January 23,2025
Utah Department of Air Quality
1950 West 150 North Temple
P.O. Box 144820
Salt Lake City, Utah 841 l6-0690
Attention: Mr. Jay Morris, Minor Source Manager.
Dear Mr. Morris:
Heber Light and Power is submitting this report is for Subpart ZZZZ, Table 7, number 3. For this reporting period of
July 1,2024 thru January 1,2025 there were no deviations from the emission limitations or operating limitations
during the reporting period.
During this reporting period Heber Light and Power did CO compliance testing on required Engine/Generators #1,
#7,#8,#11,#12 and#14. The results of the tests show no deviations from permit conditions.
Engine/Cenerator #4 has been offline for a major overhaul and location change due to AO required stack height
modifications. This unit will be scheduled to be tested as soon as it is re-installed and commissioned.
Based on information and belief formed after reasonable inquiry, the statements and information in the report are
true, accurate and complete.
v23/2025
Date
Jason Norlen
Ceneral Manager
Heber Light & Power