Loading...
HomeMy WebLinkAboutDAQ-2025-000830Submitted via EPA CEDRI January 27, 2025 Director, U.S. EPA Region 8 1595 Wynkoop Street Mail Code 8ENF – AT Denver, CO 80202-1129 Re: Kinder Morgan Altamont LLC Bluebell Facility, Title V Operating Permit # 1300033003 40 CFR 60 subpart OOOOa Semiannual LDAR Report July 1, 2024 through December 31, 2024 Kinder Morgan Altamont LLC (Kinder Morgan) is submitting the enclosed Semi-annual Report as required by 40 CFR 60 Subpart OOOOa for the Bluebell Facility. The monitoring report covers the semi-annual period from July 1, 2024 through December 31, 2024. If you have any questions or concerns, please contact me by phone at (918) 588-5044 or by email at janel_nelson@kindermorgan.com. Sincerely, Janel Nelson EHS Specialist – Air Permitting/Compliance Sr II Attachments: OOOOa Delay of Repair report for semiannual reporting period OOOOa Semi-Annual Report (July 1, 2024 through December 31, 2024) Bluebell Facility Part 60 Subpart OOOOa – 60.5422a(a) Semiannual Report Template Cc: Joe Randolph Utah Division of Air Quality 195 North 1950 West Salt Lake City, UT 84116 Electronic Submittal REVIEWED Initials JBR Date 1/22/25Comp Status Meets File # 10219 Blue 2 DOR, leaks, Semiannual Equipment Leak/VOC Monitoring Report pursuant to NSPS OOOOa This report is being submitted to meet the requirements in 40 CFR 60, Subpart OOOOa, Standards of Performance for Crude Oil and Natural Gas Facilities for which Construction, Modification, or Reconstruction Commenced after September 18, 2015. This report covers the period from July 1, 2024 through December 31, 2024. Below is the specific information required by §60.5422a(a)-(c). 60.487a(c)(1) Process unit identification Condensate Fractionation Inlet Refrigeration Storage Truck Loading Rack 60.487a(c)(2)(i)-(iv), (vii)-(viii), and 60.5422a(c) Provided in reporting template submitted via CEDRI. 60.487a(c)(2)(xi) Please see attached. 60.487a(c)(3) A scheduled plant shutdown occurred from 8/20/24 through 9/3/24. 60.487a(c)(4) Component Type Component Count (period ending 6/30/2024) Component Count (period ending 12/31/2024) Valve 1110 1133 Pump 12 12 Connector 4740 4833 PRV 0 0 Report Date :1/9/2025Compliance Repair Delay List Regulation : Begin Date : End Date : Compliance Group :FRACTIONATION Tag / Drawing Class Stream ID / Stream Inspection Date Placed On Delay Reason Documentation Expected Repair Removed from Delay 00792.00 / 014 VALVE 07 / Y-GRADE 10/3/2024 10/7/2029 Repair is technically infeasible without a process unit shutdown. Repair of this equipment shall occ AUSTIN ATWOOD 10/3/2024 00834.00 / 014 VALVE 05 / PROPANE 12/9/2024 11/19/2025 Repair is technically infeasible without a process unit shutdown. Repair of this equipment shall occ AUSTIN ATWOOD 12/10/2024 01034.00 / 015 VALVE 07 / Y-GRADE 12/9/2024 11/19/2025 Repair is technically infeasible without a process unit shutdown. Repair of this equipment shall occ AUSTIN ATWOOD 12/10/2024 Number of Components Delayed for Compliance Group FRACTIONATION = 3 Signature of Owner or Operator Responsible for Delay of Repair Decision TI_R800_3.xml Page 1 of 1 40 CFR Part 60 - Standards of Performance for Crude Oil and Natural Gas Facilities for which Construction, Modification or Reconstruction Commenced After September 18, 2015, and on or before December 6, 2022 - 60.5422a Semiannual Report Use this tab to provide information on the sites for which you are reporting. Note: The Site Record No. will automatically generate if you do not enter one. FACILITY INFORMATION REPORTING PERIOD ADDITIONAL INFORMATIONSite Record No. (Field value will automatically generate if a value is not entered)Site Name Address of Processing Plant Address 2 City County State Abbreviation Zip Code Responsible Agency Facility ID (State Facility Identifier)Beginning Date of Reporting Period Ending Date of Reporting Period Please enter any additional information Enter associated file name reference. RecordId FacilityName AddressLine1 AddressLine2 CityName CountyName StateName ZIPCode StateFacID PeriodStartDate PeriodEndDate AddInfo AddFile e.g.: 1 e.g.: ABC Company e.g.: 123 Main Street e.g.: Suite 100 e.g.: Brooklyn e.g.: Kings County e.g.: NY e.g.: 11221 e.g.:e.g.: 01/01/2016 e.g.: 06/30/2016 e.g.: filename.pdf1Bluebell Gas Plant 5564 North 5000 West Cedarview Duchesne UT 84066 07/01/2024 12/31/2024 2025-01-27 Bluebell Semiannual LDAR Report_CEDRI Submittal.pdf 40 CFR Part 60 - Standards