0% 10t23t2024 0.085 0.086 720 720 0 00.0% 10t24t2024 0.089 0.086 720 720 0 00.0% 't0t25t2024 0.089 0.087 720 720 0 00.0% 1012612024 0.089 0.087 720 720 0 00.0% 10t2712024 0.089 0.087 720 720 0 100.0% 10128t2024 0.089 0.087 720 720 0 100.07o 10t29t2024 0.089 0.087 720 720 0 00.0% 1013012024 0.089 0.087 720 720 0 00.0% 10t31t2024 0.084 0.087 720 720 0 00.0% 11t1t2024 0 0.087 720 720 0 00.0% 11t2t2024 0.075 0.087 7',tz 712 0 00.0% 11t3t2024 0.086 0.087 712 712 0 100.07o 't'v4t2024 0.087 0.087 712 7',tz 0 100.0% 't1t5t2024 0.087 0_087 712 712 0 100.0olo 't1t6t2024 0.102 0.087 712 712 0 100.0% 11nt2024 0.088 0.087 712 712 0 100.0olo 't'U8t2024 0.073 0.087 712 712 0 100.0% 1',U912024 0.074 0.086 712 712 0 '100.0% MATS 30 Day Rolling Average Plant: HUNTER PLANT Report Period: t010112024 Throuqh t213L12024 Source: UNIT3 Parameter: SO2RMATS 11t10t2024 0.086 0.086 712 712 0 100.0% 1111112024 0.083 0.086 712 712 0 100.0% 11t12t2024 0.088 0.086 712 710 2 99.7o/o 1'U13t2024 0.087 0.086 712 710 2 99.7% 1',U'.t4t2024 0.084 0.087 712 710 2 99.7o/" 1'U't5t2024 0.086 0.087 7'.t2 710 2 99.7o/o 11t16t2024 0.087 0.087 712 710 2 99.7o/" 11t17t2024 0.086 0.087 712 709 3 99.6% 11118t2024 0.087 0.086 712 709 3 99.6% 111',t9t2024 0.097 0.087 712 709 3 99.6% 11t20t2024 0.088 0.087 712 709 3 99.6% 't112112024 0.095 0.087 712 709 3 99.6% 1',U22t2024 0.098 0.087 712 709 3 99.6% 11t23t2024 0.094 o.088 7',t2 709 3 9S.6% 't'124t2024 0.098 0.088 712 709 3 99.6% 1112512024 0.093 0.088 712 709 3 99.6olo 11t26t2024 0.091 0.088 712 709 3 99.6% 11t27t2024 0.092 0.088 712 709 3 99.6% 11t28t2024 0.'t 1 3 0.089 712 709 3 99.6% 11129t2024 0.092 0.089 712 709 3 99.6% 11t30t2024 0.091 0.089 712 709 3 99.6% 12t1t2024 0.092 0.089 712 709 3 99.6% 12t2t2024 0.09 0.09 720 7',t7 3 99.6% 12t3t2024 0.092 0.09 720 717 3 99.6% 12t4t2024 0.102 0.091 720 714 6 99.2o/o 121512024 0.104 0.091 720 714 6 99-2o/" 12t612024 0.091 0.091 720 714 6 99.2o/o 1217t2024 0.086 0.091 720 714 6 99.20/o 1218t2024 0.089 0.091 720 714 6 99.2Yo 12t9t2024 0.102 0.092 720 7't4 6 99.2Yo 12110t2024 0.094 0.092 720 714 6 99.20h 12t11t2024 0.092 0.093 720 714 6 99.20/o 1211212024 0.096 0.093 720 716 4 99.4o/o 12,1312024 0.088 0.093 720 716 4 99.40/o 1U14t2024 0.089 0.093 720 716 4 99.4o/o 12115t2024 0.088 0.093 720 7',ts 5 99.3% 12t16t2024 0.086 0.093 720 7',ts 5 99.3% 12t17t2024 0.088 0.093 720 716 4 99.4o/o 12t18t2024 0.087 0.093 720 716 4 99.4o/o 12119t2024 0.08 0.093 720 715 5 99.3% 1212012024 0.083 o.093 720 715 5 99.3% 1U21t2024 0.089 0.092 720 715 5 99.3% Value = Offline Data Valuet = Average represents a building 30D Average Value = Exceedance Report Version 5.2 Report Generated:O2/t0125 O9t3L HTRDAHS04\\reportuser Value = Offllne Data Valuer = Averate represents a buildlng 30D Average Value = Exceedance Report Generated: O2/LO/25 09:37 MATS 30 Day Rolling Average P|ant: HUNTER PI-ANT Repoft Period: 1010t12024 Throuqh 1213U2024 Source: UNIT3 Parameter: SO2RMATS Report Version 5.2 HTRDAHSO4\\reportuser 11242024 0.089 0.092 