Loading...
HomeMy WebLinkAboutDDW-2025-001212DDW Reports <ddwreports@utah.gov> Fwd: Significant Deficiency Due Next Month #07050 1 message Jennifer Yee <jyee@utah.gov>Wed, Jan 29, 2 To: DDW Reports <ddwreports@utah.gov> Please import into the site visit folder title 07050 Def Corr 1-2025 Jennifer Yee Environmental Scientist | Division of Drinking Water M: (385) 515-1501 drinkingwater.utah.gov (801) 536-4200 Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. ---------- Forwarded message ---------From: Mike Rau <Miker@cuwcd.gov> Date: Mon, Jan 27, 2025 at 12:47 PMSubject: Re: Significant Deficiency Due Next Month #07050 To: DDW IPS <ddwips@utah.gov>, jyee@utah.gov <jyee@utah.gov>, sepage@utah.gov <sepage@utah.gov>Cc: Jesse Hyde <Jesse@cuwcd.gov> Jennifer and Sarah, Thank you for your coordination with us on this matter. The following documentation is attached to this email: Documentation showing the original specifications for the filter media at the DVWTP, which are 60” anthracite (specific size 1.10-1.20 mm) over 12” sand.The original lab analysis confirming the media effective size and uniformity coefficient prior to media installation.Results from the recent coring of filter #1. Media depths were measured at 67” anthracite and 12” sand.Sieve analysis of an anthracite depth composite sample from filter #5 as per Sarah’s request. Results show an effective size of 1.16 mm and a uniformity coefficien Please review and let me know if you have any additional questions. Thank you, Mike Rau FINISHED WATER & WATER QUALITY DEPARTMENT MANAGER CENTRAL UTAH WATER CONSERVANCY DISTRICT (801) 226-7113 office | (801) 497-6385 cell 1426 E. 750 N. Suite 400 | Orem, UT 84097 From: jyee@utah.gov <jyee@utah.gov> on behalf of DDW IPS <ddwips@utah.gov>Date: Wednesday, December 11, 2024 at 11:35 AM To: Mike Rau <Miker@cuwcd.gov>Subject: Significant Deficiency Due Next Month #07050 2/3/25, 7:43 AM State of Utah Mail - Fwd: Significant Deficiency Due Next Month #07050 https://mail.google.com/mail/b/AEoRXRTEo9BVkyH_orvWHDvCX0am7TXJ52k6dGwWYeZV961SyVQ_/u/0/?ik=2401283fbe&view=pt&search=all&per…1/2 On September 23, 2024, a sanitary survey was conducted on Central Utah WCD - Duchesne Valley, revealing a significant deficiency that remains unresolved accordinrecords. TP002 DUCHESNE VALLEY WATER TREATMENT PLANT A 0 Hide Details ( 1 ) Code Description Severity Comments Determined Date Pending As T033 MEDIA DEPTHS NOT MEETING REQUIREMENTS SIG System has equipment now but needs documentation 09/23/2024 25 0 If this issue has already been addressed, kindly provide detailed documentation outlining the corrective actions taken, along with any supporting photographic evidenc As per our previous correspondence, the system was granted 120 days to rectify these deficiencies, with the deadline set for January 30, 2025. If additional time is recomplete the necessary corrections, please follow this link to request a Corrective Action Plan. Your prompt attention to this matter is greatly appreciated. Thanks, Jen- -- Image removed bysender. Division Name Jennifer Yee IPS Rule Manager Environmental Scientist | Division of DrinkingWater M: (385) 515-1501 drinkingwater.utah.gov (801) 536-4200 Emails to and from this email address may be considered public records and thus subject to Utah GRAMA requirements. Image removed by sender.Image removed by sender. 2 attachments GenDwgs.pdf 17824K January 25 2025 Filter 5 Composite.xlsx 28K 2/3/25, 7:43 AM State of Utah Mail - Fwd: Significant Deficiency Due Next Month #07050 https://mail.google.com/mail/b/AEoRXRTEo9BVkyH_orvWHDvCX0am7TXJ52k6dGwWYeZV961SyVQ_/u/0/?ik=2401283fbe&view=pt&search=all&per…2/2