of Performance for Crude Oil and Natural Gas Facilities for which Construction, Modification or Reconstruction Commenced After September 18, 2015, and on or before December 6, 2022 - 60.5422a Semiannual Report An owner or operator must include the information specified in paragraphs (c)(1) and (2) of this section in all semiannual reports in addition to the information required in § 60.487a(c)(2)(i) through (iv) and (vii) through (viii): (1) Number of pressure relief devices for which leaks were detected as required in § 60.5401a(b)(2); and (2) Number of pressure relief devices for which leaks were not repaired as required in § 60.5401a(b)(3). Note: Site Record No. selections will appear once information entered onto the Site_Information tab. Facility Record No. (Select from dropdown list) Month Identification (Select from dropdown list) Number of pressure relief devices for which leaks were detected (§60.5422a(c)(1)) Number of pressure relief devices for which leaks were not repaired as required in §60.5401a(b)(3) (§60.5422a(c)(2)) Number of valves for which leaks were detected (§60.487a(c)(2)(i), §60.5422a(c)) Number of valves for which leaks were not repaired as required in §60.482–7a(d)(1) (§60.487a(c)(2)(ii), §60.5422a(c)) Number of pumps for which leaks were detected (§60.487a(c)(2)(iii), §60.5422a(c)) Number of pumps for which leaks were not repaired as required in §60.482–2a(c)(1) and (d)(6) (§60.487a(c)(2)(iv), §60.5422a(c)) Number of connectors for which leaks were detected (§60.487a(c)(2)(vii), §60.5422a(c)) Number of connectors for which leaks were not repaired as required in §60.482–11a(d) (§60.487a(c)(2)(viii), §60.5422a(c)) RecordId MonthID SAPreRelDevCt SAPreRelDevNRCt SAValveCt SAValveNRCt SAPumpCt SAPumpNRCt SAConnectorCt SAConnectorNRCt e.g.: 1 e.g.: March e.g.: 5 e.g.: 5 e.g.: 5 e.g.: 5 e.g.: 5 e.g.: 5 e.g.: 5 e.g.: 5 1 July 0 0 14 0 0 0 6 0 1 August 0 0 13 0 0 0 3 0 1 September 0 0 5 0 0 0 2 0 1 October 0 0 6 0 0 0 2 0 1 November 0 0 15 0 0 0 4 0 1 December 0 0 8 0 0 0 2 0 Revise & Re-submit Report CEDRI Report Details 60.5422a Semiannual Report (Spreadsheet Template) for KINDER MORGAN ALTAMONT LLC - BLUEBELL GAS PLANT Report Facility Certifier Revisions Documents Download All Name Size (kb)Date Archived 2025-01-27 Bluebell Semiannual LDAR Report_CEDRI Submittal.zip 1262.7 2025-01-28 00:04:41 Report Submission Information Report Status Submitted Certification Date 2025-01-27 22:35:32 Available in WebFIRE 2025-02-26 (30 Days) CROMERR Activity ID _31c7965f-8be3-4678-b1db-42a980c867c3 CROMERR Document ID 7e22bd8f-2c76-4c7b-8c80-8c3f13b0353b Report Type Information Report Name 60.5422a Semiannual Report (Spreadsheet Template) Citation 60.5422a - Part 60 Subpart OOOOa - Crude Oil and Natural Gas Facilities for which Construction, Modification, or Reconstruction Commenced after 9/18/2015 Report Type Periodic Report Format Spreadsheet (Template v2.01) CDX Help Desk Policy Questions? (cedri@epa.gov) About CDX Frequently Asked Questions Terms and Conditions Contact Us EPA Home Privacy and Security Notice Accessibility Revise & Re-submit Report CEDRI Report Details 60.5422a Semiannual Report (Spreadsheet Template) for KINDER MORGAN ALTAMONT LLC - BLUEBELL GAS PLANT Report Facility Certifier Revisions Documents Download All Name Size (kb)Date Archived 2025-01-27 Bluebell Semiannual LDAR Report_CEDRI Submittal.zip 1262.7 2025-01-28 00:04:41 Facility KINDER MORGAN ALTAMONT LLC - BLUEBELL GAS PLANT FRS Registry ID / Program ID 110070630372 / CEDRI10044321 State Facility ID Other Facilities Contained in Report Facility Name State Address State Facility ID Bluebell Gas Plant UT 5564 North 5000 West Cedarview, UT 84066 Duchesne CDX Help Desk Policy Questions? (cedri@epa.gov) About CDX Frequently Asked Questions Terms and Conditions Contact Us EPA Home Privacy and Security Notice Accessibility Revise & Re-submit Report CEDRI Report Details 60.5422a Semiannual Report (Spreadsheet Template) for KINDER MORGAN ALTAMONT LLC - BLUEBELL GAS PLANT Report Facility Certifier Revisions Documents Download All Name Size (kb)Date Archived 2025-01-27 Bluebell Semiannual LDAR Report_CEDRI Submittal.zip 1262.7 2025-01-28 00:04:41 Manage My Profile Name Donald Perkins CDX User ID DWPERKINS Email don_perkins@kindermorgan.com CDX Help Desk Policy Questions? (cedri@epa.gov) About CDX Frequently Asked Questions Terms and Conditions Contact Us EPA Home Privacy and Security Notice Accessibility