DAQC-054-25
Site 14068 (B1)
Site 11518 (B1)
Jeffery Cowlishaw
Staker Parson Companies
2350 South 1900 West
Ogden, Utah 84401
Dear Mr. Cowlishaw:
Re: Staker Parson Companies – Temporary Relocation/Operation, Notice of Intent – Box Elder
County
Your Notice of Intent dated January 16, 2025, to relocate portable aggregate equipment to the
temporary project located at 225 North Highway 89, Willard, Utah, was received by the Utah
Division of Air Quality (DAQ) and has been reviewed.
The following equipment has been approved for operation for this temporary project:
Astec track jaw crusher with 300 hp diesel engine
Astec track screen with 173 hp diesel engine
Stacker with Whisperwatt 85 KVA/68 kW generator
Superstacker conveyor
MGL conveyor
This equipment has been permitted for portable operation in the State of Utah by the Goodfellow
Corporation portable Approval Order (AO) DAQE-AN140680003-18, dated April 18, 2018.
Approval is granted to relocate and operate this equipment at the new location for a period not to
exceed 180 operational days. As per Utah Administrative Code (UAC) R307-401-17, the
operation of equipment at this temporary site may be for up to 180 working days in any calendar
year not to exceed 365 consecutive days, starting from the initial relocation date. Approval is
subject to the conditions of the dust control plan submitted for this location and the above portable
AO. Hours of operation for this equipment shall be held to 16 hours each day. The maximum
production rate shall be held to the requested 500 tons per hour.
" / 2 / 6 Ú Ú Û Ù Û Þ
DAQC-054-25
Page 2
Emissions for this project have been estimated at the following:
Pollutant gram/sec lbs/hr lbs/24 hr tons/yr
PM10 1.97 15.67 156.71 12.22
SOx 0.78 6.16 61.56 4.80
NOx 5.15 40.91 409.11 31.91
CO 1.36 10.75 107.54 8.39
VOC 0.21 1.68 16.83 1.31
The owner/operator shall maintain records of the actual operation hours, days, and production
rate, of the above referenced equipment at this relocation site and have the ability to submit the
information to the DAQ upon the request of representatives of the Director. Please make certain
that the plant operator is aware of all the location specific requirements for this site and the
conditions of the aforementioned AO.
Federal New Source Performance Standards Subpart OOO requires that initial Method 9
observations be performed for all applicable portable crushers, screens, and attached conveyors.
Subpart OOO also mandates that all crushers constructed, modified, or reconstructed on or after
April 22, 2008, which are not enclosed, must install spray bars on the equipment and keep
maintenance records to ensure proper spray bar operations.
Utah Division of Water Quality Storm Water Permits and regulations may apply to this temporary
project. Please refer to Utah DEQ Water Quality’s current Storm Water Construction
requirements for additional information.
This approval for relocation in no way releases the owner or operator from any liability for
compliance with all other applicable federal, state, and local regulations including the UAC.
If you have any questions regarding this relocation authorization or the temporary relocation
process please contact Susan Weisenberg at (385) 306-6512.
Sincerely,
Jay P. Morris
Assistant Director
JPM:SW:rh
Enclosure: Submitted Temporary Relocation Form
cc: Bear River Health Department
4 * - - $ . — @ ? v A ? A D @ @ w D C ˜
Susan Weisenberg <sweisenberg@utah.gov>
Portable/Temporary Relocation Form
1 message
noreply@qemailserver.com <noreply@qemailserver.com>Thu, Jan 16, 2025 at 3:43 PM
Reply-To: trigger@qemailserver.com
To: sweisenberg@utah.gov
Susan/Chad:
Site # -- Staker Parson Companies has requested a Temporary Relocation. Please see the information below. Any
attachments can be access by clicking on the links.