720 715 5 99.3% 1423t2024 0.089 0.092 720 715 5 99.3% 12t24t2024 0.089 0_092 720 715 5 99.3% 12t2512024 0.089 0.091 720 715 5 99.3% 1426t2024 o.092 0.091 720 715 5 99.3o/o 12t27t2024 0.085 0.091 720 715 5 993% 12t2812024 0.089 0.09 720 715 5 99.370 12t2912024 0.089 0.09 720 715 5 99.3o/o 1213012024 0.089 0.09 720 715 5 99.3% 12t31t2024 0.085 0_09 720 715 5 99.3% Attachment B SO, Monitor Downtime Events Report Downtime Events - Duration Plant: HUNTER PLANT Report Period: 1010'112024 00:00 Through 1213112024 23:59 Time Online Criteria: 'l minute(s) Source: Paramotor: lntorYal: UNIT3 SO2RMATS 001H lncident lD Start Date/Time End Date/Time Duration (dd:hh:mm) Reason Code - Descrlption Ac-tion Code - DescrioUon 1111212024 05:00 1111212024 06:59 0d - 2h - 0m 00 - Default 00 - (default) 11t1712O2422:00 1'11171202422:59 0d - th - 0m 00 - Default _ 0g- (default) 't2lMl2O24 10:00 1210412024 12:59 0d - 3h - 0m 00 - Default 00 - (defautt) 12t15t202408:OO 1|1l1snOU6b,Sg 0d-1h-0m 00 -Default 00 - (defauh) 1211912024 08;00 1211912024 08:59 0d-1h-0m 00 -Defauh 00 - (defauft) NumberofEvents: 5 Total Duratlon: 0d - 8h - 0m " lndicates duration incident could have additional data prior to the start date or following the end dale. Report Generated: 02110/25 09:46 Report Version 4.0 HTRDAHS04\reportuser 1of 1 Attachment C Excess Emissions Report Attachment C Unit 3 Excess Emissions Report PM Excess Emissions 0.030 lbA,tMBtu (Quarterly Stack Testing) Total time for all excess emissions QQ hours Total time for excess emissions occurring during startup/shutdown or malfunction 0.0 hours Malfunction reason and corrective /preventive action taken) No PM Excess Emissions occurred during the reporting period No PM Malfunction occurred during the reporting period SOz Excess Emissions 0.20 lbA4MBtu (30 Boiler Operating Day Average) Total time for all excess emissions QQ hours Total time for excess emissions occurring during startup/shutdown or malfunction 0.0 hours Malfunction reason and corrective /preventive action taken) No SOz Excess Emissions occurred during the reporting period SOz monitor equipment malfunctions noted in Attachment B. Excess Emission Incident Number Magnitude of Excess Emissions lb/MMBtu Date Time Beginning Time Ending Hours Involved Malfunction Y/N Cause Corrective Action Excess Emission Incident Number Magnitude of Excess Emissions lb/MMBtu Date Time Beginning Time Ending Hours Involved Malfunction Y/N Csuse Corrective Action Hg Excess Emissions 1.2 lb/TBtu (30 Boiler Operating Day Average) Total time for all excess emissions 0.0 hours Total time for excess emissions occurring during startup/shutdown or malfunction 0.0 hours Malfunction reason and corrective /preventive action taken) No Hg Excess Emissions occurred during the reporting period Hg monitor equipment malfunctions noted in Attachment B. Excess Emission Incident Number Magnitude of Excess Emissions lb/IvIMBtu Dete Time Beginning Time Ending Hours Involved Malfunction Y/N Cause Corrective Action