HomeMy WebLinkAboutDSHW-2024-004755February XX, 2024 Neil Schwendiman, O&M Committee Chair Northern Utah Environmental Resource Agency 1997 East 3500 North Layton, UT 84040 RE:Acceptance of Cell 2 Stage 3 Liner Installation report, Bayview Landfill Utah County, SW118 Dear Mr. Scott: On October 27, 2022, the Division of Waste Management and Radiation Control (Division) received theBayview Landfill Cell 2 Stage 3 Construction Report and appendices (As-Built Report) for the Bayview Landfill. On December 7, 2023, the Division received a document verifying that the placement of protective soils cover in Cell 2 Stage 3 had been completed and surveyed as specified in the approved cell construction documents; it also received its final inspection approval by a professional engineer. The As-Built Report was provided by IGES, Inc. andstamped by a professional engineer certifying that Cell 2 Stage 3 has been completed. The newly constructed Cell 2 Stage 3 is adjacent to and east of Cell 2 Stage 2. The progress of the Cell 2 Stage 3 construction was inspected by a representative from the Division. Based on our review of the As-Built Report and protective soils cover inspection document submitted toour office, the Division accepts and concurs with the engineer’s statement and As-Built Report. Cell 2 Stage 3may receive solid waste as specified in Bayview Landfill’s current permit. If you have any questions, please call Matt Sullivan at (385) 454-8012. Sincerely, Douglas J. Hansen,Director Division of Waste Management and Radiation Control DJH/MS/??? c:Eric Edwards, Health Officer, Utah County Health Department Tyler Plewe, Deputy Director, Utah County Health Department Jason Garrett, Environmental Health Director, Utah County Health Department