HomeMy WebLinkAboutDWQ-2025-001718
Rob Wight
Region 1 Director
Utah Department of Transportation (UDOT)
166 West Southwell Street
Ogden, Utah 84404-4195
rwight@utah.gov
Dear Mr. Wight:Subject:Approval to UseUDOT Morgan Maintenance Site Improvements
The Division of Water Quality (DWQ) conducted a final inspection on March 25, 2022 of the UDOT Morgan Maintenance Site Improvements. This included but is not limited to a new Retention
Pond, a Solids Settling Concrete Pad, a Truck Wash Pad, and a Material Storage Bin. On December12, 2022 DWQ received the liner documentation from Bren Edwards. On January 29, 2025 DWQ
received the P.E. Stamped As-Constructed Plans also from Bren Edwards. A review of our records indicates that an Approval to Use Letter had not been sent out.
Therefore, based on the final inspection and the review of the liner documentation and the As-Constructed Plans, DWQ approves the use ofUDOT Morgan Maintenance Site Improvements.
If we can be of further assistance, please contact Mr. Woodrow Campbell at wwcampbell@utah.gov or (801) 536-4353.
Sincerely,
Woodrow Campbell, P.E.
Environmental Engineercc:Via EmailScott Braeden, Weber-Morgan Health DepartmentMichela Harris, Weber-Morgan Health DepartmentJosh Black (josh.black@wcg.us)