Recipient Data:
Time Finished: 2025-01-16 15:43:28 MST
IP: 165.225.10.112
ResponseID: R_7I4PlE1UgwODyPv
Link to View Results: Click Here
URL to View Results: https://utahgov.iad1.qualtrics.com/apps/single-response-reports/reports/Uk-
HYVksdUpy4p9raNidQqBiHiDPeY6Uq8dlqE7Lc21GIfxYly22W-cUQyq1vugRZxfRmcRyhxjZ7%
2EL1Cmve1S9M14ZFX8E0Ac3Pt5bH%2EvD6m4wR09q%2EiDw2K4KK6IUEBe71tYV9rrfTYucHSgLSOW3F-
nuYV0H6TSAskzlkqaNxe5xE55KKYRmmv2KSXWDJ938Z2ymSnj5OK3xcLC9SSFe8cVauM1cKQn2OXPburTCKHtt3hby
%2Edh5wIG84lbnSqIYZUHv7KTGW2lKGwLlsMl7SxkXXE5pWyra4i70XQBgkeYlIGYLXr40A2bZxCH9KmnYs-
4F6fXwmq1%2EYVQL6zw
Response Summary:
Please fill out the information below:
Contact Person: Jeffery Cowlishaw
Company Name: Staker Parson Companies
Mailing Address: 2350 S 1900 W
City: Ogden
Zip: 84401
Phone Number: 385-405-4315
Email: jeffery.cowlishaw@stakerparson.com
Is the site located within a PM2.5 non-attainment and maintenance plan areas on cleared land grea...
Yes
All temporary relocation projects are required to submit a Fugitive Dust Control Plan (FDCP). Lo...
9F7492484B
Briefly give directions to the site and/or physical address:
225 N HWY 89 Willard, UT 84340. Turn East on 300 N from Hwy 89 in Willard. Stay left to continue onto 200 N to
reach gate/entrance.
Proposed Relocation Information:
Closest City Willard
County Box Elder
UTM X Coordinates 4,585,265.446 N
UTM Y Coordinates 414,173.667 E
Approximate distance to the nearest house/business 1044 Feet
UTM X Coordinates to nearest house/business 4,584,944.937 N
UTM Y Coordinates to nearest house/business 414,047.825 E
1/28/25, 2:50 PM State of Utah Mail - Portable/Temporary Relocation Form
https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1821425419226479516%7Cmsg-f:1821447200612155252&s…1/2
Does this site currently have a permit with DAQ?
No
Please provide the permit ID for the equipment? (DAQE-XXXXXXXXX-XX)
Goodfellows
Please list all the Equipment on Site:Note: It is important to identify ALL diesel powered engine...
1
Equipment Type Track Jaw Crusher
Make/Model Astec/FT2650
Serial or ID# TBD
Manufactured Date TBD
Design Capacity 500TPH/300HP Diesel
2
Equipment Type Track Screen
Make/Model Astec/GT206 2 deck 6'X20 and 6'X18
Serial or ID# TBD
Manufactured Date TBD
Design Capacity 173HP Diesel
3
Equipment Type Superstacker conveyor
Make/Model KPI/33-3160
Serial or ID# TBD
Manufactured Date TBD
Design Capacity 10HP
4
Equipment Type Conveyor
Make/Model MGL/842XR
Serial or ID# TBD
Manufactured Date TBD
Design Capacity 74HP
Please attach a site diagram showing the equipment layout and general site dimensions for this re...
https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_25SiYPWiy7M34rq
Have any other state or local regulatory agencies issued any other "Conditional Use Permits" for...
No
Operational Information: (Please note: Operating time over 16 hours in a 24 hour period will re...
Total Hours of operation per 24 hr period 16
Starting time of operation (am/pm) 6AM
Ending time of operation (am/pm) 10PM
Maximum hourly production rate for project 500 TPH
Expected startup date 01/27/2025
Expected completion date 06/30/2025
What type of application is this for?
New Application
In accordance with the fee schedule approved by the Utah State Legislature, the Division of Air Q...
https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_OGQWwF3PM8cHWIp
Owner/Operator Representative:
https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_1DXYTzslNAO4xcJ
1/28/25, 2:50 PM State of Utah Mail - Portable/Temporary Relocation Form
https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1821425419226479516%7Cmsg-f:1821447200612155252&s…2/2
Susan Weisenberg <sweisenberg@utah.gov>
Fwd: [EXT] additional info regarding distance to Granite site for Willard relocation
1 message
Susan Weisenberg <sweisenberg@utah.gov>Mon, Feb 3, 2025 at 9:10 AM
To: Chad Gilgen <cgilgen@utah.gov>
I'm not certain if I forwarded this site map and response from Staker regarding the TRP to the Willard location near
Granite. Is this sufficient if I include this as an attachment?
