HomeMy WebLinkAboutDAQ-2025-000794KINDE ORGANwALTA[OltlT LLC
irraH oe-pnRTMENT oF; I'IVI RONMENTAL QUALITY
) 1 ,n25FedEx 2843 49592L5O
January L7,2025
Bryce Bird, Director
Utah Department of Environmental Quality
Division of Air Quality
195 North 1950 West
salt Lake city, Utah 84LL6
NIVISION OF AIR OUALITY
Kinder Morgan Altamont ILC
Altamont East Compressor Station, Title V Operating Permit No. 1300039005
Semiannual Monitoring Report -July 1,,2024 through December 3t,2024
Dear Mr. Bird,
Kinder Morgan Altamont LLC respectfully submits the attached Semiannual Monitoring Report
for the reporting period from July L,2024 through December 31,2024 as required by Condition
l.S.2.a of Title V Operating Permit No. 1300039005 for Altamont East Compressor Station.
There were no deviations from the facility Title V Operating Permit conditions during this six-
month period as noted in the attached report.
lf you have any questions or require additional information, please contact me by phone at
(303) 914-7605 or by email at Erin_Dunman@KinderMorgan.com.
Sincerely,
Erin Dunman
Environmental Engineer
Enclosures:r Slx-Month Monitoring Report (July 1, 2024 through December 3t,2024)
Re:
REVIEWED
Initials JBR Date 2/11/2025
Comp Status Meets
File # 10209 Blue 2
No dev in file
KINDE RGAN$no ALTAMONT LLC
t rrAi i llFPA.tTM':N I Ot-
F] I.I',/i RON M FJ NTAL Q UA LITY
! \ )l 2_ I ,r[r?( '
i
I
DIVISION OF AIR QUALITYTO:
FROM:
RE:
DATE:
SIX MONTH MONITORING REPORT
Director, Utah Division of Air Quality
Kinder Morgan Altamont LLC - Altamont East Compressor Station
Monitoring Report for Permit #1300039005
lanuarv L7,2O25
ln accordance with Operating Permit provision 1.S.2.a, and Utah Administrative Code (UAC)
R307-4L5-6a(3XcXi), the following monitoring report is submitted
This report covers the period from July L,2024 through December 3L,ZOZ4.
For the indicated reporting period:
There were no deviations from any permit requirements.
Attached is a list of permit requirements for which there were deviations.
The list includes the information required by Operating Permit provision
l.S.2.a and UAC R307-415-6a(3XcXi).
ln lieu of attaching the above list, deviation reports submitted in accordance
with permit provision 1.S.2.c, and UAC R307-415-6a(3XcXii) as referenced
below.
ln accordance with Operating Permit provision l.K and UAC R307-415-5d, and based on
information and belief formed after reasonable inquiry, I certify that the statements and
information in this document are true, accurate, and complete.
Signature of Responsible Official for the Source
Don Perkins, Director
Print or type the name and title of Responsible Official
E
tr
tr