HomeMy WebLinkAboutDAQ-2025-000738
195 North 1950 West • Salt Lake City, UT
Mailing Address: P.O. Box 144820 • Salt Lake City, UT 84114-4820
Telephone (801) 536-4000 • Fax (801) 536-4099 • T.D.D. (801) 903-3978
www.deq.utah.gov
Printed on 100% recycled paper
State of Utah
Department of
Environmental Quality
Kimberly D. Shelley
Executive Director
DIVISION OF AIR QUALITY
Bryce C. Bird
Director
SPENCER J. COX
Governor
DEIDRE HENDERSON
Lieutenant Governor
DAQC-107-25
Site ID 11234 (B1)
Christopher Rose
Staker Parson Companies
89 West 13490 South, Suite 100
Draper, Utah 84020
Dear Mr. Rose:
Re: Staker Parson Companies – Temporary Relocation/Operation, Notice of Intent – Utah
County
Your Notice of Intent dated January 27, 2025, to relocate portable aggregate equipment to the
temporary project for Staker Parson Companies’ Point of the Mountain facility, located off the
frontage road, north of I-15, near Lehi, Utah, was received by the Utah Division of Air Quality
(DAQ) and has been reviewed.
The following equipment has been approved for operation for this temporary project:
II.A.576 Erie Strayer concrete batch plant
The State of Utah has permitted portable equipment for Staker Parson Companies on the Approval
Order (AO) DAQE-AN115180014-15 dated July 6, 2015. The above relocation address is a
permitted aggregate facility with established emission and production limits. All equipment
operating at this site must be in accordance with the current AO for this site
DAQE-AN112340015-24 dated August 5, 2024. The total production of concrete when combined
with the permanent equipment’s production of concrete cannot exceed the 12-month rolling limits
as per Condition II.B.1.a.1 - C. of this AO.
Approval is granted to relocate and operate this equipment at the new location for a period not to
exceed 180 operational days. As per Utah Administrative Code (UAC) R307-401-17, the
operation of equipment at this temporary site may be for up to 180 working days in any calendar
year not to exceed 365 consecutive days, starting from the initial relocation date.
" / 2 / 6 à Û Ù Û Þ
DAQC-107-25
Page 2
The owner/operator shall maintain records of the actual operation hours, days, and production
rate, of the above referenced equipment at this relocation site and have the ability to submit the
information to the DAQ upon the request of representatives of the director. Please make certain
that the plant operator is aware of all the location specific requirements for this site and the
conditions of the aforementioned AO.
Utah Division of Water Quality Storm Water Permits and regulations may apply to this temporary
project. Please refer to Utah DEQ Water Quality’s current Storm Water Construction
requirements for additional information.
This approval for relocation in no way releases the owner or operator from any liability for
compliance with all other applicable federal, state, and local regulations including the UAC.
If you have any questions regarding this relocation authorization or the temporary relocation
process please contact Susan Weisenberg at (385) 306-6512.
Sincerely,
Jay P. Morris
Assistant Director
JPM:SW:rh
Enclosure: Submitted Temporary Relocation Form and email correspondence
cc: Utah County Health Department
4 * - - $ . — E v A ? A D @ C w A B ˜
Susan Weisenberg <sweisenberg@utah.gov>
Portable/Temporary Relocation Form
1 message
noreply@qemailserver.com <noreply@qemailserver.com>Mon, Jan 27, 2025 at 5:13 PM
Reply-To: trigger@qemailserver.com
To: sweisenberg@utah.gov
Susan/Chad:
Site # -- Staker Parson Companies has requested a Temporary Relocation. Please see the information below. Any
attachments can be access by clicking on the links.
Recipient Data:
Time Finished: 2025-01-27 17:13:39 MST
IP: 165.225.10.103
ResponseID: R_3EoAyW6n7PAXDB7
Link to View Results: Click Here
URL to View Results: https://utahgov.iad1.qualtrics.com/apps/single-response-reports/reports/
wLmuHSdfEpwRLk1vhBbqRQKVus-ZpXVIP0Z7xf4on12NP%2E%2E95fHy5VuQovSvwPSz0MXVvUOw1Tz
g8WjIOJYoIAyLYn7ZJ50ZFJTz-P23PYLjUPDI4XnM5MXZKcnGhdgJaOUgMHWV7IvIDitQUT6hA1MdadgILDQn4
AUZPsKvbIZIFRo-XggSUH9menwOeUT8pYiPTB2mQlvgT5VMz6I0kqdWo-JER5uu-qdf0ZCAxkJcd3FK8%
2E2u3ZRoVTqkosWH-dPgXbDKQSDCHgDpgLrwilZwt9-tQY%2EODdfzlwOOQ%2EpYqeztmFOEYZfq0ImvyqExRBzQyJ
9VdtgE2wDNxzgIHA
Response Summary:
Please fill out the information below:
Contact Person: Christopher Rose
Company Name: Staker Parson Companies
Mailing Address: 89 W 13490 S
City: Draper
Zip: 84020
Phone Number: 3854002119
Email: chris.rose@stakerparson.com
Is the site located within a PM2.5 non-attainment and maintenance plan areas on cleared land grea...
