Loading...
HomeMy WebLinkAboutDAQ-2025-000870 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144820 • Salt Lake City, UT 84114-4820 Telephone (801) 536-4000 • Fax (801) 536-4099 • T.D.D. (801) 903-3978 www.deq.utah.gov Printed on 100% recycled paper State of Utah Department of Environmental Quality Kimberly D. Shelley Executive Director DIVISION OF AIR QUALITY Bryce C. Bird Director SPENCER J. COX Governor DEIDRE HENDERSON Lieutenant Governor DAQC-054-25 Site 14068 (B1) Site 11518 (B1) Jeffery Cowlishaw Staker Parson Companies 2350 South 1900 West Ogden, Utah 84401 Dear Mr. Cowlishaw: Re: Staker Parson Companies – Temporary Relocation/Operation, Notice of Intent – Box Elder County Your Notice of Intent dated January 16, 2025, to relocate portable aggregate equipment to the temporary project located at 225 North Highway 89, Willard, Utah, was received by the Utah Division of Air Quality (DAQ) and has been reviewed. The following equipment has been approved for operation for this temporary project: Astec track jaw crusher with 300 hp diesel engine Astec track screen with 173 hp diesel engine Stacker with Whisperwatt 85 KVA/68 kW generator Superstacker conveyor MGL conveyor This equipment has been permitted for portable operation in the State of Utah by the Goodfellow Corporation portable Approval Order (AO) DAQE-AN140680003-18, dated April 18, 2018. Approval is granted to relocate and operate this equipment at the new location for a period not to exceed 180 operational days. As per Utah Administrative Code (UAC) R307-401-17, the operation of equipment at this temporary site may be for up to 180 working days in any calendar year not to exceed 365 consecutive days, starting from the initial relocation date. Approval is subject to the conditions of the dust control plan submitted for this location and the above portable AO. Hours of operation for this equipment shall be held to 16 hours each day. The maximum production rate shall be held to the requested 500 tons per hour. " / 2 / 6 Ú Ú Û Ù Û Þ DAQC-054-25 Page 2 Emissions for this project have been estimated at the following: Pollutant gram/sec lbs/hr lbs/24 hr tons/yr PM10 1.97 15.67 156.71 12.22 SOx 0.78 6.16 61.56 4.80 NOx 5.15 40.91 409.11 31.91 CO 1.36 10.75 107.54 8.39 VOC 0.21 1.68 16.83 1.31 The owner/operator shall maintain records of the actual operation hours, days, and production rate, of the above referenced equipment at this relocation site and have the ability to submit the information to the DAQ upon the request of representatives of the Director. Please make certain that the plant operator is aware of all the location specific requirements for this site and the conditions of the aforementioned AO. Federal New Source Performance Standards Subpart OOO requires that initial Method 9 observations be performed for all applicable portable crushers, screens, and attached conveyors. Subpart OOO also mandates that all crushers constructed, modified, or reconstructed on or after April 22, 2008, which are not enclosed, must install spray bars on the equipment and keep maintenance records to ensure proper spray bar operations. Utah Division of Water Quality Storm Water Permits and regulations may apply to this temporary project. Please refer to Utah DEQ Water Quality’s current Storm Water Construction requirements for additional information. This approval for relocation in no way releases the owner or operator from any liability for compliance with all other applicable federal, state, and local regulations including the UAC. If you have any questions regarding this relocation authorization or the temporary relocation process please contact Susan Weisenberg at (385) 306-6512. Sincerely, Jay P. Morris Assistant Director JPM:SW:rh Enclosure: Submitted Temporary Relocation Form cc: Bear River Health Department 4 * - - $ . — @ ? v A ? A D @ @ w D C ˜ Susan Weisenberg <sweisenberg@utah.gov> Portable/Temporary Relocation Form 1 message noreply@qemailserver.com <noreply@qemailserver.com>Thu, Jan 16, 2025 at 3:43 PM Reply-To: trigger@qemailserver.com To: sweisenberg@utah.gov Susan/Chad: Site # -- Staker Parson Companies has requested a Temporary