Loading...
HomeMy WebLinkAboutDSHW-2025-000636Site Information Finalized Yes Facility Name Great Salt Lake Recycling, LLC Facility_ID SW0587 Facility Name Great Salt Lake Recycling, LLC Street Address 2174 South 7200 West City Magna ZIP Code 84044 County Salt lake County Inspection Date 01-28-2025 Type of Visit Routine Oversite Is the Visit Announced?Yes 40.016100, -111.734191 Weather Conditions 36 and sunny Inspection Goal To determine compliance with Solid Waste Permitting and Management Rules, and the Waste Tire Recycling Act. Facility Contact David George, Manager, is the primary contact. Participants Alex Milne, DWMRC Beatriz Avila, DWMRC Chris, GSL Recycling Follow Up Inspection Needed?N/A Recommended Follow Up Date Depart Office Date 01-28-2025 Depart Office time 07:00 AM (-7 GMT) Return to Office Date 01-28-2025 Return to Office time 02:00 PM (-7 GMT) 1. Pre-Inspection Review 1.1 Permit Review Yes Comment The facility has submitted the 2025 Utah Waste Tire Recycler registration. 1.2 Annual Report Review N/A Comment The 2024 Annual Report has not been received. 1.3 Previous Inspection Review Yes Comment The 10/12/2023 Inspection Letter was reviewed. At the time of the inspection, the facility was not accepting waste tires and was still in its infancy stage. Date Submitted: 01-30-2025 08:21 AM Submitted By: amilne@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 1 of 7 1.4 Facility Contacts Confirmed Yes Comment David George is the primary contact. 1.5 Facility Contacted (If an announced inspection) No Comment The facility was not notified of the inspection. 1.6 Local Health Contacted N/A Comment The local health department was not notified of the inspection. 1.7 Other N/A Comment N/A 2. Facility / Operational Controls (1-Good, 5-Poor) 2.1 Litter 1 2.2 Roads 1 2.3 Gate House Operations 1 2.4 Vectors 1 2.5 Communications 1 2.6 Recycling Area 1 2.7 Fugitive Dust Control 1 2.8 Waste Inspection Area 1 2.9 Scavenging Control 1 2.10 Open Burning NA 2.11 Fences, Gates, Locks, Access Control 1 2.12 Working Face NA 2.13 Daily - Soil NA 2.14 Daily - Alternative NA 2.15 Leachate Collection System NA 2.16 Other NA Comment (Required)The facility is well secured. All waste tire processing operations are conducted within a fully enclosed building. A minimal waste tire pile was observed and final products are quickly sent out. 3. Signs Required / Properly Posted 3.1 Operating Days / Hours N/A 3.2 Directions & Procedures N/A 3.3 Emergency Numbers N/A Date Submitted: 01-30-2025 08:21 AM Submitted By: amilne@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 2 of 7 3.4 List of Unacceptable Materials N/A 3.5 Other N/A Comment (Required)Minimal signage was observed on the outside of the building. 4. Operator / Representative / Employees 4.1 On-site While Open Yes 4.2 Training Yes 4.3 Other N/A Comment (Required)Several staff members were present operating equipment and processing waste tires. 5. Monitoring 5.1 Methane N/A 5.2 Random Inspections N/A 5.3 Leachate N/A 5.4 Ground Water N/A 5.5 Other N/A Comment (Required)The facility does not have any gas or groundwater monitoring requirements. 6. Drainage / Erosion 6.1 Water Run-on Yes 6.2 Water Run-off Yes 6.3 Other N/A Comment (Required)No accumulation of water or ponding was observed. 7. Proper Storage / Isolation / Disposal 7.1 Special Waste N/A 7.2 Batteries N/A 7.3 Hazardous Waste N/A 7.4 Infectious Waste N/A 7.6 Dead Animals N/A 7.7 Asbestos N/A 7.8 Bulky Waste N/A 7.9 Contaminated Soil N/A 7.10 Ash N/A 7.11 Sludge N/A 7.12 Other N/A Date Submitted: 01-30-2025 08:21 AM Submitted By: amilne@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 3 of 7 Comment (Required)This is a waste tire recycling facility. No waste is covered at the facility. 8. Cover 8.1 Intermediate N/A 8.2 Final N/A 8.3 Vegetation N/A 8.4 Other N/A Comment (Required)This is a waste tire recycling facility. No waste is covered at the facility. 9. Inspection Records 9.1 Random Inspection Report N/A 9.2 Gas Monitoring System N/A 9.3 Surface Drainage Control N/A 9.4 Daily Records N/A 9.5 Weight or Volumes N/A 9.6 Intermediate Cover N/A 9.7 Final Cover N/A 9.8 Self Inspection (Quarterly Reports) N/A 9.9 Deviation From Plans N/A 9.10 Permit, Permit Application, and Rules Available N/A 9.11 Other N/A Comment (Required)No records were reviewed at the time of the inspection. The facility has submitted the 2025 Waste Tire Recycler registration. 10. Monitoring / Sampling / Analysis Records 10.1 Explosive Gas Monitoring N/A 10.2 Leachate Sampling & Treatment N/A 10.3 Ground Water Sampling Results N/A 10.4 Other N/A Comment (Required)The facility does not have any gas or groundwater monitoring requirements. 11. Special Waste Records 11.1 Lab Analysis Results N/A 11.2 Manifests N/A 11.3 Treatment Certification N/A Date Submitted: 01-30-2025 08:21 AM Submitted By: amilne@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 4 of 7 11.4 Paint Filter Test Results N/A 11.5 Onsite Treatment Documentation N/A 11.6 Other N/A Comment (Required)This is a waste tire recycling facility. No solid waste is landfilled on-site. 12. Waste Tires 12.1 Acceptance procedures for Waste Tires Yes 12.2 Waste Tire Pile Segregated Yes 12.3 Estimated Quanitity of Waste Tires No Number of Tires 12.4 Waste Tire Fund Training Yes Comment (Required)Waste tires are quickly sorted and processed. Large waste tire piles were not observed. Minimal final product was observed as they get sent off right away. 13 Other Items 13.1 Notice of Inspections Form Completed and Signed N/A 13.2 N/A 13.3 N/A 13.4 N/A Comment (Required)N/A 14. Special Permit Requirements 14.1 N/A 14.2 N/A 14.3 N/A Comment (Required)N/A General Comments Comments The facility is well organized and all operations are within a fully enclosed building. Minimal waste tire piles were observed. The facility quickly processes waste tires as they come in. Minimal bags of final products were observed. The facility quickly gets final products sent out. Date Submitted: 01-30-2025 08:21 AM Submitted By: amilne@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 5 of 7 DWMRC Inspector Signature DWMRC Inspector Name Alex Milne Date/Time 01-30-2025 Photos Attach Photos View of the unloading zone where waste tires are received. Waste tires are loaded onto the conveyer belt to make their way into the shredder. View of the inside of the building. Date Submitted: 01-30-2025 08:21 AM Submitted By: amilne@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 6 of 7 View of material that comes out of the shredder. View of additional processing equipment to convert the waste tires to an ultimate product. Additional view of waste tires that has undergone processing. Date Submitted: 01-30-2025 08:21 AM Submitted By: amilne@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 7 of 7