HomeMy WebLinkAboutDAQ-2025-000830Submitted via EPA CEDRI
January 27, 2025
Director, U.S. EPA Region 8
1595 Wynkoop Street
Mail Code 8ENF – AT
Denver, CO 80202-1129
Re: Kinder Morgan Altamont LLC
Bluebell Facility, Title V Operating Permit # 1300033003
40 CFR 60 subpart OOOOa Semiannual LDAR Report
July 1, 2024 through December 31, 2024
Kinder Morgan Altamont LLC (Kinder Morgan) is submitting the enclosed Semi-annual Report as required
by 40 CFR 60 Subpart OOOOa for the Bluebell Facility. The monitoring report covers the semi-annual
period from July 1, 2024 through December 31, 2024.
If you have any questions or concerns, please contact me by phone at (918) 588-5044 or by email at
janel_nelson@kindermorgan.com.
Sincerely,
Janel Nelson
EHS Specialist – Air Permitting/Compliance Sr II
Attachments:
OOOOa Delay of Repair report for semiannual reporting period
OOOOa Semi-Annual Report (July 1, 2024 through December 31, 2024)
Bluebell Facility Part 60 Subpart OOOOa – 60.5422a(a) Semiannual Report Template
Cc: Joe Randolph
Utah Division of Air Quality
195 North 1950 West
Salt Lake City, UT 84116
Electronic Submittal
REVIEWED
Initials JBR Date 1/22/25Comp Status Meets
File # 10219 Blue 2
DOR, leaks,
Semiannual Equipment Leak/VOC Monitoring Report pursuant to NSPS OOOOa
This report is being submitted to meet the requirements in 40 CFR 60, Subpart OOOOa, Standards of
Performance for Crude Oil and Natural Gas Facilities for which Construction, Modification, or
Reconstruction Commenced after September 18, 2015. This report covers the period from July 1, 2024
through December 31, 2024. Below is the specific information required by §60.5422a(a)-(c).
60.487a(c)(1) Process unit identification
Condensate
Fractionation
Inlet
Refrigeration
Storage
Truck Loading Rack
60.487a(c)(2)(i)-(iv), (vii)-(viii), and 60.5422a(c)
Provided in reporting template submitted via CEDRI.
60.487a(c)(2)(xi)
Please see attached.
60.487a(c)(3)
A scheduled plant shutdown occurred from 8/20/24 through 9/3/24.
60.487a(c)(4)
Component Type Component Count
(period ending 6/30/2024)
Component Count
(period ending 12/31/2024)
Valve 1110 1133
Pump 12 12
Connector 4740 4833
PRV 0 0
Report Date :1/9/2025Compliance Repair Delay List
Regulation :
Begin Date :
End Date :
Compliance Group :FRACTIONATION
Tag / Drawing Class Stream ID / Stream Inspection
Date
Placed On
Delay Reason Documentation Expected
Repair
Removed
from Delay
00792.00 / 014 VALVE 07 / Y-GRADE 10/3/2024 10/7/2029
Repair is technically infeasible without a
process unit shutdown. Repair of this
equipment shall occ
AUSTIN
ATWOOD 10/3/2024
00834.00 / 014 VALVE 05 / PROPANE 12/9/2024 11/19/2025
Repair is technically infeasible without a
process unit shutdown. Repair of this
equipment shall occ
AUSTIN
ATWOOD 12/10/2024
01034.00 / 015 VALVE 07 / Y-GRADE 12/9/2024 11/19/2025
Repair is technically infeasible without a
process unit shutdown. Repair of this
equipment shall occ
AUSTIN
ATWOOD 12/10/2024
Number of Components Delayed for Compliance Group
FRACTIONATION = 3
Signature of Owner or Operator
Responsible for Delay of Repair Decision
TI_R800_3.xml Page 1 of 1
40 CFR Part 60 - Standards of Performance for Crude Oil and Natural Gas Facilities for which Construction, Modification or Reconstruction Commenced After September 18, 2015, and on or before December 6, 2022 - 60.5422a Semiannual Report
Use this tab to provide information on the sites for which you are reporting.
Note: The Site Record No. will automatically generate if you do not enter one.
FACILITY INFORMATION REPORTING PERIOD ADDITIONAL INFORMATIONSite Record No. (Field value will
automatically
generate if a value is not entered)Site Name Address of Processing Plant Address 2 City County State Abbreviation Zip Code
Responsible Agency
Facility ID (State Facility Identifier)Beginning Date of Reporting Period Ending Date of Reporting Period Please enter any additional information Enter associated file name reference.
RecordId FacilityName AddressLine1 AddressLine2 CityName CountyName StateName ZIPCode StateFacID PeriodStartDate PeriodEndDate AddInfo AddFile
e.g.: 1 e.g.: ABC Company e.g.: 123 Main Street e.g.: Suite 100 e.g.: Brooklyn e.g.: Kings County e.g.: NY e.g.: 11221 e.g.:e.g.: 01/01/2016 e.g.: 06/30/2016 e.g.: filename.pdf1Bluebell Gas Plant 5564 North 5000 West Cedarview Duchesne UT 84066 07/01/2024 12/31/2024 2025-01-27 Bluebell Semiannual LDAR Report_CEDRI Submittal.pdf
40 CFR Part 60 - Standards of Performance for Crude Oil and Natural Gas Facilities for which Construction, Modification or Reconstruction Commenced After September 18, 2015, and on or before December 6, 2022 - 60.5422a Semiannual Report
An owner or operator must include the information specified in paragraphs (c)(1) and (2) of this section in all semiannual reports in addition to the information required in § 60.487a(c)(2)(i) through (iv) and (vii) through (viii):
(1) Number of pressure relief devices for which leaks were detected as required in § 60.5401a(b)(2); and (2) Number of pressure relief devices for which leaks were not repaired as required in § 60.5401a(b)(3).
