Loading...
HomeMy WebLinkAboutDERR-2025-001370 __________________________________________________________________________________________ Push Drilling, LLC. 852 Chelsea Drive, Bountiful, Utah 84010  Phone 801-928-0101  russ@pushdrilling.com PUSH DRILLING LLC 1715 February 11, 2025 WORK PLAN: NUF-07 Groundwater Monitoring Well Abatement and Reporting Former LW Miller Perry (Pilot) 1674 W. 1100 S. Perry, UT Facility ID #0100650, Release Site: NUF Submitted To: Mr. Brent Miller LW Miller Transportation Services, Inc. P.O. Box 512 Logan, Utah 84323 Copy To: Mr. Michael Percorelli Department of Environmental Quality Division of Environmental Response and Remediation P.O. Box 144840 Salt Lake City, Utah 84114-4840 Dear Mr. Miller: Push Drilling, LLC submits this workplan and budget, on behalf of LW Miller Transportation Services, Inc., to perform groundwater monitoring well abandonment activities and reporting at the above referenced site. This work plan was prepared in response to the Post No Further Action letter dated June 13, 2024, from the Utah Division of Environmental Response and Remediation (DERR). The site is referred to as Facility ID #0100650, Release Site NUF in the DERR files and correspondence. PST Fund payment claims will reference this workplan and the specific tasks itemized below. 2 OBJECTIVE The objective of this work plan is to outline the activities and budget associated with performing groundwater monitoring well abandonment activities and reporting at the site. SCOPE OF WORK Push Drilling, LLC and a sub-contractor (DSO Build, LLC) will mobilize to the site to perform the following well abandonment activities:  Cut asphalt around each monitoring well and concrete ring (approx. 14-inch by 14-inch square).  Chip out and remove well protector, concrete ring, and remaining asphalt within the cut area.  Remove all or part of the 2-inch diameter well casing (well depths are approximately 12 feet below ground surface).  Place coated bentonite pellets into the remaining casing and/or open bore holes.  Place and compact 1-inch gravel/road base in each hole to stabilize subsurface.  Place and compact asphalt to match existing surface pavement and grade. (Note – MW-1 is located in a cobble covered landscape area. The depression left from removing the well protector and concrete ring will be backfilled with road base/dirt to match surface elevation and covered with matching cobble. After completing the groundwater monitoring well abandonment and surface restoration activities, a summary report, including a site map, will be prepared and submitted to the DERR. A detailed cost estimate for the proposed work, prepared according to the format specified in UAC R311-207-5 is attached. Petroleum storage tank (PST) fund payment claims will reference the approved work plan and portions of work completed. KEY PERSONNEL Senior Project Manager, Project Manager, Field Scientist, Field Technician, Drafter, PST Claim Specialist, Admin Assistant: Russell Hicks COST ESTIMATE Push Drilling, LLC estimates the cost to complete the work as described in this Work Plan is $3,492.00. A detailed cost breakdown is presented in Table 1. The estimated budget will require adjustment if the scope of services identified herein is modified. Please feel free to contact me at (801) 928-0101 should you have any questions or concerns. 3 Sincerely, Push Drilling, LLC Russell J. Hicks, P.G. Certified UST Consultant #CC-0204 Attachments: Budget Site Map Sub-Contractor Quote Push Drilling, LLC LW Miller Perry (Pilot); Fac ID# 0100650 1674 W. 1100 S., Perry, Utah Groundwater Monitoring Well Abandonment and Reporting Work Plan NUF-07 Dated 2-11-25 Task 1 - Work Plan and Budget Development LABOR Hours Title Code Description Rate Total 1 Work plan preparation (as per 2025 NTE costs table)760.00$ 760.00$ Subtotal 760.00$ SUBCONTRACTORS Item Quantity Unit Rate Total -$ Subtotal -$ OTHER DIRECT COSTS Item Quantity Unit Rate Total Mileage 0 Miles 0.585$ -$ Subtotal -$ Task Total 760.00$ Task 2 - Well Abandonment and Reporting LABOR Hours Title Code Description Rate Total 4 Field Technician 106 Field work prep (2 hr); mob/demob (2 hrs) 78.00$ 312.00$ 5 Field Technician 106 Well abandonment oversight 78.00$ 390.00$ 1 Senior Project Manager 101 Final Document Review 163.00$ 163.00$ 2 Project Manager 103 Report preparation 127.00$ 254.00$ 2.5 Field Scientist 104 Data compilation 109.00$ 272.50$ 2 Drafter 107 Map preparation 90.00$ 180.00$ 1 PST Claim Specialist 108 PST reimbursement request prep 84.00$ 84.00$ 1 Admin. Assistant 109 Document formatting and proofing 66.00$ 66.00$ Subtotal 1,721.50$ SUBCONTRACTORS Item Quantity Unit Rate Total 1 Quote 595.00$ 595.00$ Subtotal 595.00$ OTHER DIRECT COSTS Item Quantity Unit Rate Total Traffic Safety 1 Days 15.00$ 15.00$ Concrete/Asphalt Saw 1 Day 30.00$ 30.00$ Electric Jack Hammer and Generator 1 Day 50.00$ 50.00$ Asphalt Patch 6 Per bag 40.00$ 240.00$ Mileage 115 Miles 0.700$ 80.50$ Subtotal 415.50$ Task Total 2,732.00$ Grand Total 3,492.00$ DSO Build, LLC (provide labor for well abandonment) Page 1 of 1 Maverik #612 (Former LW Miller Perry) 1674 W. 1100 S. Perry, Utah 84302 Facility ID #0100650 00 20 40 8060 approx scale in feet NORTH LEGEND Date: By: Storm Water Piping Sanitary Sewer Natural Gas Electrical (Buried) Communications Groundwater Monitoring Well to be abandonedMW-1 F I G U R E 1 Well Abandonment Site Map February 2025 February 11, 2025 RJH ParkingMa v e r i k # 6 1 2 (F o r m e r L W M i l l e r P e r r y ) 16 7 4 W. 1 10 0 S . Pe r r y , U T 8 4 3 0 2 Asphalt Asphalt Grass Si d e w a l k Asphalt Asphalt Concrete Can o p y Ca n o p y Vacant Lot Sto r m D r a i n Sediment/Grease Trap Sediment/Grease Trap Sediment/Grease Trap MW-1 MW-2 MW-3 MW-4 MW-5 MW-6 Destroyed during construction