Yes
All temporary relocation projects are required to submit a Fugitive Dust Control Plan (FDCP). Lo...
5983F52755
Briefly give directions to the site and/or physical address:
Located near Staker Parson Companies' Point South batch plant on frontage rd. North of I-15.
Proposed Relocation Information:
Closest City Lehi
County Utah
UTM X Coordinates 422800.88 m E
UTM Y Coordinates 4478231.84 m N
Approximate distance to the nearest house/business 3492 ft.
UTM X Coordinates to nearest house/business 423566.82 m E
UTM Y Coordinates to nearest house/business 4477499.47 m N
Does this site currently have a permit with DAQ?
1/28/25, 7:35 PM State of Utah Mail - Portable/Temporary Relocation Form
https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1822449440707275343%7Cmsg-f:1822449440707275343&s…1/2
Yes
If yes, what is the Permit (DAQ-AN) # ?
DAQE-AN112340015-24
If yes, what is the Permit Holder's Name?
Staker & Parson Companies
Please provide the permit ID for the equipment? (DAQE-XXXXXXXXX-XX)
DAQE-AN115180014-15
Please list all the Equipment on Site:Note: It is important to identify ALL diesel powered engine...
1
Equipment Type Concrete batch plant
Make/Model Erie Strayer
Serial or ID# II.A.576
Manufactured Date 2013
Design Capacity 350 yd3/hr
Please attach a site diagram showing the equipment layout and general site dimensions for this re...
https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_1QnMdld7gKJzlTu
Have any other state or local regulatory agencies issued any other "Conditional Use Permits" for...
No
Operational Information: (Please note: Operating time over 16 hours in a 24 hour period will re...
Total Hours of operation per 24 hr period 16
Starting time of operation (am/pm) 6 AM
Ending time of operation (am/pm) 10 PM
Maximum hourly production rate for project 350 yd3/hr
Expected startup date 02/24/2025
Expected completion date 02/01/2026
What type of application is this for?
New Application
Owner/Operator Representative:
https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_1M4FJ2BfW2s0nct
1/28/25, 7:35 PM State of Utah Mail - Portable/Temporary Relocation Form
https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1822449440707275343%7Cmsg-f:1822449440707275343&s…2/2
Susan Weisenberg <sweisenberg@utah.gov>
RE: [EXT] generator or line power question for batch plant TRP
1 message
Rose, Chris (Staker & Parson Companies) <chris.rose@stakerparson.com>Wed, Jan 29, 2025 at 9:38 AM
To: Susan Weisenberg <sweisenberg@utah.gov>
Susan,
This plant will be lined and plumbed for electricals and water.
Let me know if you have any other questions.
Thanks,
Christopher Rose
Environmental Specialist
West Division
Staker Parson
A CRH COMPANY
89 West 13490 South
Draper, Utah 84020
C +1 (385) 400 2119
E chris.rose@stakerparson.com
From: Susan Weisenberg <sweisenberg@utah.gov>
Sent: Wednesday, January 29, 2025 9:36 AM
To: Rose, Chris (Staker & Parson Companies) <chris.rose@stakerparson.com>
Subject: [EXT] generator or line power ques on for batch plant TRP
1/29/25, 9:55 AM State of Utah Mail - RE: [EXT] generator or line power question for batch plant TRP
https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-a:r6054649340939222078%7Cmsg-f:1822601990608369350…1/2
CAUTION: This email originated from outside of the organiza on. Do not click links or open a achments unless you are
expec ng this email and know the contents are safe. If you believe this email may be phishing or malicious, please use the
Report Phish bu on.
Hello, I received your relocation request and credit email for the temporary batch plant in Lehi. The permanent AO for this
location doesn't have conditions for diesel generators. Can you verify that this plant will be powered by electricity?
Thanks!
Susan Weisenberg,
Environmental Scientist
Office: 385-306-6512
ATTENTION: Ce courriel vient de l'exterieur de l'entreprise. Ne cliquez pas sur les liens, et n'ouvrez pas les pièces jointes, à
moins que vous ne connaissiez l'expéditeur du courriel et savez que le contenu est sécuritaire. Si vous pensez qu’il s’agit d’un
courriel d’hameçonnage ou malveillant, veuillez cliquer sur le bouton Signaler une tenta ve d’hameçonnage.
1/29/25, 9:55 AM State of Utah Mail - RE: [EXT] generator or line power question for batch plant TRP
https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-a:r6054649340939222078%7Cmsg-f:1822601990608369350…2/2