Relocation. Please see the information below. Any attachments can be access by clicking on the links. Recipient Data: Time Finished: 2025-01-16 15:43:28 MST IP: 165.225.10.112 ResponseID: R_7I4PlE1UgwODyPv Link to View Results: Click Here URL to View Results: https://utahgov.iad1.qualtrics.com/apps/single-response-reports/reports/Uk- HYVksdUpy4p9raNidQqBiHiDPeY6Uq8dlqE7Lc21GIfxYly22W-cUQyq1vugRZxfRmcRyhxjZ7% 2EL1Cmve1S9M14ZFX8E0Ac3Pt5bH%2EvD6m4wR09q%2EiDw2K4KK6IUEBe71tYV9rrfTYucHSgLSOW3F- nuYV0H6TSAskzlkqaNxe5xE55KKYRmmv2KSXWDJ938Z2ymSnj5OK3xcLC9SSFe8cVauM1cKQn2OXPburTCKHtt3hby %2Edh5wIG84lbnSqIYZUHv7KTGW2lKGwLlsMl7SxkXXE5pWyra4i70XQBgkeYlIGYLXr40A2bZxCH9KmnYs- 4F6fXwmq1%2EYVQL6zw Response Summary: Please fill out the information below: Contact Person: Jeffery Cowlishaw Company Name: Staker Parson Companies Mailing Address: 2350 S 1900 W City: Ogden Zip: 84401 Phone Number: 385-405-4315 Email: jeffery.cowlishaw@stakerparson.com Is the site located within a PM2.5 non-attainment and maintenance plan areas on cleared land grea... Yes All temporary relocation projects are required to submit a Fugitive Dust Control Plan (FDCP). Lo... 9F7492484B Briefly give directions to the site and/or physical address: 225 N HWY 89 Willard, UT 84340. Turn East on 300 N from Hwy 89 in Willard. Stay left to continue onto 200 N to reach gate/entrance. Proposed Relocation Information: Closest City Willard County Box Elder UTM X Coordinates 4,585,265.446 N UTM Y Coordinates 414,173.667 E Approximate distance to the nearest house/business 1044 Feet UTM X Coordinates to nearest house/business 4,584,944.937 N UTM Y Coordinates to nearest house/business 414,047.825 E 1/28/25, 2:50 PM State of Utah Mail - Portable/Temporary Relocation Form https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1821425419226479516%7Cmsg-f:1821447200612155252&s…1/2 Does this site currently have a permit with DAQ? No Please provide the permit ID for the equipment? (DAQE-XXXXXXXXX-XX) Goodfellows Please list all the Equipment on Site:Note: It is important to identify ALL diesel powered engine... 1 Equipment Type Track Jaw Crusher Make/Model Astec/FT2650 Serial or ID# TBD Manufactured Date TBD Design Capacity 500TPH/300HP Diesel 2 Equipment Type Track Screen Make/Model Astec/GT206 2 deck 6'X20 and 6'X18 Serial or ID# TBD Manufactured Date TBD Design Capacity 173HP Diesel 3 Equipment Type Superstacker conveyor Make/Model KPI/33-3160 Serial or ID# TBD Manufactured Date TBD Design Capacity 10HP 4 Equipment Type Conveyor Make/Model MGL/842XR Serial or ID# TBD Manufactured Date TBD Design Capacity 74HP Please attach a site diagram showing the equipment layout and general site dimensions for this re... https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_25SiYPWiy7M34rq Have any other state or local regulatory agencies issued any other "Conditional Use Permits" for... No Operational Information: (Please note: Operating time over 16 hours in a 24 hour period will re... Total Hours of operation per 24 hr period 16 Starting time of operation (am/pm) 6AM Ending time of operation (am/pm) 10PM Maximum hourly production rate for project 500 TPH Expected startup date 01/27/2025 Expected completion date 06/30/2025 What type of application is this for? New Application In accordance with the fee schedule approved by the Utah State Legislature, the Division of Air Q... https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_OGQWwF3PM8cHWIp Owner/Operator Representative: https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_1DXYTzslNAO4xcJ 1/28/25, 2:50 PM State of Utah Mail - Portable/Temporary Relocation Form https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1821425419226479516%7Cmsg-f:1821447200612155252&s…2/2 Susan Weisenberg <sweisenberg@utah.gov> Fwd: [EXT] additional info regarding distance to Granite site for Willard relocation 1 message Susan Weisenberg <sweisenberg@utah.gov>Mon, Feb 3, 2025 at 9:10 AM To: Chad Gilgen <cgilgen@utah.gov> I'm not certain if I forwarded this site map and response from Staker regarding the TRP to the Willard location near Granite. Is this sufficient if I include this as an attachment? Susan Weisenberg, Environmental