Loading...
HomeMy WebLinkAboutDAQ-2025-000819KTNDE ORGANwALTAUONT LLC FedEx 2843 4959 2L5O January L7,2025 Bryce Bird, Director Utah Department of Environmental Quality Division of Air Quality 195 North L950 West salt Lake city, utah 84LL6 NIVISION OF AIR OUALITY Re:Kinder Morgan Altamont LLC Altamont Main Gas Processing Plant, Title V Operating Permit No. 1300006003 Semiannual Monitoring Report-July 1,2024 through December 37.,2024 Dear Mr. Bird, Kinder Morgan Altamont LLC respectfully submits the attached Semiannual Monitoring Report for the reporting period from July L,2024 through December 3L,2024 as required by Condition l.S.2.a of Title V Operation Permit No. 1300005003 forthe Altamont Main Gas Processing Plant (Altamont Plant). There was one deviation from the f..ifity Title V Operating Permit conditions during the compliance period covered by this six month monitoring report. lf you have any questions or require additional information, please contact me by phone at (303) 9L4-7605 or by email at Erin_Dunman@KinderMorgan.com. Enclosures:r Six-Month Monitoring Report (July 1, 2024 through December 3L,20241 Sincerely,A-h Erin Dunman Environmental Engineer REVIEWED Initials JBR Date 2/12/25 Comp Status Meets File # 10005 Blue 2 late test notice NFA KTNDEFl#./illORGAN i/ ALrAmoNrLLc SIX MONTH MONITORING REPORT Director, Utah Division of Air Quality Kinder Morgan LIC - Altamont Main Gas Processing Plant Monitoring Report for Permit # 1300006003 Januarv 17.2025 i-: I t- I I I I I I LI;n" rii+nF.r-rn xf OF \. rti.o\I\.:ENil a.l. QLIALITY [;lti rSION OFAIR OtfALITY TO: FROM: RE: DATE: ln accordance with Operating Permit provision 1.S.2.a, and Utah Administrative Code (UAC) R307-415-5a (3)(c) (i), the fotlowing monitorin g report is subm itted. This Report covers the period from July L,2024 through December 3L,2024. For the indicated reporting period: There were no deviations from any permit requirements. Attached is a list of permit requirements for whlch there were deviations. The list includes the information required by Operating Permit provision l.S.2.a and uAc R307-a1s-6a(3)(c)(i). ln lieu of attaching the above list, deviation reports submitted in accordance with permit provision 1.S.2.c, and UAC R307-415-5a(3XcXii) as referenced below. 1) On March 3,2024, Kinder Morgan mailed the test notification for ICE-I, ICE- 2,lCE-3,lCE-4, ICE-S, ICE-6, lCE-7,lCE-8, ICE-9, ICE-10 & ICE-12 via FedEx. The Utah Division of Air Quality (UDAq never received the test notification. Upon notification the test notification was missing, Kinder Morgan submitted an electronic copy to Mr. Harold Burge on June L8,2024. The engine testing was completed on April24,2024 and the final test report was submitted on June 19, 2024. The deviation report was submitted on June 24, 2024, which was within 14 days of discovery. ln accordance with Operating Permit provision l.K and UAC R307-415-5d, and based on information and belief formed after reasonable inquiry, I certify that the statements and information in this document are true, accurate, and complete. Don Perkins, Director tr tr tr Signature of Responsible Official for the Source Print or type the name and title of Responsible Official