Susan Weisenberg,
Environmental Scientist
Office: 385-306-6512
---------- Forwarded message ---------
From: Cowlishaw, Jeffery (Staker & Parson Companies) <jeffery.cowlishaw@stakerparson.com>
Date: Tue, Jan 28, 2025 at 3:51 PM
Subject: RE: [EXT] additional info regarding distance to Granite site for Willard relocation
To: Susan Weisenberg <sweisenberg@utah.gov>
Susan,
An additional site map is attached. The properties are immediately adjacent to each other. This project will
be fairly short in duration. We hope to start crushing right away but will likely be finished within 2-3 months.
Please let me know if you need any other information.
Thanks,
Jeffery (J) Cowlishaw
Environmental Specialist
Staker Parson Materials & Construction
A CRH COMPANY
2350 S 1900 W
Ogden, Utah 84401
C +1(385)405-4315
E Jeffery.cowlishaw@stakerparson.com
2/5/25, 6:22 PM State of Utah Mail - Fwd: [EXT] additional info regarding distance to Granite site for Willard relocation
https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-a:r1732389786754517054%7Cmsg-a:r3917933210467223095…1/2
www.stakerparson.com
The Preferred Source for quality sand, rock, landscape products, ready mix concrete, asphalt, paving & construction
services.
From: Susan Weisenberg <sweisenberg@utah.gov>
Sent: Tuesday, January 28, 2025 3:03 PM
To: Cowlishaw, Jeffery (Staker & Parson Companies) <jeffery.cowlishaw@stakerparson.com>
Subject: [EXT] addi onal info regarding distance to Granite site for Willard reloca on
CAUTION: This email originated from outside of the organiza on. Do not click links or open a achments unless you are
expec ng this email and know the contents are safe. If you believe this email may be phishing or malicious, please use the
Report Phish bu on.
Hello, I received your relocation request for the temporary project near Willard. It appears that this site is fairly close to
Granite Construction's South Wells facility. Can you provide more information regarding how close your temporary
operation is to the Granite facility? Also because of the close proximity to the other aggregate site, please provide a site
diagram. Thanks, let me know if you have any questions.
Susan Weisenberg,
Environmental Scientist
Office: 385-306-6512
ATTENTION: Ce courriel vient de l'exterieur de l'entreprise. Ne cliquez pas sur les liens, et n'ouvrez pas les pièces jointes, à
moins que vous ne connaissiez l'expéditeur du courriel et savez que le contenu est sécuritaire. Si vous pensez qu’il s’agit d’un
courriel d’hameçonnage ou malveillant, veuillez cliquer sur le bouton Signaler une tenta ve d’hameçonnage.
Willard Crushing Site Map 2 01282025.jpg
878K
2/5/25, 6:22 PM State of Utah Mail - Fwd: [EXT] additional info regarding distance to Granite site for Willard relocation
https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-a:r1732389786754517054%7Cmsg-a:r3917933210467223095…2/2
Susan Weisenberg <sweisenberg@utah.gov>
RE: [EXT] additional info regarding distance to Granite site for Willard relocation
1 message
Cowlishaw, Jeffery (Staker & Parson Companies) <jeffery.cowlishaw@stakerparson.com>Tue, Feb 4, 2025 at 2:07
PM
To: Susan Weisenberg <sweisenberg@utah.gov>
Susan,
Attached is a scaled site map showing the equipment layout and site boundary. We do need to add a
generator that will run a stacker. This is a whisperwatt diesel generator, specifications in attached picture
(85KVA, 68KW). And we will have a D8 dozer, a loader, and two vehicles for maintenance (a forklift and a
man lift).
Please let me know if you need any other information. The equipment arrived onsite today and the crew is
ready to begin operation.
Thanks,
Jeffery (J) Cowlishaw
Environmental Specialist
Staker Parson Materials & Construction
A CRH COMPANY
2350 S 1900 W
Ogden, Utah 84401
C +1(385)405-4315
E Jeffery.cowlishaw@stakerparson.com
www.stakerparson.com
The Preferred Source for quality sand, rock, landscape products, ready mix concrete, asphalt, paving & construction
services.
2/5/25, 10:57 AM State of Utah Mail - RE: [EXT] additional info regarding distance to Granite site for Willard relocation
https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-a:r1732389786754517054%7Cmsg-f:1823162536965582639…1/4