HomeMy WebLinkAboutDAQ-2025-000797KINDE RGANn{po
ALTAMOilT LLC
FedEx 2843 4959 2l5O
January L7,2025
Bryce Bird, Director
Utah Department of Environmental Quality
Division of Air Quality
195 North 1950 West
salt Lake city, Utah 84116
Re: Klnder Morgan Altamont LLC
Altamont South Compressor Station, Title V Operating Permit No. 1300041005
Semiannual Monitoring Report - July 1,,2024 through December 31,2024
Dear Mr. Bird,
Kinder Morgan Altamont LLC respectfully submits the attached Semiannual Monitoring Report
for the reporting period from July L,2024 through December 3L,2024 as required by Condition
l.S.2.a of Title V Operating Permit No. 1300041005 for the Altamont South Compressor Station.
There were no deviations from the facility Title V Operating Permit conditions during this six-
month reporting period as noted in the attached report.
lf you have any questions or require additional information, please contact me by phone at (303)
9t4-7605 or by email at Erin_Dunman@KinderMorgan.com.
Enclosures:o Six-Month Monitoring Report (July 1, 2024 through December 3L,20241
! i1l, H t)rjP..'t i Mi-lJT OF
i: NVi Ii O \l rvl E N]-AL Q UAl.. I TY[ --t
II r(
I
!lri__ ___--__ I
NI\i ISION OF AIR OI.,IALITY
Sincerely,
A,,T>
Erin Dunman
Environ mental Engineer
REVIEWED
Initials JBR Date 2/11/2025
Comp Status Meets
File # 10211 Blue 2
ne dev
KINDER ONGAN i
I
I
!
i _--.-
TO:
FROM:
RE:
DATE:
ALTATONT LLC
SIX MONTH MONITORING REPORT
Director, Utah Division of Air Quality
Kinder Morgan Altamont LLC - Altamont South Compressor Station
Monitoring Report for Permit #1300041005
lanuarv 17,2O25
ln accordance with Operating Permit provision l.S.2.a and Utah Administrative Code (UAC) R307-415-
6a(3XcXi), the following monitoring report is submitted.
This Report covers the period from January L,2024 through June 30,2024.
For the indicated reporting period:
There were no deviations from any permit requirements.
Attached is a list of permit requirements for which there were deviations. The list
includes the information required by Operating Permit provision l.S.2.a and UAC
R307-41s-6a(3XcXi).
ln lieu of attaching the above list, deviation reports submitted in accordance with
permit provision 1.S.2.c, and UAC R307-415-6a(3XcXii)as referenced below.
ln accordance with Operating Permit provision l.K and UAC R307-415-5d, and based on information
and belief formed after reasonable inquiry, I certify that the statements and information in this
document are true, accurate, and complete.
Don Perkins, Dlrector
Print or type the name and title of Responsible Official
EI
D
tr
/
Signature of Responsible Official for the Source