HomeMy WebLinkAboutDAQ-2025-000705Yr*,*qmF.psr Hunter Plant
1000 South Highway l0
P.O. Box 569
Castle Dale, UT 845 t 3
January 21,2025
Mr. Bryce Bird, Director
Utah Department of Environmental eualityDivision of Air Quality
150 North 1950 West
P.O. Box 144820
salt Lake city, uT g4tt4-4920
i 1...,1i.:J Dif'AIl l'tr4l-NT C)Fr I(V i ItO iJ I"4E NTAL Q LIALITY'--.-lIt
Ii
iL____-__l
DIVISION OF AIR QI
'AI,ITY
Re: USEPA Acid Rain Program's Fourth Quarter 2024 Report: Hunter Units lr 2, and 3
Dear Mr. Bryce Bird:
The quarterly reports for the 4s quarter of 2024 for the Hunter Power plant, ORIS Code 6165,Boiler ID's I ,2, and 3, have been submitted electronically to, and accepted Uy, ttre EnvironmentalProtection Agency (EPA).
The submittals are summaized in the following table:
Boiler II)
Submission
TVne Date of Submittal Time of Submittal
Submission
II)
Quality
Assurance
Certification
yt6t25 7:53:02 1732666
I Quarterly
Emissions l/16/2s 7:53:02 1732667
2
Quality
Assurance
Certification
Ut6/2s 7:54:04 1732673
2 Quarterly
Emissions t/16/25 7:54:04 1732674
3
Quality
Assurance
Certification
U16t25 7:54:43 1732679
J Quarterly
Emissions Ut6t2s 7:54:43 1732680
Compact discs which contain the same quarterly reports that were submitted electronically toEPA are included with this mailing to the Utah Division of Air Quality and the joint owners ofHunter Units I and2.
REVIEWEDInitials: RL Date: 2/5/2025Status: ReceivedFile ID#: 10237-B5
I understand that EPA may reject any electronic data submission (including euarterlyReports) if it does not conform to the formatting requirements of EpArs EmissionsCollection and Monitoring pran system (ECMps), as required by 40 cFR 7s.64
I certify that alt data submiffed in this report was recorded in accordance with theapplicable requirements of 40 cFR Part 75, and that all emission "oa qu"rity control datais reported using component ID codes, system ID codes, and formula ID codes whichrepresent current operating conditions.
I am authorized to make this submission on behalf of the owners and operators of theaffected source or affected units for which the submission is made. I certiS under penaltyof law that I have personally examined, and am familia" *iih, ;i;rt"i.-"its andinformation submitted in this document and all its attachments. Based on my inquiry ofthose individuals with primary responsibitity for obtaining the information, r certify thatthe statements and informatio, a"i to the best of my knowledge and belief true, accurate,and complete' I am aware that there are significani penalties for knowingly submittingfalse statements and information, or omitting statements and information, including thepossibility of fine or imprisonment.
Should you have any questions regarding this information, please contact Jay Howard, SeniorEnvironmental Analyst Hunter Power Plant (435-748-65rej or James owen, pacificorp cleanAir Act Manager (S0l-220-4581).
Alternate Designated Representative
Enclosures
cc: Director - USEPA Region VIII w/o enclosures for Units l, 2, 3Layne Burningham - utah Municipal power Agency w/ encrosures for Unit lEric olsen - Deseret Generation and Transmission w/ enclosures for Unit 2Scott Fox - Utah Associated Municipal Power Systems w/ enclosures for Unit 2Eve Paulson - 3 l0 NTO w/o enclosures for Units l, 2, and 3