Loading...
HomeMy WebLinkAboutDAQ-2025-000797KINDE RGANn{po ALTAMOilT LLC FedEx 2843 4959 2l5O January L7,2025 Bryce Bird, Director Utah Department of Environmental Quality Division of Air Quality 195 North 1950 West salt Lake city, Utah 84116 Re: Klnder Morgan Altamont LLC Altamont South Compressor Station, Title V Operating Permit No. 1300041005 Semiannual Monitoring Report - July 1,,2024 through December 31,2024 Dear Mr. Bird, Kinder Morgan Altamont LLC respectfully submits the attached Semiannual Monitoring Report for the reporting period from July L,2024 through December 3L,2024 as required by Condition l.S.2.a of Title V Operating Permit No. 1300041005 for the Altamont South Compressor Station. There were no deviations from the facility Title V Operating Permit conditions during this six- month reporting period as noted in the attached report. lf you have any questions or require additional information, please contact me by phone at (303) 9t4-7605 or by email at Erin_Dunman@KinderMorgan.com. Enclosures:o Six-Month Monitoring Report (July 1, 2024 through December 3L,20241 ! i1l, H t)rjP..'t i Mi-lJT OF i: NVi Ii O \l rvl E N]-AL Q UAl.. I TY[ --t II r( I !lri__ ___--__ I NI\i ISION OF AIR OI.,IALITY Sincerely, A,,T> Erin Dunman Environ mental Engineer REVIEWED Initials JBR Date 2/11/2025 Comp Status Meets File # 10211 Blue 2 ne dev KINDER ONGAN i I I ! i _--.- TO: FROM: RE: DATE: ALTATONT LLC SIX MONTH MONITORING REPORT Director, Utah Division of Air Quality Kinder Morgan Altamont LLC - Altamont South Compressor Station Monitoring Report for Permit #1300041005 lanuarv 17,2O25 ln accordance with Operating Permit provision l.S.2.a and Utah Administrative Code (UAC) R307-415- 6a(3XcXi), the following monitoring report is submitted. This Report covers the period from January L,2024 through June 30,2024. For the indicated reporting period: There were no deviations from any permit requirements. Attached is a list of permit requirements for which there were deviations. The list includes the information required by Operating Permit provision l.S.2.a and UAC R307-41s-6a(3XcXi). ln lieu of attaching the above list, deviation reports submitted in accordance with permit provision 1.S.2.c, and UAC R307-415-6a(3XcXii)as referenced below. ln accordance with Operating Permit provision l.K and UAC R307-415-5d, and based on information and belief formed after reasonable inquiry, I certify that the statements and information in this document are true, accurate, and complete. Don Perkins, Dlrector Print or type the name and title of Responsible Official EI D tr / Signature of Responsible Official for the Source