Loading...
HomeMy WebLinkAboutDAQ-2025-000791'6'c L EA R = PEAKS clean energy. clear choice January 23,2025 Utah Department of Air Quality 1950 West 150 North Temple P.O. Box 144820 Salt Lake City, Utah 841 l6-0690 Attention: Mr. Jay Morris, Minor Source Manager. Dear Mr. Morris: Heber Light and Power is submitting this report is for Subpart ZZZZ, Table 7, number 3. For this reporting period of July 1,2024 thru January 1,2025 there were no deviations from the emission limitations or operating limitations during the reporting period. During this reporting period Heber Light and Power did CO compliance testing on required Engine/Generators #1, #7,#8,#11,#12 and#14. The results of the tests show no deviations from permit conditions. Engine/Cenerator #4 has been offline for a major overhaul and location change due to AO required stack height modifications. This unit will be scheduled to be tested as soon as it is re-installed and commissioned. Based on information and belief formed after reasonable inquiry, the statements and information in the report are true, accurate and complete. v23/2025 Date Jason Norlen Ceneral Manager Heber Light & Power 31 S 100 W. Heber, UT 84032 Signaturc of Rcsponsiblc Otlicial C-a<r"/ //tla.^-.1 c/ 435-654-1 581 | 43s-654-2913 REVIEWEDInitials:Date: Feb 11, 2025Compliance status: In ComplianceFile #: 10884 (B2)