HomeMy WebLinkAboutDAQ-2025-000818Electronic Submittal
January 13, 2025
Mr. Harold Burge, Manager
Utah Division of Air Quality
195 North 1950 West
Salt Lake City, Utah 84116
Re: Kinder Morgan Altamont LLC
Altamont Main Gas Processing Plant (Title V Permit #1300006003)
40 CFR 60 subpart OOOO Semiannual LDAR Report
July 1, 2024 through December 31, 2024
Dear Mr. Burge,
Kinder Morgan Altamont LLC (Kinder Morgan) is submitting the attached Semiannual Equipment
Leak/VOC Monitoring Report pursuant to NSPS OOOO, Standards of Performance for Crude Oil and
Natural Gas Production, Transmission, and Distribution. This report covers the period from July 1, 2024
through December 31, 2024.
If you have any questions or require additional information, please contact me by phone at
(303) 914-7605 or by email at Erin_Dunman@KinderMorgan.com.
Sincerely,
Erin Dunman
Environmental Engineer
Attachments:
Attachment 1: NSPS OOOO Semiannual LDAR Report
Cc: Joe Randolph (UDAQ)
REVIEWED
Initials JBR Date 2/12/25
Comp Status Meets
File # 10005 Blue 2
ATTACHMENT 1
NSPS OOOO
SEMIANNUAL LDAR REPORT
Kinder Morgan LLC - Altamont Main Gas Processing Plant
17790 W. 3750 N.
Altamont, UT 84001
Page 1
Semiannual Equipment Leak/VOC Monitoring Report pursuant to NSPS OOOO
This report is being submitted to meet the requirements in 40 CFR 60, Subpart OOOO, Standards of
Performance for Crude Oil and Natural Gas Production, Transmission and Distribution. This report covers
the period from July 1, 2024 through December 31, 2024. Below is the specific information required by
§60.5422(a) and (c).
60.487a(c)(1) Process Unit Identification
Condensate
Refrigeration
Truck Loading
Second Half 2024
Citation Jul Aug Sep Oct Nov Dec
Valves – Gas Vapor/Light Liquid
60.487a(c)(2)(i) Leak count 2 9 6 7 16 12
60.487a(c)(2)(ii) Repaired Late 0 0 0 0 0 0
Pumps – Light Liquid
60.487a(c)(2)(iii) Leak Count 0 0 0 0 0 1
60.487a(c)(2)(iv) Repaired Late 0 0 0 0 0 0
Pressure Relief Devices – Gas Vapor/Light Liquid
60.5422(c)(1) Leak Count 0 0 0 0 0 0
60.5422(c)(2) Repaired late 0 0 0 0 0 0
Connectors
60.5422(a) &
60.487a(c)(2)(vii)
Leak Count 6 5 2 2 6 1
60.5422(a) &
60.487a(c)(2)(viii)
Repaired late 0 0 0 0 0 0
Reporting per 60.487a(c)(2)(xi)
No components were placed on delay of repair during the semi-annual reporting period.
Reporting per 60.487a(c)(3)
There were no process unit shutdowns during the reporting period.
Kinder Morgan LLC - Altamont Main Gas Processing Plant
17790 W. 3750 N.
Altamont, UT 84001
Page 2
Reporting per 60.487a(c)(4)
Reportable Inventory Components Current Period Ending 6/30/2024 Current Period Ending 12/31/2024
Valves (Excluding no detectable
emissions) (60.487a(b)(2))
798 809
Pumps (excluding dual-seal and
closed vent) (60.487a(b)(3))
7 7
Connectors (60.487a(b)(5)) 3571 3614