Note: Site Record No. selections will appear once information entered onto the Site_Information tab.
Facility Record No.
(Select from
dropdown list)
Month
Identification
(Select from
dropdown list)
Number of pressure
relief devices for
which leaks were
detected
(§60.5422a(c)(1))
Number of pressure relief
devices for which leaks
were not repaired as
required in
§60.5401a(b)(3)
(§60.5422a(c)(2))
Number of valves for
which leaks were
detected
(§60.487a(c)(2)(i),
§60.5422a(c))
Number of valves for which
leaks were not repaired as
required in
§60.482–7a(d)(1)
(§60.487a(c)(2)(ii),
§60.5422a(c))
Number of pumps for
which leaks were
detected
(§60.487a(c)(2)(iii),
§60.5422a(c))
Number of pumps for
which leaks were not
repaired as required in
§60.482–2a(c)(1) and (d)(6)
(§60.487a(c)(2)(iv),
§60.5422a(c))
Number of connectors
for which leaks were
detected
(§60.487a(c)(2)(vii),
§60.5422a(c))
Number of connectors for
which leaks were not
repaired as required in
§60.482–11a(d)
(§60.487a(c)(2)(viii),
§60.5422a(c))
RecordId MonthID SAPreRelDevCt SAPreRelDevNRCt SAValveCt SAValveNRCt SAPumpCt SAPumpNRCt SAConnectorCt SAConnectorNRCt
e.g.: 1 e.g.: March e.g.: 5 e.g.: 5 e.g.: 5 e.g.: 5 e.g.: 5 e.g.: 5 e.g.: 5 e.g.: 5
1 July 0 0 14 0 0 0 6 0
1 August 0 0 13 0 0 0 3 0
1 September 0 0 5 0 0 0 2 0
1 October 0 0 6 0 0 0 2 0
1 November 0 0 15 0 0 0 4 0
1 December 0 0 8 0 0 0 2 0
Revise & Re-submit Report
CEDRI
Report Details
60.5422a Semiannual Report (Spreadsheet Template) for KINDER MORGAN ALTAMONT LLC - BLUEBELL GAS PLANT
Report Facility Certifier Revisions
Documents Download All
Name Size (kb)Date Archived
2025-01-27 Bluebell Semiannual LDAR Report_CEDRI Submittal.zip 1262.7 2025-01-28 00:04:41
Report Submission
Information
Report Status Submitted
Certification Date 2025-01-27 22:35:32
Available in WebFIRE 2025-02-26 (30 Days)
CROMERR Activity ID _31c7965f-8be3-4678-b1db-42a980c867c3
CROMERR Document ID 7e22bd8f-2c76-4c7b-8c80-8c3f13b0353b
Report Type
Information
Report Name 60.5422a Semiannual Report (Spreadsheet Template)
Citation 60.5422a - Part 60 Subpart OOOOa - Crude Oil and Natural Gas Facilities for which Construction,
Modification, or Reconstruction Commenced after 9/18/2015
Report Type Periodic Report
Format Spreadsheet (Template v2.01)
CDX Help Desk Policy Questions? (cedri@epa.gov)
About CDX Frequently Asked Questions Terms and Conditions Contact Us
EPA Home Privacy and Security Notice Accessibility
Revise & Re-submit Report
CEDRI
Report Details
60.5422a Semiannual Report (Spreadsheet Template) for KINDER MORGAN ALTAMONT LLC - BLUEBELL GAS PLANT
Report Facility Certifier Revisions
Documents Download All
Name Size (kb)Date Archived
2025-01-27 Bluebell Semiannual LDAR Report_CEDRI Submittal.zip 1262.7 2025-01-28 00:04:41
Facility
KINDER MORGAN ALTAMONT LLC - BLUEBELL GAS PLANT
FRS Registry ID / Program ID
110070630372 / CEDRI10044321
State Facility ID
Other Facilities Contained in Report
Facility Name State Address State Facility ID
Bluebell Gas Plant UT 5564 North 5000 West
Cedarview, UT 84066
Duchesne
CDX Help Desk Policy Questions? (cedri@epa.gov)
About CDX Frequently Asked Questions Terms and Conditions Contact Us
EPA Home Privacy and Security Notice Accessibility
Revise & Re-submit Report
CEDRI
Report Details
60.5422a Semiannual Report (Spreadsheet Template) for KINDER MORGAN ALTAMONT LLC - BLUEBELL GAS PLANT
Report Facility Certifier Revisions
Documents Download All
Name Size (kb)Date Archived
2025-01-27 Bluebell Semiannual LDAR Report_CEDRI Submittal.zip 1262.7 2025-01-28 00:04:41
Manage My Profile
Name
Donald Perkins
CDX User ID
DWPERKINS
Email
don_perkins@kindermorgan.com
CDX Help Desk Policy Questions? (cedri@epa.gov)
About CDX Frequently Asked Questions Terms and Conditions Contact Us
EPA Home Privacy and Security Notice Accessibility