Loading...
HomeMy WebLinkAboutDSHW-2025-000690Site Information Finalized No Facility Name Bluebell Disposal Facility Facility_ID SW0388 Facility Name Bluebell Disposal Facility Street Address 6878 Bluebell Road City Roosevelt ZIP Code 84066 County Duchesne County Inspection Date 12-23-2024 Type of Visit Routine Oversite Is the Visit Announced?No 40.433212, -110.027784 Weather Conditions Sunny, high of 56 degrees Fahrenheit Inspection Goal To accompany EPA during surprise facility inspection and conduct own inspection to determine compliance with permit conditions and solid waste rules. Facility Contact Kendal Hacking Participants Bryan Watt (DWMRC) Annette Maxwell (EPA) Orlan Wallace (DOGM) Kendal Hacking (Dalbo) Follow Up Inspection Needed?No Recommended Follow Up Date Depart Office Date 10-16-2024 Depart Office time 08:00 AM (-7 GMT) Return to Office Date 10-16-2024 Return to Office time 02:00 PM (-7 GMT) 1. Pre-Inspection Review 1.1 Permit Review Yes Comment Permit was reviewed prior to inspection. 1.2 Annual Report Review No Comment Annual Report was not reviewed prior to inspection. 1.3 Previous Inspection Review Yes Comment Previous inspection was reviewed prior to inspection. Date Submitted: 12-23-2024 03:19 PM Submitted By: bryanwatt@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 1 of 7 1.4 Facility Contacts Confirmed Yes Comment Facility contacts were confirmed during inspection. 1.5 Facility Contacted (If an announced inspection) No Comment This was an unannounced inspection. 1.6 Local Health Contacted No Comment EPA initiated inspection and invited both DWMRC and DOGM inspectors. 1.7 Other No Comment No other comments. 2. Facility / Operational Controls (1-Good, 5-Poor) 2.1 Litter 1 2.2 Roads 1 2.3 Gate House Operations 1 2.4 Vectors 1 2.5 Communications 2 2.6 Recycling Area NA 2.7 Fugitive Dust Control 1 2.8 Waste Inspection Area 1 2.9 Scavenging Control 1 2.10 Open Burning NA 2.11 Fences, Gates, Locks, Access Control 1 2.12 Working Face 1 2.13 Daily - Soil NA 2.14 Daily - Alternative NA 2.15 Leachate Collection System 1 2.16 Other NA Comment (Required)Main gate to facility ticket house is open 24/7 because it shares access with another adjacent company/landowner. Gate to landfill cells is only open during regular hours of operation when employee(s) is(are) present. Communication between inspectors, employees, and facility management was clear and open during the inspection. 3. Signs Required / Properly Posted 3.1 Operating Days / Hours No Date Submitted: 12-23-2024 03:19 PM Submitted By: bryanwatt@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 2 of 7 3.2 Directions & Procedures No 3.3 Emergency Numbers No 3.4 List of Unacceptable Materials No 3.5 Other N/A Comment (Required)Signage still needs to be updated and include hours of operation, directions and procedures, emergency numbers, and list of unacceptable materials. For example, permit condition I.C. contains a list of prohibited waste to include: Hazardous Waste; PCBs; Household waste; Municipal waste; Commercial waste; and Regulated asbestos-containing material. 4. Operator / Representative / Employees 4.1 On-site While Open Yes 4.2 Training Yes 4.3 Other N/A Comment (Required)Employees were initially onsite when inspectors showed up for inspection. 5. Monitoring 5.1 Methane N/A 5.2 Random Inspections Yes 5.3 Leachate Yes 5.4 Ground Water Yes 5.5 Other N/A Comment (Required)No methane monitoring is required with facility. However, during the inspection several locations of previously closed cells under DOGM demonstrated oil surfacing and included on location actively bubbling. 6. Drainage / Erosion 6.1 Water Run-on Yes 6.2 Water Run-off Yes 6.3 Other N/A Comment (Required)Run-on and runoff controls were present during the inspection. 