HomeMy WebLinkAboutDSHW-2024-004649February XX, 2024
Darin Olson, Environmental Manager
Republic Services
P.O. Box 69
East Carbon, UT 84520
RE:Acceptance of Phase 3A Cell Construction, Wasatch Regional Landfill, Tooele County
SW237
Dear Mr. Olson:
The Division of Waste Management and Radiation Control (Division) has completed its review of theProject Manual – Phase 3A Expansion Wasatch Regional Landfill(Project Manual) for cell
construction at Wasatch Regional Landfill in Tooele County. Based on our review of the Project Manual, the Division accepts your proposed engineering and construction plans.
Prior to cell construction, protection of all cell liner material must be properly stored as explained in the Project Manual. During cell construction, inspections may be conducted by
the Division or the Tooele County Health Department. These inspections may cover the entire facility, cell construction, or any other part of the facility operation covered by the current
permit and applicable solid waste rules.
After the completion of the Phase 3A expansion, please submit a cell construction report along with “as-built” construction drawings and documents for Division to review. Please note
that solid waste cannot be placed in this cell until 1) a cell construction report and “as-built” documents have been reviewed and accepted by the Division, 2) a final site inspection
has been conducted by the Division, and 3) a letter of acceptance from the Division on Phase 3A expansion has been issued to Wasatch Regional Landfill.
If you have any questions, please call Matt Sullivan at (385) 454-8012.
Sincerely,
Douglas J. Hansen,Director
Division of Waste Management and Radiation Control
DJH/MS/[???]
c:Jeff Coombs, Health Officer, Tooele County Health Department
Bryan Slade, Environmental Health Director, Tooele County Health Department