Loading...
HomeMy WebLinkAboutDSHW-2025-000638Site Information Finalized Yes Facility Name Rocky Mountain Recycling Services -South Facility_ID SW0282 Facility Name Rocky Mountain Recycling Services -South Street Address 3110 South 900 West City Salt Lake City ZIP Code 84119 County Salt Lake County Inspection Date 02-03-2025 Type of Visit Routine Oversite Is the Visit Announced?No 40.664163, -111.955270 Weather Conditions Overcast, windy, 60 degrees Inspection Goal Ensure compliance with Utah rules and regulations and the facility permit. Facility Contact Rob Guernsey Participants Rob Guernsey, Jeff Clark (Facility), Kelly Shaw (DWMRC) Follow Up Inspection Needed?N/A Recommended Follow Up Date Depart Office Date 02-03-2025 Depart Office time 10:30 AM (-7 GMT) Return to Office Date 02-03-2025 Return to Office time 01:30 PM (-7 GMT) 1. Pre-Inspection Review 1.1 Permit Review Yes Comment Plan of Operation was reviewed 1.2 Annual Report Review Yes Comment In 2023 38,209.4 tons of paper materials were recycled, 4,821.2 tons of plastic recycled, 1,034.9 tons of metal recycled. 19,767 tons were sent for landfilling. 1.3 Previous Inspection Review Yes Comment Litter was observed at the facility. 1.4 Facility Contacts Confirmed Date Submitted: 02-03-2025 02:42 PM Submitted By: kellyshaw@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 1 of 8 Comment Rob Guernsey 1.5 Facility Contacted (If an announced inspection) No Comment 1.6 Local Health Contacted Yes Comment Declined to participate 1.7 Other Comment 2. Facility / Operational Controls (1-Good, 5-Poor) 2.1 Litter 3 2.2 Roads 1 2.3 Gate House Operations 1 2.4 Vectors 1 2.5 Communications 1 2.6 Recycling Area 1 2.7 Fugitive Dust Control NA 2.8 Waste Inspection Area 1 2.9 Scavenging Control 1 2.10 Open Burning NA 2.11 Fences, Gates, Locks, Access Control 1 2.12 Working Face NA 2.13 Daily - Soil NA 2.14 Daily - Alternative NA 2.15 Leachate Collection System NA 2.16 Other Comment (Required)Most of the facility is contained within a building. Some materials are stored outside which allows for Windblown litter. 3. Signs Required / Properly Posted 3.1 Operating Days / Hours Yes 3.2 Directions & Procedures N/A 3.3 Emergency Numbers No 3.4 List of Unacceptable Materials N/A 3.5 Other Date Submitted: 02-03-2025 02:42 PM Submitted By: kellyshaw@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 2 of 8 Comment (Required)The facility will order signage with emergency information. 4. Operator / Representative / Employees 4.1 On-site While Open Yes 4.2 Training Yes 4.3 Other Comment (Required)Training records are maintained on an internal facility portal. 5. Monitoring 5.1 Methane N/A 5.2 Random Inspections N/A 5.3 Leachate N/A 5.4 Ground Water N/A 5.5 Other Comment (Required)Not applicable to this facility. All loads are inspected. 6. Drainage / Erosion 6.1 Water Run-on N/A 6.2 Water Run-off N/A 6.3 Other Comment (Required)Not applicable to this facility. 7. Proper Storage / Isolation / Disposal 7.1 Special Waste N/A 7.2 Batteries N/A 7.3 Hazardous Waste N/A 7.4 Infectious Waste N/A 7.6 Dead Animals N/A 7.7 Asbestos N/A 7.8 Bulky Waste N/A 7.9 Contaminated Soil N/A 7.10 Ash N/A 7.11 Sludge N/A 7.12 Other Comment (Required)Not applicable to this facility. 8. Cover Date Submitted: 02-03-2025 02:42 PM Submitted By: kellyshaw@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 3 of 8 8.1 Intermediate N/A 8.2 Final N/A 8.3 Vegetation N/A 8.4 Other Comment (Required)Not applicable to this facility. 9. Inspection Records 9.1 Random Inspection Report N/A 9.2 Gas Monitoring System N/A 9.3 Surface Drainage Control N/A 9.4 Daily Records Yes 9.5 Weight or Volumes Yes 9.6 Intermediate Cover N/A 9.7 Final Cover N/A 9.8 Self Inspection (Quarterly Reports) Yes 9.9 Deviation From Plans N/A 9.10 Permit, Permit Application, and Rules Available Yes 9.11 Other Comment (Required)Records are maintained. The facility has a copy of its Plan of Operation. 10. Monitoring / Sampling / Analysis Records 10.1 Explosive Gas Monitoring N/A 10.2 Leachate Sampling & Treatment N/A 10.3 Ground Water Sampling Results N/A 10.4 Other Comment (Required)Not applicable to this facility. 11. Special Waste Records 11.1 Lab Analysis Results N/A 11.2 Manifests N/A 11.3 Treatment Certification N/A 11.4 Paint Filter Test Results N/A 11.5 Onsite Treatment Documentation N/A Date Submitted: 02-03-2025 02:42 PM Submitted By: kellyshaw@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 4 of 8 11.6 Other Comment (Required)Not applicable to this facility. 12. Waste Tires 12.1 Acceptance procedures for Waste Tires N/A 12.2 Waste Tire Pile Segregated N/A 12.3 Estimated Quanitity of Waste Tires No Number of Tires 12.4 Waste Tire Fund Training N/A Comment (Required)This facility does not accept tires. 13 Other Items 13.1 Notice of Inspections Form Completed and Signed N/A 13.2 N/A 13.3 N/A 13.4 N/A Comment (Required)Not applicable to this facility. 14. Special Permit Requirements 14.1 N/A 14.2 N/A 14.3 N/A Comment (Required)Not applicable to this facility. General Comments Comments The facility is mostly operated within a building. Some materials are stored on asphalt pavement outside. Netting can be deployed during wind events to reduce Windblown litter. At the time of the inspection the netting had not been deployed and litter was blowing on the property. According to Jeff Clark, Windblown litter is picked up weekly. Signage with emergency contact information was not posted. The facility will order signage and send photos. DWMRC Inspector Signature DWMRC Inspector Name Kelly Shaw Date Submitted: 02-03-2025 02:42 PM Submitted By: kellyshaw@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 5 of 8 Date/Time 02-03-2025 Photos Attach Photos Scale and offices Container for non-recyclable material to be landfilled at IRL. Sorting process within the MRF Sorting within the MRF. Date Submitted: 02-03-2025 02:42 PM Submitted By: kellyshaw@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 6 of 8 Cardboard pile within the MRF. Train cars to transport recyclable materials. Plastics to be recycled. Outdoor cardboard pile and wind nets. Date Submitted: 02-03-2025 02:42 PM Submitted By: kellyshaw@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 7 of 8 Materials stored outdoors and windblown litter. Gates at the facility Date Submitted: 02-03-2025 02:42 PM Submitted By: kellyshaw@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 8 of 8