7. Proper Storage / Isolation / Disposal 7.1 Special Waste N/A 7.2 Batteries N/A 7.3 Hazardous Waste N/A 7.4 Infectious Waste N/A Date Submitted: 12-23-2024 03:19 PM Submitted By: bryanwatt@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 3 of 7 7.6 Dead Animals N/A 7.7 Asbestos N/A 7.8 Bulky Waste N/A 7.9 Contaminated Soil N/A 7.10 Ash N/A 7.11 Sludge N/A 7.12 Other N/A Comment (Required)No other waste special waste was at the disposal facility. 8. Cover 8.1 Intermediate N/A 8.2 Final N/A 8.3 Vegetation N/A 8.4 Other N/A Comment (Required)Cover of landfill cells not required at this time. 9. Inspection Records 9.1 Random Inspection Report Yes 9.2 Gas Monitoring System N/A 9.3 Surface Drainage Control Yes 9.4 Daily Records Yes 9.5 Weight or Volumes Yes 9.6 Intermediate Cover N/A 9.7 Final Cover N/A 9.8 Self Inspection (Quarterly Reports) Yes 9.9 Deviation From Plans Yes 9.10 Permit, Permit Application, and Rules Available Yes 9.11 Other N/A Comment (Required)All records of inspection and reports are recorded digitally and available upon request. 10. Monitoring / Sampling / Analysis Records 10.1 Explosive Gas Monitoring N/A 10.2 Leachate Sampling & Treatment N/A Date Submitted: 12-23-2024 03:19 PM Submitted By: bryanwatt@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 4 of 7 10.3 Ground Water Sampling Results Yes 10.4 Other N/A Comment (Required)Groundwater sampling has been conducted and recorded on a regular basis. 11. Special Waste Records 11.1 Lab Analysis Results N/A 11.2 Manifests N/A 11.3 Treatment Certification N/A 11.4 Paint Filter Test Results N/A 11.5 Onsite Treatment Documentation N/A 11.6 Other N/A Comment (Required)No special wastes are excepted at this facility. 12. Waste Tires 12.1 Acceptance procedures for Waste Tires N/A 12.2 Waste Tire Pile Segregated N/A 12.3 Estimated Quanitity of Waste Tires No Number of Tires 12.4 Waste Tire Fund Training N/A Comment (Required)No waste tires are accepted at this facility. However, many large equipment tires from previous owner were observed outlining some arbitrary drainage or other boundary. When asked about it the operator stated they didn’t know their original purpose and they intend on disposing of the tires at a permitted landfill. 13 Other Items 13.1 Notice of Inspections Form Completed and Signed N/A 13.2 N/A 13.3 N/A 13.4 N/A Comment (Required)No notice of inspection forms required. 14. Special Permit Requirements 14.1 N/A 14.2 N/A 14.3 N/A Date Submitted: 12-23-2024 03:19 PM Submitted By: bryanwatt@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 5 of 7 Comment (Required)No additional special permit requirements associated with this facility. General Comments Comments The DWMRC permitted portions of the facility appeared to be in proper working condition. Some reclaimed portions of the DOGM permitted area still needs cleaned up and monitored. Signage still needs to be updated and include hours of operation, directions and procedures, emergency numbers, and list of unacceptable materials. For example, permit condition I.C. contains a list of prohibited waste to include: Hazardous Waste; PCBs; Household waste; Municipal waste; Commercial waste; and Regulated asbestos-containing material. DWMRC Inspector Signature DWMRC Inspector Name Bryan Watt Date/Time 10-16-2024 Photos Attach Photos Facility signage is lacking information. See comments in report. Landfill Cell 3 (Pond 9) bedding sand being spread out and liquids being displaced from the salts beneath the bedding sand. Date Submitted: 12-23-2024 03:19 PM Submitted By: bryanwatt@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 6 of 7 Landfill Cell 2 (Pond 8) liquids being extracted from soils and collected and spread over top of landfill cell for dust control. Date Submitted: 12-23-2024 03:19 PM Submitted By: bryanwatt@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 7 of 7