HomeMy WebLinkAboutDSHW-2023-001649 - 0901a06881195e2dDeq submit <dwmrcsubmit@utah.gov>
Fwd: Syro Steel Site: Documents relating to corrective measures
1 message
Dale Urban <durban@utah.gov>Thu, Feb 23, 2023 at 4:14 PM
To: Deq submit <dwmrcsubmit@utah.gov>
Please log these 2 documents into the project Trinity Hwy Products (fka Syro Steel).
Thanks
---------- Forwarded message ---------
From: Brent Bingham <bsb@binghamnet.com>
Date: Wed, Feb 22, 2023 at 4:41 PM
Subject: Re: Syro Steel Site: Documents relating to corrective measures
To: Dale Urban <durban@utah.gov>
Hi Dale,
Sorry I'm tardy in responding. Attached are those two documents.
Brent
On 2/17/2023 10:39 AM, Dale Urban wrote:
Hi Brent;
Thank you for the follow up on this project. I looked through the hard file in our office and can't seem to find
Document 2 or 3 that you mentioned. Do you have copies of those that you could send me?
I would appreciate it.
Thanks again...
On Thu, Feb 16, 2023 at 3:15 PM Brent Bingham <bsb@binghamnet.com> wrote:
Hi Dale,
Sorry it's been a while since our last communication. I had some other
project emergencies to deal with.
I've been through all of our files but could not find a separate document as
you described. However, I think the equivalent was part of other larger
documents.
There appear to be 3 cleanup-up projects at Syro. There may have more,
but the ones I have identified are detailed in the following documents, the
first and most important you said you had.
1.Risk Assessment dated October 1998 (160+/- pages) (I think you said
you have this)
2.Project Memorandum: Subsurface Investigation Results, January 25,
2001 (85 +/- pages) (copy to Doug Taylor, DS&HW)
State of Utah Mail - Fwd: Syro Steel Site: Documents relating to corrective measures
DSHW-2023-001649
3.Project Memorandum: Results of west field stripped top soil sampling,
March 8, 2002 (12 pages)
Document 1 is a summary of work completed as a result of the earlier
Corrective Measures Plan. Section 2.4 (beginning on Page 7) describes the
contaminated areas. Table 2-2 (page 14) indicates the corrective action for
each area. Exposure and Toxicity Assessments and Risk Characterization
follow. Conclusions and Recommendations follow on Page 45 with maps,
model and Appendices (analytical results) following.
Document 2 Is not only the subsurface investigation details but also the
description of the clean-up, results, conclusions and analytical testing
results.
Document 3 is a report of topsoil sampling which had be stripped from one
area of the Syro property and piled in another area. Analytical data is
attached. I do not see that this was forwarded by us to the Division but may
have been forwarded by Syro.
In summary, it wasn't our practice for such work to give an "all clear"
concerning contaminated sites especially a site with a long history of
contamination and existing structures with on-going operations. Rather,
we presented the data to the Division and the owner with "risk based"
conclusions. Further work was done when appropriate or required by the
State or EPA (Super-Fund Sites or other).
Let me know if you need additional information.
Brent
Brent S. Bingham | BINGHAM ENGINEERING, INC. | 262 N. Wright Brothers Drive | Salt Lake City, Utah
84116
bsb@binghamnet.com | 801-532-2520 tel | 801-328-3381 fax | cell
--
Dale T. Urban, P.G. | Environmental Scientist
Phone: 801.536.0239
DISCLAIMER: Statements made in this e-mail do not cons tute the official posi on of the Director of the Division of Waste
Management and Radia on Control.
--
Dale T. Urban, P.G. | Environmental Scientist
Phone: 801.536.0239
State of Utah Mail - Fwd: Syro Steel Site: Documents relating to corrective measures
DISCLAIMER: Statements made in this e-mail do not cons tute the official posi on of the Director of the Division of Waste Management and
Radia on Control.
2 attachments
Syro Project Memo Jan 25 2001.pdf
410K
Syro Memo Mar 8 2002.pdf
413K
State of Utah Mail - Fwd: Syro Steel Site: Documents relating to corrective measures