Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
DERR-2024-005350
Testing and Inspection Certificate Tanknology Inc. 11000 North MoPac Expressway, Suite 500, Austin, TX 78759 800-800-4633 www.tanknology.com Page 1 of 1 Test Date 2/6/2024 Tanknology WO#NW1-2366434 Test Purpose COMPLIANCE Customer PO# Customer Location EA Engineering, Science, and Technology, Inc., PBC 225 Schilling Circle, Suite 400 Hunt Valley, MD 21031 Dugway Proving Ground (DUGWAY 5468) 5468 Stark Road, Building 5468 Dugway, UT 84022 Attn: Project Manager Attn: Stephen Tomczewski (EA Contractor) (410) 584-7000 (410) 584-5622 Test / Inspection Description Item Tested Date Tested Result Precision Line Tightness (.1 GPH) Tank UST 5468-2 Line 1 Diesel 2/6/2024 Pass Precision Line Tightness (.1 GPH) Tank UST 5468-1 Line 1 MOGAS 2/6/2024 Pass PEI RP 1200 Leak Detector See test report for details 2/6/2024 Pass RP 1200 Overfill See test report for details 2/6/2024 P/F Overfill Insp OPW Flapper Valve UST 5468-1 MOGAS 2/6/2024 Incomplete Overfill Insp OPW Flapper Valve UST 5468-2 Diesel 2/6/2024 Pass Tanknology Representative: David Edens Technician: David Mathie Telephone: ()Technician Certification: (See forms) Product Line Tightness Test Page 1 of 1 Work Order: 2366434 Date: 2/6/2024 Site Name/ID: Dugway Proving Ground / DUGWAY 5468 Address: 5468 Stark Road, Building 5468 City: Dugway State: UT Zip: 84022 Tank Information Test Method Customer Tank ID Product Name Delivery Type Test Pressure (psi) Test Start Time Test End Time Final Leak Rate (gph) Test Result(P/F/I) Test was performed per 3rd party certifications as specified in 40 CFR parts 280 and 281 Tank # 1 Line # 1 TLD-1 UST 5468-2 Diesel Pressure 60 09:47 10:17 0.00 Pass Yes Tank # 2 Line # 1 TLD-1 UST 5468-1 MOGAS Pressure 60 09:47 10:17 0.00 Pass Yes Tank # Line # Tank # Line # Tank # Line # Tank # Line # Technician Comments: UT151 Technician Name:David Mathie Certification #:41442 exp: 10/20/2025 Technician Signature: Environmental Compliance for Petroleum Systems ©2024 Tanknology Inc., Austin, TX. All rights reserved. tanknology.com Dugway Proving Ground 5468 Stark Road, Building 5468 Dugway UT 84022 DUGWAY 5468 Tanknology, Inc. Dugway Proving Ground 5468 Stark Road, Building 5468 Dugway UT 84022 02/06/2024 Diesel MOGAS Veeder Root FX1DV Veeder Root FX1V 30 22 100 2 10 3 22 18 80 2 10 3 UT151 David Mathie NW1-2366434 TUST 5468-2:1 TUST 5468-1:1 Dugway Proving Ground 5468 Stark Road, Building 5468 Dugway, UT 84022 DUGWAY 5468 Tanknology, Inc. Dugway Proving Ground 800-800-4633 02/06/2024 DSL 1 10004 95.5 OPW MOGAS 2 20077 143.5 OPW MOGAS TOP FILL ADPT SIZED CANNOT REMOVE David Mathie 5468 Stark Road, Building 5468 Dugway, UT 84022 Overfill Prevention Equipment Inspection OPW 61 and 71 Series Overfill Prevention Device Inspection Date:2/6/2024 Customer Name:Dugway Proving Ground Location #:Dugway Proving Ground Location Address:5468 Stark Road, Building 5468 ,Dugway ,UT , 84022 OPW Model Number:71S00 PART 1) Proper height setting calculation Maximum Tank Volume per: Tank Chart A gallons Max shut off requirement for Flapper is 95% B 95% Multiply Maximum tank volume by 95% C gallons Use tank chart to determine height of calculated volume D inches Measure top of fill riser threads, or face seal adapter when used, to tank top E inches Tank diameter From Chart F inches Upper Tube in tank (G) F - D = G G inches Subtract 2 inches from upper tube in tank G - 2"= H H inches Calculated minimum upper tube length (I) H + E = I I inches Actual measured upper tube length (Without fill adapter) (J) J inches PART 2) Device certification criteria evaluation Criteria 1 Does the overfill prevention device meet the 95% requirement? Criteria 1a If the final shutoff volume is installed greater than 95%, is there at least 250 gallons of ullage above the overfill device activation point to ensure that none of the tank top fittings are exposed to product, meeting the criteria established in EPA 280.20iic and per OPW installation guidelines. Criteria 2 Is the Actual measured upper tube length 6.5 inches or more than the fill riser? (J must be 6.5" or more than E) Criteria 3 Does the overfill prevention device function as required? (Inspect the device for damage, contamination, freedom of movement, weakening due to wear and corrosion) PART 3) Device Certification PASS / FAIL Technician certifies that the device is operationally compliant. UST 5468-2 10004.000 0.95 9503.800 85.875 32.875 95.500 9.625 7.625 40.500 40.500 Yes NA Yes Yes Pass UST 5468-1 20077.000 0.95 19073.150 129.000 143.500 14.500 12.500 NA-seized NA-seized 0.95 0.95 Comments: Signature of Technician: Date: 2/6/2024 David Mathie WO: NW1- 2366434 Site Diagram (This site diagram is for reference only and is not drawn to scale) Work Order:2366434 Site ID / Name:DUGWAY 5468 / Dugway Proving Ground Address:5468 Stark Road, Building 5468 City:Dugway State:UT Zip:84022