Loading...
HomeMy WebLinkAboutDAQ-2025-000858ffi l!{r{oIAlt0lil t0l UY[]G " owEt{s coRNlNG IIISUIATING SY5IEM5, TtC Nephl t.clllty 2762 Soutlr Main Strcct NeDhi, Utah 8.1648 1,800.GET. PrNri',' wsv.owenlc o rnlnS.com Januarv 29,2025 REVIEV/ED - ,,,,^,.:Zi - ;,, a1 5^2t, .;,,iliu-norunk1"'r Division of Air Quality Utah Department of Environmental Quality 195 North 1950 West P,O" Box L44820 salt Lake city, UT 84116 Via Certified Mail: Reference: Forming Sectlon Scrubbers NSPS Report Owens Corning lnsulating Systems, LLC - Nephi Facility Approval Order DAQE-AN 141780008-23 Period from July l,2124through December 3L,2024 To Whonr lt May Concern: This {etter serves as the semi-annual report of deviations of required monitoring parameters for the four Forming Section Scrubbers and the one Process Development Line Scrubber, as required by 40 CFR 60.684(d) (Subpart PPP: Standards of Performance for Wool Fiherglass lnsulation Manufacturing Plants). Section ll.B.2.b of Approval Order DAQE-AN141780008-23 (lssued April 6,20231provides the operating parameters to be maintained and monitored, The report period is July L,2024 through December 31,2024. Emissions from the bonded fiberglass insulation line are controlled by four scrubbers, and the process development line is controlled by one scrubber. Water flow and differential pressure (dP) monitoring deviations are summarized below. Water Flow Monitoring Results r Scrubber A: No Deviations. o Scrubber B: No Deviations. r Scrubber C: No Deviations. o Scrubber D: No Deviations.r Process Development Line: No Deviations. UTAH DEPANTMETVT OFqlvBgIuElIAL!uALtrY DIVISION OF AIR QUALITY Differential Pressure (dP) Monitorine Results o Scrubber A: No Deviations.r Scrubber B: No Deviations,e Scrubber C: No Deviations.. Scrubber D: No Deviations.o Process Development Line: No Deviations. Equipment calibrations are required per 40 CFR 60.683(c) and Section 1t.8.2.b.1 of Approval Order DAQE-AN141780008-23. Calibration checks were conducted for each scrubber's flow meter which operated in the 3'd and 4th quarters. All calibration checks were within specification, per the manufacturer's recommendation, calibration of the dP gauges is not required. I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system deslgned to assure that qualified personnel properly gather and evaluate the information submltted. Based on information and belief formed after reasonable inquiry, including the person or persons who manage the system, or those persons directly responsible for gathering the information, the stated information in this letter is trLre) accurate and complete, Please contact stefan Messmer at (618) 7L3-3L92 if you have any questions. Sincerely, Kirk Budge Acting Plant Leader Ovrens Corning lnsulating Systems, LLC - Nephi Attachments ULF Scrubber "A" Flow Deviation Summary 2nd Half 2024 NSPS Semi-Annual Report Owens Corning lnsulating Systems LLC Nephi, UT Q3+q4 Total No Data I O Hleh : 0 ULF Scrubber "A" Differential Pressure Deviation Summary 2nd Half 2024 NSPS Semi-Annual Report Owens Corning lnsulating Systems LLC Nephi, UT Q3+q4 Total Low l Hieh 0 0 ULF Scrubber "8" Flow Deviation Summary 2nd Half 2024 NSPS Semi-Annual Report Owens Corning lnsulating Systems LLC Nephi, UT Q3+Qa Total No Data 0_1._ _- _ _Lowio Hish O ULF Scrubber "B" Differentia! Pressure Deviation Summary 2nd Half 2024 NSPS Semi-Annual Report Owens Corning lnsulating Systems LLC Nephi, UT ULF Scrubber "8" Differentlal Pressure: Q3 + q4 2024tt./iir., -[--zoo--l- i1-oo -i-iroo I rg:oo I zg:oo r:oo No Data 0Q3+Q4 Total Low 0 Hieh 0 ULF Scrubber "C" Flow Deviation Summary 2nd Half 2024 NSPS Semi-Annual Report Owens Corning lnsulating Systems LLC Nephi, UT Q3+qa Total i I 0 0 ___lg*_ ULF Scrubber "C" Differential Pressure Deviation Summary 2nd Half 2024 NSPS Semi-Annual Report Owens Corning lnsulating Systems LLC Nephi, UT ULF Scrubber "C" Differentlal Pressure: Q3 + Q4 2024 oite/rime: ,l -i:oo rr:oo I rsioo isioo I 23:oo 3:00 NA No Data ,l I 0 0 Q3+q4 Total Low ULF Scrubber "D" Flow Deviation Summary 2nd Half 2024 NSPS Semi-Annual Report Owens Corning Insulating Systems LLC Nephi, UT ULF Scrubber "D" Flow: Q3 + q4 2024 Date/Time: I 7:00 11:00 15:00 I rg:oo 23:00 3:00 NA ULF Scrubber "D" Differential Pressure Deviation Summary 2nd Half 2024 NSPS Semi-Annual Report Owens Corning lnsulating Systems LLC Nephi, UT ULF Scrubber "D" Differentlal Pressure: Q3 + Q4 2024 oaie/rime: I 7:00 11:00 I 15:oo 19:00 23:00 3:00 NA Process Development Line (Unit 8) Flow Deviation Summary 2nd Half 2024 NSPS Semi-Annual Report Owens Corning lnsulating Systems LLC Nephi, UT Q3+Q4 Total No Data Low l 0 Process Development Line (Unit 8) Differential Pressure Deviation Summary 2nd Half 2024 NSPS Semi-Annual Report Owens Corning lnsulating Systems LLC Nephi, UT Q3+Q4 Total No Data 0 Low 0 Hieh 0 UTAH DEPARTMENT OF ENVIRONMENTAL QUALITY FEB - 3 2025 DIVISION OF AIR OUALITY