of new fueling canopy DSO BUILD LLC Labor for Well Abandonment Quote 1674 W. 100 S, Perry, Utah Dated 2/11/2025 Item Quantity Rate Total Provide labor for well abandonment (lump sum) 1 $595.00 $595.00 Petroleum Storage Tank Trust Fund Claims Packet (2/27/17) Form B Petroleum Storage Tank Trust Fund Work Plan Approval Application and Agreement Work Plan No. NUF-07, Amendment No. ___ Facility Name: LW Miller Perry (Pilot) Address: 1674 W. 1100 S., Perry, Utah Facility ID No.: 0100650 Release ID: NUF ("Release") Owner/Operator, responsible party, or other person seeking PST Trust Fund Reimbursement: Brent Miller (LW Miller Transportation Services, Inc.) ("Claimant") Utah-Certified UST Consultant: Push Drilling, LLC ("Contractor") In submitting Work Plans NUF-07 and amendments thereto for the above referenced Release NUF for approval, the Claimant and the Contractor collectively, the "Parties," represent and agree to the following: Definitions: "Contractor" means the person identified as such above. "Claimant" means the person identified as such above. “Parties” means Claimant and Contractor. "Division Director" means the Division Director of the Division of Environmental Response and Remediation. “PST Fund" means the Petroleum Storage Tank Trust Fund. "Release" means the release identified above. "State" means the State of Utah including its agencies, officers, employees, volunteers and specifically, the Division of Environmental Response and Remediation (DERR), the Division Director of the Division of Environmental Response and Remediation, and the Petroleum Storage Tank Trust Fund. "Work Plan" means the work plan identified above. 1. The key personnel, for which qualifications are submitted under R311-207-3(c), are: Russell Hicks 2. The Claimant acknowledges that the Claimant is required to obtain a payment bond from the Contractor under Section 14-2-1 of the Utah Code. If the Claimant fails to do so, the Claimant is liable to each person who performed labor or services or supplied equipment or materials ("Subcontractors") in the event the Contractor does not pay the subcontractors, even if the Claimant has paid the Contractor (Utah Code Section 14-2-2). The Claimant acknowledges and agrees that the PST Fund will not reimburse the Claimant for such Subcontractors’ claims for payment against the Claimant if the PST Fund has already made Petroleum Storage Tank Trust Fund Claims Packet (2/27/17) Form B payment to the Claimant or Contractor. The Claimant understands that the premium paid for a payment bond is reimbursable. Therefore, the Claimant: a. Has required the Contractor to obtain 100 percent payment bond through a United States Treasury-listed bonding company, and attached a copy, or; b. Has obtained other equivalent assurance and waives all claims and remedies against the State if the equivalent assurance does not adequately protect the Claimant. The equivalent assurance is described as follows: Push Drilling, LLC Agreement for Professional Services Contract between Brent Miller and Push Drilling, LLC. 3. The Parties agree that the Contractor shall have no cause of action against the State for payment. The Parties acknowledge and agree that the State is not a party to any contract with the Claimant or the Contractor for reimbursement from the PST Fund in the execution of this Work Plan, except to the extent provided by a contract signed by the Division Director. Instead, the Claimant’s reimbursement is governed by the Utah Underground Storage Tank Act and the Utah Underground Storage Tank Rules. The Contractor is entitled to reimbursement solely under his/her contract with the Claimant. 4. The Parties agree that they will use a subcontracting method consistent with the requirements of R311-207. 5. The Parties agree that, as a condition of performing the work under the work plan, the Contractor shall carry the insurance specified in R311-207-3(c)(4). The Contractor represents that the Certificate of Insurance documenting the required insurance is attached or that a current certificate is on file with the Division Director and has been provided to the Claimant. The Parties assume the risk and responsibility of ensuring that the appropriate insurance coverage is in place. 6. The Parties agree that payments from the PST Trust Fund shall be limited to amounts that are customary, legitimate, reasonable and consistent with R311-207. Unless the Parties and the Division Director have entered into a written Pay-for-Performance agreement, the Parties acknowledge that payments will be for actual time and materials expended up to, but not exceeding, the amount of the Division Director approved work plan and Executive Secretary (UST) approved change orders, if any. 7. The Parties shall maintain financial and operation records in sufficient detail to document all transactions relating to PST Fund reimbursement for the execution of this work plan. The Parties shall make available for audit and inspection all such records relating to the completion of the work plan and related services, requirements, and expenditures until all audits initiated by State auditors are completed, or for a period of five years from the date of PST Fund reimbursement related to the execution of this work plan. Records which relate to disputes, litigation, or the settlement of claims arising out of the performance of this work plan, or to cost and expenses of this work plan as to which exception has been taken by the Division Director, shall be retained by the Parties until disposition has been made of such disputes, litigation, claims, or exceptions. 8. The Parties certify that there is a contract between the Claimant and the Contractor for the performance of work under the work plan for which approval is sought ("Contract") and