Scientist Office: 385-306-6512 ---------- Forwarded message --------- From: Cowlishaw, Jeffery (Staker & Parson Companies) <jeffery.cowlishaw@stakerparson.com> Date: Tue, Jan 28, 2025 at 3:51 PM Subject: RE: [EXT] additional info regarding distance to Granite site for Willard relocation To: Susan Weisenberg <sweisenberg@utah.gov> Susan, An additional site map is attached. The properties are immediately adjacent to each other. This project will be fairly short in duration. We hope to start crushing right away but will likely be finished within 2-3 months. Please let me know if you need any other information. Thanks, Jeffery (J) Cowlishaw Environmental Specialist Staker Parson Materials & Construction A CRH COMPANY 2350 S 1900 W Ogden, Utah 84401 C +1(385)405-4315 E Jeffery.cowlishaw@stakerparson.com 2/5/25, 6:22 PM State of Utah Mail - Fwd: [EXT] additional info regarding distance to Granite site for Willard relocation https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-a:r1732389786754517054%7Cmsg-a:r3917933210467223095…1/2 www.stakerparson.com The Preferred Source for quality sand, rock, landscape products, ready mix concrete, asphalt, paving & construction services. From: Susan Weisenberg <sweisenberg@utah.gov> Sent: Tuesday, January 28, 2025 3:03 PM To: Cowlishaw, Jeffery (Staker & Parson Companies) <jeffery.cowlishaw@stakerparson.com> Subject: [EXT] addional info regarding distance to Granite site for Willard relocaon CAUTION: This email originated from outside of the organizaon. Do not click links or open aachments unless you are expecng this email and know the contents are safe. If you believe this email may be phishing or malicious, please use the Report Phish buon. Hello, I received your relocation request for the temporary project near Willard. It appears that this site is fairly close to Granite Construction's South Wells facility. Can you provide more information regarding how close your temporary operation is to the Granite facility? Also because of the close proximity to the other aggregate site, please provide a site diagram. Thanks, let me know if you have any questions. Susan Weisenberg, Environmental Scientist Office: 385-306-6512 ATTENTION: Ce courriel vient de l'exterieur de l'entreprise. Ne cliquez pas sur les liens, et n'ouvrez pas les pièces jointes, à moins que vous ne connaissiez l'expéditeur du courriel et savez que le contenu est sécuritaire. Si vous pensez qu’il s’agit d’un courriel d’hameçonnage ou malveillant, veuillez cliquer sur le bouton Signaler une tentave d’hameçonnage. Willard Crushing Site Map 2 01282025.jpg 878K 2/5/25, 6:22 PM State of Utah Mail - Fwd: [EXT] additional info regarding distance to Granite site for Willard relocation https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-a:r1732389786754517054%7Cmsg-a:r3917933210467223095…2/2 Susan Weisenberg <sweisenberg@utah.gov> RE: [EXT] additional info regarding distance to Granite site for Willard relocation 1 message Cowlishaw, Jeffery (Staker & Parson Companies) <jeffery.cowlishaw@stakerparson.com>Tue, Feb 4, 2025 at 2:07 PM To: Susan Weisenberg <sweisenberg@utah.gov> Susan, Attached is a scaled site map showing the equipment layout and site boundary. We do need to add a generator that will run a stacker. This is a whisperwatt diesel generator, specifications in attached picture (85KVA, 68KW). And we will have a D8 dozer, a loader, and two vehicles for maintenance (a forklift and a man lift). Please let me know if you need any other information. The equipment arrived onsite today and the crew is ready to begin operation. Thanks, Jeffery (J) Cowlishaw Environmental Specialist Staker Parson Materials & Construction A CRH COMPANY 2350 S 1900 W Ogden, Utah 84401 C +1(385)405-4315 E Jeffery.cowlishaw@stakerparson.com www.stakerparson.com The Preferred Source for quality sand, rock, landscape products, ready mix concrete, asphalt, paving & construction services. 2/5/25, 10:57 AM State of Utah Mail - RE: [EXT] additional info regarding distance to Granite site for Willard relocation https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-a:r1732389786754517054%7Cmsg-f:1823162536965582639…1/4